Operator Master Site ID BCF ID 566 Site Name Configuration 2+2+2 Infra Provider BTS Type FLEXI Sharing status Indoor/ Outdoor OUTDOOR Date 12 MAR 2014 FLM Engineer SUKANTA DASH A A.1 A.2 A.3 A.4 A.5 A.6 A.7 B B.1 B.2 B.3 B.4 B.5 B.6 B.7 B.8 B.9 B.10 B.11 B.12 B.13 Alarm no. Alarm Name OK/ Not OK Alarm No. Alarm Name 7401 Site on Battery OK 7407 DG Fail to start 7402 Rectifier Fail OK 7408 Smoke & Fire 7403 Mains Fail OK 7409 DG Fail to Stop 7404 AC Fail/High Temp OK 7410 Low Fuel 7405 Low Battery OK 7411 TMA Fail 7406 Load on DG OK 7412 Door Open B.15 VSWR TRX 1 46 Antenna 1 Antenna 1 TRX 2 46 Antenna 2 Antenna 2 TRX 3 Antenna 3 Antenna 3 TRX 4 Antenna 4 Antenna 4 TRX 5 46 Antenna 5 Antenna 5 TRX 6 45 Antenna 6 Antenna 6 TRX 7 Antenna 7 Antenna 7 TRX 8 Antenna 8 Antenna 8 TRX 9 45 Antenna 9 Antenna 9 TRX 10 45 Antenna 10 Antenna 10 TRX 11 Antenna 11 Antenna 11 TRX 12 Antenna 12 Antenna 12 C INDUS Is the site clean(Shelter for indoor sites)? Is the room cool and AC working(mention room temperature wherever available from P Preventive M BHARTI M&G5675 KHOKARLAGBT_ODF Is there any opening in hatch plate(Ensure proper sealing to close opening)? BTS Check Value for Earth resistance by earth tester( clamp meter) SHARED Site Check Is any visual alarm ON(Check from LEDs-amber/ Red)? Any hardware level alarm(Mention alarm number)? Is the IGB/ EGB connected to Earth pit? Is the alarm frame accessible? Is there any leakage of Shelter? Conduct TRX Test and mention TRX no. where TRX test failed (Replace if applicable)? Is intelligent BTS Shutdown implemented/LVLD implemented and working (Rectify if no Is the BTS clean(for outdoor BTS, clean internal and external and free all air inlets/ outl Is the door lock sensor and Fan working(Outdoor BTS)? Is the BTS grounded with IGB/EGB? Is the alarm cleared during Preventive Maintenance (if not mention reason)? Any software level alarm(mention alarm no.)? Tighten all SMA Cables if loose(Transceiver/ Multicoupler/ Combiner)? Are all cables properly terminated and routed ? Is TMA/TMB installed and in working condition? Check External alarms? Check transmitter power, VSWR and RSSI values( Use Site master / Laptop/ TRX Tes TX Power Microwave Transmission Check

Upload: rachel-curry

Post on 08-May-2017

231 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Khokarlagbt Odf

Operator Master

Site ID BCF ID 566

Site Name Configuration 2+2+2

Infra Provider BTS Type FLEXI

Sharing status Indoor/ Outdoor OUTDOOR

Date 12 MAR 2014 FLM Engineer SUKANTA DASH

AA.1

A.2

A.3

A.4

A.5

A.6

A.7

BB.1

B.2

B.3

B.4

B.5

B.6

B.7

B.8

B.9

B.10

B.11

B.12

B.13

Alarm no. Alarm Name OK/ Not OK Alarm No. Alarm Name7401 Site on Battery OK 7407 DG Fail to start

7402 Rectifier Fail OK 7408 Smoke & Fire

7403 Mains Fail OK 7409 DG Fail to Stop

7404 AC Fail/High TempOK 7410 Low Fuel

7405 Low Battery OK 7411 TMA Fail

7406 Load on DG OK 7412 Door Open

B.15

VSWR

TRX 1 46 Antenna 1 Antenna 1

TRX 2 46 Antenna 2 Antenna 2

TRX 3 Antenna 3 Antenna 3

TRX 4 Antenna 4 Antenna 4

TRX 5 46 Antenna 5 Antenna 5

TRX 6 45 Antenna 6 Antenna 6

TRX 7 Antenna 7 Antenna 7

TRX 8 Antenna 8 Antenna 8

TRX 9 45 Antenna 9 Antenna 9

TRX 10 45 Antenna 10 Antenna 10

TRX 11 Antenna 11 Antenna 11

TRX 12 Antenna 12 Antenna 12

C

INDUS

Is the site clean(Shelter for indoor sites)?

