ingenierÍa de detalle a nivel del 100%€¦ · memoria de cÁlculo: alcantarillado sanitario y...

22
INGENIERÍA DE DETALLE A NIVEL DEL 100%

Upload: others

Post on 30-Aug-2019

6 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

INGENIERÍA DE DETALLE A

NIVEL DEL 100%

Page 2: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO
Page 3: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

EMPRESA DE ACUEDUCTO, ALCANTARILLADO Y ASEO DE BOGOTÁ E.S.P.

CONTRATO No. 1-02-25500-0690-2011

REALIZAR EL DISEÑO A NIVEL DE INGENIERÍA DE DETALLE DE LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE “CANOAS” EN LOS COMPONENTES ASOCIADOS AL SISTEMA DE

TRATAMIENTO PRIMARIO CON ASISTENCIA QUÍMICA

PRODUCTO No. 11

INFORME DE INGENIERÍA DE DETALLE A NIVEL DEL 100%

MEMORIA DE CÁLCULO, ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES

Preparado por: CONSORCIO CDM Smith - INGESAM SAS Agosto de 2016

Page 4: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO
Page 5: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

CONTROL DE REVISIONES TITULO DEL DOCUMENTO:

Informe Producto No. 11 “Informe de ingeniería de detalle a nivel del 100%” Memoria de Cálculo - Alcantarillado Sanitario y Drenajes de Unidades

CLIENTE:

ACUEDUCTO DE BOGOTA

PROYECTO: PTAR CANOAS No. 89244

PROPUESTA: No.

DESCRIPCION DE REVISIONES. VERSIÓN DESCRIPCIÓN Y/O ESTADO FECHA DE

APROBACIÓN OBSERVACIONES

0 Informe Producto 10 – Memoria de cálculo,

Alcantarillado Sanitario y Drenajes de Unidades

02-28-2016

1 Informe Producto 11 – Memoria de cálculo,

Alcantarillado Sanitario y Drenajes de Unidades

08-01-2016

DESCRIPCIÓN DE ANEXOS.

Anexo 1 - Cálculo de LA Red de Drenaje de Unidades.

Anexo 2 – Cálculo de la Red de Alcantarillado Sanitario.

CONTROL DE REVISION Y APROBACION.

REVISADO POR: (AREA/CARGO/FIRMA)

Solomon Abel Asistente CO-DIRECTOR NACIONAL

Consorcio CDM INGESAM

APROBADO POR: (AREA/CARGO/FIRMA)

Robert Gaudes Director Internacional de la Consultoría

Consorcio CDM INGESAM

Registro PR-01-005

Page 6: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO
Page 7: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

©2016 CDM SMITH. TODOS LOS DERECHOS RESERVADOS, REUTILIZACIÓN DE DOCUMENTOS: DOCUMENTOS Y DISEÑOS SUMINISTRADOS POR EL SERVICIO PROFESIONAL, INCORPORADOS EN ESTE DOCUMENTO, SON PROPIEDAD DE CDM SMITH Y EAB, NO SERÁN UTILIZADOS, NI TOTAL NI PARCIALMENTE, PARA CUALQUIER OTRO PROYECTO SIN AUTORIZACIÓN ESCRITA DE CDM SMITH Y/O EAB.

PRODUCTO 11. INFORME DE INGENIERÍA DE DETALLE A NIVEL DEL 100%

MEMORIA DE CÁLCULO

ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES

APROBACIÓN DEL INFORME

Robert Gaudes Director Internacional de la Consultoría

Consorcio CDM Smith - INGESAM

Fernando Silva Director de la Interventoría

Unión Temporal Canoas

Reinaldo Pulido Supervisor del Contrato de Consultoría Nº 1-02-25500-0690-2011

Empresa de Acueducto, Alcantarillado y Aseo de Bogotá

Page 8: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO
Page 9: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

CLIENTETRABAJO Nº 1-02-25500-0690-2011 CALC. POR EDER DE LAPEÑA

PROJECTO FECHA REVISION 1 FECHA 22/04/2016

DETALLE VERSIÓN 1 POR VERSIÓN FINAL

FECHA REVISION FINAL

REVISION FINAL POR

MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES

1.0 OBJETIVO2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO3.0 PROCEDIMIENTO DE DISEÑO4.0 CAUDALES DE DISEÑO EN LAS UNIDADES5.0 ANEXO 1 - CALCULO DE LA RED DE DRENAJE DE UNIDADES6.0 ANEXO 2 - CALCULO DE LA RED DE ALCANTARILLADO SANITARIO

Alcantarillado Sanitario y Drenajes de Unidades

Empresa de Alcantarillado, Acueducto y Aseo de Bogotá, EAB

PTAR Canoa

CONTENIDO

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados1

Civil

Producto 11 – Versión Final

Page 10: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

1.0 OBJETIVOS

2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

-

-

3.0 PROCEDIMIENTO DE DISEÑO

1-

2-

A continuación se presenta el procedimiento para los cálculos de la Red Sanitaria

El sistema se diseñó con características de auto limpieza, definida según criterios de velocidad mínima es de 0.75 m/s yesfuerzo cortante mínimo 0.15 Kg/m2. La velocidad máxima en la tubería no alcanza el límite de 5 m/s.

Velocidad real (v): Es la velocidad del agua con el caudal real de diseño. Se debe verificar que la velocidad no sea menor de0.75m/s para evitar sedimentación ni mayor de 10 m/s para evitar la abrasión según los numerales D4.3.11 del RAS 2000.

La memoria de cálculos del dimensionamiento presentada a continuación, se desarrolla dentro del contrato de consultoría Nº 1-02-25500-0690-2011 suscrito entre la Empresa de Acueducto y Alcantarillado de Bogotá y el Consorcio CDM–INGESAM para realizar el diseño a nivel de ingeniería de detalle de la planta de tratamiento de aguas residuales de “CANOAS” en los componentes asociados al sistema de tratamiento primario con asistencia química.

Definición del número de baterias sanitarias en los edificios de Administracion, Edificio de Mantenimiento y Casino

El objetivo de este documento es presentar los cálculos de la redes de Aguas Residuales y Drenajes de Unidades de la Planta deTratamiento de Aguas Residuales de Canoas (PTAR Canoas). El propósito de estas memorias es brindar una información clara yprecisa de todos los criterios de diseño, incluyendo códigos, estándares y referencias, así como también las diferentes hipótesis,metodologías y cálculos aplicados para el análisis y diseño de las redes de Alcantarillado Sanitario y Drenajes de Unidades

El análisis y diseño de las redes objeto de esta memoría de cálculo, y los elementos que la componen, se rigen por los siguientescódigos, estándares y referencias:

RAS 2000 Reglamento Técnico para el Sector de Agua Potable y Saneamiento Básico

NTC 1500 ICONTEC Norma Técnica Colombiana 1500, Código Colombiano de Fontanería

Aparato Diámetro en pulgadas Unidades de descarga

Desagüe 2 2

Inodoro 4 3

Lavamanos 2 2

Orinal de Llave 2 2

Tabla 1. Aporte de Caudal por Aparato NTC 1500

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados2

Civil

Producto 11 – Versión Final

Page 11: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

1-

2-

3-

4.0 CAUDALES DE DISEÑO EN LAS UNIDADES

Caudal (ft3/s) Caudal (l/s)

0.119 3.37

2.674 75.72

0.729 20.65

3.565 100.96

4.527 128.20

9.262 262.30

7.191 203.66

4.340 122.92

0.892 25.26

8.827 249.98

4.413 124.99

14.929 422.78

5.114 144.82

28.075 795.08

6.595 186.78

8.83 250.00

Pre deshidratacion

Drenaje tanque de cloracion

Drenaje espesadores a gravedad

Sobrenadante espesadores a gravedad total

Sobrenadante espesadores a gravedad total

Espesadores de bandas Fase II

En esta tabla se muestran algunos caudales para el cálculo de drenajes de unidades, los otros caudales fueron estimaron teniendo en cuenta el tiempo estimado para drenar de cada unidad.

