kita melangkah terus untuk membuat …iforbit.co.id/wp-content/uploads/2016/11/agenda-2018-1.pdf ·...
TRANSCRIPT
SERVICE EXPRES : 0822 1666 9919
Kami siap mengadakan training pada saat weekend (By Request)
KITA MELANGKAH TERUS UNTUK MEMBUAT PELANGGAN PUAS PADA SETIAP PERMINTAAN. KITA TAHU KEBUTUHAN MEREKA DAN
MENYEDIAKAN SOLUSI YANG BERKUALITAS DAN PELAYANAN PROFESIONAL, PROAKTIF, TEPAT GUNA DAN TEPAT WAKTU.
NO TOPIC NO TOPIC NO TOPIC
1 ACOMODATION 21 FINANCIAL 41 PLAT
2 ADMINISTRATOR / ADMINISTRASI 22 GAS 42 PROCUREMENT
3 BOILER 23 GENERAL AFFAIRS 43 PRODUCTION
4 BUILDING 24 GENERATOR 44 PROJECT
5 CALIBRATION 25 HEALTH 45 PUBLIC
6 CHEMICHAL 26 HEATING 46 PUMP
7 COAL 27 HUMAN RESOURCE / SUMBER DAYA MANUSIA 47 SAFETY
8 COMMUNICATION 28 INSPECTION 48 SUPPLY CHAIN
9 COMPRESSOR 29 INSTRUMENTATION 49 SYSTEM/SISTEM
10 CONTRACT 30 LEGAL 50 TECHNIC/TEHNIK
11 CONTROL 31 LOGISTIC 51 TURBIN
12 COOLING 32 MAINTENANCE 52 VECHILE
13 CORROSION 33 MANAGEMENT / MANAJEMEN 53 VIBRATION
14 DESIGN 34 MARKETING 54 WAREHOUSE
15 DRILLING 35 MATERIAL 55 WATER
16 ELECTRICAL 36 MEASURENMENT 56 WELDING
17 ENVIRONMENT 37 MECHANICAL 57 OIL REFINERY
18 EQUIPMENT 38 MINING
19 EXPLORATION 39 OPERATION / OPERASI
20 FAMILIARIZATION 40 PIPING
JUDUL - JUDUL DI BAWAH KAMI SELENGGARAKAN DI BANDUNG, JAKARTA, JOGYA, SURABAYA. BATAM DAN BALI
BOOKING KHUSUS TANGGAL DAN KOTA MINIMAL 4 PESERTA HUB MARKETING KHUSUS KAMI DI 0822 1449 2424 / [email protected]
1 ACOMODATION / AKOMODASI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 CATERING & ACCOMMODATION IN OIL & MINE INDUSTRY 3 8-10 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 CATERING SERVICE, HYGIENE & SANITATION 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 26-28 6.500.000
3 FINANCING CONDOTEL/HOTEL OPERATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 MANAGEMENT OF OUTSOURCE STAFF HOUSING AND
CATERING SERVICES 4
15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 SAY NO!!! TO GIVE UP 3 22-24 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 ADMINISTRATOR / ADMINISTRASI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 EFFECTIVE COMPETENCY MODELLING & REPORTING 3 8-10 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 EFFECTIVE LINE BALANCING 3 22-24 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 EFFECTIVE MASTER OF CEREMONY (MC) 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 3 8-10 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
5 EFFECTIVE PRESENTATION SKILLS 3 22-24 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 ENGLISH REPORT WRITING 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATION
PROFESSIONAL 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23
10-12 6.500.000
8 EXCELLENT COMMUNICATION AT WORK 3 8-10 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 FAILURE ANALYSIS METHODS AND CASES 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
10 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
11 FILING MANAGEMENT FOR SECRETARY AND ADMINISTRATION
STAFF (USING MICROSOFT WORD, MICROSOFT EXCEL, &
MICROSOFT ACCESS)
3
8-10
5-7
26-28
16-18
2-4
5-7
16-18
6-8
17-19
1-3
5-7
8-10 6.500.000
12 FILLING SYSTEM FOR SECRETARY 3 22-24 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 GOOD CORPORATE GOVERNANCE 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
14 HOW TO IMPROVE BUSINESS PERFORMANCE 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 HYPNO-PRESENTATION SKILL: UNLOCKING YOUR POTENTIAL
POWER 3 8-10 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
16 ICE BREAKING AND ENERGIZERS 3 22-24 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
17 IMPROVING PERSONAL SKILL FOR SECRETARY &
ADMINISTRATIVE ASSISTANT 3
2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23
10-12 6.500.000
18 INFLUENTIAL LEADERSHIP EXCELLENCE 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 INTERPERSONAL COMMUNICATION SKILL 3 22-24 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
20 COMMUNICATION SKILL AND INTERACTION 3 8-10 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
21 NEGOTIATION SKILL 3 22-24 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
22 SUPERVISORY SKILL 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
23 LEADER AS A C.O.A.C.H 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
24 LEADERSHIP FOR QUALITY MANAGEMENT 3 22-24 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
25 MANAGING STRESS FOR PRACTICAL PURPOSE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
26 ENVIROMENTAL MANAGEMENT 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
27 LIBRARY MANAGEMENT 4 2-5 19-22 12-14 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
28 MC (MASTER OF CEREMONY) 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
29 MEDIA RELATION AND COMMUNICATION 3 22-24 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
30 MEDIA RELATIONS STRATEGY AND EXECUTIONS 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
31 MEDIA RELATIONS STRATEGY FOR EFFECTIVE PROMOTION 3 22-24 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
32 PROFESSIONAL SECRETARY COMPETENSI 4 2-5 19-22 12-14 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
33 TEAM WORK DEVELOPMENT 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
34 SUPERVISORY IMPROVEMENT FUNCTION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
35 BASIC MENTAL 3 22-24 5-7 26-28 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
36 NEGOTIATION SKILL FOR PURCHASING STAFF 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
37 OFFICE AUTOMATION 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
38 DECISION MAKING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
39 PERSONAL EXCELLENCE: WINNER ATTITUDE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
40 PERSONALITY DEVELOPMENT BASED ON EMOTIONAL AND
SPRITUAL QUETIENTS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
41 PLAN LAY OUT OFFICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
42 POWERFUL PRESENTATION EXCELLENCE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
43 PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING
STAFF (USING MICROSOFT POWER POINT) 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
44 PRESENTATION SKILL FOR THE BEGINNERS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
45 PROBLEM SOLVING & DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
46 SERVICE EXCELLENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
47 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
48 SPARE PARTS MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
49 SPEAKING FOR BUSINESS (PRESENTATION, NEGOTIATION AND
LOBBYING) 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
50 STRATEGIC HUMAN RESOURCE MANAGEMENT AND
ORGANIZATION DEVELOPMENT 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23
10-12 6.500.000
51 STRATEGIC PERFORMANCE MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
52 STRATEGIC PLANNING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
53 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
54 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
55 WORKING AS A TEAM EXCELLENCE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
56 WORKLOAD ANALYSIS 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
57 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
58 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
59 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
60 EXCELLENT MOTIVATION AND TEAM WORK OUTBOUND
TRAINING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
61 vLEADERSHIP DEVELOPMENT PROGRAM 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
62 LEADERSHIP FOR FOREMAN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
63 POSITIVE FIGHTER FOR SALES PEOPLE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
64 POWERFUL COMMUNICATION SKILL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
65 POWERFUL PUBLIC SPEAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
66 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
67 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
68 SERVICE WITH DELIGHT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
69 BUILDING A TEAM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
70 CAREER PLANNING SYSTEM 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
71 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
72 EFFECTIVE PERFORMANCE APPRAISAL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
73 EFFECTIVE TRAINING MANAGEMENT 3 22-24 5-7 16-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
74 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER
3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5
6.500.000
75 JOB COMPETENCY PROFILING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
76 MEASURING TRAINING IMPACT 3 22-24 5-7 16-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
77 PERFORMANCE BASED PAY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
78 SELF-EFFECTIVENESS & DEVELOPMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
79 STRATEGIC HUMAN RESOURCES MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
80 COMMUNICATION STRATEGY WITH GOFERNMENT
INSTITUTION
3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5
6.500.000
81 ASPECTS OF CONTRACT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
82 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 8-10 12-14 12-15 16-18 7-9 25-27 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
83 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
84 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
85 ADMINISTRASI PERKANTORAN 3 8-10 12-14 12-15 16-18 7-9 25-27 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
86 ACCOUNT PAYABLE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
3 BOILER
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BOILER AND TURBIN UAP: OPERATION, MAINTENANCE DAN
TROUBLESHOOTING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 BOILER WATER TREATMENT 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 BOILER, TURBIN (STEAM) : OPERATION MAINTENANCE AND
TROUBLESHOOTING 4 2-5 19-22 12-15 23-26
14-17 25-28 9-12 13-16 17-20 8-11 26-29 17-20 8.500.000
4 BOILER: OPERATION & MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 BOILER: OPERATION, MAINTENANCE & TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
6 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 BUILDING / BANGUNAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ENERGY CONSERVATION TECHNIC ON BUILDING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 BUILDING A TEAM 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 CORPORATE BUILDING FOR INTERNAL ORGANISATION CULTUR
AND ETIC DEVELOPEMENT 4
15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 TECHNIC FOR ENERGY CONSERVATION THRU ENERGY AUDIT
IN BUILDING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 CALLIBRATION / CALIBRA SI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 CALLIBRATION OF MEASURING TOOL 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 INSTRUMENTATION AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 SYSTEM MEASUREMENT AND CALIBRATION 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 CHEMICAL / KIMIA
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 CHEMICAL ENGINEERING FUNDAMENTALS FOR NON ENGINEER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR OIL
AND GAS REFINERY AND PETROCHEMICAL INSTALLATION 3
8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 SIMULATION PROCESS CHEMICAL TECHNIC USING HYSYS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 WATER TREATING AND CHEMICALS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
7 COAL
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 COAL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 COATING SYSTEM AND PROTECTION CORROSION 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 END WORK PROCESS WITH METAL COATING
(ELECTROPLATING) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 COMMUNICATION / KOMUNIKASI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 EFFECTIVE COMMUNICATION IN COMPAIGN PILLEG
LEGISLATION AND PILKADA 3
2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
2 INTERPERSONAL COMMUNICATION SKILL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 MEDIA RELATION AND COMMUNICATION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
4 EXCELLENT COMMUNICATION AT WORK 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 POWERFUL COMMUNICATION SKILL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
6 COMMUNICATION, ASSERTIVENESS AND CONFLICT
MANAGEMENT
3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
7 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 COMPRESSOR
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 COMPRESSOR : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 3
2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
2 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITION
EVALUATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 COMPRESSOR OPERATION, MAINTENANCE &
TROUBLESHOOTING 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 CONTRACT / KONTRAK
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 CONTRACT MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 ASPECTS OF CONTRACT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 PROCUREMENT AND CONTRACT MONITORING 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 CONTROL