Is the room cool and AC working(mention room temperature wherever available from PIU/ Power Plant/ AC Display)?

Preventive Maintenance ChecklistBHARTI

M&G5675

KHOKARLAGBT_ODF

Is there any opening in hatch plate(Ensure proper sealing to close opening)?

BTS Check

Value for Earth resistance by earth tester( clamp meter)

SHARED

Site Check

Is any visual alarm ON(Check from LEDs-amber/ Red)?

Any hardware level alarm(Mention alarm number)?

Is the IGB/ EGB connected to Earth pit?

Is the alarm frame accessible?

Is there any leakage of Shelter?

Conduct TRX Test and mention TRX no. where TRX test failed (Replace if applicable)?

Is intelligent BTS Shutdown implemented/LVLD implemented and working (Rectify if not working)?

Is the BTS clean(for outdoor BTS, clean internal and external and free all air inlets/ outlets of obstructions)?

Is the door lock sensor and Fan working(Outdoor BTS)?

Is the BTS grounded with IGB/EGB?

Is the alarm cleared during Preventive Maintenance (if not mention reason)?

Any software level alarm(mention alarm no.)?

Tighten all SMA Cables if loose(Transceiver/ Multicoupler/ Combiner)?

Are all cables properly terminated and routed ?

Is TMA/TMB installed and in working condition?

Check External alarms?

Check transmitter power, VSWR and RSSI values( Use Site master / Laptop/ TRX Test)

TX Power RSSI Value

Microwave Transmission Check

Page 2: Khokarlagbt Odf

C.1

C.2

C.3

C.4

C.5

C.6

C.7

C.8

C.9

C.10

C.11 Link Details

To Tx. Freq Rx. Freq Polarization

Link 1 CHICHAL_IND_ODU 14690000 15110000 VERTICAL

Link 2

Link 3

Link 4

Link 5

Link 6

Link 7

Link 8

C.12

Available Time ES SES

Link 1

Link 2

Link 3

Link 4

Link 5

Link 6

Link 7

Link 8

DD.1

D.2

D.3

D.4

D.5

D.6

Sec A Sec A(OAC) Sec A(Exp.) Sec B Sec B(OAC)

Tilt Mech 2 2

Tilt Elect. 0 0

Orientation 30 130

Additional Remarks1 DG not in automation

2 PIU,BB,and Power Plant not Graunded

3 SITE NOT CLEAN

4 LA DIRECTED TO TOWER

5 RLS not as required

6 Low battery backup

7 Aviation lamp not working

Is the BTS synchronized with site E1(Platform interface of the BTS)?

Is there any visual alarm in MUX (if yes clear else put remark)?

Are all IF cables tightened?

Any alarm holding in RRI/ FIFA/ FIU/ MUX/ IDU/ (if not cleared mention alarm details)?

Is the Transmission rack and FIU/ IDU/ MUX grounded?

Are all IF Cables routed properly and grounded?

Is there any visual alarm in FIU(if yes clear else put remark)?

Is there any visual alarm in IDU(if yes clear else put remark)?

Is the MUX synchronized with incoming E1/ STM (mention E1/ STM details- Slot/ Trib)?

Outdoor CheckAre all RF/ IF Cables properly clamped to cable tray (Indoor & Outdoor)?

Are all RF/ IF Cables labelled(Indoor & Outdoor)?

Is the DDF labled and cables properly terminated?

Statistics

(Compare with Planning Data)

Check and correct GSM antenna tilt and orientation (Compare with Planning data)

Are all connectors(at feeders/jumpers/antennas) properly weather poffed and tied?

Are GSM and microwave antennas accessible for maintenance?