Rebose de emergencia de digestores

Post deshidratacion

Drenajes tanques de aireacion

Drenaje clarificadores secundarios

Desarenacion drenaje camaras

Para el cálculo de la tubería de drenajes de unidades, en sedimentadores, se tomó como criterio de diseño la tubería a tubo lleno, aplicando la fórmula de Manning, teniendo en cuenta el caudal controlado en la descarga de cada Unidad por medio del sistema de válvulas y compuertas. Se estimó un tiempo de vaciado para cada unida de 60 minutos aproximadamente. Este tiempo de descarga depende del volumen de agua contenido en cada unidad.Para el diseño de los tramos de alcantarillas se utilizará la ecuación de Manning, la cual se describe a continuación:

Donde: Q = Caudal (m3//s)

n = Coeficiente a dimensional de Manning. (0.009). n: el valor del coeficiente de Manning de acuerdo al diámetro nominal elegido. Para tuberías PVC es de 0.009.

A = Área de flujo (m2)

R = Radio Hidráulico, se define como la relación entre el área de flujo y el perímetro mojado (m)

S = Pendiente del tramo (m/m)

De la anterior ecuación se desprende el Cálculo de la Velocidad de Flujo.

Lavador compactador de deshechos rejas

Drenaje de canales de cribado

Descarga lavador clasificador de arenas

Clarificadores primarios drenaje

Unidad

Porcedimiento de calculo de la Red de Dreanajes de unidades

Para el cálculo de la tubería de drenajes de unidades, en pretratamiento, se tomó como criterio de diseño la tubería a tubo lleno, aplicando la fórmula de Manning, teniendo en cuenta el caudal de aporte de cada Unidad.

Tanque de Almacenamiento de Agua Potable

Nota:

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados3

Civil

Producto 11 – Versión Final

Page 12: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

Horas Minutos

- 5.0

- 0.0

- 30.0

4.0 20.0

1.0 0.0

5.0 15.0

1.0 0.0

10.0 45.0

1.0 45.0

4.0 45.0

1.0 0.0

- 0.0

- 10.0

1.0 -

1.0 0.0

2.0 45.0

2.0 10.0

3.0 30.0

5.0 ANEXO 1 - CALCULO DE LA RED DE DRENAJE DE UNIDADES6.0 ANEXO 2 - CALCULO DE LA RED DE ALCANTARILLADO SANITARIO

Estación de Bombeo lodo espesado

Cadica Lodo primario

EstructuraTIEMPO ESTIMADO DE DRENAJES DE UNIDADES

Caja de filtrado - Deshidratación

Pre-deshidratación - Caja de Centrado

Rebose de emergencia de Digestores.

Drenaje del Espesador

Cribado de lodos y natas tanque almacenamiento lodo espesado

Cadica General

Almacenamiento de polímero

Mezcla rápida

Drenaje cloruro férrico

Deshidratación

Biofiltro

Canales de cribado y compactador de desechos

Clasificadores

Estación de Bombeo lodo Primario

Cadica Secundaria

Tanque de Almacenamiento de Agua Potable

Nota: El valor de las elevaciones, en drenajes de unidades, es el valor correspondiente al número mostrado aumentado 2500.

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados4

Civil

Producto 11 – Versión Final

Page 13: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

TRABAJO Nº CALC. POR EDER DE LAPEÑA

FECHA VERSIÓN 1 FECHA 22/04/2016

VERSIÓN 1 POR VERSIÓN FINAL

FECHA REVISION FINAL

REVISION FINAL POR

De: A:

BF1 D3A 12.46 1.00 0.12 54.33 54.45 52.29 52.17 100 99 52.41 52.29 0.94 7.26 4.10 OK

BF2 D3A 6.64 1.00 0.07 54.05 54.45 51.49 51.42 100 99 51.61 51.54 0.94 7.26 4.10 OK

D3A D3 10.80 1.00 0.11 54.45 54.93 51.39 51.28 200 182 51.61 51.50 1.42 36.84 8.20 OK

D3 D 8 11.46 0.96 0.11 54.93 55.38 49.48 49.37 200 182 49.70 49.59 1.39 36.10 8.20 OK

D8 D9 25.60 0.23 0.06 55.38 54.95 49.00 48.94 200 182 49.22 49.16 0.68 17.67 8.20 OK

D9 D10 22.38 0.20 0.04 54.95 51.32 48.94 48.90 200 182 49.16 49.12 0.63 16.48 8.20 OK

D10 D11 23.93 0.20 0.05 51.32 51.18 48.80 48.75 200 182 49.02 48.97 0.63 16.48 8.20 OK

D11 D12 6.41 0.20 0.01 51.18 51.13 48.61 48.60 200 182 48.83 48.82 0.63 16.48 8.20 OK

D12A D12 11.58 1.00 0.12 51.14 51.13 49.58 49.46 400 362 50.00 49.88 2.24 230.51 79.09 OK

D12 D13A 35.46 0.24 0.09 51.13 50.67 44.57 44.48 400 362 44.99 44.90 1.10 112.93 87.29 OK

BF4 D13B 8.35 0.59 0.05 51.05 51.04 50.45 50.40 100 99 50.57 50.52 0.72 5.58 4.10 OK

D13B D13A 13.43 1.00 0.13 51.04 50.67 45.69 45.56 200 182 45.91 45.78 1.42 36.84 4.10 OK

CDCA OCC D13A 10.10 1.00 0.10 50.68 50.67 49.92 49.82 400 362 50.34 50.24 2.24 230.51 100.96 OK

D13A D13 19.17 0.57 0.11 50.67 51.07 44.48 44.38 600 595 45.10 45.00 2.36 654.82 180.06 OK

D13 D63 60.91 0.20 0.12 51.07 49.70 44.38 44.25 600 595 45.00 44.87 1.40 387.88 180.06 OK

D6 D7 6.41 1.00 0.06 51.17 51.16 49.58 49.52 400 362 50.01 49.95 2.24 230.51 79.09 OK

D7 D14 33.95 0.736 0.25 51.16 50.81 44.57 44.32 400 362 45.00 44.75 1.92 197.76 79.09 OK

CDCA ORIE. D14 10.1 1.00 0.10 50.68 50.81 49.92 49.82 400 362 50.35 50.25 2.24 230.51 101.0 OK

BF 3 C12 0.2 0.50 0.00 50.70 50.70 49.70 49.70 100 99 49.83 49.83 0.67 5.14 4.10 OK

C12 D14 15.04 1.00 0.15 50.70 50.81 49.70 49.55 200 182 49.93 49.78 1.42 36.84 4.10 OK

D14 D15 22.05 0.2 0.04 50.81 50.42 44.32 44.28 600 595 44.95 44.91 1.40 387.88 184.16 OK

D15 D67 60.7 0.2 0.12 50.42 48.93 44.28 44.15 600 595 44.91 44.78 1.40 387.88 184.16 OK

BIOFILTRO 4

CLASIFICADORES

CANALES DE CRIBADO ORIENTAL Y COMPACTADOR DE DESECHOS

CLASIFICADORES

BIOFILTRO 3

Caudal de diseño (L/s)

Chequeo del Caudal de

diseño (L/s)

Observaciones

BIOFILTRO 1

BIOFILTRO 2

CANALES DE CRIBADO OCCIDENTAL Y COMPACTADOR DE DESECHOS

DRENAJES AREA PRETRATAMIENTO

DRENAJE UNIDADES

TramoLongitud

(m)Pendiente

(%)

Caida en el tramo

(m)

Cota terreno inicial

(msnm)

Cota terreno

final (msnm)

Cota batea inicial

(msnm)

Cota batea final

(msnm)

Diametro Nominal

(mm)

Diametro interno (mm)

Cota clave inicial

(msnm)

Cota clave final

(msnm)

Velocidad (m/s)

Capacidad a flujo libre

(L/s)

ANEXO 1 - CÁLCULO DE LA RED DE DRENAJE DE UNIDADES

Empresa de Alcantarillado, Acueducto y Aseo de Bogotá, EAB

PTAR Canoa

Alcantarillado Sanitario y Drenajes de Unidades

CLIENTE

PROJECTO

DETALLE

1-02-25500-0690-2011

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados5

Civil

Producto 11 – Versión Final

Page 14: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

De: A:

