james c. chen (陳建良) - ie.nthu.edu.t · james c. chen is professor in the department of...

16
145 Publications James C. Chen (陳建良) Professor Ph.D., University of Wisconsin-Madison, U.S.A., 1992 Advanced Planning and Scheduling, Lean Production, Supply Chain Management, Business Process Reengineering, Project Management E-mail: [email protected] James C. Chen is Professor in the Department of Industrial Engineering and Engineering Management at National Tsing-Hua University (NTHU), Taiwan. Prior to his current position, he was Chair Professor in the Department of Industrial Management at National Taiwan University of Science and Technology (NTUST), Professor in the Department of Industrial and Systems Engineering at Chung Yuan Christian University (CYCU), and Researcher at Industrial Technology Research Institute (ITRI), Taiwan. He received a B.S. in Industrial Engineering from NTHU, Taiwan, an M.S. in Manufacturing Systems Engineering, and a Ph.D. in Industrial Engineering, both from the University of Wisconsin- Madison. His current research interests include advanced planning and scheduling, lean production, supply chain management, business process reengineering, and project management. Dr. Chen was awarded Dr. Yi-Chi Mei Scholarship at NTHU in 1983, IBM Manufacturing Research Graduate Fellowship 1991-92, Outstanding Teaching Awards at CYCU, Distinguished University-Industry Collaborative Research Award at Chung Hua Picture Tubes (CPT) in 2009, Distinguished Industrial Engineer Award from Chinese Institute of Industrial Engineers (CIIE) in 2011, Outstanding Research Award at NTUST in 2011, and Feature Person: Enjoying the International University-Industry Collaboration, Engineering Science and Technology Bulletin, NSC in 2011. Publications: Journal Papers 1. J. C. Chen, P. B. Huang, J. G. Wu, K. Y. Lai, C. C. Chen, Advanced Planning and Scheduling for TFT-LCD Color Filter Plants, International Journal of Advanced Manufacturing Technology (To Appear) (SCI). 2. Y. F. Hung, C. H. Liang, and J. C. Chen, 2012, Sensitivity Search for Rescheduling of the Semiconductor Photolithography Operations, International Journal of Advanced Manufacturing Technology (To Appear) (SCI). 3. Y. K. Lin, P. C. Chang, J. C. Chen, 2012, Performance Evaluation for a Footwear Manufacturing System with Multiple Production Lines and Different Station Failure Rates, International Journal of Production Research (To Appear) (SCI). 4. J. C. Chen, S. H. Lee, C. Y. Chen, N. Anggono, P. T. B. Huang, C. C. Chen, T. W. Peng, J. T. Huang, C. C. Chu, 2012, Simulation-Based Look-Ahead Release Planning for Color Filter Fabs, SID Symposium Digest of Technical Papers, Vol. 43 (To Appear). 5. P. T. B. Huang, C. W. Yu, M. Y. Chang, J. C. Chen, C. C. Chen, T. W. Peng, 2012, A Simulation Assisted Neural-Networks Forecasting System for TFT-LCD Color Filter Fabs, SID Symposium Digest of Technical Papers, Vol. 43 (To Appear). 6. J. C. Chen, C. C. Chen, L. H. Su, H. B. Wu, C. J. Sun, 2012, Assembly Line Balancing in Garment Industry, Expert Systems with Applications, Vol. 39, pp. 10073-10081 (SCI). 7. J. C. Chen, J. J. Wu, C. W. Chen, K. H. Chen, 2012, Flexible Job Shop Scheduling with Parallel Machines Using Genetic Algorithm and Grouping Genetic Algorithm, Expert Systems with Applications, Vol. 39, pp. 10016-10021 (SCI). 8. L. H. Su, F. D. Chou, J. C. Chen, 2012, Minimizing makespan subject to minimum total absolute deviation of completion time on identical parallel machines, Engineering Optimization, iFirst, pp. 1-9 (SCI).

Upload: phamduong

Post on 12-Apr-2018

228 views

Category:

Documents


7 download

TRANSCRIPT

  • 145

    Publications

    James C. Chen Professor

    Ph.D., University of Wisconsin-Madison, U.S.A., 1992

    Advanced Planning and Scheduling, Lean Production, Supply

    Chain Management, Business Process Reengineering, Project

    Management

    E-mail: [email protected]

    James C. Chen is Professor in the Department of Industrial Engineering and Engineering Management

    at National Tsing-Hua University (NTHU), Taiwan. Prior to his current position, he was Chair

    Professor in the Department of Industrial Management at National Taiwan University of Science and

    Technology (NTUST), Professor in the Department of Industrial and Systems Engineering at Chung

    Yuan Christian University (CYCU), and Researcher at Industrial Technology Research Institute (ITRI),

    Taiwan. He received a B.S. in Industrial Engineering from NTHU, Taiwan, an M.S. in

    Manufacturing Systems Engineering, and a Ph.D. in Industrial Engineering, both from the University

    of Wisconsin- Madison. His current research interests include advanced planning and scheduling,

    lean production, supply chain management, business process reengineering, and project management.

    Dr. Chen was awarded Dr. Yi-Chi Mei Scholarship at NTHU in 1983, IBM Manufacturing Research

    Graduate Fellowship 1991-92, Outstanding Teaching Awards at CYCU, Distinguished

    University-Industry Collaborative Research Award at Chung Hua Picture Tubes (CPT) in 2009,

    Distinguished Industrial Engineer Award from Chinese Institute of Industrial Engineers (CIIE) in 2011,

    Outstanding Research Award at NTUST in 2011, and Feature Person: Enjoying the International

    University-Industry Collaboration, Engineering Science and Technology Bulletin, NSC in 2011.

    Publications: Journal Papers 1. J. C. Chen, P. B. Huang, J. G. Wu, K. Y. Lai, C. C. Chen, Advanced Planning and Scheduling for

    TFT-LCD Color Filter Plants, International Journal of Advanced Manufacturing Technology (To Appear)

    (SCI).

    2. Y. F. Hung, C. H. Liang, and J. C. Chen, 2012, Sensitivity Search for Rescheduling of the Semiconductor Photolithography Operations, International Journal of Advanced Manufacturing Technology (To Appear)

    (SCI).

    3. Y. K. Lin, P. C. Chang, J. C. Chen, 2012, Performance Evaluation for a Footwear Manufacturing System with Multiple Production Lines and Different Station Failure Rates, International Journal of Production

    Research (To Appear) (SCI).

    4. J. C. Chen, S. H. Lee, C. Y. Chen, N. Anggono, P. T. B. Huang, C. C. Chen, T. W. Peng, J. T. Huang, C. C. Chu, 2012, Simulation-Based Look-Ahead Release Planning for Color Filter Fabs, SID Symposium Digest

    of Technical Papers, Vol. 43 (To Appear).

    5. P. T. B. Huang, C. W. Yu, M. Y. Chang, J. C. Chen, C. C. Chen, T. W. Peng, 2012, A Simulation Assisted Neural-Networks Forecasting System for TFT-LCD Color Filter Fabs, SID Symposium Digest of

    Technical Papers, Vol. 43 (To Appear).

    6. J. C. Chen, C. C. Chen, L. H. Su, H. B. Wu, C. J. Sun, 2012, Assembly Line Balancing in Garment Industry, Expert Systems with Applications, Vol. 39, pp. 10073-10081 (SCI).

    7. J. C. Chen, J. J. Wu, C. W. Chen, K. H. Chen, 2012, Flexible Job Shop Scheduling with Parallel Machines Using Genetic Algorithm and Grouping Genetic Algorithm, Expert Systems with Applications, Vol. 39, pp.

    10016-10021 (SCI).

    8. L. H. Su, F. D. Chou, J. C. Chen, 2012, Minimizing makespan subject to minimum total absolute deviation of completion time on identical parallel machines, Engineering Optimization, iFirst, pp. 1-9 (SCI).