Check antenna clamp and support rod tightness

Page 3: Khokarlagbt Odf

sukanta dash Kamalesh Hatewar

(Site Engineer) (Cluster Team Lead)

Page 4: Khokarlagbt Odf

Slave

BSC Name

BSC ID

BSC ET

Site Type

Cluster

Yes/ NoNO

NO

YES

NO

YES

NO

NO

YES

YES

YES

NO

NO

NO

NO

YES

YES

YES

YES

NO

YES

OK/ Not OKOK

OK

OK

OK

OK

OK

2 MASTER 2040

1

1

2

0

0

Yes/ No

470

Is the site clean(Shelter for indoor sites)?

Is the room cool and AC working(mention room temperature wherever available from PIU/ Power Plant/ AC Display)?

Preventive Maintenance Checklist

BSC106TMP

206898

Is there any opening in hatch plate(Ensure proper sealing to close opening)?

BTS Check Remarks

Value for Earth resistance by earth tester( clamp meter)

BTS

Nagpur

Site Check Remarks

Is any visual alarm ON(Check from LEDs-amber/ Red)?

Any hardware level alarm(Mention alarm number)?

Is the IGB/ EGB connected to Earth pit?

Is the alarm frame accessible?

Is there any leakage of Shelter?

Conduct TRX Test and mention TRX no. where TRX test failed (Replace if applicable)?

Is intelligent BTS Shutdown implemented/LVLD implemented and working (Rectify if not working)?

Is the BTS clean(for outdoor BTS, clean internal and external and free all air inlets/ outlets of obstructions)?

Is the door lock sensor and Fan working(Outdoor BTS)?

Is the BTS grounded with IGB/EGB? BTS GRAUNDING THEFT

Is the alarm cleared during Preventive Maintenance (if not mention reason)?

Any software level alarm(mention alarm no.)?

Tighten all SMA Cables if loose(Transceiver/ Multicoupler/ Combiner)?

Remarks

Are all cables properly terminated and routed ?

Is TMA/TMB installed and in working condition?

Check External alarms?

VSWR NOT MEASURED

RSSI VALUE WITHIN LIMIT

Check transmitter power, VSWR and RSSI values( Use Site master / Laptop/ TRX Test)

RSSI Value DAC Value Remark

Microwave Transmission Check Remarks

Page 5: Khokarlagbt Odf

NA

YES

YES

NO

NO

NO

YES

YES

NO

YES

Q1 Address (Compare with Planning Data)

Near End Far End Tx Power Rx Level Capacity VXRB/ FIU

12 -52 4X2E1 FIFA

BBE EB

YES

YES

YES

YES

YES

YES

Sec B (Exp.) Sec C Sec C(OAC) Sec C(Exp.) Sec D Sec D(OAC)

2

0

250

Is the BTS synchronized with site E1(Platform interface of the BTS)?

Is there any visual alarm in MUX (if yes clear else put remark)?

Are all IF cables tightened?

Any alarm holding in RRI/ FIFA/ FIU/ MUX/ IDU/ (if not cleared mention alarm details)?

Is the Transmission rack and FIU/ IDU/ MUX grounded?

Are all IF Cables routed properly and grounded?

Is there any visual alarm in FIU(if yes clear else put remark)?

Is there any visual alarm in IDU(if yes clear else put remark)?

Is the MUX synchronized with incoming E1/ STM (mention E1/ STM details- Slot/ Trib)?

Outdoor CheckAre all RF/ IF Cables properly clamped to cable tray (Indoor & Outdoor)?

Are all RF/ IF Cables labelled(Indoor & Outdoor)?

Is the DDF labled and cables properly terminated?

Statistics

Check and correct GSM antenna tilt and orientation (Compare with Planning data)

Are all connectors(at feeders/jumpers/antennas) properly weather poffed and tied?

Are GSM and microwave antennas accessible for maintenance?

Check antenna clamp and support rod tightness

Page 6: Khokarlagbt Odf

Kamalesh Hatewar

(Cluster Team Lead) (FLM Manager)

Page 7: Khokarlagbt Odf

470

Preventive Maintenance Checklist

BSC106TMP

206898

Remarks

BTS

Nagpur

Remarks

BTS GRAUNDING THEFT

Remarks

VSWR NOT MEASURED

RSSI VALUE WITHIN LIMIT

Check transmitter power, VSWR and RSSI values( Use Site master / Laptop/ TRX Test)

Remark

Remarks

Page 8: Khokarlagbt Odf

Slot Flexbus no.

