james c. chen (陳建良) - ie.nthu.edu.t · james c. chen is professor in the department of...
TRANSCRIPT
-
145
Publications
James C. Chen Professor
Ph.D., University of Wisconsin-Madison, U.S.A., 1992
Advanced Planning and Scheduling, Lean Production, Supply
Chain Management, Business Process Reengineering, Project
Management
E-mail: [email protected]
James C. Chen is Professor in the Department of Industrial Engineering and Engineering Management
at National Tsing-Hua University (NTHU), Taiwan. Prior to his current position, he was Chair
Professor in the Department of Industrial Management at National Taiwan University of Science and
Technology (NTUST), Professor in the Department of Industrial and Systems Engineering at Chung
Yuan Christian University (CYCU), and Researcher at Industrial Technology Research Institute (ITRI),
Taiwan. He received a B.S. in Industrial Engineering from NTHU, Taiwan, an M.S. in
Manufacturing Systems Engineering, and a Ph.D. in Industrial Engineering, both from the University
of Wisconsin- Madison. His current research interests include advanced planning and scheduling,
lean production, supply chain management, business process reengineering, and project management.
Dr. Chen was awarded Dr. Yi-Chi Mei Scholarship at NTHU in 1983, IBM Manufacturing Research
Graduate Fellowship 1991-92, Outstanding Teaching Awards at CYCU, Distinguished
University-Industry Collaborative Research Award at Chung Hua Picture Tubes (CPT) in 2009,
Distinguished Industrial Engineer Award from Chinese Institute of Industrial Engineers (CIIE) in 2011,
Outstanding Research Award at NTUST in 2011, and Feature Person: Enjoying the International
University-Industry Collaboration, Engineering Science and Technology Bulletin, NSC in 2011.
Publications: Journal Papers 1. J. C. Chen, P. B. Huang, J. G. Wu, K. Y. Lai, C. C. Chen, Advanced Planning and Scheduling for
TFT-LCD Color Filter Plants, International Journal of Advanced Manufacturing Technology (To Appear)
(SCI).
2. Y. F. Hung, C. H. Liang, and J. C. Chen, 2012, Sensitivity Search for Rescheduling of the Semiconductor Photolithography Operations, International Journal of Advanced Manufacturing Technology (To Appear)
(SCI).
3. Y. K. Lin, P. C. Chang, J. C. Chen, 2012, Performance Evaluation for a Footwear Manufacturing System with Multiple Production Lines and Different Station Failure Rates, International Journal of Production
Research (To Appear) (SCI).
4. J. C. Chen, S. H. Lee, C. Y. Chen, N. Anggono, P. T. B. Huang, C. C. Chen, T. W. Peng, J. T. Huang, C. C. Chu, 2012, Simulation-Based Look-Ahead Release Planning for Color Filter Fabs, SID Symposium Digest
of Technical Papers, Vol. 43 (To Appear).
5. P. T. B. Huang, C. W. Yu, M. Y. Chang, J. C. Chen, C. C. Chen, T. W. Peng, 2012, A Simulation Assisted Neural-Networks Forecasting System for TFT-LCD Color Filter Fabs, SID Symposium Digest of
Technical Papers, Vol. 43 (To Appear).
6. J. C. Chen, C. C. Chen, L. H. Su, H. B. Wu, C. J. Sun, 2012, Assembly Line Balancing in Garment Industry, Expert Systems with Applications, Vol. 39, pp. 10073-10081 (SCI).
7. J. C. Chen, J. J. Wu, C. W. Chen, K. H. Chen, 2012, Flexible Job Shop Scheduling with Parallel Machines Using Genetic Algorithm and Grouping Genetic Algorithm, Expert Systems with Applications, Vol. 39, pp.
10016-10021 (SCI).
8. L. H. Su, F. D. Chou, J. C. Chen, 2012, Minimizing makespan subject to minimum total absolute deviation of completion time on identical parallel machines, Engineering Optimization, iFirst, pp. 1-9 (SCI).
-
146
NTHU IEEM Annual Report 2012
9. Y. K. Lin, P. C. Chang, J. C. Chen, 2012, Reliability Evaluation for a Waste-reduction Parallel-line manufacturing system, Journal of Cleaner Production, Vol. 35, pp. 99 101 (SCI).
10. C. W. Wu, M. Y. Liao, J. C. Chen, 2012, An Improved Approach for Constructing Lower Confidence Bound on Process Yield, European Journal of Industrial Engineering, Vol. 6, No. 3, pp. 369-390 (SCI).
11. Y. F. Hung, W. C. Chen, and J. C. Chen, 2012, Search Algorithms in the Selection of Warehouses and Transshipment Arrangement for High-End Low-Volume Products, Journal of Advanced Engineering, Vol.
7, No. 2, pp. 51-60.
12. J. C. Chen, L. H. Su, C. C. Chen, T. W. Peng, G. C. Chao, 2011, Release Planning for Color Filter Fabs Based on Iterative Simulation, Journal of the Society for Information Display, Vol. 19, No. 7, pp. 480
487 (SCI). (Invited Paper)
13. T. Y. Lin, C. W. Wu, J. C. Chen, Y. H. Chiou, 2011, Applying Bayesian Approach to Assess Process Capability for Asymmetric Tolerances Based on Cpmk" Index, Applied Mathematical Modeling, Vol. 35,
No. 9, pp. 4473 - 4489 (SCI). 14. J. C. Chen, K. H. Chen, C. H. Lin, C. W. Chen, C. L. Yang, S. P. He, 2011, A Study of A Heuristic
Capacity Planning Algorithm for Weapon Production System, International Journal of Electronic Business
Management, Vol. 9, No. 1, pp. 46 - 57 (EI). 15. L. H. Su and J. C. Chen, 2011, The Two-and-Three Machine Flowshop Scheduling Problems with Optimal
Final Operation, Journal of the Chinese Institute of Industrial Engineers, Vol. 28, No. 1, pp. 55 - 71 (EI).
16. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, C. C. Chen, T. W. Peng, Y. Y. Wei, C. H. Feng, 2011, CONWIP for Order Release and WIP Control in Color Filter Fabs, SID Symposium Digest of Technical
Papers, Vol. 42, No. 1, pp. 1388 1391. 17. J. C. Chen, J. G. Wu, C. C. Chen, T. W. Peng, H. C. Chien, 2011, Automated Scheduling and Dispatching
for TFT-LCD Color Filter Fabrication Plants, Key Engineering Materials, Vol. 486, pp. 305 308 (EI).
18. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, C. C. Chen, T. W. Peng, S. W. Li, S. M. Huang, 2011, Simulation Modeling and Analysis of TFT-LCD Color Filter Fabrication Plants, Key Engineering
Materials, Vol. 486, pp. 119 122 (EI).
19. J. C. Chen, C. H. Cheng, K. J. Wang, P. T. B. Huang, C. C. Chang, C. J. Huang, T. C. Ting, 2011, Application of RFID to Warehouse Management, Key Engineering Materials, Vol. 486, pp. 297 300
(EI).
20. J. C. Chen, L. H. Su, G. C. Chao, C. C. Chen, T. W. Peng, C. J. Sun, J. W. Chien, H. C. Chien, 2011, Advanced Planning and Scheduling for Color Filter Fabs, Key Engineering Materials, Vol. 450, pp. 361
364 (EI).