Caudal de diseño (L/s)

Chequeo del Caudal de

diseño (L/s)

Observaciones

DRENAJE UNIDADES

TramoLongitud

(m)Pendiente

(%)

Caida en el tramo

(m)

Cota terreno inicial

(msnm)

Cota terreno

final (msnm)

Cota batea inicial

(msnm)

Cota batea final

(msnm)

Diametro Nominal

(mm)

Diametro interno (mm)

Cota clave inicial

(msnm)

Cota clave final

(msnm)

Velocidad (m/s)

Capacidad a flujo libre

(L/s)

ANEXO 1 - CÁLCULO DE LA RED DE DRENAJE DE UNIDADES

S25 D24 20.31 0.23 0.05 51.16 51.18 43.88 43.83 250 227 44.14 44.09 0.79 31.85 10.0 OK

EBLP 3 D21 16.15 1.12 0.18 50.35 51.01 44.26 44.079 300 284 44.57 44.39 2.02 127.72 15.0 OK

EBLP 3 D21 9.11 1.60 0.15 50.35 51.01 44.26 44.114 300 284 44.57 44.42 2.41 152.66 15.0 OK

D21 D24 17.14 0.31 0.05 51.01 51.18 44.08 44.03 300 284 44.39 44.34 1.06 67.20 30.0 OK

CADICA 2 D23 13.88 0.74 0.10 51.33 51.18 46.50 46.40 300 284 46.81 46.71 1.64 103.82 20.0 OK

D23 D24 32.49 0.20 0.06 51.18 51.18 46.40 46.34 300 284 46.71 46.65 0.85 53.97 20.0 OK

D24 D 25 11.94 0.09 0.01 51.18 51.32 43.83 43.82 400 362 44.24 44.23 0.67 69.15 60.0 OK

CADICA 2 D 25 5.51 0.20 0.01 51.33 51.32 43.50 43.49 300 284 43.81 43.80 0.85 53.97 40.0 OK

D 25 D26 3.61 0.28 0.01 51.32 51.33 43.49 43.48 400 362 43.90 43.89 1.19 121.98 100.0 OK

CADICA 2 D26 4.92 0.50 0.02 51.33 51.33 46.50 46.48 300 284 46.81 46.79 1.35 85.34 20.0 OK

D26 D27 4.13 0.24 0.01 51.33 51.26 43.48 43.47 450 407 43.94 43.93 1.19 154.35 120.0 OK

EBLP 4 D22 13.74 1.23 0.17 50.42 50.97 44.26 44.091 300 284 44.57 44.40 2.11 133.85 15.0 OK

EBLP 4 D22 6.71 1.99 0.13 50.42 50.97 44.26 44.126 300 284 44.57 44.44 2.69 170.25 15.0 OK

D22 D27 15.63 0.25 0.04 50.97 51.26 44.09 44.05 300 284 44.40 44.36 0.95 60.34 30.0 OK

D27 D27A 17.6 0.06 0.01 51.26 51.22 43.47 43.46 600 595 44.08 44.07 0.76 212.45 150.0 OK

CADICA 2 D27A 11.75 0.91 0.11 51.33 51.22 46.50 46.39 300 284 46.81 46.70 1.82 115.13 20.0 OK

D27A D34A 38.09 0.08 0.03 51.22 51.05 43.46 43.43 600 595 44.07 44.04 0.88 245.32 170.0 OK

CADICA GEN.

D30 4.14 0.20 0.01 50.50 50.36 46.52 46.51 300 284 46.83 46.82 0.85 53.97 20.0 OK

D30 D29 6.35 0.20 0.01 50.36 50.40 46.51 46.50 300 284 46.82 46.81 0.85 53.97 20.0 OK

D29 D28 21.05 0.20 0.04 50.40 50.34 43.06 43.02 300 284 43.37 43.33 0.85 53.97 20.0 OK

DRENAJE AREA SEDIMENTADORES

CADICA 2

CADICA 2 (DESCARGAN DOS TUBERÍAS)

CADICA 2 (DESCARGA UNA TUBERÍA)

ESTACIÓN DE BOMBEO LODO

PRIMARIO 4ESTACIÓN DE

BOMBEO LODO PRIMARIO 4

CADICA 2

Aporte de agua del sistema sanitario Q= 10 LPS

ESTACIÓN DE BOMBEO LODO

PRIMARIO 3

ESTACIÓN DE BOMBEO LODO

PRIMARIO 3

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados6

Civil

Producto 11 – Versión Final

Page 15: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

De: A:

Caudal de diseño (L/s)

Chequeo del Caudal de

diseño (L/s)

Observaciones

DRENAJE UNIDADES

TramoLongitud

(m)Pendiente

(%)

Caida en el tramo

(m)

Cota terreno inicial

(msnm)

Cota terreno

final (msnm)

Cota batea inicial

(msnm)

Cota batea final

(msnm)

Diametro Nominal

(mm)

Diametro interno (mm)

Cota clave inicial

(msnm)

Cota clave final

(msnm)

Velocidad (m/s)

Capacidad a flujo libre

(L/s)

ANEXO 1 - CÁLCULO DE LA RED DE DRENAJE DE UNIDADES

D28 D28A 7.72 0.10 0.01 50.34 50.37 43.02 43.01 300 284 43.33 43.32 0.60 38.16 20.0 OK

CADICA GEN.

D28A 5.96 0.30 0.02 50.50 50.37 43.02 43.00 300 284 43.33 43.31 1.04 66.10 20.0 OK

CADICA GEN.

D33B 5.96 0.30 0.02 50.50 50.33 43.02 43.00 300 284 43.33 43.31 1.04 66.10 20.0 OK

D28A D33B 5.49 0.20 0.01 50.37 50.33 43.00 42.99 400 362 43.41 43.40 1.00 103.09 60.0 OK

D33B D33A 7.66 0.10 0.01 50.33 50.23 42.99 42.98 500 452 43.50 43.49 0.82 131.78 100.0 OK

D33A D33 9.30 0.10 0.01 50.23 50.50 42.98 42.97 500 452 43.49 43.48 0.82 131.78 100.0 OK

CADICA GEN.

D31 5.00 0.20 0.01 50.50 50.29 46.52 46.51 300 284 46.83 46.82 0.85 53.97 20.0 OK

D31 D32 6.21 0.20 0.01 50.29 50.24 46.51 46.50 300 284 46.82 46.81 0.85 53.97 20.0 OK

D32 D33 10.45 0.10 0.01 50.24 50.50 42.99 42.98 300 284 43.30 43.29 0.60 38.16 20.0 OK

D33 D36 50.6 0.09 0.05 50.50 49.93 42.97 42.93 600 595 43.58 43.54 0.94 260.20 120.0 OK

BF 7 D34A 12.42 0.50 0.06 51.01 51.05 43.45 43.39 100 99 43.56 43.50 0.67 5.14 4.1 OK

D34A D36 16.69 0.11 0.02 51.05 49.93 43.39 43.37 600 595 44.00 43.98 1.03 287.66 174.1 OK

BF 6 D35A 12.42 0.50 0.06 51.00 51.04 42.82 42.76 100 99 42.93 42.87 0.67 5.14 4.1 OK

D36 D35A 19.52 0.11 0.02 49.93 51.04 42.93 42.91 600 595 43.54 43.52 1.03 287.66 174.1 OK

D35A D36A 37.75 0.11 0.04 51.04 51.22 42.91 42.87 600 595 43.52 43.48 1.03 287.66 174.1 OK

CADICA 1 D36A 11.31 0.88 0.10 51.33 51.22 46.50 46.40 300 284 46.81 46.71 1.79 113.21 20.0 OK

D36A D43 25.61 0.13 0.03 51.22 51.22 42.87 42.83 600 595 43.48 43.44 1.12 312.72 194.1 OK

EBLP 1 D37 16.51 1.00 0.17 50.35 51.03 44.26 44.095 300 284 44.57 44.40 1.91 120.69 15.0 OK

EBLP 1 D37 9.30 1.40 0.13 50.35 51.03 44.26 44.130 300 284 44.57 44.44 2.25 142.80 15.0 OK

D37 D40 15.24 0.32 0.05 51.03 51.24 44.09 44.05 300 284 44.40 44.36 1.08 68.27 30.0 OK

CADICA 1 D39 11.79 0.93 0.11 51.33 51.22 46.50 46.39 300 284 46.81 46.70 1.84 116.39 20.0 OK

D39 D40 24.38 0.26 0.06 51.22 51.24 46.39 46.33 300 284 46.70 46.64 0.97 61.54 20.0 OK

D40 D41 7.57 0.16 0.01 51.24 51.33 44.05 44.03 400 362 44.46 44.44 0.90 92.21 20.0 OK

CADICA 1 D41 5.5 1.00 0.06 51.33 51.33 43.50 43.45 300 284 43.81 43.76 1.91 120.69 40.0 OK

ESTACIÓN DE BOMBEO LODO

PRIMARIO 1

CADICA1 (DESCARGA UNA TUBERÍA)