1 FB1

Sec D(Exp.)

Page 9: Khokarlagbt Odf

(FLM Manager)

Page 10: Khokarlagbt Odf

Operator Master Slave

Site ID BCF ID 566

Site Name Configuration 2+2+2

Infra Provider BTS Type FLEXI

Sharing status Indoor/ Outdoor OUTDOOR

Date 12 MAR 2014 FLM Engineer SUKANTA DASH

Sr No

1

2

3

4

5

6

7

8

9

10

12

13

14

15

16

17

18

19

20

21

22

23

24

24

26

27

28

29

30

31

32

Pre / Post Monsoon ChecklistBHARTI

M&G5675

KHOKARLAGBT_ODF

Pre Monsoon Checklist

Is the Roxtec properly sealed: else seal with puff seal or packing material+insulation tape

DC Fan working status in chiller/Shelter?

BTS and Infra Check List

Description

Shelter Check List

Is the BTS Dust Free : do proper cleaning

Is the BTS Grounded as per Recommendation for Ultra/MR/Metro

Power Plant LVD bypassed ?

Is SA connected to RF feeder cables and grounded ?

INDUS

SHARED

Is the door lock sensor and Fan working(Outdoor BTS)?

Tighten all SMA Cables if loose(Transceiver/ Multicoupler/ Combiner)?

Is any Active alarm present in BTS during the PM? (TRX test,RSSI, Active alarm, Tx Alarm in the node was checked and

cleared or put remarks)

BTS Dust Guard present for Ultra Cabinet?

All the HW units are grounded properly for Flexi BTS( EXGA,EXDA,ESMA,ESEA units)

All external Alarms are reporting and as per standard guideline. If No Mentioned in the Alarm Nos's

MW Outdoor

Availabilty of Check nut for Antenna clamps/support rod and tight properly

Is the site clean(Shelter for indoor sites)?

Is the room cool and AC working(mention room temperature wherever available from PIU/ Power Plant/ AC Display)?

Is there any opening in hatch plate(Ensure proper sealing to close opening)?

Are all cables properly terminated and routed ?

Power Plant supports Dual LVD (critical/non-critical)

Are all the connection terminals/lugs/bolts rust free and tight

Txn Indoor

Sealing of case

Is the Transmission rack and FIU/ IDU/ MUX grounded?

Antenna Radome Intact

Are all IF cables tightened?

Are the strut rods for m/w antennas tight?

Is the Rx level as per the desired/designed level?

Is the DDF labeled and cables properly terminated?

Are the mounting fixtures of the m/w antennas intact?

Flexi Hybrid Dust cleaning and Protection?

Proper sealing cap available with Txn cable connected to System modules?

Unused ports are having sealing boots in system module?

Is there any visual alarm in MUX / FIU / IDU (if yes clear else put remark)?

Page 11: Khokarlagbt Odf

33

34

35

36

37

38

39

40

41

42

43

43

43

1

2

3

Outdoor CablesFeeder grounding kit nut/bolt tight and properly connected to EGB

In case of Outdoor BTS /IP55/IP 65 fan is working

In case of Outdoor BTS /IP55/IP 65 Dust filter is clean

Is ODU connector tight & water proof?

In case of Outdoor BTS /IP55/IP 65 no possibility of leakage from BTS Door and Rubber glands

Is ODU grounded?

General Check List

Access RoadWill the Access Road be inaccessible due to flooding?

Photograph for the site

Is the IGB/ EGB connected to Earth pit?

Weather proofing of GSM antenna ports are ok; else do necessary weatherproofing

Is Lightning Arrestor available and connected to earth ?

Take the snap shot of the site and share with the Bharti and NSN O&M head

Outdoor Cage SheltersAre all RF/ IF Cables properly clamped to cable tray (Indoor & Outdoor)?

Is the roofing sheet intact?(If No, please get the same rectified by the vendor)

Are all connectors(at feeders/jumpers/antennas) properly weather poffed and tied?

Are there any holes, leakages developed through the roof?. (If yes please seal or get the sheets changed.)