21. J. C. Chen, C. W. Chen, K. H. Chen, C. H. Lin, 2011, Capacity Planning for Cluster Tools of Wafer Fabrication Plant, Key Engineering Materials, Vol. 450, pp. 365 368 (EI).
22. J. C. Chen, C. J. Sun, P. B. Huang, 2011, Integrated Capacity Planning System for IC Backend Factory, Key Engineering Materials, Vol. 450, pp. 369 372 (EI).
23. J. C. Chen, K. J. Wang, C. H. Cheng, Y. J. Fang, C. J. Sun, J. W. Chien, 2011, Logistics Efficiency Improvement with Lean Management and RFID Application, Key Engineering Materials, Vol. 450, pp.
373 376 (EI).
24. J. C. Chen, H. Lee, S. Chiu, B. Tseng, 2011, Productivity Improvement with Lean Production in Glove Manufacturing Industry, Key Engineering Materials, Vol. 450, pp. 247 250 (EI).
25. S. J. Hu, L. H. Su, K. L. Lee, J. C. Chen, C. H. Chang, 2011, Applying TRIZ Methodology to Assist Product Improvement: Take Folding Bicycle as an Example, Key Engineering Materials, Vol. 450, pp.
27 30 (EI).
26. P. B. Huang, J. C. Chen, C. J. Lin, P. H. Lyu, B. C. Lai, 2011, A Taguchi-neural-based in-process tool breakage monitoring system in end milling operations, Key Engineering Materials, Vol. 450, pp. 251 254
(EI).
27. J. C. Chen, L. H. Su, C. J. Sun, and M. F. Hsu, 2010, Infinite Capacity Planning for IC Packaging Plants, International Journal of Production Research, Vol. 48, No. 19, pp. 5729 - 5748 (SCI).
28. J. C. Chen and C. W. Chen, 2010, Capacity Planning of Serial and Batch Machines with Capability Constraints for Wafer Fabrication Plants, International Journal of Production Research, Vol. 48, No. 11, pp.
3207-3223 (SCI).
29. L. H. Su and J. C. Chen, 2010, Sequencing Two-Stage Flowshop with Non-Identical Job Sizes, International Journal of Advanced Manufacturing Technology, Vol. 47, pp. 259-268 (SCI).
30. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2010, Release Planning for Color Filter Fabs Based on Iterative
Simulation, SID Symposium Digest of Technical Papers, Vol. 41, No. 1, pp. 1462 1465.
-
147
Publications
31. J. C. Chen, W. H. Jaong, C. J. Sun, H. Y. Lee, J. S. Wu, and C. C. Ku, 2010, Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems, Key Engineering Materials, Vols. 419-420,
pp. 633-636 (EI).
32. J. C. Chen, S. J. Hu, P. T. B. Huang, C. J. Lin, K. J. Chao, and C. C. Chen, 2010, Finite Capacity Planning for Multiple TFT-LCD Color Filter Fabs, Key Engineering Materials, Vols. 419-420, pp. 637-640 (EI).
33. J. C. Chen, S. J. Hu, Y. H. Chen, C. L. Yang, C. J. Sun, C. W. Chen, 2010, Facility Planning for TFT-LCD Array Fab, Key Engineering Materials, Vols. 419-420, pp. 641-644 (EI).
34. P. T. B. Huang, J. C. Chen, Y. T. Jou, 2010, A Regression Neural Model for In-process Surface Roughness Monitoring in End Milling Operations, Key Engineering Materials, Vols. 419-420, pp. 369-372 (EI).
35. S. J. Hu, J. C. Chen, W. C. Chen, C. S. Chung, Y. Y. Su, 2010, The Design of Portable Stereo Using Ergonomics Engineering and Image Analysis, Journal of Advanced Engineering, Vol. 5, No. 2, pp. 119
128.
36. J. C. Chen, Y. C. Fan, and C. W. Chen, 2009, Capacity Requirements Planning for Twin Fabs of Wafer Fabrication, International Journal of Production Research, Vol. 47, No. 16, pp. 4473-4496 (SCI).
37. K. J. Wang, Y. S. Lin, C. F. Chien, and J. C. Chen, 2009, A Fuzzy-Knowledge Resource- Allocation Model of the Semiconductor Final Test Industry, Robotics and Computer- Integrated Manufacturing, Vol.
25, No. 1, pp. 32-41 (SCI).
38. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2009, Effective Order Assignment for Color Filter Fabs, SID
Symposium Digest of Technical Papers, Vol. 40, No. 1, pp. 1309 - 1312.
39. J. C. Chen, R. D. Dai, and C. W. Chen, 2008, A Practical Fab Design Procedure for Wafer Fabrication Plants, International Journal of Production Research, Vol. 46, No. 10, pp. 2565-2588 (SCI).
40. J. C. Chen, K. J. Wang, S. M. Wang, and S. J. Yang, 2008, Price Negotiation for Capacity Sharing in a Two-Factory Environment Using Genetic Algorithm, International Journal of Production Research, Vol.
46, No. 7, pp. 1847-1868 (SCI).
41. J. C. Chen, K. H. Chen, J. J. Wu, and C. W. Chen, 2008, A Study of the Flexible Job Shop Scheduling Problem with Parallel Machines and Reentrant Process, International Journal of Advanced Manufacturing
Technology, Vol. 39, pp. 344-354 (SCI).
42. K. J. Wang, S. M. Wang, and J. C. Chen, 2008, A Resource Portfolio Planning Model Using Sampling-Based Stochastic Programming and Genetic Algorithm, European Journal of Operational
Research, Vol. 184, No. 1, pp. 327-340 (SCI).
43. C. J. Lin, Y. H. Hsieh, H. C. Chen, and J. C. Chen, 2008, Visual Performance and Fatigue in Reading Vibrating Numeric Displays, Displays, Vol. 29, No. 4, pp. 386-392 (SCI).
44. J. C. Chen, K. J. Wang, J. J. Wu, Y. L. Lai, C. W. Chen, 2008, Application of Neural Network to the Forecasting Model of Agriculture Production and Sales, Journal of Advanced Engineering, Vol. 3, No. 3,
pp. 241-249.
45. S. M. Wang, J. C. Chen, and K. J. Wang, 2007, Resource Portfolio Planning of Make-to-Stock Products Using a Constraint Programming-Based Genetic Algorithm, Omega-International Journal of Management
Science, Vol. 35, No. 2, pp. 237-246 (SCI, SSCI).
46. Y. H. Hsieh, C. J. Lin, H. C. Chen, T. T. Huang, and J. C. Chen, 2007, Reading Performance of Chinese Text with Automatic Scrolling, Lecture Notes in Computer Science, Vol. 4551, pp. 311-319 (EI).
47. Y. H. Hsieh, C. J. Lin, and J. C. Chen, 2007, Customer Satisfaction Measurement with Neural Network, Human Systems Management, Vol. 26, No.1, pp. 47-52 (EI).
48. C. S. Chiang, S. H. Tsai, and J. C. Chen, 2007, The Control Vector Scheme for Design of Planar Primitive PH Curves, International Journal of Mathematics Sciences, Vol. 1, No. 4, pp. 227-233.