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 BASIC TECHNICAL CONTROL FOR INDUSTRY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 CONTROL VALVE: OPERATION, MAINTENANCE, AND
TROUBLESHOOTING 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 FLOW MEASUREMENT AND CONTROL ELEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 HYDRAULIC CONTROL SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
7 INDUSTRIAL AUTOMATION & CONTROL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 MANUFACTURING PLANNING & CONTROL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 MICRO CONTROLLER APPLICATION IN INDUSTRIAL PLANTS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
10 PRESSURE VESSELS : CALCULATION, CODES, PRODUCTION,
OPERATION, CONTROLS AND SAFETIES 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
11 PROCESS CONTROL INSTRUMENTATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
12 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
13 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
12 COOLIN G
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 AC CONTROLLING SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 AIR CONDITIONING AND HVAC 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
4 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 BASIC REFRIGERATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 CHILLER AND COOLING TOWER: DESIGN AND OPERATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 DESIGN OF HEATING, VENTILATION AND AIR CONDITIONING
SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
8 PETROLEUM INDUSTRIAL REFRIGERATION: OPERATION AND
MAINTENANCE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
9 PRACTICAL AND ADVANCED COURSE ON HVAC SYSTEMS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 REFRIGERATION : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5
8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
11 RELIABILITAS SISTEM : TO EVALUATE MAINTENANCE RESULT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
12 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 CORROSION / KOROSI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 COATING SYSTEM AND PROTECTION CORROSION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 CORROSION AND CATHODIC PROTECTION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
4 CORROSION MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 END WORK PROCESS WITH METAL COATING
(ELECTROPLATING) 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
6 INSPECTION AND CORROTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 NON DESTRUCTIVE TEST (NDT) 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
8 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
14 DESIGN / DESAIN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 DESIGN OF JIGS AND FIXTURES ( ALAT BANTU CEKAM DAN
PEGANG) 4
22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
3 DESIGN OF MACHINE CONSTRUCTION AND INDUSTRIAL
EQUIPMENT (KONSTRUKSI MESIN DAN PERALATAN INDUSTRI) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 DESIGN OF PRESS AND FORMING TOOL (ALAT PENEKAN DAN
PEMBENTUK) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 DRILLING/PENGEBORAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &
ENVIRONMENTAL CONSIDERATION 5
8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
2 DRILLING AND EXPLOSIVE IN MINING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 DRILLING ENGINEERING AND WELL PLANING 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
16 ELECTRICAL / LISTRIK
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ADVANCE COURSE ON LIGHTNING PROTECTION AND
GROUNDING SYSTEM 5
8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
2 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
3 ARC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
4 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 AUDIT ENERGY AND POWER SYSTEM MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 BASIC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
7 ELECTRIC SUBMERSIBLE PUMP : PRINCIPLES, INSTALLATION,
OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
8 ELECTRICAL MACHINES, DRIVES, TRANSFORMER AND POWER
SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
9 ELECTRICAL POWER SYSTEM ANALYSIS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
10 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
11 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
12 ELECTRICITY POWER SUBSTATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
13 LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR
POWER PLANT, TRANSMISSION, DISTRIBUTION AND LARGE
INDUSTRY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
14 MANUAL METAL ARC WELDING (LAS LISTRIK) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
15 POWER PLANT ELECTRICAL DISTRIBUTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
16 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
17 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
18 PROGRAMMABLE LOGIC CONTROLLER (PLC): ADVANCED AND
APPLICATED 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
19
PROGRAMMABLE LOGIC CONTROLLER (PLC): PRINCIPLES,
HARDWARE AND SOFTWARE, DIAGNOSTICS AND
TROUBLESHOOTING
5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
20 ELECTRICAL MOTOR CONTROL SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
21 TECHNIC INSTALATION AND ELECTRICAL PROTECTION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
22 TECHNIC FOR ENERGY CONSERVATION THRU ENERGY AUDIT
IN BUILDING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
23 MECHANICAL POWER TRANSMISSION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
24 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
25 MECHANIC TRANMISION VOLT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
26 MEDIUM VOLTAGE PANEL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
17 ENVIRONMENT / LINGKUNGAN HIDUP
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR
EXECUTIVES 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
2 EARTH MOVEMENT MECHANICAL 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 EFFLUENT PRODUCED WASTE WATER 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 H2S AWARENESS 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
6 HSE AUDIT TECHNIQUES 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN
THE OIL & GAS INDUSTRY 3
8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
9
WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL GATHERING
(PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)
3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
10 WATER TREATING AND CHEMICALS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
18 EQUIPMENT / PERALATA N
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BELT CONVEYOR : OPERATION & MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 BASIC GAS ENGINE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
3 BASIC MACHINERY VIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 BASIC PRINCIP LUBRICATION AND APLICATION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 BEARING AND OIL LUBRICATION FOR MACHINERY 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
6 BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
7 BELT CONVEYOR MAINTENANCE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITION
EVALUATION 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
9 CONVEYOR: OPERASI DAN PERAWATAN 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
10 CONVEYOR: OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
11 DESIGN OF JIGS AND FIXTURES ( ALAT BANTU CEKAM DAN
PEGANG) 4
22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
12 DESIGN OF MACHINE CONSTRUCTION AND INDUSTRIAL
EQUIPMENT (KONSTRUKSI MESIN DAN PERALATAN INDUSTRI) 4
2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
13 DESIGN OF PRESS AND FORMING TOOL (ALAT PENEKAN DAN
PEMBENTUK) 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
14 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
15 DYNAMIC OF MACHINE TOOLS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
16 EARTH MOVEMENT MECHANICAL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
17 FLANGE AND JOINT INTEGRITY 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
18 HAND TOOL UTILIZATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
19 HEAVY DUTY EQUIPMENT 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
20 HEAVY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
21 HEAVY EQUIPMENT MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
22 HYDRAULICS AND PNEUMATICS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
23 KINEMATICS AND DYNAMICS OF MACHINERIES 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
24 LUBRICATION AND BEARING TECHNOLOGY 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
25 MACHINERY NOISE AND PROBLEM SOLVING 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
26 MACHINERY VIBRATION ANALYSIS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
27 MAINTENANCE OF MACHINE TOOLS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
28 MATERIAL SELECTION MACHINE COMPONENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
29 OFFSHORE WELLHEAD PLATFORM OPERATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
30 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
31 PIGGING OPERATIONS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
32 PREVENTIVE MAINTENANCE GENERATOR 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
33 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
34 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
35 ROOT CAUSE ANALYSIS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
36 ROTATING EQUIPMENTS: OPERATION, MAINTENANCE,
TROUBLE SHOOTING AND ANALYSIS 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
37 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
38 SURFACE PRODUCTION OPERATION & EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
39 SYSTEM MEASUREMENT AND CALIBRATION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
40 TESTING OF MACHINE TOOLS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
41 THEORY AND APPLICATION BELT CONVEYOR 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
42 TROUBLE SHOOTING, INSPECTION, AND MONITORING OF
MACHINERY 3
8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
19 EXPLORATION / EKSPLORASI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 FORMATION DAMAGE AND WELL STIMULATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
2 COAL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 COATING SYSTEM AND PROTECTION CORROSION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 DRILLING AND EXPLOSIVE IN MINING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 END WORK PROCESS WITH METAL COATING
(ELECTROPLATING) 4
2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
7 MINING VENTILATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
20 FAMILIARIZATION / PENGENALAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM
ENGINEER 5
22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
2 CHEMICAL ENGINEERING FUNDAMENTALS FOR NON ENGINEER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
4 GEOLOGY FOR NON GEOLOGIST 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 PETROLEUM ENGINEERING FOR NON PETROLEUM ENGINEERS 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
7 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
21 FINANCIAL / KEUANGAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ADVANCE MAINTENANCE PLANNING, SCHEDULLING,
AUDITING, BENCHMARKING & IMPROVEMENT 3
22-24 5-7 26-28 16-18
7-9 25-27
16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 BASIC PROCUREMENT & PURCHASING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 COST MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 BASIC TREASURY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 E-PROCUREMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 INVENTORY MANAGEMENT AND COST INVESTMENT
RECOVERY 4
2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
8 INVENTORY AND WAREHOUSE MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
10 MAINTENANCE: SYSTEM AND COST 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
11 NATURAL GAS RESERVOIR, PROCESSING AND ECONOMICS
ASPECTS 5
22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
12 TAX AND IMPLEMANTATION PROCEDURE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
13 PROCUREMENT AND CONTRACT MONITORING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
14 RISK MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
15 SUPPLY CHAIN MANAGEMENT (SCM) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
16 TAX AND FINANCIAL CONTROL 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
17 SYSTEM AND COST PRODUCTION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
18 TOTAL COST OF OWNERSHIP ANALYSIS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
19 WORKLOAD ANALYSIS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
20 PRODUCTION PLAN & INVENTORY CONTROL (PPIC) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
21 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
22 IT RISK MANAGEMENT 5 22-26 5-9 19-23 23-26 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
23 PROJECT COST MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
24 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
22 GAS