Page 12: Khokarlagbt Odf

BSC Name

BSC ID

BSC ET

Site Type

Cluster

Status Remarks

NO

NO

NO

NO

NO

NO

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

NO

YES

NO

YES

NO

YES

YES

NO

NO

YES

YES

YES

YES

Pre / Post Monsoon Checklist

BSC106TMP

Pre Monsoon Checklist

Is the Roxtec properly sealed: else seal with puff seal or packing material+insulation tape

DC Fan working status in chiller/Shelter?

BTS and Infra Check List

Description

Shelter Check List

Is the BTS Dust Free : do proper cleaning

Is the BTS Grounded as per Recommendation for Ultra/MR/Metro

206898

Power Plant LVD bypassed ?

Is SA connected to RF feeder cables and grounded ?

470

BTS

Nagpur

Is the door lock sensor and Fan working(Outdoor BTS)?

Tighten all SMA Cables if loose(Transceiver/ Multicoupler/ Combiner)?

Is any Active alarm present in BTS during the PM? (TRX test,RSSI, Active alarm, Tx Alarm in the node was checked and

cleared or put remarks)

BTS Dust Guard present for Ultra Cabinet?

All the HW units are grounded properly for Flexi BTS( EXGA,EXDA,ESMA,ESEA units)

All external Alarms are reporting and as per standard guideline. If No Mentioned in the Alarm Nos's

MW Outdoor

Availabilty of Check nut for Antenna clamps/support rod and tight properly

Is the site clean(Shelter for indoor sites)?

Is the room cool and AC working(mention room temperature wherever available from PIU/ Power Plant/ AC Display)?

Is there any opening in hatch plate(Ensure proper sealing to close opening)?

Are all cables properly terminated and routed ?

Power Plant supports Dual LVD (critical/non-critical)

Are all the connection terminals/lugs/bolts rust free and tight

Txn Indoor

Sealing of case

Is the Transmission rack and FIU/ IDU/ MUX grounded?

Antenna Radome Intact

Are all IF cables tightened?

Are the strut rods for m/w antennas tight?

Is the Rx level as per the desired/designed level?

Is the DDF labeled and cables properly terminated?

Are the mounting fixtures of the m/w antennas intact?

Flexi Hybrid Dust cleaning and Protection?

Proper sealing cap available with Txn cable connected to System modules?

Unused ports are having sealing boots in system module?

Is there any visual alarm in MUX / FIU / IDU (if yes clear else put remark)?

Page 13: Khokarlagbt Odf

YES

YES

NO

YES

YES

YES

NO

YES

YES

YES

YES

YES

YES

YES

YES

YES

Outdoor CablesFeeder grounding kit nut/bolt tight and properly connected to EGB

In case of Outdoor BTS /IP55/IP 65 fan is working

In case of Outdoor BTS /IP55/IP 65 Dust filter is clean

Is ODU connector tight & water proof?

In case of Outdoor BTS /IP55/IP 65 no possibility of leakage from BTS Door and Rubber glands

Is ODU grounded?

General Check List

Access RoadWill the Access Road be inaccessible due to flooding?

Photograph for the site

Is the IGB/ EGB connected to Earth pit?

Weather proofing of GSM antenna ports are ok; else do necessary weatherproofing

Is Lightning Arrestor available and connected to earth ?

Take the snap shot of the site and share with the Bharti and NSN O&M head

Outdoor Cage SheltersAre all RF/ IF Cables properly clamped to cable tray (Indoor & Outdoor)?

Is the roofing sheet intact?(If No, please get the same rectified by the vendor)

Are all connectors(at feeders/jumpers/antennas) properly weather poffed and tied?

Are there any holes, leakages developed through the roof?. (If yes please seal or get the sheets changed.)