49. C. W. Yang, C. J. Lin, and J. C. Chen, 2006, Applying Human Reliability Growth Analysis to System Performance Enhancement, Human Systems Management, Vol. 25, No. 1, pp. 77-86 (EI).
50. S. M. Wang, J. C. Chen, H. M. Wee, and K. J. Wang, 2006, Non-Linear Stochastic Optimization Using Genetic Algorithm for Portfolio Selection, International Journal of Operations Research, Vol. 3, No. 1, pp.
16-22.
51. J. C. Chen, C. W. Chen, C. J. Lin, and H. Rau, 2005, Capacity Planning with Capability for Multiple Semiconductor Manufacturing Fabs, Computers and Industrial Engineering, Vol. 48, No. 4, pp. 709-732
(SCI).
52. K. J. Wang, J. C. Chen, and Y. S. Lin, 2005, A Hybrid Knowledge Discovery Model Using Decision Tree and Neural Network for Selecting Dispatching Rules of A Semiconductor Final Testing Factory,
Production Planning and Control, Vol. 16, No. 7, pp. 665-680 (SCI).
53. S. M. Wang, K. J. Wang, H. M. Wee, and J. C. Chen, 2005, An Economic Capacity Planning Model Considering Inventory and Capital Time Value, Lecture Notes in Computer Science, Vol. 3483, pp.
333-341 (SCI).
-
148
NTHU IEEM Annual Report 2012
54. J. C. Chen, C. C. Wang, S. H, Shiau, 2005, Reference Models for the Application of Customer Relationship Management to Marketing, Chung Yuan Journal, Vol. 33, No. 4, pp. 595-622.
55. J. C. Chen, J. Y. Shiau, C. M. Lu, J. R. Sun, 2005, A Study of Capacity Planning for Wafer Probe Plants, Chung Yuan Journal, Vol. 33, No. 3, pp. 495-511.
56. J. C. Chen, W. J. Shiang, J. J. Chen, J. R. Sun, 2005, A Study of Capacity Planning for IC Final Test Plants, Chung Yuan Journal, Vol. 33, No. 1, pp. 57-70.
57. J. C. Chen, R. T. Yang, G. M. Peng, J. J. Wang, 2005, A Study of Layout Improvement for Wafer Fabs, Chung Yuan Journal, Vol. 33, No. 1, pp. 41-55.
58. J. C. Chen, C. W. Chen, J. Y. Tai, and J. C. Tyan, 2004, Dynamic State-Dependent Dispatching for Wafer Fabrication, International Journal of Production Research, Vol. 42, No. 21, pp. 4547-4562 (SCI).
59. J. C. Tyan, T. C. Du, J. C. Chen, and I. H. Chang, 2004, Multiple Response Optimization in a Fully Automated Fab: An Integrated Tool and Vehicle Dispatching Strategy, Computers and Industrial
Engineering, Vol. 46, No. 1, pp. 121-139 (SCI).
60. J. C. Chen, J. S. Lin, C. W. Chen, J. W. Chang, 2004, A Study of Reference Models and Methodologies for Business Process Reengineering, Chung Yuan Journal, Vol. 32, No. 4, pp. 527-554.
61. J. C. Tyan, J. C. Chen, and F. K. Wang, 2002, Development of a State-Dependent Dispatch Rule Using Theory of Constraints in Near-Real-World Wafer Fabrication, Production Planning and Control, Vol. 13,
No. 3, pp. 253-261 (SCI).
62. J. C. Chen, J. Y. Shiau, J. C. Jeng, 2002, A Study of Lot Priority Distribution and Setting for Wafer Fabs, Chung Yuan Journal, Vol. 30, No. 1, pp. 33-49.
63. J. C. Chen, C. W. Chen, S. H. She, 2001, Application of Group Technology to the Facility Planning of Wafer Fabs, Chung Yuan Journal, Vol. 29, No. 3, pp. 259 - 277.
64. J. C. Chen, J. K. Yang, S. W. Shu, Dynamic Dispatching for Wafer Fabs, 2000, Journal of the Chinese Institute of Industrial Engineers, Vol. 17, No. 6, pp. 573 - 592.
65. J. C. Chen, T. Du, H. Rau, G. J. Jeng, 2000, Transportation Cost Analysis of Collaborative Distribution, Chung Yuan Journal, Vol. 28, No. 1, pp. 55-71.
66. F. K. Wang and J. C. Chen, 1999, Capability Index Using Principal Components Analysis, Quality Engineering, Vol. 11, No. 1, pp. 21 - 27 (EI).
67. T. Du, H. Rau, J. C. Chen, M. K. Wang, 1998, A Study of Vehicle Routing Problems with Time Window Constraints, Chung Yuan Journal, Vol. 26, No. 1, pp. 67-82.
68. J. C. Chen and L. Chen, 1993, A Fast Simulator for Tandem Queueing Systems, Computers and Industrial Engineering, Vol. 24, No. 2, pp. 267 - 280 (SCI).
Publications: Magazine and Newletter Papers 1. 2012 3100
2. 2011117pp. 54 65.
3. 2011161 E-paper. 4. J. C. Chen, 2010, Supply Chain Management, Asian Productivity Organization (APO) News: Information
to Make a Difference in Productivity, Vol. 40, No. 6, p. 4, June 2010.
5. J. C. Chen, 2010, Business Process Reengineering, Asian Productivity Organization (APO) News: Information to Make a Difference in Productivity, Vol. 40, No. 5, p. 4, May 2010.
6. 2009
315pp.97-111
7. 2009
101pp. 115-118
8. 2008
301pp.116-136
9. 2005265
pp.253-272
10. 2004
250pp. 131-150
11. 2000--ITIS 89
pp. 13-21
mailto:[email protected]
-
149
Publications
12. 2000ITIS 88
pp. 1-6
13. 2000213pp. 165-174
14. 2000 RosettaNet IC
213pp. 138-154
15. 1999 UML IC
201pp. 222-236
16. 199935
pp.33-35
17. 1998IC
189pp. 189-203
18. 1998184
pp. 128-143
19. 1997
177pp. 128-134
20. 1995153pp. 122-137
21. 1995153
pp. 138-143
22. 1994136pp. 143-156
23. 1993 CIM 124
pp. 179-185
Publications: Books and Chapters 1. 20072006
2. 20062005
3. 20052004
4. 20042003
5. 20022002
6. 20002000
7. 2000
- (Supply Chain Management) (ITIS) 8. J. C. Chen, A. Thesen, 1994, 'Optimal' Rule-Switching for Flow Shops with Random Workloads, in
Handbook of Expert Systems Applications in Manufacturing: Structure and Rules, A. Mital and S. Anand
(eds), pp. 288-302, Chapman & Hall.
9. J. C. Chen, 1992, State-Dependent Scheduling for Manufacturing Systems, Ph.D. Thesis, University of Wisconsin-Madison, U. S. A.
Publications: Conference Papers 1. J. C. Chen, Y. F. Hung, C. W. Wu, Y. K. Lin, Q. F. Tu, B. R. Pratama, Capacity Planning System for
TFT-LCD Array Manufacturing, the 13th Asia Pacific Industrial Engineering & Management Systems
(APIEMS) Conference, Phuket, Thailand, December 2 - 5, 2012.