CADICA1 (DESCARGAN DOS TUBERÍAS)

CADICA 2 (DESCARGAN DOS TUBERÍAS)

CADICA 2 (DESCARGAN DOS TUBERÍAS)

BIOFILTRO 7

BIOFILTRO 6

CADICA1 (DESCARGA UNA TUBERÍA)

ESTACIÓN DE BOMBEO LODO

PRIMARIO 1

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados7

Civil

Producto 11 – Versión Final

Page 16: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

De: A:

Caudal de diseño (L/s)

Chequeo del Caudal de

diseño (L/s)

Observaciones

DRENAJE UNIDADES

TramoLongitud

(m)Pendiente

(%)

Caida en el tramo

(m)

Cota terreno inicial

(msnm)

Cota terreno

final (msnm)

Cota batea inicial

(msnm)

Cota batea final

(msnm)

Diametro Nominal

(mm)

Diametro interno (mm)

Cota clave inicial

(msnm)

Cota clave final

(msnm)

Velocidad (m/s)

Capacidad a flujo libre

(L/s)

ANEXO 1 - CÁLCULO DE LA RED DE DRENAJE DE UNIDADES

D41 D42 2.69 0.34 0.01 51.33 51.34 43.45 43.44 400 362 43.86 43.85 1.31 134.41 70.0 OK

CADICA 1 D42 4.92 1.07 0.05 51.33 51.34 46.50 46.45 300 284 46.81 46.76 1.97 124.84 40.0 OK

D42 D43 7.9 0.31 0.02 51.34 51.22 43.44 43.41 400 362 43.85 43.82 1.25 128.34 110.0 OK

EBLP 2 D38 14.26 1.19 0.17 50.42 50.97 44.26 44.090 300 284 44.57 44.40 2.08 131.65 20.0 OK

EBLP 2 D38 7.23 1.83 0.13 50.42 50.97 44.26 44.128 300 284 44.57 44.44 2.58 163.26 20.0 OK

D38 D43 16.52 0.20 0.03 50.97 51.22 44.09 44.06 300 284 44.40 44.37 0.85 53.97 40.0 OK

D43 D65A 38.34 0.13 0.05 51.22 51.05 42.83 42.78 675 670 43.52 43.47 1.22 429.19 344.1 OK

BF 5 C18 4.0 1.00 0.04 51.10 51.03 50.00 49.96 100 99 50.11 50.07 0.94 7.26 4.1 OK

C18 D65A 3.51 1.00 0.04 51.03 51.05 49.96 49.92 200 182 50.17 50.13 1.42 36.84 4.1 OK

D65A D65 18.37 0.13 0.02 51.05 49.05 42.78 42.76 675 670 43.47 43.44 1.22 429.2 348.2 OK

BF 10 D44 5.74 1.00 0.06 51.17 51.20 48.73 48.67 100 99 48.84 48.78 0.94 7.26 4.1 OK

D44 D48 32.98 0.21 0.07 51.20 51.24 48.50 48.43 300 284 48.81 48.74 0.87 55.31 29.1 OK

EBLP 6 D46 7.79 0.77 0.06 50.45 50.99 44.26 44.200 200 182 44.47 44.41 1.24 32.33 20.0 OK

EBLP 6 D46 14.82 0.40 0.06 50.45 50.99 44.26 44.201 200 182 44.47 44.41 0.90 23.30 20.0 OK

D46 D48 17.13 0.35 0.06 50.99 51.24 44.20 44.14 200 182 44.41 44.35 0.84 21.80 20.0 OK

CADICA 3 D47 8.89 0.91 0.08 51.33 51.24 46.50 46.42 300 284 46.81 46.73 1.82 115.13 20.0 OK

D47 D48 22.21 0.26 0.06 51.24 51.24 46.12 46.06 300 284 46.43 46.37 0.97 61.54 20.0 OK

CADICA 3 D49 4.1 0.91 0.04 51.33 51.33 43.50 43.46 300 284 43.81 43.77 1.82 115.13 40.0

CADICA 3 D50 3.5 0.91 0.03 51.33 51.34 46.50 46.47 300 284 46.81 46.78 1.82 115.13 20.0

D48 D49 7.11 0.13 0.01 51.24 51.33 44.14 44.13 400 362 44.55 44.54 0.81 83.11 44.1 OK

D49 D50 2.64 0.34 0.01 51.33 51.34 43.46 43.45 400 362 43.87 43.86 1.31 134.41 84.1 OK

D50 D51 7.02 0.23 0.02 51.34 51.26 43.45 43.44 400 362 43.86 43.85 1.07 110.55 64.1 OK

EBLP 5 D45 14.12 0.42 0.06 50.35 50.98 44.26 44.201 200 182 44.47 44.41 0.92 23.90 20.0 OK

CADICA1 (DESCARGAN DOS TUBERÍAS)

CADICA3 (DESCARGAN DOS TUBERÍAS)

ESTACIÓN DE BOMBEO LODO 5

BIOFILTRO

BIOFILTRO

Aporte de agua del sistema sanitario Q= 25 LPS

ESTACIÓN DE BOMBEO LODO

PRIMARIO 6

ESTACIÓN DE BOMBEO LODO

PRIMARIO 6

CADICA3 (DESCARGA UNA TUBERÍA)

CADICA1 (DESCARGAN DOS TUBERÍAS)

ESTACIÓN DE BOMBEO LODO

PRIMARIO 2ESTACIÓN DE

BOMBEO LODO PRIMARIO 2

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados8

Civil

Producto 11 – Versión Final

Page 17: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

De: A:

Caudal de diseño (L/s)

Chequeo del Caudal de

diseño (L/s)

Observaciones

DRENAJE UNIDADES

TramoLongitud

(m)Pendiente

(%)

Caida en el tramo

(m)

Cota terreno inicial

(msnm)

Cota terreno

final (msnm)

Cota batea inicial

(msnm)

Cota batea final

(msnm)

Diametro Nominal

(mm)

Diametro interno (mm)

Cota clave inicial

(msnm)

Cota clave final

(msnm)

Velocidad (m/s)

Capacidad a flujo libre

(L/s)