Page 14: Khokarlagbt Odf

Circle Maharashtra and Goa

Site ID M&G5675

Sl.No. Work Performed

RF

GIS Data

1 Configuration 2+2+2

2 Main BTS Type (Flexi/Ultra/Ultra Mini/ MR/Flexi Stck/Metro) FLEXI

3 Main BTS Type (Indoor / Out door) OUTDOOR

4 Expansion BTS type (ultra,flexi,metro,stack,MR etc) N/A

5 Exp BTS Type (Indoor / Out door) N/A

6 Number of anteena 3

7 Azumith of anteena Sec1 30

8 Azumith of anteena Sec2 120

9 Azumith of anteena Sec3 260

10 Azumith of anteena Sec4

11 Anteena Type sec1 (make and model number)-1 KATHERIN-742186

12 Anteena Type sec1 (make and model number)-2

13 Anteena Type sec2 (make and model number)-1 KATHERIN-742186

14 Anteena Type sec2 (make and model number)-2

15 Anteena Type sec3 (make and model number)-1 KATHERIN-742186

16 Anteena Type sec3 (make and model number)-2

17 Anteena Type sec4 (make and model number)-1

18 Anteena Type sec4 (make and model number)-2

19 Feeder type 7/8"

20 Feeder Length 55X6=330

sec1-1 55X2=110

sec1-2

sec2-1 55X2=110

sec2-2

sec3-1 55X2=110

sec3-2

21 Tower height 40

22 Building height 0

23 Antenna height sec1 38

24 Antenna height sec2 38

25 Antenna height sec3 38

26 Antenna height sec4

27 Tower type GBT

28 TMA sec1 NO

29 TMA sec2 NO

30 TMA sec3 NO

31 TMA sec4

32 Site Type OM

33 Operation mode (combined/uncombined) sector1 UNCOMBINED

34 Operation mode (combined/uncombined) sector2 UNCOMBINED

35 Operation mode (combined/uncombined) sector3 UNCOMBINED

36 Operation mode (combined/uncombined) sector4

RF Checksheet for GIS Accuracy

PRM DATE

Engg Name

Page 15: Khokarlagbt Odf

37 Elect Tilt Sect1 0

38 Mech. Tilt Sect1 2

39 Elect Tilt Sect2 0

40 Mech. Tilt Sect2 2

41 Elect Tilt Sect3 0

42 Mech. Tilt Sect3 2

Page 16: Khokarlagbt Odf

Site DataAs per GIS

Yes/No Remarks

2+2+2 YES

FLEXI YES

OUTDOOR YES

N/A

N/A

3 YES

30 YES

130 NO

250 NO

ANDREW NO sr.no.not visible

ANDREW NO sr.no.not visible

ANDREW NO sr.no.not visible

7/8" YES

49X6=294 NO

49X2=98 NO

49X2=98 NO

40 YES

0 YES

34 NO

34 NO

34 NO

GBT YES

NO NO

NO NO

NO NO

OM YES

UNCOMBINED YES

UNCOMBINED YES

UNCOMBINED YES

RF Checksheet for GIS Accuracy

SUKANTA DASH

12-Mar-14PRM DATE

Engg Name

Page 17: Khokarlagbt Odf

4 YES

3 YES

4 YES

2 YES

5 YES

7 YES

Page 18: Khokarlagbt Odf

Circle Maharashtra and Goa

Site ID M&G5675

Sl.No. Work Performed GIS Data Site Data1 Link Details (link1) CHICHAL_IND_ODU CHICHAL_IND_ODU