2. J. C. Chen, S. Wirasambada, I. N. Pujawan, K. J. Wang, C. W. Wu, C. J. Lin, S. Chiu, Minimizing Total Tardiness and Makespan for Hybrid Flow Shop Problem with Resource Constraint in Footwear
Manufacturing, the 13th Asia Pacific Industrial Engineering & Management Systems (APIEMS)
Conference, Phuket, Thailand, December 2 - 5, 2012.
-
150
NTHU IEEM Annual Report 2012
3. J. C. Chen, H. Parwananta, T. D. D. Thao, K. J. Wang, M. Anityasari, C. C. Chen, Branch and Bound Method for Solving Line Balancing Problem in Footwear Sewing Line, the 13th Asia Pacific Industrial
Engineering & Management Systems (APIEMS) Conference, Phuket, Thailand, December 2 - 5, 2012.
4. P. T. B. Huang, C. W. Yu, M. Y. Chang, J. C. Chen, C. C. Chen, A Simulation Assisted Neural-Networks Forecasting System on the Optimization between WIP and Throughput for TFT-LCD Color Filter Fabs,
International Conference on Machine Learning and Cybernetics (ICMLC), Xian, Shaanxi, China, July
15-17, 2012.
5. H. Parwananta, J. C. Chen, M. Anityasari, Heuristic Rule Evaluation in Solving Resource-Constraint Assembly Line Balancing Problem in Footwear Sewing Line, Seminar Nasional Pascasarjana XII ITS,
Surabaya, Indonesia, 12 July 2012.
6. J. C. Chen, Productivity Improvement with Lean Management in Footwear Industry in China and Southeastern Asia, IIE Asian Conference 2012, Singapore, June 28-30, 2012.
7. J. C. Chen, S. H. Lee, C. Y. Chen, N. Anggono, P. T. B. Huang, C. C. Chen, T. W. Peng, J. T. Huang, C. C. Chu, Simulation-Based Look-Ahead Release Planning for Color Filter Fabs, Society for Information
Display (SID) International Symposium 2012, Boston, MI, USA, June 3-8, 2012.
8. P. T. B. Huang, C. W. Yu, M. Y. Chang, J. C. Chen, C. C. Chen, T. W. Peng, A Simulation Assisted Neural-Networks Forecasting System for TFT-LCD Color Filter Fabs, Society for Information Display
(SID) International Symposium 2012, Boston, MI, USA, June 3-8, 2012.
9. J. C. Chen, J. Chang, S. Chiu, V. Chang, Productivity Improvement with Lean Production in Footwear Manufacturing Industry, the Fourth International Conference on Lean Six Sigma, Glasgow, UK., March
26 27, 2012.
10. J. C. Chen, J. G. Wu, K. Y. Lai, P. B. Huang, C. C. Chen, T. W. Peng, H. C. Chien, C. P. Liu, Automated Assignment and Scheduling for Color Filter Plants, POMS-Hong Kong, Hong Kong, January 5 - 6, 2012.
11. J. C. Chen, S. H. Li, C. Y Chen, P. B. Huang, C. C. Chen, T. W. Peng, J. T. Huang, C. C. Chu, Look-Ahead Release Planning for Color Filter Plants, POMS-Hong Kong, Hong Kong, January 5 - 6,
2012.
12. ,
2011, Hsinchu, Taiwan, December 10, 2011.
13. AutoMod
2011, Hsinchu, Taiwan, December 10, 2011. (
) 14. J. C. Chen, C. H. Cheng, K. J. Wang, P. T. B. Huang, C. C. Chang, C. J. Huang, T. C. Ting, Application of
RFID to Warehouse Management, The 4th International Conference on Advanced Design and
Manufacturing (ADM 2011), Kunming, China, September 21 - 23, 2011 (EI).
15. J. C. Chen, J. G. Wu, C. C. Chen, T. W. Peng, H. C. Chien, Automated Scheduling and Dispatching for TFT-LCD Color Filter Fabrication Plants, The 4th International Conference on Advanced Design and
Manufacturing (ADM 2011), Kunming, China, September 21 - 23, 2011 (EI).
16. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, C. C. Chen, T. W. Peng, S. W. Li, S. M. Huang, Simulation Modeling and Analysis of TFT-LCD Color Filter Fabrication Plants, The 4th International
Conference on Advanced Design and Manufacturing (ADM 2011), Kunming, China, September 21 - 23,
2011 (EI).
17.
Taipei, Taiwan, June 10, 2011.
18.
4.5 AutoModTaipei, Taiwan, June 10, 2011.
19. 66 AutoMod
Taipei, Taiwan, June 10, 2011. 20. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, C. C. Chen, T. W. Peng, Y. Y. Wei, C. H. Feng, 2011,
CONWIP for Order Release and WIP Control in Color Filter Fabs, Society for Information Display (SID)
International Symposium 2011, Los Angeles, California, USA, May 15 - 20, 2011.
21. C. H. Cheng, J. C. Chen, P. T. B. Huang, C. C. Chang, T. C. Ting, C. J. Huang, K. F. Li, P. S. Chen, Application of Lean and RFID to Warehouse Management, The Second POMS-HK International
Conference, Hongkong, China, January 6 7, 2011.
22. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, T. W. Peng, Y. Y. Wei, C. H. Feng, Y. C. Liu, 2011, Integration of Simulation and Look-Ahead Release Planning for Color Filter Fabs, The Second POMS-HK
International Conference, Hongkong, China, January 6 7, 2011.
-
151
Publications
23. ,, , , , , 2010, AutoMod, 2010
, Tainan, Taiwan, December 25, 2010. ()
24. , , , , , , 2010, ,
,, November, 1 3, 2010. 25. J. C. Chen, L. H. Su, G. C. Chao, C. C. Chen, T. W. Peng, C. J. Sun, J. W. Chien, H. C. Chien, 2010,
Advanced Planning and Scheduling for Color Filter Fabs, The 3rd International Conference on Advanced
Design and Manufacturing (ADM 2010), Nottingham, UK, September 8 - 10, 2010 (EI).
26. J. C. Chen, C. W. Chen, K. H. Chen, C. H. Lin, 2010, Capacity Planning for Cluster Tools of Wafer Fabrication Plant, The 3rd International Conference on Advanced Design and Manufacturing (ADM 2010),
Nottingham, UK, September 8 - 10, 2010 (EI).
27. J. C. Chen, H. Lee, S. Chiu, B. Tseng,, 2010, Productivity Improvement with Lean Production in Glove Manufacturing Industry, The 3rd International Conference on Advanced Design and Manufacturing (ADM
2010), Nottingham, UK, September 8 - 10, 2010 (EI).
28. J. C. Chen, C. J. Sun, P. B. Huang, 2010, Integrated Capacity Planning System for IC Backend Factory, The 3rd International Conference on Advanced Design and Manufacturing (ADM 2010), Nottingham, UK,
September 8 - 10, 2010 (EI).
29. J. C. Chen, K. J. Wang, C. H. Cheng, Y. J. Fang, C. J. Sun, J. W. Chien, 2010, Logistics Efficiency Improvement with Lean Management and RFID Application, The 3rd International Conference on
Advanced Design and Manufacturing (ADM 2010), Nottingham, UK, September 8 - 10, 2010 (EI).