  • 146

    NTHU IEEM Annual Report 2012

    9. Y. K. Lin, P. C. Chang, J. C. Chen, 2012, Reliability Evaluation for a Waste-reduction Parallel-line manufacturing system, Journal of Cleaner Production, Vol. 35, pp. 99 101 (SCI).

    10. C. W. Wu, M. Y. Liao, J. C. Chen, 2012, An Improved Approach for Constructing Lower Confidence Bound on Process Yield, European Journal of Industrial Engineering, Vol. 6, No. 3, pp. 369-390 (SCI).

    11. Y. F. Hung, W. C. Chen, and J. C. Chen, 2012, Search Algorithms in the Selection of Warehouses and Transshipment Arrangement for High-End Low-Volume Products, Journal of Advanced Engineering, Vol.

    7, No. 2, pp. 51-60.

    12. J. C. Chen, L. H. Su, C. C. Chen, T. W. Peng, G. C. Chao, 2011, Release Planning for Color Filter Fabs Based on Iterative Simulation, Journal of the Society for Information Display, Vol. 19, No. 7, pp. 480

    487 (SCI). (Invited Paper)

    13. T. Y. Lin, C. W. Wu, J. C. Chen, Y. H. Chiou, 2011, Applying Bayesian Approach to Assess Process Capability for Asymmetric Tolerances Based on Cpmk" Index, Applied Mathematical Modeling, Vol. 35,

    No. 9, pp. 4473 - 4489 (SCI). 14. J. C. Chen, K. H. Chen, C. H. Lin, C. W. Chen, C. L. Yang, S. P. He, 2011, A Study of A Heuristic

    Capacity Planning Algorithm for Weapon Production System, International Journal of Electronic Business

    Management, Vol. 9, No. 1, pp. 46 - 57 (EI). 15. L. H. Su and J. C. Chen, 2011, The Two-and-Three Machine Flowshop Scheduling Problems with Optimal

    Final Operation, Journal of the Chinese Institute of Industrial Engineers, Vol. 28, No. 1, pp. 55 - 71 (EI).

    16. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, C. C. Chen, T. W. Peng, Y. Y. Wei, C. H. Feng, 2011, CONWIP for Order Release and WIP Control in Color Filter Fabs, SID Symposium Digest of Technical

    Papers, Vol. 42, No. 1, pp. 1388 1391. 17. J. C. Chen, J. G. Wu, C. C. Chen, T. W. Peng, H. C. Chien, 2011, Automated Scheduling and Dispatching

    for TFT-LCD Color Filter Fabrication Plants, Key Engineering Materials, Vol. 486, pp. 305 308 (EI).

    18. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, C. C. Chen, T. W. Peng, S. W. Li, S. M. Huang, 2011, Simulation Modeling and Analysis of TFT-LCD Color Filter Fabrication Plants, Key Engineering

    Materials, Vol. 486, pp. 119 122 (EI).

    19. J. C. Chen, C. H. Cheng, K. J. Wang, P. T. B. Huang, C. C. Chang, C. J. Huang, T. C. Ting, 2011, Application of RFID to Warehouse Management, Key Engineering Materials, Vol. 486, pp. 297 300

    (EI).

    20. J. C. Chen, L. H. Su, G. C. Chao, C. C. Chen, T. W. Peng, C. J. Sun, J. W. Chien, H. C. Chien, 2011, Advanced Planning and Scheduling for Color Filter Fabs, Key Engineering Materials, Vol. 450, pp. 361

    364 (EI).

    21. J. C. Chen, C. W. Chen, K. H. Chen, C. H. Lin, 2011, Capacity Planning for Cluster Tools of Wafer Fabrication Plant, Key Engineering Materials, Vol. 450, pp. 365 368 (EI).

    22. J. C. Chen, C. J. Sun, P. B. Huang, 2011, Integrated Capacity Planning System for IC Backend Factory, Key Engineering Materials, Vol. 450, pp. 369 372 (EI).

    23. J. C. Chen, K. J. Wang, C. H. Cheng, Y. J. Fang, C. J. Sun, J. W. Chien, 2011, Logistics Efficiency Improvement with Lean Management and RFID Application, Key Engineering Materials, Vol. 450, pp.

    373 376 (EI).

    24. J. C. Chen, H. Lee, S. Chiu, B. Tseng, 2011, Productivity Improvement with Lean Production in Glove Manufacturing Industry, Key Engineering Materials, Vol. 450, pp. 247 250 (EI).

    25. S. J. Hu, L. H. Su, K. L. Lee, J. C. Chen, C. H. Chang, 2011, Applying TRIZ Methodology to Assist Product Improvement: Take Folding Bicycle as an Example, Key Engineering Materials, Vol. 450, pp.

    27 30 (EI).

    26. P. B. Huang, J. C. Chen, C. J. Lin, P. H. Lyu, B. C. Lai, 2011, A Taguchi-neural-based in-process tool breakage monitoring system in end milling operations, Key Engineering Materials, Vol. 450, pp. 251 254

    (EI).

    27. J. C. Chen, L. H. Su, C. J. Sun, and M. F. Hsu, 2010, Infinite Capacity Planning for IC Packaging Plants, International Journal of Production Research, Vol. 48, No. 19, pp. 5729 - 5748 (SCI).

    28. J. C. Chen and C. W. Chen, 2010, Capacity Planning of Serial and Batch Machines with Capability Constraints for Wafer Fabrication Plants, International Journal of Production Research, Vol. 48, No. 11, pp.

    3207-3223 (SCI).

    29. L. H. Su and J. C. Chen, 2010, Sequencing Two-Stage Flowshop with Non-Identical Job Sizes, International Journal of Advanced Manufacturing Technology, Vol. 47, pp. 259-268 (SCI).

    30. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2010, Release Planning for Color Filter Fabs Based on Iterative

    Simulation, SID Symposium Digest of Technical Papers, Vol. 41, No. 1, pp. 1462 1465.

  • 147

    Publications

    31. J. C. Chen, W. H. Jaong, C. J. Sun, H. Y. Lee, J. S. Wu, and C. C. Ku, 2010, Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems, Key Engineering Materials, Vols. 419-420,

    pp. 633-636 (EI).

    32. J. C. Chen, S. J. Hu, P. T. B. Huang, C. J. Lin, K. J. Chao, and C. C. Chen, 2010, Finite Capacity Planning for Multiple TFT-LCD Color Filter Fabs, Key Engineering Materials, Vols. 419-420, pp. 637-640 (EI).

    33. J. C. Chen, S. J. Hu, Y. H. Chen, C. L. Yang, C. J. Sun, C. W. Chen, 2010, Facility Planning for TFT-LCD Array Fab, Key Engineering Materials, Vols. 419-420, pp. 641-644 (EI).

    34. P. T. B. Huang, J. C. Chen, Y. T. Jou, 2010, A Regression Neural Model for In-process Surface Roughness Monitoring in End Milling Operations, Key Engineering Materials, Vols. 419-420, pp. 369-372 (EI).

    35. S. J. Hu, J. C. Chen, W. C. Chen, C. S. Chung, Y. Y. Su, 2010, The Design of Portable Stereo Using Ergonomics Engineering and Image Analysis, Journal of Advanced Engineering, Vol. 5, No. 2, pp. 119

    128.

    36. J. C. Chen, Y. C. Fan, and C. W. Chen, 2009, Capacity Requirements Planning for Twin Fabs of Wafer Fabrication, International Journal of Production Research, Vol. 47, No. 16, pp. 4473-4496 (SCI).

    37. K. J. Wang, Y. S. Lin, C. F. Chien, and J. C. Chen, 2009, A Fuzzy-Knowledge Resource- Allocation Model of the Semiconductor Final Test Industry, Robotics and Computer- Integrated Manufacturing, Vol.

    25, No. 1, pp. 32-41 (SCI).

    38. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2009, Effective Order Assignment for Color Filter Fabs, SID

    Symposium Digest of Technical Papers, Vol. 40, No. 1, pp. 1309 - 1312.