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 BASIC GAS ENGINE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
3 FLUID FLOW MEASUREMENT AND METER PROVING IN OIL AND
GAS INDUSTRY 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 GAS AND STEAM TURBINE : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5
8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
5 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 GAS METAL ARC WELDING (LAS MIG/MAG) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
7 GAS TUNGSTEN ARC WELDING (LAS TIG) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
8 GAS TURBINE : PRINCIPLES, INSPECTION, OPERATION,
MAINTENANCE AND TROUBLESHOOTING 5
8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
9 GAS TURBINE: OPERATION, MAINTENANCE AND
TROUBLESHOOTING 4
2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
10 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
23 GENERAL AFFAIRS / UMUM
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BUILDING A TEAM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 BASIC MENTAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
3 DECISION MAKING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 ENGLISH REPORT WRITING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 ENVIROMENTAL MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 EXCELLENT COMMUNICATION AT WORK 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
7
FILING MANAGEMENT FOR SECRETARY AND ADMINISTRATION
STAFF (USING MICROSOFT WORD, MICROSOFT EXCEL, &
MICROSOFT ACCESS) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
8 FILLING SYSTEM FOR SECRETARY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
9 HOW TO IMPROVE BUSINESS PERFORMANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 HYPNO-PRESENTATION SKILL: UNLOCKING YOUR POTENTIAL
POWER 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
11 ICE BREAKING AND ENERGIZERS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
12 IMPROVING PERSONAL SKILL FOR SECRETARY &
ADMINISTRATIVE ASSISTANT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
13 INFLUENTIAL LEADERSHIP EXCELLENCE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
14 INTERPERSONAL COMMUNICATION SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
16 LEADERSHIP FOR QUALITY MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
17 LIBRARY MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
18 MANAGING STRESS FOR PRACTICAL PURPOSE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 MC (MASTER OF CEREMONY) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
20 MEDIA RELATION AND COMMUNICATION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
21 MEDIA RELATIONS STRATEGY AND EXECUTIONS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
22 MEDIA RELATIONS STRATEGY FOR EFFECTIVE PROMOTION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
23 NEGOTIATION SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
24 NEGOTIATION SKILL FOR PURCHASING STAFF 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
25 OFFICE AUTOMATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
26 POWERFUL PRESENTATION EXCELLENCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
27 PRACTICAL CUSTOMER SERVICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
28 PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING
STAFF (USING MICROSOFT POWER POINT) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
29 PRESENTATION SKILL FOR THE BEGINNERS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
30 PROBLEM SOLVING & DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
31 PROFESSIONAL SECRETARY COMPETENSI 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
32 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
33 SUPERVISORY IMPROVEMENT FUNCTION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
34 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
35 SUPERVISORY SKILL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
36 TEAM WORK DEVELOPMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
37 TECHNIC FOR HUMAN RELATIONS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
38 WORKING AS A TEAM EXCELLENCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
39 WORKLOAD ANALYSIS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
40 CUSTOMER SATIS FACTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
41 HANDLING CUSTOMER COMPLANT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
24 GENERATOR
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
2 GENERATOR: TEKNOLOGY, OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
4 PREVENTIVE MAINTENANCE GENERATOR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 STEAM GENERATOR AND TURBINE: OPERATION AND
MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
25 HEALTH / KESEHATAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 CATERING SERVICE, HYGIENE & SANITATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &
ENVIRONMENTAL CONSIDERATION 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
3 OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN
THE OIL & GAS INDUSTRY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
4 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 STRATEGIC HEALTH INFORMATION SYSTEM IN HOSPITAL 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
26 HEATING / PEMANASAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 DESIGN OF HEATING, VENTILATION AND AIR CONDITIONING
SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
2 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 MINING VENTILATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
27 HUMAN RESOURCE / SUMBER DAYA MANUSIA
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ACHIEVEMENT MOTIVATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
5 EXCELLENT MOTIVATION AND TEAM WORK OUTBOUND
TRAINING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 2-4 6.500.000
6 ADVANCE SUPERVISORY MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 LEADERSHIP DEVELOPMENT PROGRAM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 LEADERSHIP FOR FOREMAN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
9 POSITIVE FIGHTER FOR SALES PEOPLE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
10 POWERFUL COMMUNICATION SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
11 POWERFUL PUBLIC SPEAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 2-4 6.500.000
12 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
14 SERVICE WITH DELIGHT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
15 PRACTICAL BALANCED SCORECARD 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
16 ENJOYMENT AND PRODUCTIFE AFTER RETIREMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 17-20 8.500.000
17 BOOST YOUR CREATIVITY IN THINKING: MIND MAP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
18 COACHING AND COUNSELING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 COACHING AND COUNSELING (MONITORING) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
20 BUILDING A TEAM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
21 COMMUNICATION, ASSERTIVENESS AND CONFLICT
MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
22 CAREER PLANNING SYSTEM 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
23 CHANGE & CONFLICT MANAGEMENT AND DEALING WITH
DIFFICULT PEOPLE 3
8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
24 COMPENSATION SYSTEM DEVELOPMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
25 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
26 EFFECTIVE PERFORMANCE APPRAISAL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
27 EFFECTIVE TRAINING MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
28 JOB COMPETENCY PROFILING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
29 MEASURING TRAINING IMPACT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
30 CORPORATE BUILDING FOR INTERNAL ORGANISATION CULTUR
AND ETIC DEVELOPEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
31 PERFORMANCE BASED PAY 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
32 SELF-EFFECTIVENESS & DEVELOPMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
33 STRATEGIC HUMAN RESOURCES MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
34 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
35 WORKLOAD ANALYSIS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
36 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
37 BASIC MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
38 DEVELOPING EXCELLENT INTERNAL TRAINER 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
39 DEVELOPING HIGH PERFORMANCE TEAMS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
40 COMMUNICATION STRATEGY WITH GOFERNMENT
INSTITUTION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
41 EFFECTIVE COMMUNICATION SKILL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
42 EFFECTIVE COMPETENCY MODELLING & REPORTING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
43 EFFECTIVE LINE BALANCING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
44 EFFECTIVE MASTER OF CEREMONY (MC) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
45 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
46 EFFECTIVE PRESENTATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
47 EMOTIONAL QUETIENTS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
48 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
49 ENTREPRENEURSHIP 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
50 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
51 ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATION
PROFESSIONAL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
52 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
53 EXCELLENT COMMUNICATION AT WORK 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
54
FILING MANAGEMENT FOR SECRETARY AND ADMINISTRATION
STAFF (USING MICROSOFT WORD, MICROSOFT EXCEL, &
MICROSOFT ACCESS)
3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
55 FILLING SYSTEM FOR SECRETARY 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
56 GOOD CORPORATE GOVERNANCE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
57 HR MANAGEMENT OF CHANGE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
58 ICE BREAKING AND ENERGIZERS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
59 IMPROVING PERSONAL SKILL FOR SECRETARY &
ADMINISTRATIVE ASSISTANT 3
2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23
10-12 6.500.000
60 INFLUENTIAL LEADERSHIP EXCELLENCE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
61 INTERPERSONAL COMMUNICATION SKILL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
62 LEADERSHIP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
63 COMMUNICATION SKILL AND INTERACTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
64 NEGOTIATION SKILL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
65 SUPERVISORY SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
66 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
67 LEADERSHIP FOR QUALITY MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
68 MAN POWER PLANNING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
69 MANAGEMENT OF OUTSOURCE STAFF HOUSING AND
CATERING SERVICES 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
70 MANAGING STRESS FOR PRACTICAL PURPOSE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
71 ENVIROMENTAL MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
72 PROFESSIONAL SECRETARY COMPETENSI 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
73 TEAM WORK DEVELOPMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
74 SUPERVISORY IMPROVEMENT FUNCTION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
75 BASIC MENTAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
76 NEGOTIATION SKILL FOR PURCHASING STAFF 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
77 OFFICE AUTOMATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
78 TRAINING FOR SENIOR MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
79 DECISION MAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
80 PERFORMANCE MANAGEMENT 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
81 PERSONAL EXCELLENCE: WINNER ATTITUDE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
82 PERSONALITY DEVELOPMENT BASED ON EMOTIONAL AND
SPRITUAL QUETIENTS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
83 PLAN LAY OUT OFFICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
84 PLANNING AND ORGANIZE TRAINING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
85 POWERFUL PRESENTATION EXCELLENCE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
86 PROBLEM SOLVING & DECISION MAKING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
87 SERVICE EXCELLENT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
88 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
89 SEVEN HABITS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
90 SPARE PARTS MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
91 SPEAKING FOR BUSINESS (PRESENTATION, NEGOTIATION AND
LOBBYING) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
92 STRATEGIC HUMAN RESOURCE MANAGEMENT AND
ORGANIZATION DEVELOPMENT 3
22-24 5-7 26-28 16-18
7-9 25-27
16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
93 STRATEGIC PERFORMANCE MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
94 STRATEGIC PLANNING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
95 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