30. P. B. Huang, J. C. Chen, C. J. Lin, P. H. Lyu, B. C. Lai, 2010, A Taguchi-neural-based in-process tool breakage monitoring system in end milling operations, The 3rd International Conference on Advanced
Design and Manufacturing (ADM 2010), Nottingham, UK, September 8 - 10, 2010 (EI).
31. S. J. Hu, L. H. Su, K. L. Lee, J. C. Chen, C. H. Chang, 2010, Applying TRIZ Methodology to Assist Product Improvement: Take Folding Bicycle as an Example, The 3rd International Conference on
Advanced Design and Manufacturing (ADM 2010), Nottingham, UK, September 8 - 10, 2010 (EI).
32. J. C. Chen, C. C. Chen, T. W. Peng, C. J. Sun, K. J. Chao, and J. W. Chien, Simulation and 3D Animation for TFT-LCD Color Filter Plants, INFORMS Service Science Conference, Taipei, Taiwan, July
7 - 10, 2010.
33. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2010, Release Planning for Color Filter Fabs Based on Iterative
Simulation, Society for Information Display (SID) International Symposium 2010, Seattle, Washington,
USA., May 23 - 28, 2010.
34. 2009
9812/12/2009 35. J. C. Chen, P. B. Huang, C. J. Sun, K. J. Chao, G. C. Chao, Simulation Modeling of TFT-LCD Color Filter
Fab, The 16th
International Display Workshops (IDW 2009), Miyazaki, Japan, December 9 - 11, 2009.
36. J. C. Chen, W. H. Jaong, C. J. Sun, H. Y. Lee, J. S. Wu and C. C. Ku, 2009, Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems, the 2nd International Conference on
Advanced Design and Manufacturing (ADM 2009), Harbin, China, September 24 - 26, 2009 (EI).
37. J. C. Chen, S. J. Hu, P. B. Huang, C. J. Lin, K. J. Chao and C. C. Chen, 2009, Finite Capacity Planning for Multiple TFT-LCD Color Filter Fabs, the 2nd International Conference on Advanced Design and
Manufacturing (ADM 2009), Harbin, China, September 24 - 26, 2009 (EI).
38. J. C. Chen, S. J. Hu, Y. H. Chen, C. L. Yang, C. J. Sun and C. W. Chen, 2009, Facility Planning for TFT-LCD Array Fab, the 2nd International Conference on Advanced Design and Manufacturing (ADM
2009), Harbin, China, September 24 - 26, 2009 (EI).
39. P. B. Huang, J. C. Chen and Y. T. Jou, 2009, A Regression Neural Model for In-process Surface Roughness Monitoring in End Milling Operations, the 2nd International Conference on Advanced Design
and Manufacturing (ADM 2009), Harbin, China, September 24 - 26, 2009 (EI).
40. J. C. Chen, K. H. Chen, C. H. Lin, C. W. Chen, C. L. Yang and S. H. He, 2009, Capacity Planning for Weapon Production System, The 2009 International Conference on Innovation and Management (IAM
2009), Boracay (Long Beach), Philippine, September 9 - 11, 2009.
41. J. C. Chen, M. H. Hsaio, C. C. Chen and C. J. Sun, 2009, A Grouping Genetic Algorithm for The Assembly Line Balancing Problem of Sewing Lines in Garment Industry, the Eighth International
Conference on Machine Learning and Cybernetics (ICMLC 2009), Baoding, Hebei, China, July 12 - 15,
2009 (EI).
42. J. C. Chen, W. H. Hsieh, C. H. Cheng, and C. S. Chen, 2009, Hybrid Meta-Heuristics for Vehicle Routing Problem with Time Window Constraints, the 6th International Conference on Service Systems and Service
Management (ICSSSM09), Xiamen, PR China, June 8 - 10, 2009 (EI).
-
152
NTHU IEEM Annual Report 2012
43. J. C. Chen, M. F. Hsu, and C. J. Sun, 2009, A Study of Capacity Planning for Integrated Circuit Packaging Plants, the 13
th IFAC Symposium on Information Control Problems in Manufacturing (INCOM 2009),
Moscow, Russia, June 3 - 5, 2009 (EI).
44. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2009, Effective Order Assignment for Color Filter Fabs, Society
for Information Display (SID) International Symposium 2009, San Antonio, Texas USA., May 31 - June 5,
2009.
45. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2009, Infinite Capacity Planning for Color Filter Fabs,
International Display Manufacturing Conference (IDMC) 2009, Taipei, Taiwan, April 28 - 30, 2009.
46. J. C. Chen, H. Rau, C. J. Sun, H. W. Stzeng, and C. H. Chen, 2009, Workflow Design and Management for IC Supply Chain, the 2009 IEEE International Conference on Networking, Sensing and Control (IEEE
ICNSC'09), Okayama, Japan, March 26 29, 2009 (EI).
47. C. J. Lin, W. J. Shiang, H. Rau, J. C. Chen, 2008, Applying Neural Networks and Optimization Techniques to the Simulation of Human Motion, International Conference on Machine Learning and
Cybernetics, Kunming, China. (EI).
48. 2008RFID
200812/25/2008
49. 200897
12/13/2008
50. 2008
9712/13/2008
51. 2008RFID2008
pp. 111-11912/4/2008 52. J. C. Chen, C. J. Sun, and C. C. Chen, 2008, Capacity Planning System for IC Final Test Plant, the 9th
Asia Pacific Industrial Engineering & Management Systems Conference, Bali, Indonesia, December 3 - 5,
2008.
53. C. W. Chen, J. C. Chen, and C. J. Lin, 2008, Finite Capacity Requirements Planning with Equipment Capability and Dedication for Semiconductor Manufacturing, the 9th Asia Pacific Industrial Engineering
& Management Systems Conference, Bali, Indonesia, December 3 - 5, 2008.
54. J. C. Chen, G. C. Chao, C. J. Sun, and C. C. Chen, 2008, A Study of Order Assignment for Multiple Color Filter Fabs, the 9th Asia Pacific Industrial Engineering & Management Systems Conference, Bali,
Indonesia, December 3 - 5, 2008.
55. 2008
(I) 56. Y. H. Hsieh, C. J. Lin, H. C. Chen, T. T. Huang, and J. C. Chen, 2007, Reading Performance of Chinese
Text with Automatic Scrolling, the 12th International Conference on Human-Computer Interaction,
Beijing, China, July 22 - 27, 2007.
57. 2007
pp. 2-18 ~ 2-2611/30/2007
58. 2007
11/29/2007
59. 2007 (2/2)
pp. 191 - 192TaipeiTaiwan
60. 2007
pp. 192 - 193TaipeiTaiwan
61. 2007
pp. 82 - 83TaipeiTaiwan 62. J. C. Chen, C. W. Chen, and C. J. Lin, 2007, Capacity Planning for Serial and Batch Machines with
Capability for Wafer Fabrication Plant, Proceedings of the 37th International Conference on Computers
and Industrial Engineering, Alexandria, Egypt, pp. 2444-2451, October 20 - 23, 2007.
63. Y. M. Fei, C. J. Lin, and J. C. Chen, 2007, Verification of A Computer Assisted Creativity Assessment System, Proceedings of the 37th International Conference on Computers and Industrial Engineering,
Alexandria, Egypt, pp. 512-519, October 20 - 23, 2007.