    39. J. C. Chen, R. D. Dai, and C. W. Chen, 2008, A Practical Fab Design Procedure for Wafer Fabrication Plants, International Journal of Production Research, Vol. 46, No. 10, pp. 2565-2588 (SCI).

    40. J. C. Chen, K. J. Wang, S. M. Wang, and S. J. Yang, 2008, Price Negotiation for Capacity Sharing in a Two-Factory Environment Using Genetic Algorithm, International Journal of Production Research, Vol.

    46, No. 7, pp. 1847-1868 (SCI).

    41. J. C. Chen, K. H. Chen, J. J. Wu, and C. W. Chen, 2008, A Study of the Flexible Job Shop Scheduling Problem with Parallel Machines and Reentrant Process, International Journal of Advanced Manufacturing

    Technology, Vol. 39, pp. 344-354 (SCI).

    42. K. J. Wang, S. M. Wang, and J. C. Chen, 2008, A Resource Portfolio Planning Model Using Sampling-Based Stochastic Programming and Genetic Algorithm, European Journal of Operational

    Research, Vol. 184, No. 1, pp. 327-340 (SCI).

    43. C. J. Lin, Y. H. Hsieh, H. C. Chen, and J. C. Chen, 2008, Visual Performance and Fatigue in Reading Vibrating Numeric Displays, Displays, Vol. 29, No. 4, pp. 386-392 (SCI).

    44. J. C. Chen, K. J. Wang, J. J. Wu, Y. L. Lai, C. W. Chen, 2008, Application of Neural Network to the Forecasting Model of Agriculture Production and Sales, Journal of Advanced Engineering, Vol. 3, No. 3,

    pp. 241-249.

    45. S. M. Wang, J. C. Chen, and K. J. Wang, 2007, Resource Portfolio Planning of Make-to-Stock Products Using a Constraint Programming-Based Genetic Algorithm, Omega-International Journal of Management

    Science, Vol. 35, No. 2, pp. 237-246 (SCI, SSCI).

    46. Y. H. Hsieh, C. J. Lin, H. C. Chen, T. T. Huang, and J. C. Chen, 2007, Reading Performance of Chinese Text with Automatic Scrolling, Lecture Notes in Computer Science, Vol. 4551, pp. 311-319 (EI).

    47. Y. H. Hsieh, C. J. Lin, and J. C. Chen, 2007, Customer Satisfaction Measurement with Neural Network, Human Systems Management, Vol. 26, No.1, pp. 47-52 (EI).

    48. C. S. Chiang, S. H. Tsai, and J. C. Chen, 2007, The Control Vector Scheme for Design of Planar Primitive PH Curves, International Journal of Mathematics Sciences, Vol. 1, No. 4, pp. 227-233.

    49. C. W. Yang, C. J. Lin, and J. C. Chen, 2006, Applying Human Reliability Growth Analysis to System Performance Enhancement, Human Systems Management, Vol. 25, No. 1, pp. 77-86 (EI).

    50. S. M. Wang, J. C. Chen, H. M. Wee, and K. J. Wang, 2006, Non-Linear Stochastic Optimization Using Genetic Algorithm for Portfolio Selection, International Journal of Operations Research, Vol. 3, No. 1, pp.

    16-22.

    51. J. C. Chen, C. W. Chen, C. J. Lin, and H. Rau, 2005, Capacity Planning with Capability for Multiple Semiconductor Manufacturing Fabs, Computers and Industrial Engineering, Vol. 48, No. 4, pp. 709-732

    (SCI).

    52. K. J. Wang, J. C. Chen, and Y. S. Lin, 2005, A Hybrid Knowledge Discovery Model Using Decision Tree and Neural Network for Selecting Dispatching Rules of A Semiconductor Final Testing Factory,

    Production Planning and Control, Vol. 16, No. 7, pp. 665-680 (SCI).

    53. S. M. Wang, K. J. Wang, H. M. Wee, and J. C. Chen, 2005, An Economic Capacity Planning Model Considering Inventory and Capital Time Value, Lecture Notes in Computer Science, Vol. 3483, pp.

    333-341 (SCI).

  • 148

    NTHU IEEM Annual Report 2012

    54. J. C. Chen, C. C. Wang, S. H, Shiau, 2005, Reference Models for the Application of Customer Relationship Management to Marketing, Chung Yuan Journal, Vol. 33, No. 4, pp. 595-622.

    55. J. C. Chen, J. Y. Shiau, C. M. Lu, J. R. Sun, 2005, A Study of Capacity Planning for Wafer Probe Plants, Chung Yuan Journal, Vol. 33, No. 3, pp. 495-511.

    56. J. C. Chen, W. J. Shiang, J. J. Chen, J. R. Sun, 2005, A Study of Capacity Planning for IC Final Test Plants, Chung Yuan Journal, Vol. 33, No. 1, pp. 57-70.

    57. J. C. Chen, R. T. Yang, G. M. Peng, J. J. Wang, 2005, A Study of Layout Improvement for Wafer Fabs, Chung Yuan Journal, Vol. 33, No. 1, pp. 41-55.

    58. J. C. Chen, C. W. Chen, J. Y. Tai, and J. C. Tyan, 2004, Dynamic State-Dependent Dispatching for Wafer Fabrication, International Journal of Production Research, Vol. 42, No. 21, pp. 4547-4562 (SCI).

    59. J. C. Tyan, T. C. Du, J. C. Chen, and I. H. Chang, 2004, Multiple Response Optimization in a Fully Automated Fab: An Integrated Tool and Vehicle Dispatching Strategy, Computers and Industrial

    Engineering, Vol. 46, No. 1, pp. 121-139 (SCI).

    60. J. C. Chen, J. S. Lin, C. W. Chen, J. W. Chang, 2004, A Study of Reference Models and Methodologies for Business Process Reengineering, Chung Yuan Journal, Vol. 32, No. 4, pp. 527-554.

    61. J. C. Tyan, J. C. Chen, and F. K. Wang, 2002, Development of a State-Dependent Dispatch Rule Using Theory of Constraints in Near-Real-World Wafer Fabrication, Production Planning and Control, Vol. 13,

    No. 3, pp. 253-261 (SCI).

    62. J. C. Chen, J. Y. Shiau, J. C. Jeng, 2002, A Study of Lot Priority Distribution and Setting for Wafer Fabs, Chung Yuan Journal, Vol. 30, No. 1, pp. 33-49.

    63. J. C. Chen, C. W. Chen, S. H. She, 2001, Application of Group Technology to the Facility Planning of Wafer Fabs, Chung Yuan Journal, Vol. 29, No. 3, pp. 259 - 277.

    64. J. C. Chen, J. K. Yang, S. W. Shu, Dynamic Dispatching for Wafer Fabs, 2000, Journal of the Chinese Institute of Industrial Engineers, Vol. 17, No. 6, pp. 573 - 592.

    65. J. C. Chen, T. Du, H. Rau, G. J. Jeng, 2000, Transportation Cost Analysis of Collaborative Distribution, Chung Yuan Journal, Vol. 28, No. 1, pp. 55-71.

    66. F. K. Wang and J. C. Chen, 1999, Capability Index Using Principal Components Analysis, Quality Engineering, Vol. 11, No. 1, pp. 21 - 27 (EI).

    67. T. Du, H. Rau, J. C. Chen, M. K. Wang, 1998, A Study of Vehicle Routing Problems with Time Window Constraints, Chung Yuan Journal, Vol. 26, No. 1, pp. 67-82.

    68. J. C. Chen and L. Chen, 1993, A Fast Simulator for Tandem Queueing Systems, Computers and Industrial Engineering, Vol. 24, No. 2, pp. 267 - 280 (SCI).

    Publications: Magazine and Newletter Papers 1. 2012 3100

    2. 2011117pp. 54 65.

    3. 2011161 E-paper. 4. J. C. Chen, 2010, Supply Chain Management, Asian Productivity Organization (APO) News: Information

    to Make a Difference in Productivity, Vol. 40, No. 6, p. 4, June 2010.

