introducing physics-based digitalclone models and computational prognostics to reduce o&m costs -...
TRANSCRIPT
GE 1.5 Wind PR Deck
China WINDPOWER 2015
U.S. Material Genome Initiative
Human DNAMaterial Microstructure
China WINDPOWER 2015
Human genome -> human life information Material genome -> material life informationFunded by US government
2
New Prognostic Solution to Predict FailuresChina WINDPOWER 2015 Extend the Remaining Useful Life (RUL) through Prognostics
Prognostics vs. Diagnostics Data Model versus Material Science Model - Compatible Calculates Remaining Useful Life (RUL) and Recommends Options to Extend Life Simulates What if Scenarios to Optimize Performance Enables Efficient Asset Management Reduces the Time and Cost of Physical Design Testing
Technology differentiation prognostics vs. diagnosticsCrack initiation detected very earlyOperators make change as early as possible Differentiation: right bottom-top-left3
DigtialClone Live Technical ApproachChina WINDPOWER 2015
Technical approach4
What Process does DigitalClone Replace?Create a multi-physics model to test the life and performance of a specific gearbox and components under sensitivity studiesBuild a digital model and then run thousands of testsManage by exception by only focusing on changes to predictionsSoftware as a Service (nothing to install)
VS.PrognosticsDiagnosticsNO CAPEX / $31,000 development costs$3.5M CAPEX / $323,000in development costsChina WINDPOWER 2015
Prognostics vs. Diagnostics Top right, cost in capex US approximation
5
Ranking Fleet-wide GBX assets worst to best (whats not on your watch list?)
List of all GBX candidates for Up-tower component replacement critical component(s) list, new lifing predictions post replacement and ROI
List of all GBX candidates for de-rating to extend GBX life, calculated power levels and ROI
Per asset lifing predictions for any uprated GBX
/Per Asset GBX as-is BOM and to-be simulated BOM stored in ERP
55 year budgeting plan, based on data above, to estimate spend per site
Primary Data on Fleet HealthChina WINDPOWER 2015
Results of the DigitalClone6
DigitalClone Live UIChina WINDPOWER 2015
Site 1Site 2Site 3Site 4Site 5Site 6Site 7Site 8Fleet 1
Looks in fleet Observable damage
7
China WINDPOWER 2015
Site 1Site 2
Fleet 1
8
GBX System Level Power flow (DigitalClone System/Modelica)China WINDPOWER 2015
Components
9
China WINDPOWER 2015
Note: Clipper GBX Example
Simulation before changing the subcomponent
Clipper:10
China WINDPOWER 2015
Message: feedback form customers11
China WINDPOWER 2015
Note: Clipper GBX Example
Fleet level recommendation12
China WINDPOWER 2015 1.5 MW Fleet Failure Rate Predictions
Supplier 1Supplier 2Supplier 3Supplier 45 years10 years15 years20 yearsSentient Science applied our DigitalClone prognostic modeling to 1.5 MW gearboxes
DigitalClone predicts an increase in O&M costs in the next 6 years
:Optimizing Uptower Component ReplacementsGearbox Upgrades and Operational Changes (Lubricants, Derate/Uprate)Major Component Long Lead Time PlanningScheduled versus Unscheduled MaintenanceEvaluate New Gearbox and Components Life Extension before Procurement
Information: Suppliers for wind turbineMW:
13
China WINDPOWER 2015
Quantify Impact of: Lubrication change, de-rating, bearing replacement, surface treatments, etc.
Prognostics allows you to quantify what-if scenarios to extend RUL.GBX Bearing Performance Comparisons
Blue: averageRecommendation14
China WINDPOWER 2015 Endurance Limit, >10 years (90% confidence bounds)At no derate, the gearbox health will continue to degrade and may lead to catastrophic gear tooth loss due to bearing play (radial clearance of 1.5 mm)
Based on the full gearbox analysis, it is recommended to derate turbine to 1.2 MWs to avoid catastrophic failureLife Extension OptionsDerating Specific to Turbine Health State1.51.21.00.750Healthy GBXDamaged GBX
How do we calculate the derateEndurance Limit: Radial clearance
15
China WINDPOWER 2015
Results: Early failure were predicted on the sun gear and planetary bearing
The DriveMax upgrades were shown to improve the sun gear by a factor of 3x and improve the planetary bearing life by a factor of 1.65x1.5 MW Models Available for SuppliersBroadwind Case Study
Supplier prove their gear performance is betterSun gear:Planetary bearing:16
China WINDPOWER 2015
DigitalClone Live Integrated into a Smart GridSentient 5%4% 20
Inventory and Supply Chain Optimization (Build data at lower cost and time)
Big Data AnalyticsMaximoSAP
Fleet Process Optimization: ($10K reduction per asset)
CBM-PHM Industrial Internet investment Cap-ex reductionSensor reductionDecision Data at lowest costPeople OptimizationAsset Acquisition SupportM&A SupportRefinancing Support
O&M Aftermarket Life Extension & Super Components Decisions (O&M reductions of 10% - revenue increase 6%)
OEM/Supplier SaaSTest & Compare:UpgradesRepair, Remain, ReplaceContract negotiation
Start with Sentient information (top left)Inventory:Supply Chain Optimization: Smart Grid:Revenue:17
Introducing Physics-Based DigitalClone Models and Computational Prognostics to Reduce O&M CostsWe are Looking for a Partner in ChinaXiawa (Eva) Wu
Ed Wagner
18