96 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
97 TECHNIC FOR HUMAN RELATIONS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
98 TRAINING DEVELOPMENT MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
99 TRAINING OF TRAINER (TOT) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
100 TRAINING OF TRAINERS SAFETY 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
101 TRAINING OF TRAINER (TOT) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
102 WORKING AS A TEAM EXCELLENCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
28 INSPECTION / INSPEKSI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 INSPECTION AND CORROTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 RELIABILITY CENTERED MAINTENANCE & RISK BASED
INSPECTION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 RELIABILITY CENTERED MAINTENANCE (RCM) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
7 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
8 TROUBLE SHOOTING, INSPECTION, AND MONITORING OF
MACHINERY 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
29 INSTRUMENTATION / INSTRUMENTASI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ADVANCE PROCESS CONTROL, INSTRUMENTATION AND
METERING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
2 ADVANCE INSTRUMENTATION MEASUREMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 CALLIBRATION OF MEASURING TOOL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4
FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR,
POTENSI
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
INSTRUMENTATION
4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 FLOW MEASUREMENT AND CONTROL ELEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 FLUID FLOW MEASUREMENT AND METER PROVING IN OIL AND
GAS INDUSTRY 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
8 MEASUREMENT TECHNIQUE FOR MAINTENANCE AND
OPERATION LATHE MACHINE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
9 OIL & GAS: MEASUREMENT AND CALCULATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
10 PROCESS CONTROL AND INSTRUMENTATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
11 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
13 VIBRATION ANALYSIS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
30 LEGAL / HUKUM
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ASPECTS OF CONTRACT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 2-4 6.500.000
2 BUSINESS PROCESS MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 COMMUNICATION STRATEGY WITH GOFERNMENT
INSTITUTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 CONTRACT MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
5 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 ISO 31000 - RISK MANAGEMENT : PRINCIPLES AND GUIDELINES 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 ISO 9001 2015 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 IT RISK MANAGEMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
9
METHODE TO SET COMPANY HPS "TECHNIC AND PROCEDURE
PRICE CALCULATION IN THE AUCTION OF GOOD SERVICE OF
COMPANY" 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 PROCUREMENT AND CONTRACT MONITORING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
11 PROJECT RISK MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
12 RISK INVESTMENT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
13 RISK MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
14 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
15 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
16 STRATEGIC MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
17 SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (
SCADA ) 5
22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
31 LOGISTI C
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 AIR AND SEA CARGO HANDLING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 FLIGHT OPERATION MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
3 HAZARDOUS MATERIAL HANDLING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 INVENTORY MANAGEMENT AND COST INVESTMENT
RECOVERY 4
2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 INVENTORY AND WAREHOUSE MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
8 LOGISTIC MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
9 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 MATERIAL HANDLING & APLICATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
11 MATERIAL HANDLING & PACKAGING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
12 MATERIAL MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
13 MATERIAL MANAGEMENT FOR PROJECT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
14
METHODE TO SET COMPANY HPS "TECHNIC AND PROCEDURE
PRICE CARCULATION IN THE AUCTION OF GOOD SERVICE OF
COMPANY"
3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
15 PLANNING AND MANAGING INVENTORIES IN A SUPPLY CHAIN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
16 PRACTICAL SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
17 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
18 SUPPLY CHAIN MANAGEMENT (SCM) 3 2-4 19-21 13-25 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 SUPPLY MARKET ANALYSIS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
20 TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY
CHAIN 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
21 TRANSPORTATION MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
22 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
23 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
24 WASTE HANDLING & TREATMENT IN THE OIL & GAS
INDUSTRIES 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
25
WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL GATHERING
(PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)
3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
32 MAINTENANCE / PERAWATAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 BASIC PRINCIP LUBRICATION AND APLICATION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 BEARING AND OIL LUBRICATION FOR MACHINERY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
5 BELT CONVEYOR : OPERATION & MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 BELT CONVEYOR MAINTENANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 BOILER AND TURBIN UAP: OPERATION, MAINTENANCE DAN
TROUBLESHOOTING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 BOILER, TURBIN (STEAM) : OPERATION MAINTENANCE AND
TROUBLESHOOTING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
9 BOILER: OPERATION & MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
10 BOILER: OPERATION, MAINTENANCE & TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
11 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
12 COMPRESSOR : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
14 CONTROL VALVE: OPERATION, MAINTENANCE, AND
TROUBLESHOOTING 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
15 CONVEYOR: OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
16 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
17 ELECTRIC SUBMERSIBLE PUMP : PRINCIPLES, INSTALLATION,
OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
18 GAS AND STEAM TURBINE : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
19 GAS TURBINE : PRINCIPLES, INSPECTION, OPERATION,
MAINTENANCE AND TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
20 GAS TURBINE: OPERATION, MAINTENANCE AND
TROUBLESHOOTING 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
21 GENERATOR: TEKNOLOGY, OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
22 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
23 HEAT EXCHANGERS: OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
24 HEAVY EQUIPMENT MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
25 HIGH PRESSURE PUMP (HPP): OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5
22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
26 HVAC SYSTEM: OPERATION AND MAINTENANCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
27 INTEGRATED PIPELINE DESIGN, OPERATION DAN
MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
28 LUBRICATION AND BEARING TECHNOLOGY 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
29 MACHINERY VIBRATION ANALYSIS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
30 MAINTENANCE PLANNING, SCHEDULLING AND WORK
CONTROL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
31 MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
32 MAINTENANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
33 MAINTENANCE MANAGEMENT (FOR MANUFACTURE AND OIL
& GAS COMPANY 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
34 MAINTENANCE OF MACHINE COMPONENTS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
35 MAINTENANCE OF MACHINE TOOLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
36 MAINTENANCE PLANNING AND SCHEDULING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
37 MAINTENANCE STRATEGIC PLANNING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
38 MAINTENANCE SYSTEM AND DOCUMENTATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
39 MAINTENANCE: SYSTEM AND COST 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
40 MANAGING MAINTENANCE RESOURCES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
41 MEASUREMENT TECHNIQUE FOR MAINTENANCE AND
OPERATION LATHE MACHINE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
42 MECHANICAL MAINTENANCE TECHNIC 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
43 MODERN MAINTENANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
44 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
45 PREDICTIVE MAINTENANCE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
46 PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVE
MAINTENANCE) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
47 PREVENTIVE MAINTENANCE GENERATOR 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
48 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
49 PUMP : OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
50 PUMP AND COMPRESOR: OPERATION, COMPRESSOR AND
MAINTENANCE TROUBLESHOOTING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
51 PUMP AND COMPRESSOR : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
52 PUMP OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
53 PUMP SELECTION, DESIGN AND OPERATION FOR OIL AND GAS
SURFACE PRODUCTION FACILITIES 5
22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
54 REFRIGERATION : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5
8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
55 RELIABILITAS SISTEM : TO EVALUATE MAINTENANCE RESULT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
56 RELIABILITY CENTERED MAINTENANCE & RISK BASED
INSPECTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
57 RELIABILITY CENTERED MAINTENANCE (RCM) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
58 RISK MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
59 ROOT CAUSE ANALYSIS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
60 ROTATING EQUIPMENTS: OPERATION, MAINTENANCE,
TROUBLE SHOOTING AND ANALYSIS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
61 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
62 SIX SIGMA CHAMPIONS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
63 STEAM TURBINE: OPERATION, MAINTENANCE AND
TROUBLESHOOTING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
64 TECHNIC MACHANICAL MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
65 TECHNIC VECHILES MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
66 TECHNOLOGY ENGINE MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
67 TOTAL PRODUCTIVE MAINTENANCE (TPM) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
68 TRAFO: PRINCIPLES, APPLICATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
69 VECHICLE MAINTENANCE TECHNIC (PREVENTIVE
MAINTENANCE) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
70 VIBRATION ANALISIS IN ROTARY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
33 MANAGEMENT / MANAJEMEN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ADVANCE SUPERVISORY MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR
EXECUTIVES 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 ASPECTS OF CONTRACT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
5 COMMUNICATION, ASSERTIVENESS AND CONFLICT
MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
7 CONTRACT MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
8 CORPORATE BUILDING FOR INTERNAL ORGANISATION
CULTUR AND ETIC DEVELOPEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
9 COST MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
11 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
12 BASIC MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
13 EFFECTIVE EXECUTIVE SECRETARY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
14 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
15 ENGLISH REPORT WRITING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
16 ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATION
PROFESSIONAL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
17
FILING MANAGEMENT FOR SECRETARY AND
ADMINISTRATION
STAFF (USING MICROSOFT WORD, MICROSOFT EXCEL, &
MICROSOFT ACCESS)
3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
18 FILLING SYSTEM FOR SECRETARY 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 FLOW MEASUREMENT AND CONTROL ELEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
