Kokosing’s Heavy Highway DivisionDesign Build Experience.

• I75 Miami County   2000  ‐ 2002                                   $ 49,549,200.00 • WPAFB ‐West Ramp  2001  ‐ 2002                                   $ 20,553,011.00 • I‐71 Noisewall (Fra/Del)  2005  ‐ 2006                                     $ 8,835,576.00  WVDOH USR 35  WVDOH  2007  ‐ 2009                                   $ 78,073,862.23 • I275 Hamilton Slide    2009  ‐ 2011                                     $ 1,157,800.00 • I70 Belmont County  2009  ‐ 2011                                   $ 23,881,848.00• City of Avon Recreation Lane Bridge   2010  ‐ 2011                                         $ 692,316.00 • CSX Rock Spring  2010  ‐ 2011                                      $ 4,712,336.36 • Patoka River Bridge  2011  ‐ 2013                                    $ 35,124,184.00 • US 20 Sandusky  2011  ‐ 2013                                    $ 12,224,208.50  McQuain Brothers Bridge                      2011  ‐ 2012                                      $ 7,504,820.00 • I670‐I71 Columbus                                  2011  ‐ 2014                                  $ 200,350,000.00 • CSX TR 391/TR150  2011  ‐ 2012                                      $ 2,411,911.00  IR 81 N. Martinsburg                              2011  ‐ 2013                                    $ 35,643,000.00 • I71 Morrow County                                 2011  ‐ 2013                                    $ 42,036,977.00 • I77 D/B Bridges                                        2011  ‐ 2013                            $ 6,911,875.50 

TOTAL TO DATE $  529,662,925.59

#68 – KOKOSING CONST. CO.

$74 millionPutnam County, WV DOH

• Design-build (First and Largest in WV)

• 6.8 miles of new four lane highway

WV 35 D/B

7.5 Million Cubic Yards

2 Sets ofMainline Bridges

130,000 Cubic Yardsof Mainline Concrete Pavement

$ 7.5 millionKanawha County, WV DOH

• Designed and Constructed new Northbound and Southbound Bridges.

• Total bridge length was 344 feet.

• 1,760 cy Concrete.

McQUAIN BROTHERS BRIDGE

2,760 LF new 66” tall Concrete Girders.

$35 millionBerkeley County, WV DOH

• Project length 5 miles

• Full depth asphalt outside shoulders, new third lanes and median with new concrete median wall.

• Widening 4 mainline Bridge Structures

I-81 Martinsburg, WV

New Concrete Median Wall.

96 inch tall at tallest point.

Why Design-Build?1 ) Cost and Schedule

a) A Design Build project is less expensive overall than a Design-Bid-Build project.

b) The Contractor and Designer will work together to reduce costs by efficiently phasing the project and assuring that production is considered in each major component of the design.

c) The public receives the completed project much earlier.

d) Project Cost is also reduced since escalation and finance costs are lower for a project built sooner rather than later.

Why Design-Build?

2 ) Quality

a) We believe that higher levels of quality control and assurance is achieved on these type projects.

Why Design-Build?

3 ) Innovationa) More flexible because of a single responsibility for

design, construction and operations.

b) The Owner stands to gain new ideas that not only save $’s on specific projects but that can be utilized on other projects going forward.

c) The Owner should be careful to not hinder innovation by being too prescriptive.

Enhanced ConstructabilityThe Design Build process allows the Contractor the opportunity to be involved in concurrent “over‐the‐shoulder” reviews of the Designer’s efforts. This allows the Design Build Team to put forth a cost‐effective and customized project design that allows for “ means and methods” that match the Contractors past experiences, abilities, strengths and available resources.

RISK MODELDesign‐Bid‐Build   ~vs~  Design‐Build

0%10%20%30%40%50%60%70%80%90%100%

DBB DB

Contractor Risk

DOH Risk

The Contractor’s PerspectiveAdvantages of Design-Build for Kokosing

• Open venue to apply our innovation • Allows us to direct the design to our strengths• Direct access to Designer to resolve field issues

– RFI’s – 2 to 3 day turnaround

• Design Build works on any size project.• Larger, more complex projects, is where we find the 

Design Build process really pays off.

Contractor’s PerspectivePre‐Bid Efforts

• Tremendous Bidding Effort Involved Up‐Front.– Coordination with Designer – Define Roles & Responsibilities.

– Ensure Common Understanding of Project Scope as Written.

– Develop, Enhance and Reach Agreement on Design Concepts.

– Technical Proposal Development/Writing.

– Detailed Pre‐Bid Schedule.  Proposed dates become contractual.

– Bidding from a Very Limited set of Drawings.

Contractor’s PerspectiveNew Experience for our Employees

• Upfront staffing more intense – Commit personnel long before construction 

begins for design review and optimization

• Additional staffing needs– Plan review during design– Budget control– Subcontractor coordination– Design task force meetings

Contractor’s PerspectiveOther Considerations

Subcontractors and Suppliers. Must bid off of partial plans also.

Heavily Involved in plan development.

Proper upfront staffing and planning is essential.

• Understand that 100% Project Drawings are typically not complete until well into construction.

• Open & Honest Communication. – Creates a partnering atmosphere– Expedites issues resolution– Design Build = 100’s of Meetings 

• Clearly written scope is essential to a successful project for all Parties.

• Accurate and detailed Geotechnical and Environmental data needed pre‐bid.

Contractor’s PerspectiveOther Lessons

Contractors Perspective

Keys to Success• Clear Concise Project Scope.• Bring your ‘A’ Team. • Quick Response Time.• Problem Solving by Committee.• Shared Goals.• Commitment to Safety.• Constant and Open Communication.• Decisions Based on Scope.• Culture of Quality at all Levels.• Equitable Risk Allocation.• Partnering / Team Work Attitude.• Shared Understanding of all Outside Interests.• Open to Alternate Technical Concepts.

One Team + One Goal = SUCCESS !

THANK YOU.