-
153
Publications
64. J. C. Chen, C. S. Chiang, B. B. Chen, and C. W. Chen, 2007, Solving Vehicle Routing Problem with Time Window Constraints, Proceedings of 2007 International Conference on Service Systems and Service
Management (ICSSSM07), Chengdu, China, June 9 - 11, 2007 (EI).
65. 2006
pp. 5-54 - 5-61
66. 2006
67. C. E. Wang, J. C. Chen, H. M. Wee, K. J. Wang, and Y. S.Lin, 2006, Supply Chain Inventory Strategies
Using Fuzzy Neural Network, Proceedings of the 9th
Joint Conference on Information Sciences (JCIS
2006), Kaohsiung, Taiwan, October 8 - 11, 2006 (EI).
68. J. C. Chen and C. W. Chen, 2006, A Study of Order Assignment with Equipment Capability and Dedication for Multiple Wafer Fabs, Proceedings of the 2
nd International Conference From Scientific
Computing to Computational Engineering (2nd
IC-SCCE), Athens, Greece, July 5 - 8, 2006.
69. 2005
70. C. J. Lin, J. C. Chen, and C. W. Yang, 2005, Applying the Human Reliability Growth Analysis System
(HRGAS) to the Improvement Strategy of Human-machine Systems, Proceedings of the Sixth Asia-Pacific
Conference on Industrial Engineering and Management Systems (APIEMS 2005), Manila, Philippines.
71. Y.-S. Lin, J. C. Chen, K.-J. Wang, and C. F. Chien, 2005, A Fundamental Resource Allocation Model
Using Genetic Algorithm under A Fuzzy Environment, . 72. M. J. Chen, J. C Chen, C. F. Lan, and P. Chang, 2005, The Development of Smart Phone System in Home
Care Evaluation, Proceedings of the 7th International Workshop on Enterprise Networking and Computing
in Healthcare Industry, Busan, Korea.
73. C.-S. Chiang, S.-Y. Lin, and J.C. Chen, 2005, The Cyclographic Maps for Bezier Curve, Proceedings of the 35th International Conference on Computers and Industrial Engineering, Istanbul, Turkey, Vol. I, pp.
453-458, June 19 - 22, 2005.
74. J. C. Chen, C. W. Chen, J. Y. Shiau, and C. S. Chiang, 2005, A Study of Load Allocation with Equipment Capability and Dedication for Wafer Fab, Proceedings of the 35th International Conference on Computers
and Industrial Engineering, Istanbul, Turkey, Vol. I, pp. 423-428, June 19 - 22, 2005.
75. 2005
pp. 16 - 26 76. S. M. Wang, K. J. Wang, H. M. Wee, and J. C. Chen, 2005, An Economic Capacity Planning Model
Considering Inventory and Capital Time Value, International Conference on Computational Science and
its Applications (ICCSA 2005), Singapore.
77. 20052005
78. 2004IC (1/2)
p. 114TaipeiTaiwan
79. 2004
p. 27TaipeiTaiwan 80. J. Y. Shiau, J. C. Chen, Y. J. Lin, and C. M. Chang, Architecture of Distributed Conceptual Design System
for EMS Providers, Proceedings of the 34th International Conference on Computers and Industrial
Engineering, San Francisco, CA, November 14 - 16, 2004.
81. Y. S. Lin, J. C. Chen, and K. J. Wang, 2004, Knowledge Discovery of Dispatching Rules in
Semiconductor Testing Industry2004
p. 104TaipeiTaiwan
82. , , , 2004, , , Jun 4, 2004.
83. J. C. Chen, R. T. Yang, K. M. Peng, and C. C. Wang, 2004, Layout Improvement for Wafer Fabrication Plants, Proceedings of the 33
rd International Conference on Computers & Industrial Engineering, Jeju,
Korea, CIE432.
84. J. C. Chen, J. Y. Shiau, P. F. Cheng, and Y. J. Tsai, 2004, A Hybrid Heuristic for Vehicle Routing Problem with Time Window Constraints, Proceedings of the 33
rd International Conference on Computers &
Industrial Engineering, Jeju, Korea, CIE042.
85. J. C. Chen, C. W. Chen, and H. Rau, 2004, Integrated Capacity Planning for Semiconductor Fabrication, Proceedings of the 33
rd International Conference on Computers & Industrial Engineering, Jeju, Korea,
CIE403.
-
154
NTHU IEEM Annual Report 2012
86. 20032003
pp. 95 - 116
87. 20032003
10/21 - 10/23/2003 88. J. C. Chen, P. F. Chang, B. B. Chen, C. S. Chen, and C. W. Chen, 2003, Application of Vehicle Routing
Problem with Hard Time Window Constraints Using Hybrid Meta-Heuristics, Proceedings of International
Conference on High Performance Scientific Computing 2003, Hanoi, Vietnam, p. 28.
89. J. C. Chen, G. M. Peng, C. J. Sun, J. J. Wang, P. F. Chang, and R. D. Dai, 2003, Layout Improvement for the Facility Design of Semiconductor Fabrication, Proceedings of International Conference on High
Performance Scientific Computing 2003, Hanoi, Vietnam, p. 29.
90. C. W. Chen, J. C. Chen, Y. C. Fan, and C. J. Sun, 2003, Finite Capacity Requirements Planning with Capability for Multiple Wafer Fabs, Proceedings of International Conference on High Performance
Scientific Computing 2003, Hanoi, Vietnam, p. 27.
91. J. C. Chen, C. J. Lin, H. Rau, C. W. Chen, and J. C. Tyan, 2002, Capacity Planning with Capability for Multiple Fabs, Proceedings of the 30th International Conference on Computers & Industrial Engineering,
Greece, pp. 125-130.
92. C. J. Lin, J. C. Chen, H. Rau, H. J. Chen, and C. W. Huang, 2002, The Effect of Large Display Sizes on the Musculoskeletal System in Visual Display Terminal Workstations, Proceedings of the 30th
International Conference on Computers & Industrial Engineering, Greece, pp. 557-562.
93. H. Rau, C. J. Lin, J. C. Chen, H. M. Wee, and M. Y. Wu, 2002, An Integrated Inventory Model for Deteriorating Item with Exponentially Varying Demand, Proceedings of the 30th International Conference
on Computers & Industrial Engineering, Greece, pp. 743-748.
94. J. C. Chen, C. S. Chen, B. J. Chen, M. Lay, L. Liu, B. Lee, S. Huang, W. Chang, and D. Huang, 2001, Application of Vehicle Routing Problem with Hard Time Window Constraints, Proceedings of the 29th
International Conference on Computers & Industrial Engineering, Montreal, Canada, pp. 533-538.
95. J. C. Chen, C. J. Lin, C. Y. Hsiao, and C. W. Chen, 2001, A Study of Priority Distribution and Setting in Wafer Fabs, Proceedings of the 29th International Conference on Computers & Industrial Engineering,
Montreal, Canada, pp. 20-25.
96. 2000III
p. 116TaipeiTaiwan
97. 2000
pp. 1 - 16TaipeiTaiwan
98. 2000
pp. 26 - 41TaipeiTaiwan
99. 2000
TaipeiTaiwan
100. 2000
TaipeiTaiwan
101. 1999 (II)
TaipeiTaiwan
102. 1999
pp. 266 - 271HsinchuTaiwan 103. J. C. Chen, Y. C. Fan, J. Y. Wang, T. K. Lin, S. H. Leea, S. C. Wu, and Y. J. Lan, 1999, Capacity Planning
for a Twin Fab, In Proceedings of the Eighth International Symposium on Semiconductor Manufacturing
(ISSM), Santa Clara, California, U. S. A., pp. 317 - 320 (EI).