ANEXO 1 - CÁLCULO DE LA RED DE DRENAJE DE UNIDADES

EBLP 5 D45 7.1 0.85 0.06 50.35 50.98 44.26 44.200 200 182 44.47 44.41 1.31 33.97 20.0 OK

D45 D51 15.56 0.24 0.04 50.98 51.26 44.20 44.16 400 362 44.61 44.57 1.10 112.93 40.0 OK

D51 D51A 18.68 0.06 0.01 51.26 51.22 43.44 43.43 600 595 44.05 44.04 0.76 212.45 124.1 OK

D51A D54C 30.84 0.18 0.06 51.22 51.12 43.43 43.37 600 595 44.04 43.98 1.32 367.98 124.1 OK

BF 9 D54C 13.25 0.50 0.07 51.02 51.12 43.40 43.33 100 99 43.51 43.44 0.67 5.14 4.1 OK

D54C D54B 48.44 0.10 0.05 51.12 51.12 43.33 43.29 600 595 43.94 43.90 0.99 274.28 128.2 OK

BF 12 D54B 16.4 0.50 0.08 51.03 51.12 43.41 43.33 100 99 43.52 43.44 0.67 5.14 4.1 OK

D54B D54A 31.56 0.10 0.03 51.12 51.22 43.29 43.25 600 595 43.90 43.86 0.99 274.28 132.3 OK

CADICA 4 D54A 11.57 0.86 0.10 51.33 51.22 46.50 46.40 300 284 46.81 46.71 1.77 111.92 20.0 OK

D54A D62 25.82 0.08 0.02 51.22 51.22 43.25 43.23 600 595 43.86 43.84 0.88 245.32 152.3 OK

EBLP 8 D57 13.87 0.43 0.06 50.99 50.49 44.26 44.200 300 284 44.57 44.51 1.25 79.14 20.0 OK

EBLP 8 D57 6.82 0.88 0.06 50.99 50.49 44.26 44.20 300 284 44.57 44.51 1.79 113.21 20.0 OK

D57 D59 16.92 0.24 0.04 50.49 51.25 44.20 44.16 300 284 44.51 44.47 0.93 59.12 40.0 OK

CADICA 4 D58 11.44 0.92 0.11 51.33 51.22 46.50 46.39 300 284 46.81 46.70 1.83 115.76 20.0 OK

D58 D59 23.11 0.27 0.06 51.22 51.25 44.30 44.24 300 284 44.61 44.55 0.99 62.71 20.0 OK

D59 D60 7.11 0.16 0.01 51.25 51.33 44.16 44.15 400 362 44.57 44.56 0.90 92.21 60.0 OK

CADICA 4 D60 4.1 0.92 0.04 51.33 51.33 43.50 43.46 300 284 43.81 43.77 1.83 115.76 40.0 OK

D60 D61 2.64 0.30 0.01 51.33 51.34 43.46 43.45 400 362 43.87 43.86 1.23 126.26 100.0 OK

D61 D62 7.76 0.24 0.02 51.34 51.22 43.45 43.44 450 407 43.91 43.90 1.19 154.35 140.0 OK

EBLP 7 D55 13.95 0.43 0.06 50.35 50.96 44.26 44.200 300 284 44.57 44.51 1.25 79.14 20.0 OK

EBLP 7 D55 6.98 0.86 0.06 50.35 50.96 44.26 44.200 300 284 44.57 44.51 1.77 111.92 20.0 OK

D55 D62 17.08 0.24 0.04 50.96 51.22 44.20 44.16 300 284 44.51 44.47 0.93 59.12 20.0 OK

D62 D63A 36.09 0.12 0.04 51.22 51.05 43.23 43.19 750 747 43.99 43.95 1.26 551.13 312.3 OK

CADICA 4 (DESCARGAN DOS TUBERÍAS)

ESTACIÓN DE BOMBEO LODO

PRIMARIO 7

ESTACIÓN DE BOMBEO LODO

PRIMARIO 7

BIOFILTRO 12

CADICA 4 (DESCARGA UNA TUBERÍA)

ESTACIÓN DE BOMBEO LODO

PRIMARIO 8

ESTACIÓN DE BOMBEO LODO

PRIMARIO 8

CADICA 4 (DESCARGA UNA TUBERÍA)

CADICA 4 (DESCARGAN DOS TUBERÍAS)

ESTACIÓN DE BOMBEO LODO

PRIMARIO 5

CADICA3 (DESCARGA UNA TUBERÍA)

BIOFILTRO 9

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados9

Civil

Producto 11 – Versión Final

Page 18: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

De: A:

Caudal de diseño (L/s)

Chequeo del Caudal de

diseño (L/s)

Observaciones

DRENAJE UNIDADES

TramoLongitud

(m)Pendiente

(%)

Caida en el tramo

(m)

Cota terreno inicial

(msnm)

Cota terreno

final (msnm)

Cota batea inicial

(msnm)

Cota batea final

(msnm)

Diametro Nominal

(mm)

Diametro interno (mm)

Cota clave inicial

(msnm)

Cota clave final

(msnm)

Velocidad (m/s)

Capacidad a flujo libre

(L/s)

ANEXO 1 - CÁLCULO DE LA RED DE DRENAJE DE UNIDADES

BF 11 D63A 13.4 1.00 0.13 51.02 51.05 43.37 43.24 100 99 43.48 43.35 0.94 7.26 4.1 OK

D63A D63 20.48 0.50 0.10 51.05 49.70 43.19 43.09 750 747 43.95 43.85 2.57 1124.99 316.4 OK

D63 D63B 41.5 0.25 0.10 49.70 49.48 43.09 42.98 750 747 43.85 43.74 1.82 795.49 500.6 OK

D63C D63B 20.88 0.09 0.02 49.50 49.48 43.20 43.18 200 182 43.41 43.39 0.42 11.05 4.1 OK

D63B D64 35.89 0.11 0.04 49.48 49.29 42.50 42.46 750 747 43.26 43.22 1.20 527.67 524.7 OK

D64A D64 16.31 0.50 0.08 49.48 49.29 47.48 47.40 300 284 47.79 47.71 1.35 85.34 20.0 OK

D64 D65C 24.61 0.08 0.02 49.29 49.16 42.46 42.44 825 824 43.30 43.28 1.10 584.56 544.7 OK

D65F D65E 24.55 0.50 0.12 49.74 49.55 47.00 46.88 300 284 47.31 47.19 1.35 85.34 20.0 OK

D65E D65D 19.5 0.50 0.10 49.55 49.32 46.88 46.78 300 284 47.19 47.09 1.35 85.34 20.0 OK

D65D D65C 14.49 0.50 0.07 49.32 49.16 46.78 46.71 300 284 47.09 47.02 1.35 85.34 24.1 OK

D65C D65 20.34 0.10 0.02 49.16 49.05 42.44 42.42 825 824 43.28 43.26 1.23 653.55 568.8 OK

D65 D67 22.56 0.13 0.03 49.05 48.93 42.42 42.39 900 900 43.33 43.30 1.48 942.82 917.0 OK

D67 D68 32.59 0.18 0.06 48.93 48.76 42.39 42.33 900 900 43.30 43.24 1.74 1109.41 1101.1 OK

D68 EBR 1 17.82 0.18 0.03 48.76 49.32 42.33 42.30 900 900 43.24 43.21 1.74 1109.41 1101.1 OK

OK

D70C D70B 21.5 2.00 0.43 53.36 51.79 49.95 49.52 200 182 50.16 49.73 2.00 52.10 6.30 OK

D70B D70A 49.06 3.50 1.72 51.79 49.57 49.52 47.80 200 182 49.73 48.01 2.65 68.92 6.30 OK

D70A D70 24.45 0.20 0.05 49.57 49.34 47.80 47.75 200 182 48.01 47.96 0.63 16.48 6.30 OK

D70 D71 43.59 0.16 0.07 49.34 49.15 47.75 47.68 200 182 47.96 47.89 0.57 14.74 6.30 OK

D71 D72 54.31 0.08 0.04 49.15 48.31 45.51 45.47 200 182 45.72 45.68 0.40 10.42 6.30 OK

D72 D74E 70.74 0.08 0.06 48.31 51.11 45.32 45.26 200 182 45.53 45.47 0.40 10.42 6.30 OK

ED, DESH. D74E 3.55 0.50 0.02 51.09 51.11 49.31 49.29 300 284 49.62 49.60 1.35 85.34 20.00 OK

D74E D74D 27.34 0.50 0.14 51.11 51.51 48.61 48.47 300 284 48.92 48.78 1.35 85.34 20.00 OK

ED. DESH. D74D 23.14 0.50 0.12 50.47 51.51 49.31 49.19 300 284 49.62 49.50 1.35 85.34 20.00 OK

D74D D74A 22.79 0.50 0.11 51.51 49.08 48.47 48.36 300 284 48.78 48.67 1.35 85.34 40.00 OK

ED. DESH. D74C 8.73 0.50 0.04 50.47 50.41 49.31 49.27 300 284 49.62 49.58 1.35 85.34 20.00 OK

ÁREA DE DESHIDRATACIÓN

DESHIDRATACION DR 1

DESHIDRATACION DR 2

DESHIDRATACION DR 3

Aporte de agua de Lavado de Camiones Q= 6.3 LPS

TUBERIA AL SUR DE MEZCLA RAPIDA

TUBERIA AL NORTE DE MEZCLA RAPIDA

DPENAJE CLORURO FERRICO

RECIBE DE PRETRATAMIENTO

ESTACIÓN DE BOMBEO RETORNO 1

BIOFILTRO 11

RECIBE DE PRETRATAMIENTO

ALMACENAMIENTO POLÍMERO

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados10

Civil

Producto 11 – Versión Final

Page 19: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

De: A:

