KINGDOM OF SAUDI ARABIAArriyadh Development AuthorityRIYAD
السعودية العربية المملكةالعلي ـئـــيـاله ا ــة
الري رـلتطوي اضـمدينة
ASSOCIATED CONSULTING ENGINEERS
![Page 2: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/2.jpg)
Project Description
The Upgrade of King Abdullah Road Project will provide a continuous 5.3 km Urban Freeway in Riyadh from Prince Turkey Road to King Abdulaziz Road.
The 5.3 km segment will complete one of the remaining gaps of grade separated intersections in one of the most congested corridors in the Kingdom’s capital. Existing traffic in the project area is mostly stop and go throughout the day.
![Page 3: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/3.jpg)
Project Purpose and Need
The primary purpose of the proposed project is to:
Reduce existing and forecast traffic congestion on king Abdullah Road between Prince Turkey Road and King Abdulaziz Road. The project is expected to enhance traffic operations by adding freeway level capacity in an area that currently experiences heavy congestion, and is expected to see increased congestion in the future.
Improve both existing and future mobility and enhance safety throughout the corridor, while minimizing environmental and economic impacts. The project will:
ease congestion, improve mobility by moving almost twice as many cars, decrease commute times for all drivers, enhance traffic safety, and reduce air pollution.
![Page 4: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/4.jpg)
Prince Turkey Underpas s
Takhas s us s i Underpas s
King Fahd Tunnel Olaya Tunnel
Prince Ahmad Inters ection
King Abdul Aziz Underpas s
![Page 5: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/5.jpg)
Project Phases
![Page 6: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/6.jpg)
Detour of Classical Construction
![Page 7: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/7.jpg)
Top-Down Construction Methodology
The “Top-Down” construction approach was primarily devised for existing structures short of space (parking, offices, utilities etc..) such as the existing building may remain in place and its activities uninterrupted while the additional construction works and expansion is happening beneath it. Later it was adopted to other construction industries such as highways, bridges, and even new buildings where significant benefits may be achieved by adding the ability to proceed with construction in both directions at the same time, starting at the ground surface.
In existing buildings or structures, where appreciable loads are present on the existing foundations, micropiles will be required to retain the sides of the excavation and to transfer the vertical loads onto a new bearing stratum taking into consideration differential settlement and its effects on the structure. Normally such works are very sensitive and require high technicity and expertise.
![Page 8: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/8.jpg)
Design principle
Step One:
Drill the 60 cm piles, 150 cm on centers, install the piles reinforcement cage, and cast concrete up to the bottom level of the (60x146) pile cap.
![Page 9: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/9.jpg)
Step Two:
Install the reinforcement cage of the (60x146) pile cap.
Design principle
![Page 10: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/10.jpg)
Step Three:
Cast 20 cm of the 146 cm depth of the pile cap to provide seating for the pre-cast pre-stressed beams.
Design principle
![Page 11: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/11.jpg)
Step Four:
Place the (60x100) pre-cast pre-stressed beams, seated 3 cm on the 20 cm cast portion of the pile cap. One beam is placed every 150 cm, i.e. one per pile.
Design principle
![Page 12: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/12.jpg)
Step Five:
Lay the 6 cm pré-dalle seated 3 cm on the top of the pre-cast pre-stressed beams.
Design principle
![Page 13: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/13.jpg)
Step Six:
Place the reinforcement of the 20 cm topping slab, anchored in the pile cap reinforcement cage.
Design principle
![Page 14: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/14.jpg)
Step Seven:
Cast the topping slab along with the pile cap.