104. 1999pp.
143-148Yunlin, Taiwan
105. 1999
pp. 149-156Yunlin, Taiwan
106. 1999
pp. 1-8Yunlin, Taiwan
107. 1998
pp. c13-c16ChanghuaTaiwan
108. 1998 Sherbrooke
p. 8, Taoyuan, Taiwan
-
155
Publications
109. 1998
Yunlin, Taiwan, pp. 167 - 174
110. 1998
Taipei, Taiwan, pp. 1 - 63 111. J. C. Chen, C. C. Chien, H. H. Tseng, C. C. Wang, and T. C. Chang, 1997, A Systematic Approach for IC
Fab Design, In Proceedings of the Sixth International Symposium on Semiconductor Manufacturing
(ISSM), San Francisco, California, U. S. A., pp. P15-P18 (EI).
112. J. C. Chen, T. C. Du, and H. Rau, 1997, A Study of Order Picking Policies, In Proceedings of the 2nd International Conference on Material Handling and the 15th International Conference on Automation in
Warehousing, Beijing, China, pp. 272-276.
113. H. Rau, J. C. Chen, and T. C. Du, 1997, A Study of Determination of Pallet Loads of AS/RS, In Proceedings of the 2nd International Conference on Material Handling and the 15th International
Conference on Automation in Warehousing, Beijing, China, pp. 320-324.
114. T. C. Du, H. Rau, and J. C. Chen, 1997, The Urban Vehicle Routing Problem: A Heuristic Approach, In Proceedings of the 2nd International Conference on Material Handling and the 15th International
Conference on Automation in Warehousing, Beijing, China, pp. 43-47.
115. 199784 - 85
pp. 85-88
116. 1997
pp. c18-c21HsinchuTaiwan
117. 1997
pp. c22-27HsinchuTaiwan
118. 1996
pp. 448-454TaipeiTaiwan
119. 1996
pp. 779-786TaipeiTaiwan 120. J. C. Chen, T. C. Du, and W. S. Lee, 1996, A Simulation Study of Operation Control Policies for an
AS/RS, In Proceedings of the Fourth International Conference on Automation Technology, Vol. 1, pp.
389-396, Hsinchu, Taiwan.
121. J. C. Chen, L. H. Chang, C. K. Yang, T. S. Long, and C. P. Hung, 1996, A Study of Scheduling Algorithms for Different Criteria Under Different Time Constraints, In Proceedings of the Fourth
International Conference on Automation Technology, Vol. 1, pp. 65-72, Hsinchu, Taiwan.
122. 1996
pp. 539-545
123. 1995
pp. 120-127ChungliTaiwan
124. 1995
pp. 799-807ChungliTaiwan
125. 1995Building A Knowledge Object Relationship Model
pp. 532-539ChungliTaiwan
126. 1995
pp.
927-937ChungliTaiwan
127. 1995
pp. 938-947ChungliTaiwan 128. J. C. Chen, W. S. Lee, and D. P. Wu, 1995, A Simulation Study of Crane Control Policies for AS/RS, In
Proceedings of the 27th CIRP International Seminar on Manufacturing Systems, Ann Arbor, Michigan, U.
S. A.
129. J. C. Chen, 1994, Characterizing Scheduling Problems in Manufacturing Systems, In Proceedings of The Third International Conference on Automation Technology, Vol. 4, pp. 53-58, Taipei, Taiwan.
130. J. Chen, S. Lu, W. Chan, and S. Chang, W. Dai, J. C. Chen, 1994, Development of SLAM II Based Simulation Testbed for Evaluating Photolithography Area Scheduling/Dispatching Schemes in IC
Fabrication, In Proceedings of the Third International Conference on Automation Technology, Vol. 4, pp.
193-200, Taipei, Taiwan.
131. J. C. Chen, 1994, State-Dependent Scheduling and Control for Flow Shops, In Proceedings of R.O.C. Automatic Control Conference, pp. 403-409, Taoyuan, Taiwan.
-
156
NTHU IEEM Annual Report 2012
132. J. C. Chen and A. Thesen, 1993, Optimal Robot Scheduling in Manufacturing Cells, ORSA/TIMS Joint National Meeting, Chicago, Illinois, U. S. A.
133. J. C. Chen and A. Thesen, 1992, State-Dependent Scheduling for Flow Shops, ORSA/TIMS Joint National Meeting, San Francisco, California, U. S. A.
134. J. C. Chen and A. Thesen, 1992, State-Dependent Robot Scheduling Using Simulated Semi-Markov Decision Processes, ORSA/TIMS Joint National Meeting, Orlando, Florida, U. S. A.
135. J. C. Chen and A. Thesen, 1991, Simulation and Semi-Markov Decision Processes for Real-Time Scheduling, ORSA/TIMS Joint National Meeting, Anaheim, California, U. S. A.
136. L. Chen and J. C. Chen, 1990, A Fast Simulation Approach for Tandem Queueing Systems, Proceedings of the Winter Simulation Conference, O. Balic, R. P. Sadowski, R. E. Nance (eds), pp. 539-546 (EI).
Technology Transfer 1. 2012
2. 2011NSC 100-2622-E-007-022-
CC2
3. Y1 AutoMod 2010 NSC
98-2622-E-011-020-CC2, NSC 99-2622-E-011-011-CC2
4. 2007NSC 96-2622-E-033-004-CC3
5. 2006NSC 95-2622-E-033-006-CC3
6. 2005
7. 2005NSC 94-2622-E-033-010-CC3
8. 2004NSC 93-2622-E-033-013-CC3
9. 2003NSC 92-2622-E-033-008-CC3
10. 2002NSC
91-2622-E-033-009-CC3
11. 1998NSC 87-2213-E-033-007
Project List: NSC Projects 1. (1/3 - 3/3)NSC 101-2221-E-007-134-MY3101/08
- 104/07
2. () (3/3)NSC
100-2622-E-007-022-CC2100/09 - 101/08
3. () (2/3)NSC
99-2622-E-011-011-CC299/09 - 100/08
4. TFT-LCD (1/3 - 3/3)NSC 99-2221-E-011-156-MY399/08
- 102/07
5. : Gavriel Salvendy, Department of Industrial Engineering, Tsinghua University, P.