Caudal de diseño (L/s)

Chequeo del Caudal de

diseño (L/s)

Observaciones

DRENAJE UNIDADES

TramoLongitud

(m)Pendiente

(%)

Caida en el tramo

(m)

Cota terreno inicial

(msnm)

Cota terreno

final (msnm)

Cota batea inicial

(msnm)

Cota batea final

(msnm)

Diametro Nominal

(mm)

Diametro interno (mm)

Cota clave inicial

(msnm)

Cota clave final

(msnm)

Velocidad (m/s)

Capacidad a flujo libre

(L/s)

ANEXO 1 - CÁLCULO DE LA RED DE DRENAJE DE UNIDADES

D74C D74B 7.86 0.50 0.04 50.41 49.15 47.55 47.51 600 595 48.16 48.12 2.21 613.30 100.00 OK

D74B D74A 14.42 0.50 0.07 49.15 49.08 47.51 47.44 600 595 48.12 48.05 2.21 613.30 100.00 OK

D74A D74 13.98 0.50 0.07 49.08 49.15 47.44 47.37 600 595 48.05 47.98 2.21 613.30 100.00 OK

D74 D73G 18.02 0.50 0.09 49.15 49.24 47.37 47.28 600 595 47.98 47.89 2.21 613.30 100.00 OK

BF 19 D73G 22.38 0.50 0.11 50.06 49.24 49.32 49.21 100 99 49.43 49.32 0.67 5.14 4.10 OK

BF 18 D73E 22.38 0.50 0.11 49.82 49.33 49.08 48.97 100 99 49.19 49.08 0.67 5.14 4.10 OK

BF 17 D73C 22.38 0.50 0.11 49.56 49.39 48.78 48.67 100 99 48.89 48.78 0.67 5.14 4.10 OK

BF 16 D73A 22.38 0.50 0.11 49.24 49.05 48.48 48.37 100 99 48.59 48.48 0.67 5.14 4.10 OK

D73G D73E 17.69 1.00 0.18 49.24 49.33 47.28 47.10 600 595 47.89 47.71 3.12 867.34 4.10 OK

D73E D73C 17.69 1.00 0.18 49.33 49.39 47.10 46.92 600 595 47.71 47.53 3.12 867.34 108.20 OK

D73C D73A 17.69 1.00 0.18 49.39 49.05 46.92 46.75 600 595 47.53 47.36 3.12 867.34 120.50 OK

D73A D73 11.66 1.00 0.12 49.05 51.11 46.75 46.63 600 595 47.36 47.24 3.12 867.34 120.50 OK

D73 D77 86.64 0.15 0.13 51.11 49.16 45.26 45.13 600 595 45.87 45.74 1.21 335.92 126.80 OK

D76 D77 17.63 0.25 0.04 49.75 49.16 45.21 45.17 825 824 46.05 46.00 1.94 1033.36 144.8 OK

D77 D77A 69.96 0.15 0.10 49.16 49.54 45.13 45.03 825 824 45.97 45.86 1.50 800.44 272 OK

D77A D77B 25.13 0.25 0.06 49.54 49.89 45.03 44.97 825 824 45.86 45.80 1.94 1033.36 272 OK

D77B EBR 2 8.07 0.20 0.02 49.89 50.03 43.93 43.91 1200 1200 45.14 45.12 2.23 2518.49 272 OK

DIG 2 FASE II

D79 6.95 1.00 0.07 50.25 49.74 47.20 47.13 600 595 47.81 47.74 3.12 867.34 795.1 OK

D79 D80 61.0 0.41 0.25 49.74 50.28 46.98 46.73 750 747 47.74 47.49 2.32 1018.72 795.1 OK

D80 D81 48.09 0.42 0.20 50.28 50.70 46.73 46.53 750 747 47.49 47.29 2.35 1031.07 795.1 OK

D81 D82 62.0 0.40 0.25 50.70 51.24 46.53 46.28 750 747 47.29 47.04 2.30 1006.22 795.1 OK

D82 D83 26.02 0.37 0.10 51.24 51.68 46.28 46.18 750 747 47.04 46.94 2.21 967.75 795.1 OK

D83 D93 10.36 0.25 0.03 51.68 51.12 46.00 45.97 750 747 46.76 46.73 1.82 795.49 795.1 OK

DIG 1 FASE II

D85 8.43 1.00 0.08 50.97 50.91 47.80 47.72 600 595 48.41 48.33 3.12 867.34 795.1 OK

DRENAJE UNIDADES ÁREA LODOS

Rebose de emergencia de Digestores. Oriente

Rebose de emergencia de Digestores. Se tomo como criterio de diseño que se drenen dos

digestores simultaneamente. Occidente

PREDESHIDRATACION - CAJA DE CENTRADO

ESTACIÓN DE BOMBEO RETORNO 2

CAJA DE FILTRADO

BIOFILTRO 19

BIOFILTRO 18

BIOFILTRO 17

BIOFILTRO 16

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados11

Civil

Producto 11 – Versión Final

Page 20: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

De: A:

Caudal de diseño (L/s)

Chequeo del Caudal de

diseño (L/s)

Observaciones

DRENAJE UNIDADES

TramoLongitud

(m)Pendiente

(%)

Caida en el tramo

(m)

Cota terreno inicial

(msnm)

Cota terreno

final (msnm)

Cota batea inicial

(msnm)

Cota batea final

(msnm)

Diametro Nominal

(mm)

Diametro interno (mm)

Cota clave inicial

(msnm)

Cota clave final

(msnm)

Velocidad (m/s)

Capacidad a flujo libre

(L/s)