20 GOOD CORPORATE GOVERNANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
21 HEAVY EQUIPMENT MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
22 HOW TO IMPROVE BUSINESS PERFORMANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
23 HR MANAGEMENT OF CHANGE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
24 HYPNO-PRESENTATION SKILL: UNLOCKING YOUR POTENTIAL
POWER 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
25 ICE BREAKING AND ENERGIZERS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
26 IMPROVING PERSONAL SKILL FOR SECRETARY &
ADMINISTRATIVE ASSISTANT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
27 INFLUENTIAL LEADERSHIP EXCELLENCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
28 INFORMATION SYSTEMS AND INFORMATION TECHNOLOGIES
FOR SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
29 INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (I T I
L) VERSION 3.1 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
30 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
31 INVENTORY MANAGEMENT AND COST INVESTMENT
RECOVERY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
32 INVENTORY AND WAREHOUSE MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
33 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
34 NEGOTIATION SKILL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
35 SUPERVISORY SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
36 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
37 LEADERSHIP FOR QUALITY MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
38 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
39 LOGISTIC MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
40 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
41 MANAGEMENT OF OUTSOURCE STAFF HOUSING AND
CATERING SERVICES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
42 MANAGEMENT PROJECT : STRATEGI DAN IMPLEMENTASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
43 TIME MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
44 LIBRARY MANAGEMENT 4 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 8.500.000
45 RISK INVESTMENT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
46 STRATEGIC MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
47 MARKETING MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
48 MODERN MAINTENANCE MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
49 NATURAL GAS RESERVOIR, PROCESSING AND ECONOMICS
ASPECTS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
50 TRAINING FOR SENIOR MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
51 PERFORMANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
52 PLAN LAY OUT OFFICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
53 POWER MANAGEMENT SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
54 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
55 STRATEGIC HUMAN RESOURCE MANAGEMENT AND
ORGANIZATION DEVELOPMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
56 STRATEGIC PERFORMANCE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
57 STRATEGIC PLANNING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
58 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
59 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
60 SUPPLY CHAIN MANAGEMENT (SCM) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
61 TRAINING DEVELOPMENT MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
62 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
63 PRINCIPLE OF MANUFACTURING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
64 PRINCIPLE OF OPERATION PLANNING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
65 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
66 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
67 CUSTOMER SERVICE EXCELLENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
68 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
69 LEADERSHIP FOR FOREMAN 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
70 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
71 ADVANCED PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
72 ESSENTIALS OF PROJECT MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
73 PROJECT COST MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
74 PROJECT MANAGEMENT FUNDAMENTALS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
75 PROJECT RISK MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
76 SOFTWARE PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
77 BUSINESS PROCESS MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
78 ISO 31000 - RISK MANAGEMENT : PRINCIPLES AND GUIDELINES 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
79 ISO/IEC 9000 : 2008 QUALITY MANAGEMENT SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
80 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
81 ISO/IEC 20000: IT SERVICE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
82 ISO/IEC 38500: IT-GOVERNANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
83 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
84 CHANGE & CONFLICT MANAGEMENT AND DEALING WITH
DIFFICULT PEOPLE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
85 COMPETENCY-BASED HUMAN RESOURCES MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
86 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
87 EFFECTIVE PERFORMANCE APPRAISAL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
88 EFFECTIVE TRAINING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
89 PROJECT MANAGEMENT (PM) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
34 MARKETING / PEMASARA N
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
3 CUSTOMER SERVICE EXCELLENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 MARKETING MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
5 PLANT LAYOUT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 POSITIVE FIGHTER FOR SALES PEOPLE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 PRACTICAL CUSTOMER SERVICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
8 PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING
STAFF (USING MICROSOFT POWER POINT) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
9 PRESENTATION SKILL FOR THE BEGINNERS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
10 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 SERVICE WITH DELIGHT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
12 SUPPLY MARKET ANALYSIS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
35 MATERIAL / BAHAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 PRODUCTION PLAN & INVENTORY CONTROL (PPIC) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 HAZARDOUS MATERIAL HANDLING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6
FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR, POTENSI
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
INSTRUMENTATION
4
23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13
8.500.000
36 MEASURENMENT / PENGUKURAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1
FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR,
POTENSI
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
INSTRUMENTATION
4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 ADVANCE INSTRUMENTATION MEASUREMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
3 CALCULATION UNDEFINITE MEASUREMENT RESULT AND
TESTING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 FLOW MEASUREMENT AND CONTROL ELEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 FLUID FLOW MEASUREMENT AND METER PROVING IN OIL
AND GAS INDUSTRY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
6 OIL & GAS: MEASUREMENT AND CALCULATION 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
7 PRODUCTION HANDLING SEPARATION AND MEASUREMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
8 SYSTEM MEASUREMENT AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
9 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
37 MECHANICAL / MEKANI K
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ADVANCE PROCESS CONTROL, INSTRUMENTATION AND
METERING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
2 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 BASIC MECHANICAL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 BEARING AND OIL LUBRICATION FOR MACHINERY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
6 CAD FOR MECHANICAL: AUTOCAD OR CATIA 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
7 MECHANIC TRANMISION VOLT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
8 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
38 MINING
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 COAL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 COATING SYSTEM AND PROTECTION CORROSION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 DRILLING AND EXPLOSIVE IN MINING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 END WORK PROCESS WITH METAL COATING
(ELECTROPLATING) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6
GPS (GLOBAL POSITIONING SYSTEM) FOR MINING AND
PETROLEUM: PRINCIPLES, EQUIPMENT, DATA COLLECTING,
DATA PROCESSING, AND APPLICATION
5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
7 MINING VENTILATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
39 OPERATION / OPERASI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 MANUFACTURING PLANNING & CONTROL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 AC CONTROLLING SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
4 PRINCIPLE OF MANUFACTURING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 PRINCIPLE OF OPERATION PLANNING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 PRODUCTION PLAN & INVENTORY CONTROL (PPIC) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 ADVANCE COURSE ON LIGHTNING PROTECTION AND
GROUNDING SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
8 ADVANCE MAINTENANCE PLANNING, SCHEDULLING,
AUDITING, BENCHMARKING & IMPROVEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
9 ADVANCE PROCESS CONTROL, INSTRUMENTATION AND
METERING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
10 ADVANCED OIL AND GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
11 LEADERSHIP FOR FOREMAN 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
12 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
13 AIR AND SEA CARGO HANDLING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
14 AIR CONDITIONING AND HVAC 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
15 HEAT EXCHANGER : OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
16 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
17 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
18 AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR
EXECUTIVES 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
19 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
20 ADVANCED PROJECT MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
21 VIBRATION ANALISIS IN ROTARY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
22 ESSENTIALS OF PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
23 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
24 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
25 BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &
ENVIRONMENTAL CONSIDERATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
26 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
27 PROJECT LEADERSHIP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
28 PROJECT RISK MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
29 BASIC REFRIGERATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
30 BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM
ENGINEER 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
31 BASIC SURFACE SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
32 BEARING AND OIL LUBRICATION FOR MACHINERY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
33 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
34 BELT CONVEYOR : OPERATION & MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
35 BOILER AND TURBIN UAP: OPERATION, MAINTENANCE DAN
TROUBLESHOOTING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
36 BOILER WATER TREATMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
37 BOILER: OPERATION, MAINTENANCE & TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
38 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
39 BOOST YOUR CREATIVITY IN THINKING: MIND MAP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
40 NON DESTRUCTIVE TEST (NDT) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
41 CAD FOR MECHANICAL: AUTOCAD OR CATIA 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
42 CALCULATION UNDEFINITE MEASUREMENT RESULT AND
TESTING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
43 STEAM GENERATOR AND TURBINE: OPERATION AND
MAINTENANCE 4
23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
44 CATERING & ACCOMMODATION IN OIL & MINE INDUSTRY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
45 CATERING SERVICE, HYGIENE & SANITATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
46 BASIC GAS ENGINE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
47 BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
48 CENTRIFUGAL COMPRESSOR & STEAM TURBINE
PERFORMANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
49 BOILER: OPERATION & MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