    5. J. C. Chen, 2010, Business Process Reengineering, Asian Productivity Organization (APO) News: Information to Make a Difference in Productivity, Vol. 40, No. 5, p. 4, May 2010.

    6. 2009

    315pp.97-111

    7. 2009

    101pp. 115-118

    8. 2008

    301pp.116-136

    9. 2005265

    pp.253-272

    10. 2004

    250pp. 131-150

    11. 2000--ITIS 89

    pp. 13-21

    mailto:[email protected]

  • 149

    Publications

    12. 2000ITIS 88

    pp. 1-6

    13. 2000213pp. 165-174

    14. 2000 RosettaNet IC

    213pp. 138-154

    15. 1999 UML IC

    201pp. 222-236

    16. 199935

    pp.33-35

    17. 1998IC

    189pp. 189-203

    18. 1998184

    pp. 128-143

    19. 1997

    177pp. 128-134

    20. 1995153pp. 122-137

    21. 1995153

    pp. 138-143

    22. 1994136pp. 143-156

    23. 1993 CIM 124

    pp. 179-185

    Publications: Books and Chapters 1. 20072006

    2. 20062005

    3. 20052004

    4. 20042003

    5. 20022002

    6. 20002000

    7. 2000

    - (Supply Chain Management) (ITIS) 8. J. C. Chen, A. Thesen, 1994, 'Optimal' Rule-Switching for Flow Shops with Random Workloads, in

    Handbook of Expert Systems Applications in Manufacturing: Structure and Rules, A. Mital and S. Anand

    (eds), pp. 288-302, Chapman & Hall.

    9. J. C. Chen, 1992, State-Dependent Scheduling for Manufacturing Systems, Ph.D. Thesis, University of Wisconsin-Madison, U. S. A.

    Publications: Conference Papers 1. J. C. Chen, Y. F. Hung, C. W. Wu, Y. K. Lin, Q. F. Tu, B. R. Pratama, Capacity Planning System for

    TFT-LCD Array Manufacturing, the 13th Asia Pacific Industrial Engineering & Management Systems

    (APIEMS) Conference, Phuket, Thailand, December 2 - 5, 2012.

    2. J. C. Chen, S. Wirasambada, I. N. Pujawan, K. J. Wang, C. W. Wu, C. J. Lin, S. Chiu, Minimizing Total Tardiness and Makespan for Hybrid Flow Shop Problem with Resource Constraint in Footwear

    Manufacturing, the 13th Asia Pacific Industrial Engineering & Management Systems (APIEMS)

    Conference, Phuket, Thailand, December 2 - 5, 2012.

  • 150

    NTHU IEEM Annual Report 2012

    3. J. C. Chen, H. Parwananta, T. D. D. Thao, K. J. Wang, M. Anityasari, C. C. Chen, Branch and Bound Method for Solving Line Balancing Problem in Footwear Sewing Line, the 13th Asia Pacific Industrial

    Engineering & Management Systems (APIEMS) Conference, Phuket, Thailand, December 2 - 5, 2012.

    4. P. T. B. Huang, C. W. Yu, M. Y. Chang, J. C. Chen, C. C. Chen, A Simulation Assisted Neural-Networks Forecasting System on the Optimization between WIP and Throughput for TFT-LCD Color Filter Fabs,

    International Conference on Machine Learning and Cybernetics (ICMLC), Xian, Shaanxi, China, July

    15-17, 2012.

    5. H. Parwananta, J. C. Chen, M. Anityasari, Heuristic Rule Evaluation in Solving Resource-Constraint Assembly Line Balancing Problem in Footwear Sewing Line, Seminar Nasional Pascasarjana XII ITS,

    Surabaya, Indonesia, 12 July 2012.

    6. J. C. Chen, Productivity Improvement with Lean Management in Footwear Industry in China and Southeastern Asia, IIE Asian Conference 2012, Singapore, June 28-30, 2012.

    7. J. C. Chen, S. H. Lee, C. Y. Chen, N. Anggono, P. T. B. Huang, C. C. Chen, T. W. Peng, J. T. Huang, C. C. Chu, Simulation-Based Look-Ahead Release Planning for Color Filter Fabs, Society for Information

    Display (SID) International Symposium 2012, Boston, MI, USA, June 3-8, 2012.

    8. P. T. B. Huang, C. W. Yu, M. Y. Chang, J. C. Chen, C. C. Chen, T. W. Peng, A Simulation Assisted Neural-Networks Forecasting System for TFT-LCD Color Filter Fabs, Society for Information Display

    (SID) International Symposium 2012, Boston, MI, USA, June 3-8, 2012.

    9. J. C. Chen, J. Chang, S. Chiu, V. Chang, Productivity Improvement with Lean Production in Footwear Manufacturing Industry, the Fourth International Conference on Lean Six Sigma, Glasgow, UK., March

    26 27, 2012.

    10. J. C. Chen, J. G. Wu, K. Y. Lai, P. B. Huang, C. C. Chen, T. W. Peng, H. C. Chien, C. P. Liu, Automated Assignment and Scheduling for Color Filter Plants, POMS-Hong Kong, Hong Kong, January 5 - 6, 2012.

    11. J. C. Chen, S. H. Li, C. Y Chen, P. B. Huang, C. C. Chen, T. W. Peng, J. T. Huang, C. C. Chu, Look-Ahead Release Planning for Color Filter Plants, POMS-Hong Kong, Hong Kong, January 5 - 6,

    2012.

    12. ,

    2011, Hsinchu, Taiwan, December 10, 2011.

    13. AutoMod

    2011, Hsinchu, Taiwan, December 10, 2011. (

    ) 14. J. C. Chen, C. H. Cheng, K. J. Wang, P. T. B. Huang, C. C. Chang, C. J. Huang, T. C. Ting, Application of

    RFID to Warehouse Management, The 4th International Conference on Advanced Design and

    Manufacturing (ADM 2011), Kunming, China, September 21 - 23, 2011 (EI).

    15. J. C. Chen, J. G. Wu, C. C. Chen, T. W. Peng, H. C. Chien, Automated Scheduling and Dispatching for TFT-LCD Color Filter Fabrication Plants, The 4th International Conference on Advanced Design and

    Manufacturing (ADM 2011), Kunming, China, September 21 - 23, 2011 (EI).

    16. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, C. C. Chen, T. W. Peng, S. W. Li, S. M. Huang, Simulation Modeling and Analysis of TFT-LCD Color Filter Fabrication Plants, The 4th International

    Conference on Advanced Design and Manufacturing (ADM 2011), Kunming, China, September 21 - 23,

    2011 (EI).

    17.

    Taipei, Taiwan, June 10, 2011.

    18.

    4.5 AutoModTaipei, Taiwan, June 10, 2011.

    19. 66 AutoMod

    Taipei, Taiwan, June 10, 2011. 20. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, C. C. Chen, T. W. Peng, Y. Y. Wei, C. H. Feng, 2011,

    CONWIP for Order Release and WIP Control in Color Filter Fabs, Society for Information Display (SID)

    International Symposium 2011, Los Angeles, California, USA, May 15 - 20, 2011.

    21. C. H. Cheng, J. C. Chen, P. T. B. Huang, C. C. Chang, T. C. Ting, C. J. Huang, K. F. Li, P. S. Chen, Application of Lean and RFID to Warehouse Management, The Second POMS-HK International

    Conference, Hongkong, China, January 6 7, 2011.

    22. J. C. Chen, P. T. B. Huang, H. Y. Peng, M. C. Hung, T. W. Peng, Y. Y. Wei, C. H. Feng, Y. C. Liu, 2011, Integration of Simulation and Look-Ahead Release Planning for Color Filter Fabs, The Second POMS-HK

    International Conference, Hongkong, China, January 6 7, 2011.

