Jonathan Shue ID: 558406 Constructing Environments - Assignment 2: Full Size Option 1: In situ

Upload: jshue

Post on 10-Mar-2016

215 views

Category:

Documents


0 download

DESCRIPTION

Julians tute group

TRANSCRIPT

Page 1: Jshue a2 interim

Jonathan Shue ID: 558406

Constructing Environments -

Assignment 2: Full Size Option 1: In situ

                     

   

             

Page 2: Jshue a2 interim

Site:    Williams  Cove,  121  Kororit  Creek  Road,  Williamstown  Construction  Company:  Stonehenge    Introduction:  These  are  luxury  houses  on  a  173  m2  piece  of  land  with  a  view  onto  the  lake,  open  living  areas  and  balconies.  It  is  three  stories  high  consisting  of  3  bedrooms  and  a  double  garage.    Materials    

• Bricks:  Strong  in  compression  • Square  hollow  system  (SHS)  Structural  steel  • Timber:  is  ductile  and  not  as  brittle,  low  embodied  energy,  as  it  is  sourced  

locally  so  is  cost  effective  as  well.  Needs  to  be  kept  away  from  moisture  and  water.  

• Reinforced  Concrete:  hard  durable  flooring  system.  (Compressive  strength  of  32MPa)  

• Bolts:  some  4.6  (460mPa)  commercial  bolts  and  some  8.8  High  Strength  • Mortar:  mix  with  limestone,  cement  and  water.  • Nails  

 Structural  Features    Footings:  Strip  footings  are  used  which  run  around  the  outside  of  the  house  with  dimensions  typically  200  x  300.  The  concrete  slab  sits  on  top  of  the  footings.    Slab:  takes  the  live  load  of  occupants  and  transfers  loads  from  walls  to  the  footings    Brick  wall  for  garage  is  double  skin  load  bearing  wall.    

Page 3: Jshue a2 interim

Timber  Stud  Frame,  Load  bearing  wall.  -­‐Temporary  Bracing  is  attached  until  second  floor  is  erected  and  will  provide  lateral  stability.  -­‐Noggins  to  prevent  buckling  in  vertical  studs.  Unsure  of  strength  as  didn’t  get  to  see  up  close.    Structural  Steel:  Works  together  with  the  timber  in  the  walls  ,  since  there  is  3  stories  high  and  require  more  strength.  This    Keeps  the  walls  the  same  size  around  the  house  and  not  take  up  more  floor  space.        Detailing  

• Currently  only  a  brick  wall.  • Downpipes  for  drainage  of  stormwater  • Windows  • Plants  • Weep  holes  in  bricks  to  allow  water  to  get  out  and  give  ventilation  • Cladding  to  be  attached  to  timber  stud  walls  later.    

 Connections  

• Footings  and  slab  cast  together  and  are  interconnected  (poured  on  top  of  each  other)  

• Timber  and  steel  framing  for  walls  are  bolted  to  the  concrete  slab.  • Timber  studs,  noggins,  bottom  plates  and  top  plates  are  attached  with  a  

nail  gun.  • Bricks  are  attached  by  mortar.  • The  structural  steel  is  only  a  pin  connection,  although  the  connection  to  

the  slab  is  bolted  it  provides  some  moment  capacity.  It  is  only  when  it  is  tied  into  the  timber  stud  frame  that  it  becomes  a  rigid  connection.  (can  take  lateral  loads).      

                               

Page 4: Jshue a2 interim

• Connection  plates  to  form  a  truss  and  for  joists  to  beam  connection.  

     

• To  the  left,  there  is  a  load  bearing  masonry  brick  wall.    There  is  a  lintel  running  across  the  opening  where  there  is  going  to  be  a  double  garage.    

 • There  will  be  bricks  placed  on  top  of  it,  

which  the  lintel  will  support.    

• The  lintel  transfers  the  loads  along  it  to  the  brick  masonry  walls  on  either  side.  

   

• This  is  the  opening  of  the  living  room  with  big  glass  windows  and  sliding  doors.  • The  span  of  the  opening  is  too  long  to  use  timber  as  it  is  hard  to  get  structural  

timber  more  than  6m  long.  Instead  steel  is  used  as  it  doesn’t  deflect  as  much  and  can  be  prefabricated  to  longer  lengths.  

 • F17  Structural  timber  has  been  placed  inside  the  I  Beam  (Universal  Beam)  to  allow  

connections  to  trusses  as  joists.    

• Ceiling  joists  will  support  the  level  2  floor.