50 CENTRIFUGAL PUMP AND SEAL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
51 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
52 CHILLER AND COOLING TOWER: DESIGN AND OPERATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
53 BELT CONVEYOR MAINTENANCE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
54 TOTAL PRODUCTIVE MAINTENANCE (TPM) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
55 MECHANIC TRANMISION VOLT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
56 CAREER PLANNING SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
57 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
58 COMPRESSOR : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
59 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
60 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
61 CONTROL VALVE: OPERATION, MAINTENANCE, AND
TROUBLESHOOTING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
62 CONVEYOR: OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
63 CORROSION AND CATHODIC PROTECTION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
64 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
65 DANGEROUS GOODS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
66 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
67 BASIC TECHNICAL CONTROL FOR INDUSTRY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
68 BOILER, TURBIN (STEAM) : OPERATION MAINTENANCE AND
TROUBLESHOOTING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
69 GENERATOR: TEKNOLOGY, OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
70 PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVE
MAINTENANCE) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
71 DESIGN OF HEATING, VENTILATION AND AIR CONDITIONING
SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
72 VECHICLE MAINTENANCE TECHNIC (PREVENTIVE
MAINTENANCE) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
73 MECHANICAL MAINTENANCE TECHNIC 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
74 DESIGN OF JIGS AND FIXTURES ( ALAT BANTU CEKAM DAN
PEGANG) 4
15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
75 DESIGN OF PRESS AND FORMING TOOL (ALAT PENEKAN DAN
PEMBENTUK) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
76 DESIGN OF MACHINE CONSTRUCTION AND INDUSTRIAL
EQUIPMENT (KONSTRUKSI MESIN DAN PERALATAN INDUSTRI) 4
23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
77 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
78 DISTRIBUTED CONTROL SYSTEM (DCS): PRINCIPLES AND
APPLICATION 5
22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
79 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
80 DISTRIBUTION SYSTEM: FUZZY LOGIC & METERING LOAD
CONTROL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
81 DRILLING ENGINEERING AND WELL PLANING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
82 ALARM AND PROTECTIVE DEVICES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
83 BASIC MACHINERY VIBRATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
84 BASIC VIBRATION ANALYSIS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
85 CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITION
EVALUATION 4
2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
86 COMPRESSOR OPERATION, MAINTENANCE &
TROUBLESHOOTING 4
23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
87 CORROSION MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
88 FLANGE AND JOINT INTEGRITY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
89 INDUSTRIAL AUTOMATION & CONTROL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
90 ADVANCE INSTRUMENTATION MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
91 MACHINERY VIBRATION ANALYSIS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
92 MAINTENANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
93
FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR,
POTENSI
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
INSTRUMENTATION
4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
8.500.000
94 PROCESS CONTROL INSTRUMENTATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
95 SCADA FOR ENGINEER 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
96 SCADA FOR OPERATOR & TEKNICIAN 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
97 ELECTROPLATING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
98 SYSTEM MEASUREMENT AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
99 THEORY AND APPLICATION BELT CONVEYOR 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
100 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
101 FAILURE ANALYSIS METHODS AND CASES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
102 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
103 FLIGHT OPERATION MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
104 FINANCING CONDOTEL/HOTEL OPERATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
105 FLOW MEASUREMENT AND CONTROL ELEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
106 FLUID FLOW MEASUREMENT AND METER PROVING IN OIL
AND GAS INDUSTRY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
107 FORMATION DAMAGE AND WELL STIMULATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
108 GAS AND STEAM TURBINE : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
109 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
110 GAS METAL ARC WELDING (LAS MIG/MAG) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
111 GEOLOGY FOR NON GEOLOGIST 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
112
GPS (GLOBAL POSITIONING SYSTEM) FOR MINING AND
PETROLEUM: PRINCIPLES, EQUIPMENT, DATA COLLECTING,
DATA PROCESSING, AND APPLICATION
5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
113 H2S AWARENESS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
114 HAND TOOL UTILIZATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
115 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
116 HAZARDOUS MATERIAL HANDLING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
117 HEAT EXCHANGERS: OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
118 HEAVY DUTY EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
119 HEAVY EQUIPMENT MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
120 HIGH PRESSURE PUMP (HPP): OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
121 HSE AUDIT TECHNIQUES 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
122 HVAC SYSTEM: OPERATION AND MAINTENANCE 5 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 9.500.000
123 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
124 HYDRAULICS AND PNEUMATICS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
125 INDUSTRIAL COMBUSTION AND BURNER 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
126 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
127 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
128 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
129 INSTRUMENTATION AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
130 INTEGRATED PIPELINE DESIGN, OPERATION DAN
MAINTENANCE 4
23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
131 INVENTORY MANAGEMENT AND COST INVESTMENT
RECOVERY 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
132 INVENTORY AND WAREHOUSE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
133 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
134 KINEMATICS AND DYNAMICS OF MACHINERIES 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
135 LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR OIL
AND GAS REFINERY AND PETROCHEMICAL INSTALLATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
136 LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR
POWER PLANT, TRANSMISSION, DISTRIBUTION AND LARGE
INDUSTRY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
137 LIGTNING PROTECTION & GROUNDING SYSTEM 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
138 LUBRICATION AND BEARING TECHNOLOGY 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
139 BASIC PRINCIP LUBRICATION AND APLICATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
140 MACHINERY NOISE AND PROBLEM SOLVING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
141 MAINTENANCE PLANNING, SCHEDULLING AND WORK
CONTROL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
142 MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
143 MAINTENANCE MANAGEMENT (FOR MANUFACTURE AND OIL
& GAS COMPANY 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
144 MAN POWER PLANNING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
145 OPERATION MANAGEMENT PRODUCTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
146 MATERIAL MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
147 SERVICE REPAIR MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
148 MANUFACTURING PROCESS TO USE CNC MACHINING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
149 MANUFACTURING PROCESSES TO USE CASTING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
150 MANUFACTURING PROCESSES TO USE METAL FORMING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
151 NEGOTIATION SKILL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
152 NEGOTIATION SKILL FOR PURCHASING STAFF 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
153 OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN
THE OIL & GAS INDUSTRY 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
154 OFFSHORE WELLHEAD PLATFORM OPERATION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
155 OIL & GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
156 OIL & GAS: MEASUREMENT AND CALCULATION 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
157 OIL AND GAS HANDLING FACILITIES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
158 OIL AND GAS WELLS STIMULATION BY ACIDIZING AND
HYDRAULIC FRACTURING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
159 OIL FIELD AND 100 METHODS TO MAINTAIN AND INCREASE
PRODUCTION 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
160 OIL FILM BEARING (JOURNAL DAN THRUST BEARING /
HYDRODYNAMIC BEARINGS) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
161 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
162 OPERATING SYSTEMS TECHNOLOGIES AND INSTALLATION
PROCEDURES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
163 OPTIMIZATION FOR PRODUCTION SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
164 IMPLEMENTATION AND PROBLEM IN LAND ACCUSATIONS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
165 POWER PLANT ELECTRICAL DISTRIBUTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
166
WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL
GATHERING
(PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)
3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
167 DRILLING AND EXPLOSIVE IN MINING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
168 MATERIAL HANDLING & APLICATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
169 DESTRUCTIVE TEST SERTIFICATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
170 PLANT LAYOUT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
171 MAINTENANCE PLANNING AND SCHEDULING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
172 PETROLEUM ENGINEERING FOR NON PETROLEUM ENGINEERS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
173 PETROLEUM INDUSTRIAL REFRIGERATION: OPERATION AND
MAINTENANCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
174 PIGGING OPERATIONS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
175 PNEUMATIC CONTROL SYSTEM 5 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 9.500.000
176 PUMP AND COMPRESOR: OPERATION, COMPRESSOR AND
MAINTENANCE TROUBLESHOOTING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
177 PUMP OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
178 POWER DISTRIBUTION SYSTEM: OPERATION AND
CHARACTERISTIC 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
179 POWER DISTRIBUTION SYSTEM: PROTECTION AND RELAYING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
180 POWER MANAGEMENT SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
181 PREDICTIVE MAINTENANCE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
182 PRESSURE VESSELS : CALCULATION, CODES, PRODUCTION,
OPERATION, CONTROLS AND SAFETIES 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
183 PROCESS CONTROL AND INSTRUMENTATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
184 PROCESS CONTROL AND LOOP 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
185 PRODUCED WATER TREATMENT FOR RE-INJECTION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
186 PRODUCTION AND OPERATION MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
187 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
188 PRODUCTION HANDLING SEPARATION AND MEASUREMENT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
189 PRODUCTION OF HELICAL GEAR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
190 PRODUCTION OPERATION MANAGEMENT FOR MANAGERS 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
191 PRODUCTION SAFETY SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
192 KOMPETENSI TRAINING FOR SENIOR SAFETY (IN LIMITED
SPACE) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
193 PROJECT MANAGEMENT (PM) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
194 PROJECT MANAGEMENT (USING WIN QSB & MICROSOFT
PROJECT) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
195 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
196 END WORK PROCESS WITH METAL COATING
(ELECTROPLATING) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