Design principle
![Page 15: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/15.jpg)
Top-Down Construction Stages
![Page 16: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/16.jpg)
A view of thearea just underneath the building showing the light on theother side
Top-Down Construction Applied to Existing Buildings
![Page 17: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/17.jpg)
Top-Down Construction Applied to Existing Buildings
View of thebuilding’sfaçade
![Page 18: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/18.jpg)
Utility Detour
![Page 19: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/19.jpg)
Proposed Detours
Duration: 18 days (100 piles and 2 drilling machines)
Lanes lost: 1 lane of the service road for each direction
![Page 20: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/20.jpg)
Proposed Detours
Duration: 18 days (100 piles and 2 drilling machines)
Lanes lost: 1 lane of the service road for each direction
![Page 21: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/21.jpg)
Proposed Detours
Duration: 18 days (100 piles and 2 drilling machines)
Lanes lost: Zero (Compensated by the median between service road & freeway)
![Page 22: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/22.jpg)
Proposed Detours
Duration: 18 days (100 piles and 2 drilling machines)
Lanes lost: Zero (Compensated by the median between service road & freeway)
![Page 23: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/23.jpg)
Proposed Detours
Duration: 15 days drilling (80 piles) & 20 days slab works
Lanes lost: zero
PILES DRILLING STAGE 5
SLAB WORKS STAGE 1
![Page 24: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/24.jpg)
Proposed Detours
Duration: 20 days excavation
Lanes lost: Zero
SLAB WORKS STAGE 2
![Page 25: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/25.jpg)
Proposed Detours
STAGE 3
FREEWAAY WORKS AFTER INTERSECTION IS REINSTATED
![Page 26: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/26.jpg)
Proposed Typical Sections
CL
TYPICAL SECTION
![Page 27: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/27.jpg)
CL
TYPICAL SECTION
AT AMIR TORKEY TUNNEL
R.O
.W.
R.O
.W.
Typical section
At underpass
Proposed Typical Sections
![Page 28: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/28.jpg)
CL
Proposed Typical Sections
![Page 29: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/29.jpg)
CL
TYPICAL SECTION BEFORE KING FAHED AND AFTER OLAYA INTERSECTIONS
WHERE CLEARANCE BELOW 5.6m
Proposed Typical Sections
![Page 30: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/30.jpg)
Typical Sections
CL
TYPICAL SECTION BEFORE KING FAHED AND AFTER OLAYA INTERSECTIONS
WHERE CLEARANCE EXCEEDS OR EQUALS 5.6m
Proposed Typical Sections
![Page 31: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/31.jpg)
CL
R.O
.W.
R.O
.W.
Typical section
At tunnel
Proposed Typical Sections
![Page 32: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/32.jpg)
Analytical Preparation Works
Topographic survey for existing roads and buildings- Geometric- Levels
Underground utilities survey Verification of Dornier's design Research and proposing of an alternative construction system Introducing two support system instead of one system to provide future construction flexibility
- LRT stations- fly Overs
Testing traffic model Coordination with relevant authorities
![Page 33: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/33.jpg)
Design Criteria
![Page 34: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/34.jpg)
Design Criteria
![Page 35: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/35.jpg)
Design Criteria
![Page 36: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/36.jpg)
Design Criteria
![Page 37: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/37.jpg)
Design Criteria
![Page 38: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/38.jpg)
Raising LRT at Prince Ahmad Intersection Finalizing the LRT access opening size and location Providing LRT rails and stations loading on King Fahd/Olaya Tunnel
OUTSTANDING ISSUES
![Page 39: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/39.jpg)
Methodology for Traffic Assessment
In the macro-simulation- Check the traffic volumes - Determine the impact of detours (speeds and capacities)- Identify the diversion points and routes (by pass)
Tests of the options of detours in a micro-modeling tool - Determine the Level Of Service (LOS)- The design of the new intersections- Traffic optimization- Reduce as possible the impact of the works
Detailed detour plans and the required signage
![Page 40: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/40.jpg)
Sample Run
As per Highway Capacity Manual (HCM), the adopted Level of Service (LOS) are:
- A speed >=41 kph - B speed >=32 & speed <41 kph
- C speed >=23 & speed <32 kph
- D speed >=18 & speed <23 kph
- E speed >=14 & speed <18 kph- F speed <14 kph
![Page 41: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/41.jpg)
Microscopic Simulation
![Page 42: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/42.jpg)
Microscopic Simulation
![Page 43: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/43.jpg)
Microscopic Simulation
![Page 44: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/44.jpg)
Microscopic Simulation
![Page 45: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/45.jpg)
Microscopic Simulation
![Page 46: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/46.jpg)
Microscopic Simulation
![Page 47: King Abdullah Road 4 12 07 Presentation](https://reader033.vdocuments.pub/reader033/viewer/2022051617/55a434881a28abc9778b4664/html5/thumbnails/47.jpg)
PM: 1 LaneMicroscopic Simulation