  • Emily Bertolini RRD

    Jim Sobieraj, PE David Carstens

  • Traditional NFA Approach Site Characterization Site-wide Remediation NFA Report Submittal DEQ Approval

  • Whats Different with a Partial NFA? Limited to area, medium, contaminant Submit NFAs as cleanup is completed

  • Case Study: Former Numatics Sites

  • Whos Involved? Are we done yet?

    Theres a lot to do!

    Arent they done yet?

    DEQ

    Former Property Owner

    Former Owners

    Consultant

    Current Property Owners

    Manage that risk!

  • Project Obstacles

    Ope

    ratio

    nal H

    isto

    ry

    Different Operations Multiple COCs Small and large sources G

    eolo

    gic

    Sett

    ing Different

    media Heterogeneity between sites

    No

    Furt

    her A

    ctio

    n One Goal multiple possible pathways

  • Case Study: N. Milford Road Facility Numatics operated at

    the site from 1956 - 2008 Facility manufactured

    air-valve components 76,000 ft2 building

  • Site History: N. Milford Road Facility Fuel oil USTs Septic System Dry well and infiltration

    system Infiltration Pond Discharges to ground

    surface

    FORMER USTs

    FORMER SEPTIC

    INFILTRATION POND WASTEWATER

    INFILTRATION SYSTEM

  • Site Investigation: N. Milford Road Facility Major Environmental Concerns Chlorinated solvents (PCE) in onsite soil and

    GW, offsite GW Minor Environmental Concerns Mercury released within facility Metals, PAHs, PCBs, and TPH in onsite soil

  • Site Challenges

    How can we address the minor concerns without waiting for cleanup of the PCE plume?

    Site Cleanup

    Non-VOCs in

    Soil

    VOCs in Soil PCE Plume

  • Site Solution

    Recognize Challenges

    Define a Goal for

    Remediation

    Divide the Site

    Subdivide by COCs and

    Media

    Define Path for each

    Partial NFA

    No Further Action for Entire Site

  • Remediation Strategies Site was divided by

    area: onsite and offsite Remediation targeted

    specific COCs by area Strategies focused on

    incremental NFAs

    ONSITE

    OFFSITE

  • Remedial Milestones

    Remediation No Further Action 2005 2009: Site Investigation 2014: NFA approved for metals in GW 2009 2013: Onsite Treatment 2015: NFA approved for all COCs in onsite soil 2009 - 20??: Offsite Treatment 2015: NFA pending for VOCs and PAHs in onsite GW 20??: Site Closure for all COCs and media

  • Remedial Progress Were getting somewhere

    Theres still more to do!

    Almost done onsite

    DEQ

    Former Property Owner

    Former Owners

    Consultant

    Current Property Owner

    Keep going

  • Case Study: Former Numatics Sites

  • Case Study: E. Highland Road Facility Numatics operated at

    the site from 1974 - 1996 Facility was used for

    precision grinding and honing of stainless steel bars 12,000 ft2 building

  • Site History: E. Highland Road Facility

    FORMER DRY WELLS

    SEPTIC

    FORMER USTs

    Wastewater USTs Septic System Dry wells Transformer release

  • Site Investigation: E. Highland Road Facility Major Environmental Concerns PCBs in onsite soil VOCs in onsite soil, onsite and offsite GW Freon-113 PCE Trichlorobenzenes (TCBs)

    Minor Environmental Concerns Nickel (Ni) and Copper (Cu) in onsite soil and GW

  • Site Challenges PCE

    in GW

    How can we address the complex, multiple, overlapping concerns in an organized fashion?

    Site Cleanup

    Ni/Cu in Soil

    PCE in Soil

    PCBs in Soil

    Freon-113 in GW

    TCBs in GW

    Ni/Cu in GW

  • Site Solution

    Recognize Challenges

    Define a Goal for

    Remediation

    Defined the Site

    Characterized Aquifer Unit

    and Clay Zone

    Subdivide site by COCs and Media

    Define Path for each

    Partial NFA

    No Further Action for Entire Site

  • Remediation Strategies IRDC for onsite PCBs

    Remediation AS/SVE to address PCE in

    soil MIP investigation define

    extent of Freon-113 Targeted injections to

    address TCBs

    FREON-113 INVESTIGATION

    AREA AS/SVE SYSTEM

    TCB INJECTION AREA

    Ni/Cu Area PCB IRDC

  • Remedial Milestones

    Remediation No Further Action 2005 2012: Site Investigation 2013: NFA approved for Freon-113 in GW 2006 2008: IRDC for PCBs in soil 2015: NFA approved for Ni/Cu in soil and GW 2010 2014: VOC treatment in soil 2015: NFA pending for PCE in soil 2013 20??: TCB treatment & monitoring 20??: Site Closure for all COCs and media

  • Remedial Progress Were getting somewhere

    Theres still more to do!

    Almost done onsite

    DEQ

    Former Property Owner

    Former Owners

    Consultant

    Current Property Owner

    Keep going.

  • Not applicable to simple sites Requires continuous adaptation

    to closure strategy in response to new data

    Potential for increased reporting costs

    Pros: Cons: Facilitates administrative focus to

    closure Demonstrates value to

    responsible party through tangible progress

    Potential for reduced cost

    Right for Your Site?

  • Questions?

  • [email protected]; [email protected] www.michigan.gov/deq

    Sign up for email updates Follow us on Twitter @MichiganDEQ

    mailto:[email protected]:[email protected]

    Slide Number 1Traditional NFA ApproachWhats Different with a Partial NFA?Case Study: Former Numatics SitesWhos Involved?Project ObstaclesCase Study: N. Milford Road FacilitySite History: N. Milford Road FacilitySite Investigation: N. Milford Road FacilitySite ChallengesSite SolutionRemediation StrategiesRemedial MilestonesRemedial ProgressCase Study: Former Numatics SitesCase Study: E. Highland Road FacilitySite History: E. Highland Road FacilitySite Investigation: E. Highland Road FacilitySite ChallengesSite SolutionRemediation StrategiesRemedial MilestonesRemedial ProgressRight for Your Site?Questions?Contact Us for More Info