ANEXO 1 - CÁLCULO DE LA RED DE DRENAJE DE UNIDADES

D85 D86 44.53 0.54 0.24 50.91 51.23 47.52 47.28 750 747 48.28 48.04 2.67 1169.12 795.1 OK

D86 D87 44.69 0.43 0.19 51.23 51.50 47.28 47.09 750 747 48.04 47.85 2.38 1043.27 795.1 OK

D87 D88 62.0 0.40 0.25 51.50 51.85 47.09 46.84 750 747 47.85 47.60 2.30 1006.22 795.1 OK

D88 D91 27.98 0.44 0.12 51.85 52.03 46.84 46.72 750 747 47.60 47.48 2.41 1055.33 795.1 OK

D89D D89B 13.85 0.40 0.06 52.33 52.25 49.53 49.47 300 284 49.84 49.78 1.20 76.33 20.0 OK

D89B D89A 8.01 0.40 0.03 52.25 52.20 49.47 49.44 300 284 49.78 49.75 1.20 76.33 40.0 OK

D89A D89 14.79 0.40 0.06 52.20 52.19 49.44 49.38 300 284 49.75 49.69 1.20 76.33 60.0 OK

D89 D91 26.07 0.40 0.10 52.19 52.03 49.38 49.28 350 327 49.74 49.64 1.32 111.16 80.0 OK

D91 D90 29.67 0.42 0.12 52.03 52.00 46.72 46.59 825 824 47.55 47.43 2.51 1339.39 875.1 OK

BF 14 D90 6.99 1.00 0.07 51.96 52.00 51.26 51.19 100 99 51.37 51.30 0.94 7.26 4.10 OK

D90 D92 37.37 0.41 0.15 52.00 51.53 46.59 46.44 825 824 47.43 47.27 2.48 1323.34 879.18 OK

D92 D93 32.6 0.41 0.13 51.53 51.12 46.44 46.30 825 824 47.27 47.14 2.48 1323.34 1301.96 OK

D93A D93 17.18 0.45 0.08 51.39 51.12 46.30 46.22 300 284 46.61 46.53 1.28 80.96 40.0 OK

D93 D94 30.20 0.42 0.13 51.12 50.76 45.97 45.85 1050 1054 47.03 46.91 2.96 2582.31 2137.04 OK

D94 D95 28.85 0.44 0.13 50.76 50.32 45.85 45.72 1050 1054 46.91 46.78 3.03 2643.08 2137.04 OK

D95 D103 12.93 0.50 0.06 50.32 50.20 45.72 45.66 1050 1054 46.78 46.72 3.23 2817.53 2137.04 OK

BF 13 D96 10.76 1.00 0.11 52.20 52.10 48.45 48.34 100 99 48.56 48.45 0.94 7.26 4.10 OK

D96 D97 21.58 0.47 0.10 52.10 51.82 48.34 48.24 100 99 48.45 48.35 0.65 4.98 4.10 OK

ESPESAD. 1 D97 15.59 2.00 0.31 51.54 51.82 50.00 49.69 450 407 50.46 50.15 3.42 445.56 422.8 OK

D97 D97A 16.52 0.42 0.07 51.82 51.66 48.24 48.17 600 595 48.85 48.78 2.02 562.10 426.9 OK

D84 D99E 13.05 0.15 0.02 50.93 50.97 45.74 45.72 250 227 46.00 45.98 0.64 25.72 20.0 OK

D99E D99D 15.02 0.27 0.04 50.97 50.98 45.72 45.68 250 227 45.98 45.94 0.85 34.51 20.0 OK

D99H D99D 5.83 0.20 0.01 50.92 50.98 45.80 45.79 250 227 46.06 46.05 0.73 29.70 20.0 OK

D99D D99B 8.99 0.20 0.02 50.98 50.93 45.68 45.66 300 284 45.99 45.97 0.85 53.97 40.0 OK

D99C D99B 7.05 0.20 0.01 50.39 50.93 45.75 45.74 250 227 46.01 46.00 0.73 29.70 20.0 OK

D99B D99A 21.42 0.14 0.03 50.93 51.13 45.66 45.63 350 327 46.02 45.99 0.78 65.77 60.0 OK

D99F D99G 8.33 0.20 0.02 50.92 51.00 45.75 45.73 250 227 46.01 45.99 0.73 29.70 20.0 OK

Drenaje de Espesador 2

CRIBADO DE LODOS Y NATAS TANQUE ALMACENAMIENTO LODO ESPESADO

BIOFILTRO 13

Drenaje de Espesador 1

ESTACIÓN DE BOMBEO LODO ESPESADO 2

SISTEMA DESARENADO LODO PRIMARIO

SISTEMA DESARENADO LODO PRIMARIO

SISTEMA DESARENADO LODO PRIMARIO

BIOFILTRO 14

CADICALODO PRIMARIO

ESTACIÓN DE BOMBEO LODO ESPESADO DRENAJE

OCCIDENATAL

ESTACIÓN DE BOMBEO LODO ESPESADO DRENAJE ORIENTAL

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados12

Civil

Producto 11 – Versión Final

Page 21: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

De: A:

Caudal de diseño (L/s)

Chequeo del Caudal de

diseño (L/s)

Observaciones

DRENAJE UNIDADES

TramoLongitud

(m)Pendiente

(%)

Caida en el tramo

(m)

Cota terreno inicial

(msnm)

Cota terreno

final (msnm)

Cota batea inicial

(msnm)

Cota batea final

(msnm)

Diametro Nominal

(mm)

Diametro interno (mm)

Cota clave inicial

(msnm)

Cota clave final

(msnm)

Velocidad (m/s)

Capacidad a flujo libre

(L/s)

ANEXO 1 - CÁLCULO DE LA RED DE DRENAJE DE UNIDADES

D99G D99A 13.94 0.20 0.03 51.00 51.13 45.73 45.71 250 227 45.99 45.97 0.73 29.70 20.0 OK

D99A D97A 33.87 0.38 0.13 51.13 51.66 45.63 45.50 400 362 46.04 45.91 1.38 142.10 80.0 OK

D97A D98 16.08 0.42 0.07 51.66 51.52 45.50 45.44 600 595 46.11 46.05 2.02 562.10 506.9 OK

D98 D98A 16.08 0.42 0.07 51.52 51.37 45.44 45.37 750 747 46.20 46.13 2.35 1031.07 506.9 OK

C17 D98A 31.69 0.50 0.16 51.16 51.37 51.07 50.91 200 182 51.28 51.12 1.00 26.05 4.10 OK

D98A D99 20.56 0.49 0.10 51.37 51.14 45.37 45.27 750 747 46.13 46.03 2.54 1113.68 510.98 OK

D99 D100 40.54 0.37 0.15 51.14 50.78 45.27 45.12 750 747 46.03 45.88 2.21 967.75 510.98 OK

D100 D101 18.30 0.20 0.04 50.78 50.61 45.12 45.08 750 747 45.88 45.84 1.62 711.51 510.98 OK

D101 D102 35.13 0.57 0.20 50.61 50.42 45.08 44.88 750 747 45.84 45.64 2.74 1201.16 510.98 OK

D102 D103 27.52 0.20 0.06 50.42 50.20 44.88 44.83 750 747 45.64 45.59 1.62 711.51 510.98 OK

D103 D77C 13.81 0.50 0.07 50.20 50.12 44.83 44.76 1050 1054 45.89 45.82 3.23 2817.53 2648.02 OK

D77C EBR 2 21.82 0.23 0.05 50.12 50.03 43.96 43.91 1200 1200 45.17 45.12 2.39 2700.78 2648.02 OK

BIOFILTRO 8

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados13

Civil

Producto 11 – Versión Final

Page 22: INGENIERÍA DE DETALLE A NIVEL DEL 100%€¦ · MEMORIA DE CÁLCULO: ALCANTARILLADO SANITARIO Y DRENAJES DE UNIDADES 1.0 OBJETIVO 2.0 CÓDIGOS, ESTÁNDARES Y REFERENCIAS DE DISEÑO

TRABAJO Nº

FECHA REVISION 1 FECHA

REVISION 1 POR REVISION Nº

FECHA REVISION FINAL

REVISION FINAL POR

n = 0.013

De velocidad De calado Total

L QD So Q v V.R. Teórica Real Chequeo v 2 / 2g d H Inicial Final Inicial Final INIC FINAL

(mts) lps Pulg. (m) ( % ) ( lps) (m /s) (m /s) ( m ) ( m ) ( m ) ( m ) ( m ) msnm msnm msnm msnm mts. mts.

S 1 S 2 23.29 10.00 PVC 8 0.18 0.97 31.71 1.25 0.94 OK! 0.32 OK! 0.49 0.45 OK! 0.05 0.08 0.13 0.23 - 2551.78 2551.51 2550.01 2549.78 1.77 1.73 Entran AR Casino

S 2 S 3 32.78 13.00 PVC 8 0.18 0.49 22.54 0.89 0.80 OK! 0.58 OK! 0.25 0.28 OK! 0.03 0.11 0.14 0.16 0.01 2551.51 2551.66 2549.78 2549.62 1.73 2.04 Entran AR Edificio Mantenimiento

S 3 S 4 92.98 13.00 PVC 8 0.18 0.26 16.42 0.65 0.63 OK! 0.79 OK! 0.13 0.16 OK! 0.02 0.14 0.16 0.24 0.01 2551.66 2552.27 2549.32 2549.08 2.34 3.19

S 5 S 4 38.11 5.00 PVC 8 0.18 0.60 24.94 0.98 0.64 OK! 0.20 OK! 0.30 0.23 OK! 0.02 0.06 0.08 0.23 - 2552.88 2552.27 2549.74 2549.51 3.14 2.76 Entran AR Edificio Administracion