  • 151

    Publications

    23. ,, , , , , 2010, AutoMod, 2010

    , Tainan, Taiwan, December 25, 2010. ()

    24. , , , , , , 2010, ,

    ,, November, 1 3, 2010. 25. J. C. Chen, L. H. Su, G. C. Chao, C. C. Chen, T. W. Peng, C. J. Sun, J. W. Chien, H. C. Chien, 2010,

    Advanced Planning and Scheduling for Color Filter Fabs, The 3rd International Conference on Advanced

    Design and Manufacturing (ADM 2010), Nottingham, UK, September 8 - 10, 2010 (EI).

    26. J. C. Chen, C. W. Chen, K. H. Chen, C. H. Lin, 2010, Capacity Planning for Cluster Tools of Wafer Fabrication Plant, The 3rd International Conference on Advanced Design and Manufacturing (ADM 2010),

    Nottingham, UK, September 8 - 10, 2010 (EI).

    27. J. C. Chen, H. Lee, S. Chiu, B. Tseng,, 2010, Productivity Improvement with Lean Production in Glove Manufacturing Industry, The 3rd International Conference on Advanced Design and Manufacturing (ADM

    2010), Nottingham, UK, September 8 - 10, 2010 (EI).

    28. J. C. Chen, C. J. Sun, P. B. Huang, 2010, Integrated Capacity Planning System for IC Backend Factory, The 3rd International Conference on Advanced Design and Manufacturing (ADM 2010), Nottingham, UK,

    September 8 - 10, 2010 (EI).

    29. J. C. Chen, K. J. Wang, C. H. Cheng, Y. J. Fang, C. J. Sun, J. W. Chien, 2010, Logistics Efficiency Improvement with Lean Management and RFID Application, The 3rd International Conference on

    Advanced Design and Manufacturing (ADM 2010), Nottingham, UK, September 8 - 10, 2010 (EI).

    30. P. B. Huang, J. C. Chen, C. J. Lin, P. H. Lyu, B. C. Lai, 2010, A Taguchi-neural-based in-process tool breakage monitoring system in end milling operations, The 3rd International Conference on Advanced

    Design and Manufacturing (ADM 2010), Nottingham, UK, September 8 - 10, 2010 (EI).

    31. S. J. Hu, L. H. Su, K. L. Lee, J. C. Chen, C. H. Chang, 2010, Applying TRIZ Methodology to Assist Product Improvement: Take Folding Bicycle as an Example, The 3rd International Conference on

    Advanced Design and Manufacturing (ADM 2010), Nottingham, UK, September 8 - 10, 2010 (EI).

    32. J. C. Chen, C. C. Chen, T. W. Peng, C. J. Sun, K. J. Chao, and J. W. Chien, Simulation and 3D Animation for TFT-LCD Color Filter Plants, INFORMS Service Science Conference, Taipei, Taiwan, July

    7 - 10, 2010.

    33. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2010, Release Planning for Color Filter Fabs Based on Iterative

    Simulation, Society for Information Display (SID) International Symposium 2010, Seattle, Washington,

    USA., May 23 - 28, 2010.

    34. 2009

    9812/12/2009 35. J. C. Chen, P. B. Huang, C. J. Sun, K. J. Chao, G. C. Chao, Simulation Modeling of TFT-LCD Color Filter

    Fab, The 16th

    International Display Workshops (IDW 2009), Miyazaki, Japan, December 9 - 11, 2009.

    36. J. C. Chen, W. H. Jaong, C. J. Sun, H. Y. Lee, J. S. Wu and C. C. Ku, 2009, Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems, the 2nd International Conference on

    Advanced Design and Manufacturing (ADM 2009), Harbin, China, September 24 - 26, 2009 (EI).

    37. J. C. Chen, S. J. Hu, P. B. Huang, C. J. Lin, K. J. Chao and C. C. Chen, 2009, Finite Capacity Planning for Multiple TFT-LCD Color Filter Fabs, the 2nd International Conference on Advanced Design and

    Manufacturing (ADM 2009), Harbin, China, September 24 - 26, 2009 (EI).

    38. J. C. Chen, S. J. Hu, Y. H. Chen, C. L. Yang, C. J. Sun and C. W. Chen, 2009, Facility Planning for TFT-LCD Array Fab, the 2nd International Conference on Advanced Design and Manufacturing (ADM

    2009), Harbin, China, September 24 - 26, 2009 (EI).

    39. P. B. Huang, J. C. Chen and Y. T. Jou, 2009, A Regression Neural Model for In-process Surface Roughness Monitoring in End Milling Operations, the 2nd International Conference on Advanced Design

    and Manufacturing (ADM 2009), Harbin, China, September 24 - 26, 2009 (EI).

    40. J. C. Chen, K. H. Chen, C. H. Lin, C. W. Chen, C. L. Yang and S. H. He, 2009, Capacity Planning for Weapon Production System, The 2009 International Conference on Innovation and Management (IAM

    2009), Boracay (Long Beach), Philippine, September 9 - 11, 2009.

    41. J. C. Chen, M. H. Hsaio, C. C. Chen and C. J. Sun, 2009, A Grouping Genetic Algorithm for The Assembly Line Balancing Problem of Sewing Lines in Garment Industry, the Eighth International

    Conference on Machine Learning and Cybernetics (ICMLC 2009), Baoding, Hebei, China, July 12 - 15,

    2009 (EI).

    42. J. C. Chen, W. H. Hsieh, C. H. Cheng, and C. S. Chen, 2009, Hybrid Meta-Heuristics for Vehicle Routing Problem with Time Window Constraints, the 6th International Conference on Service Systems and Service

    Management (ICSSSM09), Xiamen, PR China, June 8 - 10, 2009 (EI).

  • 152

    NTHU IEEM Annual Report 2012

    43. J. C. Chen, M. F. Hsu, and C. J. Sun, 2009, A Study of Capacity Planning for Integrated Circuit Packaging Plants, the 13

    th IFAC Symposium on Information Control Problems in Manufacturing (INCOM 2009),

    Moscow, Russia, June 3 - 5, 2009 (EI).

    44. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2009, Effective Order Assignment for Color Filter Fabs, Society

    for Information Display (SID) International Symposium 2009, San Antonio, Texas USA., May 31 - June 5,

    2009.

    45. J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, 2009, Infinite Capacity Planning for Color Filter Fabs,

    International Display Manufacturing Conference (IDMC) 2009, Taipei, Taiwan, April 28 - 30, 2009.

    46. J. C. Chen, H. Rau, C. J. Sun, H. W. Stzeng, and C. H. Chen, 2009, Workflow Design and Management for IC Supply Chain, the 2009 IEEE International Conference on Networking, Sensing and Control (IEEE

    ICNSC'09), Okayama, Japan, March 26 29, 2009 (EI).

    47. C. J. Lin, W. J. Shiang, H. Rau, J. C. Chen, 2008, Applying Neural Networks and Optimization Techniques to the Simulation of Human Motion, International Conference on Machine Learning and

    Cybernetics, Kunming, China. (EI).

    48. 2008RFID

    200812/25/2008

    49. 200897

    12/13/2008

    50. 2008

    9712/13/2008

    51. 2008RFID2008

    pp. 111-11912/4/2008 52. J. C. Chen, C. J. Sun, and C. C. Chen, 2008, Capacity Planning System for IC Final Test Plant, the 9th

    Asia Pacific Industrial Engineering & Management Systems Conference, Bali, Indonesia, December 3 - 5,

    2008.

    53. C. W. Chen, J. C. Chen, and C. J. Lin, 2008, Finite Capacity Requirements Planning with Equipment Capability and Dedication for Semiconductor Manufacturing, the 9th Asia Pacific Industrial Engineering

    & Management Systems Conference, Bali, Indonesia, December 3 - 5, 2008.

    54. J. C. Chen, G. C. Chao, C. J. Sun, and C. C. Chen, 2008, A Study of Order Assignment for Multiple Color Filter Fabs, the 9th Asia Pacific Industrial Engineering & Management Systems Conference, Bali,

    Indonesia, December 3 - 5, 2008.

