june 20, 2013 ocean city capital plan update

31
J 20 2013 June 20, 2013 Sandy Related Project Update Sandy Related Project Update From January 2013

Upload: oceancitygazette

Post on 17-Jul-2015

282 views

Category:

News & Politics


1 download

TRANSCRIPT

J 20 2013June 20, 2013

Sandy Related Project UpdateSandy Related Project Update From January 2013y

DUNE REPAIRSDUNE REPAIRS

OC OLOCATION COST

CITYWIDE Dune Construction andCITYWIDE Dune Construction and Emergency Berm Construction Complete

Sand Fence, and Beach Grass Installationunderwayunderway

Total Contracted = $ 2.2MTotal Contracted $ 2.2M

6/20/2013 CITY OF OCEAN CITY 2

BAYFRONT REPAIRSBattersea Road Bulkhead ReplacementNorth Street Bulkhead Replacementp2nd & Bay Marina – Removed Safety Hazards3rd Street Bulkhead Emergency Repair10th Street Deck & Railing Repair Cove Walk Bulkhead Replacement (2)

th lkh d d l12th Street Bulkhead and Pavilion Reconstruction16th Street Bulkhead Replacement and DrainageI tImprovementMarcus Harbor Bulkhead ReplacementTonga Harbor Bulkhead ReplacementTonga Harbor Bulkhead Replacement

Total Under Contract  = $ 1.55M

6/20/2013 CITY OF OCEAN CITY 3

RECREATIONAL FACILITIESLOCATION COSTLOCATION COST

34th Street Tennis Surface $    136,000$ ,

Restoration of Parks and Playgrounds $    100,000

PARKING FACILITIES

Parking Lot  Repairs and Meter Replacements $      60,000

6/20/2013 CITY OF OCEAN CITY 4

PUBLIC BUILDINGS

CITY HALL TRANSPORTATION

Ground Floor • Restoration and

CENTER• Remediation isesto at o a d

Mitigation Out to bid complete• Restoration and

29th STREET FIREHOUSE• Replacement and

Mitigation – plansunderway• Replacement and 

Mitigation – plans

underwayVEHICLE MAINTENANCE• In design‐mitigationunderway  • In design‐mitigation phase

6/20/2013 CITY OF OCEAN CITY 5

REPAIRS COMPLETED ON THE FOLLOWINGPUBLIC BUILDINGS

C i C46th S B ildi • Community Center• 46th Street Buildings

• Beach Patrol Buildings • 9th St. Restaurant 

• Music Pier• Bayside Pool House 

• Golf Course Pro Shop 

Totaling =   $ 200k

6/20/2013 CITY OF OCEAN CITY 6

2013 Capital PlanUpdate

BEACH AND BAYBEACH AND BAY

ADA B h P hUPCOMING –JUNE BOND

• ADA Beach Paths Underway  • Easements for south 

end beach fill to be 

• MOBIMATS purchased, i ll i d

finalized• Additional fencing,

installation underway dune grass, MOBIMATS, through Summer 2014

• 2nd Street Beachfrontoutfall upgrade 

g

Funding Required $200kpermitting underway Funding Required $200k

6/20/2013 8CITY OF OCEAN CITY

DREDGINGDREDGING

South Harbor, Sunny Harbor, Venetian HarborCarnival Harbor and Clubhouse Lagoon to be gcomplete this Summer

Total Contracted = $ 1.2M

CDF reinforcement to facilitate additional lagoon dredging

Estimated Cost= $ 300k

6/20/2013 CITY OF OCEAN CITY 9

PAVING DRAINAGE ANDPAVING DRAINAGE AND BULKHEADS

6/20/2013 CITY OF OCEAN CITY 10

2012 F ll 2013 S i2012 Fall ‐ 2013 Spring PAVING TO BEGIN WEEK OF JUNE 17, 2013

Location From To

West Avenue 8th Street 9th Street

7th Street West Avenue Central Avenue

8th Street West Avenue Asbury Avenue

11th Street Wesley Avenue The Boardwalk

6/20/2013 CITY OF OCEAN CITY 11

2012 Fall ‐ 2013 Spring PAVING TO BEGIN WEEK OF JUNE 17, 2013,

Location From ToLocation From To

52nd Street Central Avenue The Beach

Oxford Road To be Patched15’x60’ starting at 

Bnear Bartram

P l Pl T b h il t h dPennlyn Place To be heavily patched

6/20/2013 CITY OF OCEAN CITY 12

2012 Fall ‐ 2013 Spring 

Battersea Road – Urging NJAmW and CMC get this  done ASAPdone ASAP

Pine Road at Bay Avenue  by CMC

8th Street Trenches @ Bay Ave. Intersection‐‐CMC

Tennessee Avenue at Marcus Harbor by CMC

6/20/2013 CITY OF OCEAN CITY 13

2012 Fall/13 Spring Paving: POSTPONED UNTIL FALL 20132012 Fall/13 Spring Paving: POSTPONED UNTIL FALL 2013

Location From To

Pennlyn Place Ocean  The Boardwalk

7th Street Central Avenue The Boardwalk7th Street Central Avenue The Boardwalk8th Street Asbury Avenue Atlantic Avenue