S 4 S 6 65.83 18.00 PVC 8 0.18 0.39 20.11 0.79 0.81 OK! 0.90 OK! 0.20 0.24 OK! 0.03 0.15 0.18 0.26 0.01 2552.27 2552.73 2549.08 2548.82 3.19 3.91

S 6 S8 36.91 18.00 PVC 10 0.227 0.20 26.73 0.66 0.62 OK! 0.67 OK! 0.13 0.15 OK! 0.02 0.15 0.17 0.07 - 2552.73 2553.06 2548.82 2548.75 3.91 4.31

S 7 S 7A 23.28 5.00 PVC 8 0.18 1.00 32.19 1.27 0.78 OK! 0.16 OK! 0.51 0.35 OK! 0.03 0.06 0.09 0.23 0.01 2553.35 2553.21 2550.23 2550.00 3.12 3.21 Entran AR Porteria General

S 7A S 8 38.38 5.00 PVC 8 0.18 1.02 32.51 1.28 0.77 OK! 0.15 OK! 0.52 0.35 OK! 0.03 0.05 0.08 0.39 -0.03 2553.21 2553.06 2550.00 2549.61 3.21 3.45

S 8 S 9 32.57 25.00 PVC 10 0.227 0.26 30.47 0.75 0.46 OK! 0.16 OK! 0.17 0.12 OK! 0.01 0.07 0.08 0.10 - 2553.06 2551.11 2548.75 2548.67 4.31 2.44

S 9 D44 23.69 25.00 PVC 10 0.227 0.26 30.47 0.75 0.46 OK! 0.16 OK! 0.17 0.12 OK! 0.01 0.07 0.08 0.08 - 2551.11 2551.2 2548.67 2548.60 2.44 2.60

S 10 S 11 39.31 5.00 PVC 8 0.18 0.25 16.10 0.63 0.47 OK! 0.31 OK! 0.13 0.12 OK! 0.01 0.08 0.09 0.10 - 2554.61 2552.2 2550.61 2550.51 4.00 1.69 Entran AR Porteria de Servicios

S11 S12 29.48 5.00 PVC 8 0.18 0.25 16.10 0.63 0.47 OK! 0.31 OK! 0.13 0.12 OK! 0.01 0.08 0.09 0.07 -0.03 2552.2 2551.86 2550.51 2550.44 1.69 1.42

S 12 S 15 75.33 5.00 PVC 8 0.18 0.25 16.10 0.63 0.47 OK! 0.31 OK! 0.13 0.12 OK! 0.01 0.08 0.09 0.19 0.01 2551.86 2551.17 2550.44 2550.25 1.42 0.92

S 13 S 14 62.24 7.00 PVC 8 0.18 0.23 15.44 0.61 0.51 OK! 0.45 OK! 0.12 0.12 OK! 0.01 0.10 0.11 0.14 0.01 2550.96 2552.18 2550.25 2550.11 0.71 2.07Entran AR Edificio de

Deshidratacion

S 14 S 15 45.39 7.00 PVC 8 0.18 0.24 15.77 0.62 0.51 OK! 0.44 OK! 0.12 0.13 OK! 0.01 0.09 0.10 0.11 0.01 2552.18 2551.17 2550.11 2550.00 2.07 1.17

S 15 S 16 68.76 12.00 PVC 8 0.18 0.25 16.10 0.63 0.61 OK! 0.75 OK! 0.13 0.15 OK! 0.02 0.13 0.15 0.17 0.01 2551.17 2551.51 2550.00 2549.83 1.17 1.68

S 16 S 17 21.49 12.00 PVC 8 0.18 0.23 15.44 0.61 0.59 OK! 0.78 OK! 0.12 0.14 OK! 0.02 0.13 0.15 0.05 0.01 2551.51 2551.24 2549.83 2549.78 1.68 1.46

S 17 S 3 85.46 12.00 PVC 8 0.18 0.35 19.05 0.75 0.69 OK! 0.63 OK! 0.18 0.20 OK! 0.02 0.12 0.14 0.30 0.01 2551.24 2551.66 2549.78 2549.48 1.46 2.18

S 18A S 18 22.27 8.00 PVC 8 0.18 0.23 15.44 0.61 0.53 OK! 0.52 OK! 0.12 0.13 OK! 0.01 0.10 0.11 0.05 0.01 2549.96 2550.23 2548.96 2548.91 1.00 1.32Entran AR Edificio de Calderas y

Generadores

S 18 S 19 32.28 8.00 PVC 8 0.18 0.23 15.44 0.61 0.53 OK! 0.52 OK! 0.12 0.13 OK! 0.01 0.10 0.11 0.07 0.01 2550.23 2549.97 2548.91 2548.83 1.32 1.14

S 19 S 20 11.06 8.00 PVC 8 0.18 0.23 15.44 0.61 0.53 OK! 0.52 OK! 0.12 0.13 OK! 0.01 0.10 0.11 0.03 0.01 2549.97 2549.44 2548.83 2548.81 1.14 0.63

S 20 S 21 72.38 14.00 PVC 8 0.18 0.25 16.10 0.63 0.64 OK! 0.87 OK! 0.13 0.15 OK! 0.02 0.15 0.17 0.18 0.01 2549.44 2550.26 2548.81 2548.63 0.63 1.63Entran AR Edificio de

Predeshidratacion

S 21 S 21A 36.65 14.00 PVC 8 0.18 0.25 16.10 0.63 0.64 OK! 0.87 OK! 0.13 0.15 OK! 0.02 0.15 0.17 0.09 0.01 2550.26 2551.19 2548.63 2548.54 1.63 2.65

S 21A S 22 16.24 19.00 PVC 10 0.23 0.25 29.88 0.74 0.68 OK! 0.64 OK! 0.16 0.18 OK! 0.02 0.15 0.17 0.04 0.03 2551.19 2550.42 2548.54 2548.50 2.65 1.92

S 22 S 23 21.75 19.00 PVC 10 0.23 0.25 29.88 0.74 0.68 OK! 0.64 OK! 0.16 0.18 OK! 0.02 0.15 0.17 0.05 0.03 2550.42 2550.33 2548.50 2548.44 1.92 1.89

S 23 S 24 67.85 19.00 PVC 10 0.23 0.25 29.88 0.74 0.68 OK! 0.64 OK! 0.16 0.18 OK! 0.02 0.15 0.17 0.17 0.01 2550.33 2550.73 2548.44 2548.27 1.89 2.46

S 24 S24A 24.35 19.00 PVC 10 0.23 0.25 29.88 0.74 0.68 OK! 0.64 OK! 0.16 0.18 OK! 0.02 0.15 0.17 0.06 0.01 2550.73 2550.94 2548.27 2548.21 2.46 2.73

S24A S25 48.93 19.00 PVC 10 0.23 0.24 29.28 0.72 0.67 OK! 0.65 OK! 0.15 0.18 OK! 0.02 0.15 0.17 0.12 0.01 2550.94 2551.16 2544.00 2543.88 6.94 7.28

S25 D24 20.31 19.00 PVC 10 0.23 0.23 28.66 0.71 0.66 OK! 0.66 OK! 0.15 0.17 OK! 0.02 0.15 0.17 0.05 0.01 2551.16 2551.18 2543.88 2543.84 7.28 7.34

ANEXO 2 - CALCULO DE LA RED DE ALCANTARILLADO SANITARIO

A BATEA

Inicial Finalφ

(kg/m2)

Energía Caída en: Cotas Corte a batea

ObservacionesTramo CámaraRasante CR Batea CB

Fuerza tractivaCámara LongitudCaudal de

diseñoMaterial

Diámetro interior PendienteA sección

plenaVelocidad

realChequeo

velocidad a seccion

plena

q/QChequeo

q/Q

DETALLE Alcantarillado Sanitario y Drenajes de Unidades

CALC. POR EDER DE LAPEÑA

22/04/2016

0

Empresa de Alcantarillado, Acueducto y Aseo de Bogotá, EAB CLIENTE 1-02-25500-0690-2011

PROJECTO PTAR Canoa

CDM Smith – INGESAM

© 2016 CDM Smith

Todos los derechos reservados

14Civil

Producto 11 – Versión Final