    55. 2008

    (I) 56. Y. H. Hsieh, C. J. Lin, H. C. Chen, T. T. Huang, and J. C. Chen, 2007, Reading Performance of Chinese

    Text with Automatic Scrolling, the 12th International Conference on Human-Computer Interaction,

    Beijing, China, July 22 - 27, 2007.

    57. 2007

    pp. 2-18 ~ 2-2611/30/2007

    58. 2007

    11/29/2007

    59. 2007 (2/2)

    pp. 191 - 192TaipeiTaiwan

    60. 2007

    pp. 192 - 193TaipeiTaiwan

    61. 2007

    pp. 82 - 83TaipeiTaiwan 62. J. C. Chen, C. W. Chen, and C. J. Lin, 2007, Capacity Planning for Serial and Batch Machines with

    Capability for Wafer Fabrication Plant, Proceedings of the 37th International Conference on Computers

    and Industrial Engineering, Alexandria, Egypt, pp. 2444-2451, October 20 - 23, 2007.

    63. Y. M. Fei, C. J. Lin, and J. C. Chen, 2007, Verification of A Computer Assisted Creativity Assessment System, Proceedings of the 37th International Conference on Computers and Industrial Engineering,

    Alexandria, Egypt, pp. 512-519, October 20 - 23, 2007.

  • 153

    Publications

    64. J. C. Chen, C. S. Chiang, B. B. Chen, and C. W. Chen, 2007, Solving Vehicle Routing Problem with Time Window Constraints, Proceedings of 2007 International Conference on Service Systems and Service

    Management (ICSSSM07), Chengdu, China, June 9 - 11, 2007 (EI).

    65. 2006

    pp. 5-54 - 5-61

    66. 2006

    67. C. E. Wang, J. C. Chen, H. M. Wee, K. J. Wang, and Y. S.Lin, 2006, Supply Chain Inventory Strategies

    Using Fuzzy Neural Network, Proceedings of the 9th

    Joint Conference on Information Sciences (JCIS

    2006), Kaohsiung, Taiwan, October 8 - 11, 2006 (EI).

    68. J. C. Chen and C. W. Chen, 2006, A Study of Order Assignment with Equipment Capability and Dedication for Multiple Wafer Fabs, Proceedings of the 2

    nd International Conference From Scientific

    Computing to Computational Engineering (2nd

    IC-SCCE), Athens, Greece, July 5 - 8, 2006.

    69. 2005

    70. C. J. Lin, J. C. Chen, and C. W. Yang, 2005, Applying the Human Reliability Growth Analysis System

    (HRGAS) to the Improvement Strategy of Human-machine Systems, Proceedings of the Sixth Asia-Pacific

    Conference on Industrial Engineering and Management Systems (APIEMS 2005), Manila, Philippines.

    71. Y.-S. Lin, J. C. Chen, K.-J. Wang, and C. F. Chien, 2005, A Fundamental Resource Allocation Model

    Using Genetic Algorithm under A Fuzzy Environment, . 72. M. J. Chen, J. C Chen, C. F. Lan, and P. Chang, 2005, The Development of Smart Phone System in Home

    Care Evaluation, Proceedings of the 7th International Workshop on Enterprise Networking and Computing

    in Healthcare Industry, Busan, Korea.

    73. C.-S. Chiang, S.-Y. Lin, and J.C. Chen, 2005, The Cyclographic Maps for Bezier Curve, Proceedings of the 35th International Conference on Computers and Industrial Engineering, Istanbul, Turkey, Vol. I, pp.

    453-458, June 19 - 22, 2005.

    74. J. C. Chen, C. W. Chen, J. Y. Shiau, and C. S. Chiang, 2005, A Study of Load Allocation with Equipment Capability and Dedication for Wafer Fab, Proceedings of the 35th International Conference on Computers

    and Industrial Engineering, Istanbul, Turkey, Vol. I, pp. 423-428, June 19 - 22, 2005.

    75. 2005

    pp. 16 - 26 76. S. M. Wang, K. J. Wang, H. M. Wee, and J. C. Chen, 2005, An Economic Capacity Planning Model

    Considering Inventory and Capital Time Value, International Conference on Computational Science and

    its Applications (ICCSA 2005), Singapore.

    77. 20052005

    78. 2004IC (1/2)

    p. 114TaipeiTaiwan

    79. 2004

    p. 27TaipeiTaiwan 80. J. Y. Shiau, J. C. Chen, Y. J. Lin, and C. M. Chang, Architecture of Distributed Conceptual Design System

    for EMS Providers, Proceedings of the 34th International Conference on Computers and Industrial

    Engineering, San Francisco, CA, November 14 - 16, 2004.

    81. Y. S. Lin, J. C. Chen, and K. J. Wang, 2004, Knowledge Discovery of Dispatching Rules in

    Semiconductor Testing Industry2004

    p. 104TaipeiTaiwan

    82. , , , 2004, , , Jun 4, 2004.

    83. J. C. Chen, R. T. Yang, K. M. Peng, and C. C. Wang, 2004, Layout Improvement for Wafer Fabrication Plants, Proceedings of the 33

    rd International Conference on Computers & Industrial Engineering, Jeju,

    Korea, CIE432.

    84. J. C. Chen, J. Y. Shiau, P. F. Cheng, and Y. J. Tsai, 2004, A Hybrid Heuristic for Vehicle Routing Problem with Time Window Constraints, Proceedings of the 33

    rd International Conference on Computers &

    Industrial Engineering, Jeju, Korea, CIE042.

    85. J. C. Chen, C. W. Chen, and H. Rau, 2004, Integrated Capacity Planning for Semiconductor Fabrication, Proceedings of the 33

    rd International Conference on Computers & Industrial Engineering, Jeju, Korea,

    CIE403.

  • 154

    NTHU IEEM Annual Report 2012

    86. 20032003

    pp. 95 - 116

    87. 20032003

    10/21 - 10/23/2003 88. J. C. Chen, P. F. Chang, B. B. Chen, C. S. Chen, and C. W. Chen, 2003, Application of Vehicle Routing

    Problem with Hard Time Window Constraints Using Hybrid Meta-Heuristics, Proceedings of International

    Conference on High Performance Scientific Computing 2003, Hanoi, Vietnam, p. 28.

    89. J. C. Chen, G. M. Peng, C. J. Sun, J. J. Wang, P. F. Chang, and R. D. Dai, 2003, Layout Improvement for the Facility Design of Semiconductor Fabrication, Proceedings of International Conference on High

    Performance Scientific Computing 2003, Hanoi, Vietnam, p. 29.

    90. C. W. Chen, J. C. Chen, Y. C. Fan, and C. J. Sun, 2003, Finite Capacity Requirements Planning with Capability for Multiple Wafer Fabs, Proceedings of International Conference on High Performance

    Scientific Computing 2003, Hanoi, Vietnam, p. 27.

    91. J. C. Chen, C. J. Lin, H. Rau, C. W. Chen, and J. C. Tyan, 2002, Capacity Planning with Capability for Multiple Fabs, Proceedings of the 30th International Conference on Computers & Industrial Engineering,

    Greece, pp. 125-130.

    92. C. J. Lin, J. C. Chen, H. Rau, H. J. Chen, and C. W. Huang, 2002, The Effect of Large Display Sizes on the Musculoskeletal System in Visual Display Terminal Workstations, Proceedings of the 30th

    International Conference on Computers & Industrial Engineering, Greece, pp. 557-562.

    93. H. Rau, C. J. Lin, J. C. Chen, H. M. Wee, and M. Y. Wu, 2002, An Integrated Inventory Model for Deteriorating Item with Exponentially Varying Demand, Proceedings of the 30th International Conference

    on Computers & Industrial Engineering, Greece, pp. 743-748.

    94. J. C. Chen, C. S. Chen, B. J. Chen, M. Lay, L. Liu, B. Lee, S. Huang, W. Chang, and D. Huang, 2001, Application of Vehicle Routing Problem with Hard Time Window Constraints, Proceedings of the 29th

    International Conference on Computers & Industrial Engineering, Montreal, Canada, pp. 533-538.