11th Street Central Avenue Wesley Avenue

900 Blk. alley * Palen Avenue Pleasure Avenue800 Blk. Parking Lot Behind City Hall800 Blk. Alley West Avenue Asbury Avenuey y

* Mainly a drainage project need NJAmW to replace sewer 1st

6/20/2013 CITY OF OCEAN CITY 14

2012 Fall ‐ 2013 Spring Paving Continued2012 Fall ‐ 2013 Spring  Paving Continued

Drainage Study 48th to 51st West to WetlandsDrainage Study 48th to 51st West to Wetlands under way

Analysis being accomplished in house;Analysis being accomplished in‐house; 

Report available late summerReport available late summer

Paving & Drainage CITY FUNDED under Contract  =

$1.7M 

6/20/2013 CITY OF OCEAN CITY 15

Utility Company Paving ‐‐ FALL 2013 – w/City ShareUtility Company Paving  FALL 2013  w/City Share12th Street Bay to Simpson South Side

12th @ Simpson intersection

1100 Blk. Simpson 11th to 12th East Side

11th @ Simpson intersection

Stenton Place NJAmWStenton Place NJAmW

Arkansas Avenue NJAmW

Pelham Place SJ GasAsbury Avenue—alleys  900 Block Asbury/Central SJ Gas

Asbury/West SJ Gas

6/20/2013 CITY OF OCEAN CITY 16

2013 Fall ‐ 2014 Spring  ‐‐ $600kLocation From To

Asbury Avenue 42nd Street 39th Street42nd Street West Avenue Central Avenue41st Street West Avenue Central Avenue41 Street West Avenue Central Avenue40th Street West Avenue Central Avenue39th Street West Avenue Central Avenue39th Street West Avenue Central Avenue

2013Fall – 2014 Spring ‐‐ $2.7M ‐‐Merion Park2013Fall  2014 Spring  $2.7M  Merion Park 

Outfall Area 1 Argyle,  Bartram (E), Oxford (N) Pembroke (N)O f ll A 2 P b k (S) O f d (S) S (E)Outfall Area 2 Pembroke (S), Oxford (S), Somerset(E)

Outfall Area 3 Westminster, Bartram (W), Somerset (W)

6/20/2013 CITY OF OCEAN CITY

Outfall Area 3 Westminster, Bartram (W), Somerset (W)

17

2013 Fall ‐ 2014 Spring –Location From To

West Atlantic Blvd. Battersea Road  Gardens ParkwayBridge Road West Atlantic Blvd. Gardens Parkway  Crescent Road West Inlet Road Gardens ParkwayW t S f R d W l R d W t I l t R dWest Surf Road Wesley Road West Inlet RoadWest Inlet Road Battersea Road  West Surf Road

$$1.1M 

West Station Road North Street Battersea RoadSindia Road North Street Battersea RoadHaven Avenue 2nd Street North StreetLanding Road Bulkhead

$650,000

6/20/2013 CITY OF OCEAN CITY 18

2013 Fall ‐ 2014 Spring –p gLocation From To

Haven/West alley 1st Street North StreetHaven/West alley 1st Street North StreetHaven/West alley 2nd Street 1st Street1st Street Bay West AvenueSimpson/Haven alley 2nd Street 1st StreetWarwick Road 1st Street North Street

h b dNorth Street Bay Avenue Asbury Road7th Street Bulkhead

$$850,00028th Street West Avenue Wesley AvenueWesley Avenue 26th Street 24th Street

$500,000

6/20/2013 CITY OF OCEAN CITY 19

2013 Fall ‐ 2014 Spring –Location From To

Simpson Avenue 25th Street 24th Streetp25th Street West Avenue Wesley Avenue26th Street w/drainage Asbury26th Street  w/drainagework to West Avenue

Asbury Avenue

Beach

West/Asbury alley 27th Street 26th StreetWest/Asbury alley 27th Street 26th StreetCentral Avenue 28th Street 24th Street28 h S W A W l A28th Street West Avenue Wesley AvenueCentral/Wesley alley 27th Street 26th StreetCentral/Wesley alley 28th Street 27th Street

$1.3M

6/20/2013 CITY OF OCEAN CITY 20

Fall 2014– Spring 2015 ‐‐$1.3MFall 2014 Spring 2015  $1.3MLocation To From

31st Street Bay Avenue West Avenue

32nd St. ‐ Drainage N/S Bay Avenue Haven Avenueg / y

32nd Street – N/S Haven Avenue Asbury Avenue

33rd Street Bay Avenue Haven Avenue

33rd Street Haven Avenue West Avenue

Simpson Avenue 32nd Street 31st Street

Simpson Avenue 33rd Street 32nd Street

$1.2M

6/20/2013 CITY OF OCEAN CITY 21

Fall 2014– Spring 2015 ‐‐$1.3Mp g $Location From To

Haven/West alley 34th Street 33rd StreetHaven/West alley 34 Street 33 StreetBay/Simpson alley 32nd Street 31st StreetSimpson/Haven alley 33rd Street 32nd StreetSimpson/Haven alley 33rd Street 32nd StreetWest/Asbury alley 34th Street 33rd StreetW /A b ll 33rd S 32nd SWest/Asbury alley 33rd Street 32nd Street