2 Microwave antenna Size 1.2M 1.2

3 Microwave antenna High 35M 38

4 Microwave Antenna Make and Model ANDREW ANDREW

5 Frequency band 15GHZ 15GHZ

6 Spot frequency 14690000 14690000

7 Link Configuration(1+0/1+1/2+0) 1+0 1+0

8 IDU Type Make and Model FLEXI HOPER FIFA

9 ODU Make and Model NOKIA NOKIA

10 Polarization VERTICAL VERTICAL

11 Total U space utilized (Including DDF) NA NA

12 Link Details (link2)

13 Microwave anteena Size

14 Microwave anteena Hight

15 Microwave Anteena Make and Model

16 Frequency band

17 Spot frequency

18 Link Configuration(1+0/1+1)

19 IDU Type Make and Model

20 ODU Make Make and Model

21 Link Details (link3)

22 Microwave anteena Size

23 Microwave anteena Hight

24 Microwave Anteena Make and Model

25 Frequency band

26 Spot frequency

27 Link Configuration(1+0/1+1)

28 IDU Type Make and Model

29 ODU Make Make and Model

30 Link Details (link4)

31 Microwave anteena Size

32 Microwave anteena Hight

33 Microwave Anteena Make and Model

34 Frequency band

35 Spot frequency

36 Link Configuration(1+0/1+1)

37 IDU Type Make and Model

38 ODU Make Make and Model

39 Link Details (link5)

40 Microwave anteena Size

41 Microwave anteena Hight

42 Microwave Anteena Make and Model

43 Frequency band

44 Spot frequency

45 Link Configuration(1+0/1+1)

46 IDU Type Make and Model

Transmission Checksheet for GIS AccuracyEngg Name

PRM DATE

Page 19: Khokarlagbt Odf

47 ODU Make Make and Model

48 Link Details (link6)

49 Microwave anteena Size

50 Microwave anteena Hight

51 Microwave Anteena Make and Model

52 Frequency band

53 Spot frequency

54 Link Configuration(1+0/1+1)

55 IDU Type Make and Model

56 ODU Make Make and Model

57 Link Details (link7)

58 Microwave anteena Size

59 Microwave anteena Hight

60 Microwave Anteena Make and Model

61 Frequency band

62 Spot frequency

63 Link Configuration(1+0/1+1)

64 IDU Type Make and Model

65 ODU Make Make and Model

66 Link Details (link8)

67 Microwave anteena Size

68 Microwave anteena Hight

69 Microwave Anteena Make and Model

70 Frequency band

71 Spot frequency

72 Link Configuration(1+0/1+1)

Page 20: Khokarlagbt Odf

73 IDU Type Make and Model

74 ODU Make Make and Model

75 Link Details (link9)

76 Microwave anteena Size

77 Microwave anteena Hight

78 Microwave Anteena Make and Model

79 Frequency band

80 Spot frequency

81 Link Configuration(1+0/1+1)

82 IDU Type Make and Model

83 ODU Make Make and Model

84 Link Details (link10)

85 Microwave anteena Size

86 Microwave anteena Hight

87 Microwave Anteena Make and Model

88 Frequency band

89 Spot frequency

90 Link Configuration(1+0/1+1)

91 IDU Type Make and Model

92 ODU Make Make and Model

93 Link Details (link11)

94 Microwave anteena Size

95 Microwave anteena Hight

96 Microwave Anteena Make and Model

97 Frequency band

98 Spot frequency

Page 21: Khokarlagbt Odf

99 Link Configuration(1+0/1+1)

100 IDU Type Make and Model

101 ODU Make Make and Model

102 Link Details (link12)

103 Microwave anteena Size

104 Microwave anteena Hight

105 Microwave Anteena Make and Model

106 Frequency band

107 Spot frequency

108 Link Configuration(1+0/1+1)

109 IDU Type Make and Model

110 ODU Make Make and Model

Name and signature of CTL with date

Page 22: Khokarlagbt Odf

As per GIS

Yes/No RemarksYES

YES

NO

YES

YES

YES

YES

YES

YES

YES

Transmission Checksheet for GIS Accuracy

12-Mar-14

SUKANTA DASH

Page 23: Khokarlagbt Odf
Page 24: Khokarlagbt Odf
Page 25: Khokarlagbt Odf
Page 26: Khokarlagbt Odf

Circle Maharashtra and Goa

Site ID M7G5675

Sl.No. Work Performed QuantityWorking

Yes/No

1 FIU

2 E1T1

3 FIFA1 YES

4 FIPA

5 RRI

6 FHY

7 FTIB

8 Mux Type 1 (STM1)

9 Mux Type 2 (STM-4)

10 Mux Type 3 (STM-16)

11 Mux Make (ECI)

12 Mux Make (Tejas)

13 Other Extra Material at site

14 Other Extra Material at site

15 Other Extra Material at site

16 Other Extra Material at site-4

17 Other Extra Material at site-5

18 Other Extra Material at site-6

19 Other Extra Material at site-7

20 Other Extra Material at site-8

Extra material Check sheet for siteEngg Name

PRM DATE

Page 27: Khokarlagbt Odf

Name and signature of CTL with date

Page 28: Khokarlagbt Odf

If No then SRN to be done

Remarks

whether to be use for O&M

Purpose

Extra material Check sheet for siteSUKANTA DASH