    95. J. C. Chen, C. J. Lin, C. Y. Hsiao, and C. W. Chen, 2001, A Study of Priority Distribution and Setting in Wafer Fabs, Proceedings of the 29th International Conference on Computers & Industrial Engineering,

    Montreal, Canada, pp. 20-25.

    96. 2000III

    p. 116TaipeiTaiwan

    97. 2000

    pp. 1 - 16TaipeiTaiwan

    98. 2000

    pp. 26 - 41TaipeiTaiwan

    99. 2000

    TaipeiTaiwan

    100. 2000

    TaipeiTaiwan

    101. 1999 (II)

    TaipeiTaiwan

    102. 1999

    pp. 266 - 271HsinchuTaiwan 103. J. C. Chen, Y. C. Fan, J. Y. Wang, T. K. Lin, S. H. Leea, S. C. Wu, and Y. J. Lan, 1999, Capacity Planning

    for a Twin Fab, In Proceedings of the Eighth International Symposium on Semiconductor Manufacturing

    (ISSM), Santa Clara, California, U. S. A., pp. 317 - 320 (EI).

    104. 1999pp.

    143-148Yunlin, Taiwan

    105. 1999

    pp. 149-156Yunlin, Taiwan

    106. 1999

    pp. 1-8Yunlin, Taiwan

    107. 1998

    pp. c13-c16ChanghuaTaiwan

    108. 1998 Sherbrooke

    p. 8, Taoyuan, Taiwan

  • 155

    Publications

    109. 1998

    Yunlin, Taiwan, pp. 167 - 174

    110. 1998

    Taipei, Taiwan, pp. 1 - 63 111. J. C. Chen, C. C. Chien, H. H. Tseng, C. C. Wang, and T. C. Chang, 1997, A Systematic Approach for IC

    Fab Design, In Proceedings of the Sixth International Symposium on Semiconductor Manufacturing

    (ISSM), San Francisco, California, U. S. A., pp. P15-P18 (EI).

    112. J. C. Chen, T. C. Du, and H. Rau, 1997, A Study of Order Picking Policies, In Proceedings of the 2nd International Conference on Material Handling and the 15th International Conference on Automation in

    Warehousing, Beijing, China, pp. 272-276.

    113. H. Rau, J. C. Chen, and T. C. Du, 1997, A Study of Determination of Pallet Loads of AS/RS, In Proceedings of the 2nd International Conference on Material Handling and the 15th International

    Conference on Automation in Warehousing, Beijing, China, pp. 320-324.

    114. T. C. Du, H. Rau, and J. C. Chen, 1997, The Urban Vehicle Routing Problem: A Heuristic Approach, In Proceedings of the 2nd International Conference on Material Handling and the 15th International

    Conference on Automation in Warehousing, Beijing, China, pp. 43-47.

    115. 199784 - 85

    pp. 85-88

    116. 1997

    pp. c18-c21HsinchuTaiwan

    117. 1997

    pp. c22-27HsinchuTaiwan

    118. 1996

    pp. 448-454TaipeiTaiwan

    119. 1996

    pp. 779-786TaipeiTaiwan 120. J. C. Chen, T. C. Du, and W. S. Lee, 1996, A Simulation Study of Operation Control Policies for an

    AS/RS, In Proceedings of the Fourth International Conference on Automation Technology, Vol. 1, pp.

    389-396, Hsinchu, Taiwan.

    121. J. C. Chen, L. H. Chang, C. K. Yang, T. S. Long, and C. P. Hung, 1996, A Study of Scheduling Algorithms for Different Criteria Under Different Time Constraints, In Proceedings of the Fourth

    International Conference on Automation Technology, Vol. 1, pp. 65-72, Hsinchu, Taiwan.

    122. 1996

    pp. 539-545

    123. 1995

    pp. 120-127ChungliTaiwan

    124. 1995

    pp. 799-807ChungliTaiwan

    125. 1995Building A Knowledge Object Relationship Model

    pp. 532-539ChungliTaiwan

    126. 1995

    pp.

    927-937ChungliTaiwan

    127. 1995

    pp. 938-947ChungliTaiwan 128. J. C. Chen, W. S. Lee, and D. P. Wu, 1995, A Simulation Study of Crane Control Policies for AS/RS, In

    Proceedings of the 27th CIRP International Seminar on Manufacturing Systems, Ann Arbor, Michigan, U.

    S. A.

    129. J. C. Chen, 1994, Characterizing Scheduling Problems in Manufacturing Systems, In Proceedings of The Third International Conference on Automation Technology, Vol. 4, pp. 53-58, Taipei, Taiwan.

    130. J. Chen, S. Lu, W. Chan, and S. Chang, W. Dai, J. C. Chen, 1994, Development of SLAM II Based Simulation Testbed for Evaluating Photolithography Area Scheduling/Dispatching Schemes in IC

    Fabrication, In Proceedings of the Third International Conference on Automation Technology, Vol. 4, pp.

    193-200, Taipei, Taiwan.

    131. J. C. Chen, 1994, State-Dependent Scheduling and Control for Flow Shops, In Proceedings of R.O.C. Automatic Control Conference, pp. 403-409, Taoyuan, Taiwan.

  • 156

    NTHU IEEM Annual Report 2012

    132. J. C. Chen and A. Thesen, 1993, Optimal Robot Scheduling in Manufacturing Cells, ORSA/TIMS Joint National Meeting, Chicago, Illinois, U. S. A.

    133. J. C. Chen and A. Thesen, 1992, State-Dependent Scheduling for Flow Shops, ORSA/TIMS Joint National Meeting, San Francisco, California, U. S. A.

    134. J. C. Chen and A. Thesen, 1992, State-Dependent Robot Scheduling Using Simulated Semi-Markov Decision Processes, ORSA/TIMS Joint National Meeting, Orlando, Florida, U. S. A.

    135. J. C. Chen and A. Thesen, 1991, Simulation and Semi-Markov Decision Processes for Real-Time Scheduling, ORSA/TIMS Joint National Meeting, Anaheim, California, U. S. A.

    136. L. Chen and J. C. Chen, 1990, A Fast Simulation Approach for Tandem Queueing Systems, Proceedings of the Winter Simulation Conference, O. Balic, R. P. Sadowski, R. E. Nance (eds), pp. 539-546 (EI).

    Technology Transfer 1. 2012

    2. 2011NSC 100-2622-E-007-022-

    CC2

    3. Y1 AutoMod 2010 NSC

    98-2622-E-011-020-CC2, NSC 99-2622-E-011-011-CC2

    4. 2007NSC 96-2622-E-033-004-CC3

    5. 2006NSC 95-2622-E-033-006-CC3

    6. 2005

    7. 2005NSC 94-2622-E-033-010-CC3

    8. 2004NSC 93-2622-E-033-013-CC3

    9. 2003NSC 92-2622-E-033-008-CC3

    10. 2002NSC

    91-2622-E-033-009-CC3

    11. 1998NSC 87-2213-E-033-007

    Project List: NSC Projects 1. (1/3 - 3/3)NSC 101-2221-E-007-134-MY3101/08

    - 104/07

    2. () (3/3)NSC

    100-2622-E-007-022-CC2100/09 - 101/08

    3. () (2/3)NSC

    99-2622-E-011-011-CC299/09 - 100/08

    4. TFT-LCD (1/3 - 3/3)NSC 99-2221-E-011-156-MY399/08

    - 102/07

    5. : Gavriel Salvendy, Department of Industrial Engineering, Tsinghua University, P.