197 PUMP : OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
198 PUMP AND COMPRESSOR : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
199 PUMP SELECTION, DESIGN AND OPERATION FOR OIL AND GAS
SURFACE PRODUCTION FACILITIES 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
200 RECIPROCATING COMPRESSOR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
201 REFRACTORY AND HEAT INSULATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
202 REFRIGERATION : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
203 RELIABILITAS SISTEM : TO EVALUATE MAINTENANCE RESULT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
204 RELIABILITY CENTERED MAINTENANCE & RISK BASED
INSPECTION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
205 RELIABILITY CENTERED MAINTENANCE (RCM) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
206 SAFETY RELIEF VALVE: FUNDAMENTAL CONCEPTS, SIZING
AND SELECTION 5
8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
207 SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION):
PRINCIPLES, HARDWARE SYSTEM, OPERATION &
PROGRAMMING
5
22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
9.500.000
208 SIX SIGMA CHAMPIONS 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
209 STEAM TURBINE: OPERATION, MAINTENANCE AND
TROUBLESHOOTING 3
8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
210 SUCKER ROD PUMP: DESIGN, OPERATION AND
TROUBLESHOOTING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
211 TECHNIC FOR HUMAN RELATIONS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
212 TECHNIC INSTALATION AND ELECTRICAL PROTECTION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
213 TECHNIC VECHILES MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
214 TECHNIC MACHANICAL MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
215 TECHNOLOGY ENGINE MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
216 TESTING OF MACHINE TOOLS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
217 TIG AND MIG WELDING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
218 TRAFO: PRINCIPLES, APPLICATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
219 MECHANICAL POWER TRANSMISSION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
220 TROUBLE SHOOTING, INSPECTION, AND MONITORING OF
MACHINERY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
221 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
222 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
223 WATER TREATING AND CHEMICALS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
224 WELL COMPLETION AND WORK OVER 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
225 INVETIGASI KECELAKAAN 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
226 OPERATION AND MAINTENANCE KUBIKAL LOW 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
40 PIPING / PIPA
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 INTEGRATED PIPELINE DESIGN, OPERATION DAN
MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 FLANGE AND JOINT INTEGRITY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 PIPING SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 VALVE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 PROCESS PIPING & PIPELINE SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 PIPELINE : DESIGN, TESTING, INSPECTION AND MAINTENANCE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
8 VALVE (CHOKE & CONTROL VALVE) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
41 PLAT
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 MANUFACTURING PLANNING & CONTROL 2 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 4.500.000
2 ELECTROPLATING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
3 END WORK PROCESS WITH METAL COATING
(ELECTROPLATING) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 OFFSHORE WELLHEAD PLATFORM OPERATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
5 PRINCIPLE OF MANUFACTURING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
6 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
42 PROCUREMENT / PENGADAAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
2 BASIC PROCUREMENT & PURCHASING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 E-PROCUREMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 INFORMATION SYSTEMS AND INFORMATION TECHNOLOGIES
FOR SUPPLY CHAIN MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (I T I
L) VERSION 3.1 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 LOGISTIC MANAGEMENT 2 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 4.500.000
8 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
9 MATERIAL SELECTION MACHINE COMPONENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10
METHODE TO SET COMPANY HPS "TECHNIC AND PROCEDURE
PRICE CALCULATION IN THE AUCTION OF GOOD SERVICE OF
COMPANY"
3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 PRACTICAL SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 PROCUREMENT AND CONTRACT MONITORING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
13 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
14 TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY
CHAIN 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
43 PRODUCTION / PRODUKSI
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ADVANCE PROCESS CONTROL, INSTRUMENTATION AND
METERING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
2 ADVANCED OIL AND GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
3 HEAT EXCHANGER : OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM
ENGINEER 5
8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
5 CENTRIFUGAL COMPRESSOR & STEAM TURBINE
PERFORMANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 CENTRIFUGAL PUMP AND SEAL 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
7 FLUID FLOW MEASUREMENT AND METER PROVING IN OIL
AND GAS INDUSTRY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
8 ELECTRICITY POWER SUBSTATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
10 HIGH PRESSURE PUMP (HPP): OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
11 INDUSTRIAL COMBUSTION AND BURNER 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
12 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
14 OPERATION MANAGEMENT PRODUCTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 OIL & GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
16 OIL AND GAS WELLS STIMULATION BY ACIDIZING AND
HYDRAULIC FRACTURING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
17 OIL FIELD AND 100 METHODS TO MAINTAIN AND INCREASE
PRODUCTION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
18 OPTIMIZATION FOR PRODUCTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
19 PRESSURE VESSELS : CALCULATION, CODES, PRODUCTION,
OPERATION, CONTROLS AND SAFETIES 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
20 PRODUCED WATER TREATMENT FOR RE-INJECTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
21 PRODUCTION AND OPERATION MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
22 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
23 PRODUCTION HANDLING SEPARATION AND MEASUREMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
24 PRODUCTION OF HELICAL GEAR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
25 PRODUCTION OPERATION MANAGEMENT FOR MANAGERS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
26 PRODUCTION SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
27 RECIPROCATING COMPRESSOR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
28 REFRACTORY AND HEAT INSULATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
29 SIMULATION PROCESS CHEMICAL TECHNIC USING HYSYS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
30 SUCKER ROD PUMP: DESIGN, OPERATION AND
TROUBLESHOOTING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
31 SURFACE PRODUCTION OPERATION & EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
32 SYSTEM AND COST PRODUCTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
33 WELL COMPLETION AND WORK OVER 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
34 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
35 TOTAL PRODUCTIVE MAINTENANCE (TPM) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
44 PROJECT / PROJEK
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 PROJECT MANAGEMENT (PM) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
2 ADVANCED PROJECT MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 ESSENTIALS OF PROJECT MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 IT PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 PROJECT COST MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 PROJECT LEADERSHIP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 PROJECT MANAGEMENT (USING WIN QSB & MICROSOFT
PROJECT) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 PROJECT MANAGEMENT based on PRINCE2 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 PROJECT MANAGEMENT FUNDAMENTALS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 PROJECT MANAGEMENT USING MICROSOFT PROJECT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
11 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 PROJECT RISK MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
14 SOFTWARE PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
45 PUBLIC RELATIONS / HUMAS
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 4.500.000
4 EFFECTIVE MASTER OF CEREMONY (MC) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 EXCELLENT MOTIVATION AND TEAM WORK OUTBOUND
TRAINING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
6 vLEADERSHIP DEVELOPMENT PROGRAM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 LEADERSHIP FOR FOREMAN 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 POSITIVE FIGHTER FOR SALES PEOPLE 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 POWERFUL COMMUNICATION SKILL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
10 POWERFUL PUBLIC SPEAKING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
11 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
12 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 SERVICE WITH DELIGHT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
14 BUILDING A TEAM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
15 CAREER PLANNING SYSTEM 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
16 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
17 COMMUNICATION STRATEGY WITH GOFERNMENT
INSTITUTION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
18 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 EFFECTIVE PRESENTATION SKILLS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
20 NEGOTIATION SKILL 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
21 SUPERVISORY SKILL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
22 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
23 LEADERSHIP FOR QUALITY MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
24 MC (MASTER OF CEREMONY) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
25 MEDIA RELATION AND COMMUNICATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
26 MEDIA RELATIONS STRATEGY AND EXECUTIONS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
27 MEDIA RELATIONS STRATEGY FOR EFFECTIVE PROMOTION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
28 IMPLEMENTATION AND PROBLEM IN LAND ACCUSATIONS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
29 DECISION MAKING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
30 PERSONALITY DEVELOPMENT BASED ON EMOTIONAL AND
SPRITUAL QUETIENTS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
31 POWERFUL PRESENTATION EXCELLENCE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
32 PRACTICAL CUSTOMER SERVICE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
33 PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING
STAFF (USING MICROSOFT POWER POINT) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
34 PRESENTATION SKILL FOR THE BEGINNERS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 4.500.000
35 PROBLEM SOLVING & DECISION MAKING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
36 SERVICE EXCELLENT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
37 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE 2 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 4.500.000
38 SPARE PARTS MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
39 SPEAKING FOR BUSINESS (PRESENTATION, NEGOTIATION AND
LOBBYING) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
40 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
41 TECHNIC FOR HUMAN RELATIONS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
42 WORKING AS A TEAM EXCELLENCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
43 WORKLOAD ANALYSIS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
46 PUMP
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 CENTRIFUGAL PUMP AND SEAL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 ELECTRIC SUBMERSIBLE PUMP : PRINCIPLES, INSTALLATION,
OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
3 HIGH PRESSURE PUMP (HPP): OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5 22-26 5-9 19-23 23-26 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
4 PIPELINE : DESIGN, TESTING, INSPECTION AND MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 4.500.000
5 PUMP AND COMPRESOR: OPERATION, COMPRESSOR AND
MAINTENANCE TROUBLESHOOTING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 PUMP OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 SUCKER ROD PUMP: DESIGN, OPERATION AND