$200kPAVING FUNDING FOR JUNE 2013 BOND = $2.5M

Total Paving & Drainage to be under contractTotal Paving & Drainage to be under contractFall 2013 through Spring 2015   =       $9.1M*

6/20/2013 CITY OF OCEAN CITY

* Current Estimate22

BOARDWALKBOARDWALK

Reconstruction of the Boardwalk starting at 5th Street and working Southerly has been awarded in the amount of                          $1.1M

Extensive patching is to be accomplished between 6th and 12th Streets – Summer 2013 through Spring 2014

Funding required = $150,000

6/20/2013 CITY OF OCEAN CITY 23

PUBLIC BUILDINGS

• 4TH St. LSS Exterior • UST Remediation andRestoration undercontract in the amount

Fuel Pump Rehabin punchlist statusco t act t e a ou t

$613,000• HVAC Improvements

in punchlist statusContracted amount$305 000HVAC Improvements 

at City Hall and at theMusic Pier are in

$305,000• Music Pier Painting, downspouts andMusic Pier are in

punchlist statusdownspouts, and lighting 

to be bid Fall 2013Contracted amount $440,000

– to be bid Fall 2013Funding Required $300k

6/20/2013 24CITY OF OCEAN CITY

Recreational FacilitiesRecreational Facilities

d lk 6th St t R ti• Boardwalk Footbaths and fountains

6th Street Recreation Complex

purchased• 15th Street Playground

– In design stage– Includes 5th Street15 Street Playground

Renovation  to beli h d thi F ll

Parking lot rehabilitationaccomplished this Fall

• Two contracted 

rehabilitation– Construction Bid LateS 2013irrigation projects  in

punch list statusSummer 2013

6/20/2013 25CITY OF OCEAN CITY

Parking and IntermodalParking and Intermodal

HAWK Si lMoorlyn– 8th St. • Parking lot• HAWK Signal grant

received from NJDOT• Parking lot upgradewith connector in– Will provide safe 

crossing of 9th Street ld i h d f

with connector indesign phase

hat Aldrich Road forbicycles and pedestrians

Design in‐house• Construction Fall 

hpedestrians• Design by others

$100 000

2013 thru Spring 2014  Funding

i d$100,000 Required $450,000

6/20/2013 26CITY OF OCEAN CITY

Parking and IntermodalParking and Intermodal

• Meter upgrades to 800 Central Parking lotsubsequent to pavingsubsequent to paving

• Additional Cross Street Decorations and support poles to be installed between 6thsupport poles to be installed between 6and 8th and 9th and 11th on Asbury Avenue f th H lid Sfor the Holiday Season

6/20/2013 CITY OF OCEAN CITY 27

Large Equipment and Trucksg q p• All Planned acquisition  • Fire Apparatusof Pick‐ups, Vans, and Utility vehicles are 

(Pumper)  to be bidthis summer

under contractt s su e

Up to eight cars to be decommissioned and replacedUp  to eight cars to be decommissioned and replaced with six more fuel efficient, models – Ford Focus 4 door & Hatch back– Fleet Reduction of twodoor & Hatch back Fleet Reduction of two.Current cars are rusted out, many parts are no longer available (age range 1998 and 1999)available (age range  1998 and 1999)Insurance from Sandy damage will be utilized

Funding Required $100kFunding Required $100k6/20/2013 28CITY OF OCEAN CITY

June Bond TotalsJune Bond Totals

$ 200 000BEACH  $            200,000 DREDGING $            300,000 

$PAVING   $         2,500,000 BOARDWALK   $            150,000 

$BUILDINGS   $            300,000 REC FACILITIES $            550,000 INTERMODAL   $            450,000 VEHICLES $            100,000 

TOTAL JUNE BOND = $         4,550,000 

6/21/2013 CITY OF OCEAN CITY

$200,000 $450,000 

$100,000 

$300,000 

$150,000 

$2,500,000 

BEACH  PAVING   BOARDWALK  BUILDINGS INTERMODAL VEHICLES

6/20/2013 CITY OF OCEAN CITY 30

BUILDINGS   INTERMODAL   VEHICLES

CAPITAL IMPROVEMENT BOND—PAID DOWN ANNUALLYPolice ATV $8,000 

Weapons/Equip $22,000 p q pMDT’s $20,000 E‐ticket $10,000 $ ,

IT Email Archive Hardware $9,000 Additions to WWANN (south) $4,000Additions to WWANN (south) $4,000 Replacement Server (Finance) $9,000 Application Upgrades $11 000Application Upgrades $11,000 

Fire Power Loader for Ambulance (multi yr Program) $12 000(multi‐yr. Program) $12,000 

2013 CIF TOTAL = $       125,000

6/20/2013 CITY OF OCEAN CITY 31