  • TANQUE

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    M

    BC L

    LR

    1PISO

    5PISO

    4PISO

    3PISO

    2PISO

  • CALCULO DEL VOLUMEN DE LA CISTERNA Y TANQUE ELEVADO

    La dotacin diaria del edificio es de 22850 l/da

    TANQUE CISTERNA:

    VOLUMEN EFECTIVO: DOTACION = (22.85) = 17.14 m3

    PROPORCIONES : A/L = Y H/L = 2/3

    17.14m3 = A*H*L

    17.14 m3 = L3/3

    DIMENSION EFECTIVA: L = 3.72 m; A = 1.86 m y H = 2.48 m

    BORDE LIBRE: 0.4 m

    ALTURA DE LIMPIA: 0.1 m

    DIMENSION REAL: L = 3.72 m; A = 1.86 m y H = 2.98 m

    CAPACIDAD DEL TANQUE CISTERNA: 20.63 m3

    TANQUE ELEVADO:

    VOLUMEN EFECTIVO: 1/3DOTACION = 1/3 (22.85) = 7.62 m3

    PROPORCIONES : A/L = 1 Y H/L = 1

    7.62 m3 = A*H*L

    7.62 m3 = L3

    DIMENSION EFECTIVA: L = 1.97 m; A = 1.97 m y H = 1.97 m

    BORDE LIBRE: 0.4 m

    ALTURA DE LIMPIA: 0.1 m

    DIMENSION REAL: L = 1.97 m; A = 1.97 m y H = 2.47 m

    CAPACIDAD DEL TANQUE CISTERNA: 9.58 m3

  • 25 Lb/in2

    17.57 m.c.a

    CALCULO DE LA TUBERIA DE ALIMENTACION

    1. Calculo del gasto de entrada al cisterna:

    Q = V/T = 17.14 m3/ dia

    Q = 17.14*10^3/14400 = 1.19 l/s

    2. Calculo de la carga disponible;

    H = PR- PS Ht

    17.57-1-2 = 14.57 m.c.a

    3. Calculo del medidor:

    50%(14.57)= 7.285 m.c.a = 10.34 lb/in2

    (Seleccionamos el medidor de 3/4)

    4. Seleccin del dimetro de tubera:

    La nueva carga ser ; 10.34 -3.8 = 6.54

    lb /in2 = 4.6 m.c.a

    5. Perdida de carga por accesorios:

    1 vlvula de paso: 0.20 m

    1 vlvula cam: 0.20 m

    2 codos de 90: 1.30 m

    1 codo de 45: 0.40 m

    Tramo: 15 m

    Longitud total; 17.2 m

    Para 1, S = 0.18 (abaco)

    Hf = 0.18 (17.2) = 3.096 m

    M 2 m

    1 m

    10 m

    5 m

    Por lo tanto el dimetro de medidor de y dimetro de la tubera de

    entrada de 1