CALCULO DEL VOLUMEN DE LA CISTERNA Y TANQUE ELEVADO
La dotacin diaria del edificio es de 22850 l/da
TANQUE CISTERNA:
VOLUMEN EFECTIVO: DOTACION = (22.85) = 17.14 m3
PROPORCIONES : A/L = Y H/L = 2/3
17.14m3 = A*H*L
17.14 m3 = L3/3
DIMENSION EFECTIVA: L = 3.72 m; A = 1.86 m y H = 2.48 m
BORDE LIBRE: 0.4 m
ALTURA DE LIMPIA: 0.1 m
DIMENSION REAL: L = 3.72 m; A = 1.86 m y H = 2.98 m
CAPACIDAD DEL TANQUE CISTERNA: 20.63 m3
TANQUE ELEVADO:
VOLUMEN EFECTIVO: 1/3DOTACION = 1/3 (22.85) = 7.62 m3
PROPORCIONES : A/L = 1 Y H/L = 1
7.62 m3 = A*H*L
7.62 m3 = L3
DIMENSION EFECTIVA: L = 1.97 m; A = 1.97 m y H = 1.97 m
BORDE LIBRE: 0.4 m
ALTURA DE LIMPIA: 0.1 m
DIMENSION REAL: L = 1.97 m; A = 1.97 m y H = 2.47 m
CAPACIDAD DEL TANQUE CISTERNA: 9.58 m3
-
25 Lb/in2
17.57 m.c.a
CALCULO DE LA TUBERIA DE ALIMENTACION
1. Calculo del gasto de entrada al cisterna:
Q = V/T = 17.14 m3/ dia
Q = 17.14*10^3/14400 = 1.19 l/s
2. Calculo de la carga disponible;
H = PR- PS Ht
17.57-1-2 = 14.57 m.c.a
3. Calculo del medidor:
50%(14.57)= 7.285 m.c.a = 10.34 lb/in2
(Seleccionamos el medidor de 3/4)
4. Seleccin del dimetro de tubera:
La nueva carga ser ; 10.34 -3.8 = 6.54
lb /in2 = 4.6 m.c.a
5. Perdida de carga por accesorios:
1 vlvula de paso: 0.20 m
1 vlvula cam: 0.20 m
2 codos de 90: 1.30 m
1 codo de 45: 0.40 m
Tramo: 15 m
Longitud total; 17.2 m
Para 1, S = 0.18 (abaco)
Hf = 0.18 (17.2) = 3.096 m
M 2 m
1 m
10 m
5 m
Por lo tanto el dimetro de medidor de y dimetro de la tubera de
entrada de 1