R. ChinaNSC 99-2912-I-011-0182010
6. : James M. Tien, Department of Electrical and Computer Engineering, University
of Miami, Coral Gables, Florida, USANSC 99-2912-I-011-0192010
7. RFID NSC 99-2623-E-011-006-D99/01 -
99/12
8. () (1/3) NSC
98-2622-E-011-020-CC298/09 - 99/08
9. (III) ()NSC
99-2811-E-011-01199/03 - 99/07
10. (III) NSC 98-2221-E-011-157
98/08 - 99/07
11. (II) NSC 97-2221-E-033-027
97/08 - 98/07
12. (I) NSC 96-2221-E-033-015
96/08 - 97/07
-
157
Publications
13. - NSC 96-2622-E-033-004-CC3
96/05 - 97/04
14. NSC 95-2221-E-033-093
95/08 - 96/07
15. (2/2) NSC 95-2212-E-033-00495/08 - 96/07
16. - NSC 95-2622-E-033-006-CC3
95/05 - 96/04
17. 095-2917-I-033-001
95/03 - 96/03
18. (1/2) NSC 94-2212-E-033-01594/08 - 95/07
19. NSC 94-2815-C-033 -023 E
94/07 - 95/02
20. NSC 94-2815-C-033 -022 E
94/07 - 95/02
21. - NSC 94-2622-E-033-010-CC3
94/05 - 95/04
22. NSC 94-2623-7-033-003
94/01 - 94/12
23. IC (2/2) NSC 93-2212-E-033-00393/08 - 94/07
24. - NSC 93-2622-E-033-013-CC3
93/05 - 94/04
25. IC (1/2) NSC 92-2212-E-033-00592/08 - 93/07
26. NSC 92-2815-C-033-002-E
92/07 - 93/02
27. - NSC 92-2622-E-033-008-CC3
92/06 - 93/05
28. (3/3) NSC 91-2212-E-033-01491/08 - 92/07
29. - NSC 91-2622-E-033-009-CC3
91/06 - 92/05
30. (2/3) NSC 90-2212-E-033-01390/08 - 91/07
31. (1/3) NSC 89-2212-E-033-02689/08 - 90/07
32. (3/3) NSC89-2212-E-033-01388/08 -
89/07
33. (2/3) NSC88-2213-E-033-01087/08 -
88/07
34. (3/3) NSC 87-2622-E-002-004
87/02 - 88/01
35. (1/3) NSC 87-2213-E-033-00786/08
- 87/07
36. NSC 87-2623-D-033-00186/07 -
87/06
37. (2/3) NSC 86-2622-E-002-016
86/02 - 87/01
38. (3/3) NSC 86-2213-E-033-00785/08 - 86/07
39. (1/3) NSC 85-2622-E-002-018
85/02 - 86/01
40. (2/2) NSC 85-2212-E-033-01584/08 - 85/07
41. (2/3) NSC 85-2213-E-033-00484/08 - 85/07
42. FMS NSC 84-2213-E-033-00483/08 - 84/07
43. (1/2) NSC 84-2212-E-033-01883/08 - 84/07
44. NSC 84-2212-E-002-07383/08 - 84/07
45. (1/3) NSC 84-2213-E-033-00983/08 - 84/07
-
158
NTHU IEEM Annual Report 2012
Project List: Non-NSC Projects 1. Y1Y2101/09 - 102/08
2. 101/08 - 101/12
3. (2/4)101/04 -
102/03
4. 101/2 - 101/12
5. (3/3)100/09 - 101/08
6. 100/06 -
100/09
7. 100/04 -
101/12
8. (1/4)100/04 -
101/03
9. 100/02 - 100/4
10. 100/01 - 100/12
11. PouChen-Nike 99/09 - 102/02
12. (2/3)99/09 - 100/08
13. 99/02- 99/12
14. -99/01 - 99/06
15. (1/3)98/09 - 99/08
16. -98/10 -
98/12
17. -98/10 - 98/12
18. 98/09 - 99/01
19. 98/09 - 99/01
20. -98/03 - 98/08
21. 98/01 - 98/12
22. 97/11 - 97/12
23. 97/09 - 98/06
24. 97/09 - 98/06
25. Y197/08 - 98/07
26. (7353C23100B2)97/04 - 97/11
27. 97/01 - 97/12
28. 96/09 - 97/06
29. 96/09 - 97/06
30. XR96403P803PE
96/04 - 96/11
31. 96/04 - 96/11
32. 95/11 - 96/10
33. 95/11 - 96/06
34. 95/09 - 96/06
35. 95/09 - 96/06
36. XR95405P805PE95/04 - 95/11
37. A Simulation Study of Dispatching Policies with AMHS Constraints
95/03 - 95/08
38. -94/09 - 95/06
39. 94/08 - 95/02
40. - APS94/05
- 95/10
41. APSEMS94/05 - 95/10
-
159
Publications
42. 94/01 - 94/04
43. 94/01 - 94/06
44. 94/01 - 94/06
45. 93/09 - 94/06
46. 93/03 - 94/02
47. RFID93/02 - 93/07
48. Capacity Planning for 0.13m Process at TSMC92/11 - 93/03
49. 92/09 - 93/06
50. 92/09 - 93/06
51. 92/08 - 92/12
52. 3C92/03 - 93/02
53. 91/11 - 92/06
54. 91/07 - 91/12
55. Mitac91/06 - 92/12
56. BOM91/04 - 91/12
57. 91/03 - 92/02
58. 90/06 - 90/11
59. e-Business IT 90/04 -
90/11
60. 90/03 - 91/04
61. 90/03 - 91/02
62. IC 89/05 - 89/10
63. Quick Response to Customer Demands at AMT89/03 - 91/01
64. AMT Delivery Routine Study89/02 - 89/11
65. FedEx Order Picking Study Part IFedEx89/02 - 89/11
66. FedEx Order Picking Study Part II89/02 - 89/11
67. Customer Relationship Management ()89/1 - 89/12
68. Supply Chain Management Research ()89/1 - 89/12
69. 88/12 - 90/11
70. Modeling of IC Packaging Factory88/12 - 89/12
71. IC (2/2)88/08 - 89/12
72. 88/07 -
89/06
73. Anco's Shop Floor Control88/04 - 88/08
74. 88/03 - 88/04
75. Manufacturing Resources Planning (MRP II) Research,88/2 - 88/12
76. Merck: Diagnosis of Production DepartmentMerck87/11 - 88/02
77. 87/11 - 89/10
78. Capacity Planning and Time Study87/11 - 88/10
79. IC (1/2)87/08 - 88/06
80. Facilities Planning87/07 - 87/09
81. ,87/07 - 88/06
82. 87/07 - 88/06
83. CY86-RG-00487/06 - 89/05
84. IC87/05 - 87/08
85. 86/12 - 87/04
86. Batch (2/2) 873K37BH186/09 -
87/06
87. 86/07 - 87/05
88. 85/11 - 87/10
89. VIS Plant Layout and Simulation Research85/09 - 86/06
-
160
NTHU IEEM Annual Report 2012
90. Batch (1/2) 863K37AH485/09
- 86/06
91. TSMC Fab 5A Layout Evaluation & Improvement85/07 - 85/09
92. (2/2)85/07 - 86/06
93. 85/04 - 85/06
94. (1/2)85/01 - 85/06
95. 84/10 - 85/03
96. 84/09 - 85/06
97. 84/08 - 85/07
98. Repetitive/Batch (2/2)84/08 - 85/07
99. 83/11 - 85/10
100. 83/09 - 84/08
101. Repetitive/Batch (1/2)83/09 - 84/08
102. 83/02 - 83/06
103. 82/10 - 83/09
104. 82/09 - 83/03
Honor and Awards 2012 (Marquis Whos Who in the World 2013)
2011 100
2011 100
2011 117
2010 - 2013
2009
2009
2009
2008
2005 - 2007
2001 - 2003
1991 - 1992 IBM Manufacturing Research Graduate Fellowship
1983