    R. ChinaNSC 99-2912-I-011-0182010

    6. : James M. Tien, Department of Electrical and Computer Engineering, University

    of Miami, Coral Gables, Florida, USANSC 99-2912-I-011-0192010

    7. RFID NSC 99-2623-E-011-006-D99/01 -

    99/12

    8. () (1/3) NSC

    98-2622-E-011-020-CC298/09 - 99/08

    9. (III) ()NSC

    99-2811-E-011-01199/03 - 99/07

    10. (III) NSC 98-2221-E-011-157

    98/08 - 99/07

    11. (II) NSC 97-2221-E-033-027

    97/08 - 98/07

    12. (I) NSC 96-2221-E-033-015

    96/08 - 97/07

  • 157

    Publications

    13. - NSC 96-2622-E-033-004-CC3

    96/05 - 97/04

    14. NSC 95-2221-E-033-093

    95/08 - 96/07

    15. (2/2) NSC 95-2212-E-033-00495/08 - 96/07

    16. - NSC 95-2622-E-033-006-CC3

    95/05 - 96/04

    17. 095-2917-I-033-001

    95/03 - 96/03

    18. (1/2) NSC 94-2212-E-033-01594/08 - 95/07

    19. NSC 94-2815-C-033 -023 E

    94/07 - 95/02

    20. NSC 94-2815-C-033 -022 E

    94/07 - 95/02

    21. - NSC 94-2622-E-033-010-CC3

    94/05 - 95/04

    22. NSC 94-2623-7-033-003

    94/01 - 94/12

    23. IC (2/2) NSC 93-2212-E-033-00393/08 - 94/07

    24. - NSC 93-2622-E-033-013-CC3

    93/05 - 94/04

    25. IC (1/2) NSC 92-2212-E-033-00592/08 - 93/07

    26. NSC 92-2815-C-033-002-E

    92/07 - 93/02

    27. - NSC 92-2622-E-033-008-CC3

    92/06 - 93/05

    28. (3/3) NSC 91-2212-E-033-01491/08 - 92/07

    29. - NSC 91-2622-E-033-009-CC3

    91/06 - 92/05

    30. (2/3) NSC 90-2212-E-033-01390/08 - 91/07

    31. (1/3) NSC 89-2212-E-033-02689/08 - 90/07

    32. (3/3) NSC89-2212-E-033-01388/08 -

    89/07

    33. (2/3) NSC88-2213-E-033-01087/08 -

    88/07

    34. (3/3) NSC 87-2622-E-002-004

    87/02 - 88/01

    35. (1/3) NSC 87-2213-E-033-00786/08

    - 87/07

    36. NSC 87-2623-D-033-00186/07 -

    87/06

    37. (2/3) NSC 86-2622-E-002-016

    86/02 - 87/01

    38. (3/3) NSC 86-2213-E-033-00785/08 - 86/07

    39. (1/3) NSC 85-2622-E-002-018

    85/02 - 86/01

    40. (2/2) NSC 85-2212-E-033-01584/08 - 85/07

    41. (2/3) NSC 85-2213-E-033-00484/08 - 85/07

    42. FMS NSC 84-2213-E-033-00483/08 - 84/07

    43. (1/2) NSC 84-2212-E-033-01883/08 - 84/07

    44. NSC 84-2212-E-002-07383/08 - 84/07

    45. (1/3) NSC 84-2213-E-033-00983/08 - 84/07

  • 158

    NTHU IEEM Annual Report 2012

    Project List: Non-NSC Projects 1. Y1Y2101/09 - 102/08

    2. 101/08 - 101/12

    3. (2/4)101/04 -

    102/03

    4. 101/2 - 101/12

    5. (3/3)100/09 - 101/08

    6. 100/06 -

    100/09

    7. 100/04 -

    101/12

    8. (1/4)100/04 -

    101/03

    9. 100/02 - 100/4

    10. 100/01 - 100/12

    11. PouChen-Nike 99/09 - 102/02

    12. (2/3)99/09 - 100/08

    13. 99/02- 99/12

    14. -99/01 - 99/06

    15. (1/3)98/09 - 99/08

    16. -98/10 -

    98/12

    17. -98/10 - 98/12

    18. 98/09 - 99/01

    19. 98/09 - 99/01

    20. -98/03 - 98/08

    21. 98/01 - 98/12

    22. 97/11 - 97/12

    23. 97/09 - 98/06

    24. 97/09 - 98/06

    25. Y197/08 - 98/07

    26. (7353C23100B2)97/04 - 97/11

    27. 97/01 - 97/12

    28. 96/09 - 97/06

    29. 96/09 - 97/06

    30. XR96403P803PE

    96/04 - 96/11

    31. 96/04 - 96/11

    32. 95/11 - 96/10

    33. 95/11 - 96/06

    34. 95/09 - 96/06

    35. 95/09 - 96/06

    36. XR95405P805PE95/04 - 95/11

    37. A Simulation Study of Dispatching Policies with AMHS Constraints

    95/03 - 95/08

    38. -94/09 - 95/06

    39. 94/08 - 95/02

    40. - APS94/05

    - 95/10

    41. APSEMS94/05 - 95/10

  • 159

    Publications

    42. 94/01 - 94/04

    43. 94/01 - 94/06

    44. 94/01 - 94/06

    45. 93/09 - 94/06

    46. 93/03 - 94/02

    47. RFID93/02 - 93/07

    48. Capacity Planning for 0.13m Process at TSMC92/11 - 93/03

    49. 92/09 - 93/06

    50. 92/09 - 93/06

    51. 92/08 - 92/12

    52. 3C92/03 - 93/02

    53. 91/11 - 92/06

    54. 91/07 - 91/12

    55. Mitac91/06 - 92/12

    56. BOM91/04 - 91/12

    57. 91/03 - 92/02

    58. 90/06 - 90/11

    59. e-Business IT 90/04 -

    90/11

    60. 90/03 - 91/04

    61. 90/03 - 91/02

    62. IC 89/05 - 89/10

    63. Quick Response to Customer Demands at AMT89/03 - 91/01

    64. AMT Delivery Routine Study89/02 - 89/11

    65. FedEx Order Picking Study Part IFedEx89/02 - 89/11

    66. FedEx Order Picking Study Part II89/02 - 89/11

    67. Customer Relationship Management ()89/1 - 89/12

    68. Supply Chain Management Research ()89/1 - 89/12

    69. 88/12 - 90/11

    70. Modeling of IC Packaging Factory88/12 - 89/12

    71. IC (2/2)88/08 - 89/12

    72. 88/07 -

    89/06

    73. Anco's Shop Floor Control88/04 - 88/08

    74. 88/03 - 88/04

    75. Manufacturing Resources Planning (MRP II) Research,88/2 - 88/12

    76. Merck: Diagnosis of Production DepartmentMerck87/11 - 88/02

    77. 87/11 - 89/10

    78. Capacity Planning and Time Study87/11 - 88/10

    79. IC (1/2)87/08 - 88/06

    80. Facilities Planning87/07 - 87/09

    81. ,87/07 - 88/06

    82. 87/07 - 88/06

    83. CY86-RG-00487/06 - 89/05

    84. IC87/05 - 87/08

    85. 86/12 - 87/04

    86. Batch (2/2) 873K37BH186/09 -

    87/06

    87. 86/07 - 87/05

    88. 85/11 - 87/10

    89. VIS Plant Layout and Simulation Research85/09 - 86/06

  • 160

    NTHU IEEM Annual Report 2012

    90. Batch (1/2) 863K37AH485/09

    - 86/06

    91. TSMC Fab 5A Layout Evaluation & Improvement85/07 - 85/09

    92. (2/2)85/07 - 86/06

    93. 85/04 - 85/06

    94. (1/2)85/01 - 85/06

    95. 84/10 - 85/03

    96. 84/09 - 85/06

    97. 84/08 - 85/07

    98. Repetitive/Batch (2/2)84/08 - 85/07

    99. 83/11 - 85/10

    100. 83/09 - 84/08

    101. Repetitive/Batch (1/2)83/09 - 84/08

    102. 83/02 - 83/06

    103. 82/10 - 83/09

    104. 82/09 - 83/03

    Honor and Awards 2012 (Marquis Whos Who in the World 2013)

    2011 100

    2011 100

    2011 117

    2010 - 2013

    2009

    2009

    2009

    2008

    2005 - 2007

    2001 - 2003

    1991 - 1992 IBM Manufacturing Research Graduate Fellowship

    1983