TROUBLESHOOTING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
47 SAFETY / KEAMANAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 ADVANCE COURSE ON LIGHTNING PROTECTION AND
GROUNDING SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
3 BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &
ENVIRONMENTAL CONSIDERATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
4 BASIC SURFACE SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
5 CORROSION AND CATHODIC PROTECTION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
6 DANGEROUS GOODS 2 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 4.500.000
7 EFFLUENT PRODUCED WASTE WATER 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 EMERGENCY PREPAREDNESS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
9 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
10 FAILURE ANALYSIS METHODS AND CASES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
11 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 H2S AWARENESS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
13 HAND TOOL UTILIZATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
14 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
15 HAZARDOUS MATERIAL HANDLING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
16 LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR OIL
AND GAS REFINERY AND PETROCHEMICAL INSTALLATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
17 LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR
POWER PLANT, TRANSMISSION, DISTRIBUTION AND LARGE
INDUSTRY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
18 LIGTNING PROTECTION & GROUNDING SYSTEM 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
19 OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN
THE OIL & GAS INDUSTRY 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
20
WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL GATHERING
(PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)
3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
21 DRILLING AND EXPLOSIVE IN MINING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
22 HAZARD ANALYSIS CRITICAL CONTROL POINT (HACCP) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
23 PRESSURE VESSELS : CALCULATION, CODES, PRODUCTION,
OPERATION, CONTROLS AND SAFETIES 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
24 PRODUCTION SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
25 KOMPETENSI TRAINING FOR SENIOR SAFETY (IN LIMITED
SPACE) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
26 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
27 SAFETY RELIEF VALVE: FUNDAMENTAL CONCEPTS, SIZING
AND SELECTION 5
22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
28 TECHNIC INSTALATION AND ELECTRICAL PROTECTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
29 TRAINING OF TRAINERS SAFETY 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
30 WASTE HANDLING & TREATMENT IN THE OIL & GAS
INDUSTRIES 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
31 WATER TREATING AND CHEMICALS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
32 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
33 ISO 27001: INFORMATION SECURITY MANAGEMENT SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
34 NON DESTRUCTIVE TEST (NDT) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
35 BIO SAFETY AND BIO SECURITY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
48 SUPPLY CHAIN / PENYEDIAAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
2 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 PRACTICAL SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
49 SYSTEM / SISTEM
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
3 AC CONTROLLING SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
4 ADVANCE COURSE ON LIGHTNING PROTECTION AND
GROUNDING SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
5 ADVANCED OIL AND GAS PRODUCTION SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
6 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
7 AUDIT ENERGY AND POWER SYSTEM MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
8 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
9 BASIC SURFACE SAFETY SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
10 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 DESIGN OF MACHINE CONSTRUCTION AND INDUSTRIAL
EQUIPMENT (KONSTRUKSI MESIN DAN PERALATAN INDUSTRI) 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
13 DISTRIBUTED CONTROL SYSTEM (DCS): PRINCIPLES AND
APPLICATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
14 DISTRIBUTION SYSTEM: FUZZY LOGIC & METERING LOAD
CONTROL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
15 ELECTRIC MOTOR SYSTEM : PRINCIPLES, APPLICATIONS &
CONTROL 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
16 ELECTRICAL MACHINES, DRIVES, TRANSFORMER AND POWER
SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
17 ELECTRICAL POWER SYSTEM ANALYSIS 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
18 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
19 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
20
FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR, POTENSI
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
INSTRUMENTATION
4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
21
GPS (GLOBAL POSITIONING SYSTEM) FOR MINING AND
PETROLEUM: PRINCIPLES, EQUIPMENT, DATA COLLECTING,
DATA PROCESSING, AND APPLICATION
5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
22 GROUNDING SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
23 HVAC SYSTEM: OPERATION AND MAINTENANCE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
24 HYDRAULIC CONTROL SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
25 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
26 INFORMATION SYSTEMS AND INFORMATION TECHNOLOGIES
FOR SUPPLY CHAIN MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
27 INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (I T
I L) VERSION 3.1 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
28 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
29 ISO 27001: INFORMATION SECURITY MANAGEMENT SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
30 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
31 ISO/IEC 9000 : 2008 QUALITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
32 LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR OIL
AND GAS REFINERY AND PETROCHEMICAL INSTALLATION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
33 MAINTENANCE SYSTEM AND DOCUMENTATION 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
34 MAINTENANCE: SYSTEM AND COST 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
35 OIL & GAS PRODUCTION SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
36 OPTIMIZATION FOR PRODUCTION SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
37 PIPING SYSTEM 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
38 POWER DISTRIBUTION SYSTEM: OPERATION AND
CHARACTERISTIC 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
39 POWER DISTRIBUTION SYSTEM: PROTECTION AND RELAYING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
40 POWER MANAGEMENT SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
41 PRACTICAL AND ADVANCED COURSE ON HVAC SYSTEMS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
42 PRINCIPLE OF OPERATION PLANNING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
43 PROCESS PIPING & PIPELINE SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
44 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
45 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
46
SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION):
PRINCIPLES, HARDWARE SYSTEM, OPERATION &
PROGRAMMING
5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
47 STRUCTURE CABLING SYSTEM BY SYSTIMAX 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
48 SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (
SCADA ) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
49 SYSTEM AND COST PRODUCTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
50 SYSTEM MEASUREMENT AND CALIBRATION 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
51 SYSTEMS ANALYSIS AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
52 SYSTEMS ANALYSIS AND DESIGN WITH UML
3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
50 TECHNIC / TEKNIK
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &
ENVIRONMENTAL CONSIDERATION 5
22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
3 BASIC PETROLEUM ENGINEERING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
4 BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM
ENGINEER 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
5 CHEMICAL ENGINEERING FUNDAMENTALS FOR NON
ENGINEER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 BASIC TECHNICAL CONTROL FOR INDUSTRY 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 GEOLOGY FOR NON GEOLOGIST 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
8
GPS (GLOBAL POSITIONING SYSTEM) FOR MINING AND
PETROLEUM: PRINCIPLES, EQUIPMENT, DATA COLLECTING,
DATA PROCESSING, AND APPLICATION
5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
9 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 IT AUDIT PRACTICES 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 IT HELPDESK 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 WAREHOUSE COMPUTERISATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
13 LUBRICATION AND BEARING TECHNOLOGY 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
14 BASIC PRINCIP LUBRICATION AND APLICATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 MASTERING MICROSOFT EXCEL 2007 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
16 MICRO CONTROLLER APPLICATION IN INDUSTRIAL PLANTS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
17 NON DESTRUCTIVE TEST (NDT) 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
18 NON DESTRUCTIVE TESTING (NDT) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
19 NUMERICAL CONTROL AND ROBOTIC 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
20 OIL FILM BEARING (JOURNAL DAN THRUST BEARING /
HYDRODYNAMIC BEARINGS) 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
21 OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTED
COMPONENT OBJECT MODEL (DCOM) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
22 OPERATING SYSTEMS TECHNOLOGIES AND INSTALLATION
PROCEDURES 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
23 SITUS WEB DEVELOPMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
24 TEKNOLOGI DEVELOPMENT AND STANDARD MATERIAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
25 HEAT TREATMENT FOR METAL 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
26 PLC (ROGRAMMABLE LOGIC CONTROLLER): PRINCIPLES,
OPERATION AND PROGRAMMING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
27 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
28 PROCESS CONTROL AND LOOP 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
29 PROCESS PIPING & PIPELINE SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
30 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
31 PROGRAMMABLE LOGIC CONTROLLER (PLC): ADVANCED AND
APPLICATED 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
32
PROGRAMMABLE LOGIC CONTROLLER (PLC): PRINCIPLES,
HARDWARE AND SOFTWARE, DIAGNOSTICS AND
TROUBLESHOOTING
5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
33 PROJECT MANAGEMENT (USING WIN QSB & MICROSOFT
PROJECT) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
34 PROCES MACHINING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
35 PUMP : OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
36 PUMP AND COMPRESSOR : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
37 PUMP SELECTION, DESIGN AND OPERATION FOR OIL AND GAS
SURFACE PRODUCTION FACILITIES 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
38 SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION):
PRINCIPLES, HARDWARE SYSTEM, OPERATION &
PROGRAMMING
5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
39 ELECTRICAL MOTOR CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
40 STRATEGIC HEALTH INFORMATION SYSTEM IN HOSPITAL 5 8-12 5-9 5-9 2-6 21-25 25-29 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
41 STRUCTURE CABLING SYSTEM BY SYSTIMAX 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
42 FISIBILITY STUDY FOR INVESTMENT USING APLICATION
MICROSOFT EXCEL 4
23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
43 SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (
SCADA ) 5
8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
44 TECHNIC FOR OWN CALCULATION (HPS) 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
45 TECHNIC FOR ENERGY CONSERVATION THRU ENERGY AUDIT
IN BUILDING 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
46 TECHNOLOGY CAD/CAM 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
47 TECHNOLOGY ENGINE MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
48 TESTING OF MACHINE TOOLS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
49 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
50 IT BALANCED SCORECARD 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
51 IT PROJECT MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
52 IT RISK MANAGEMENT 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
53 ITIL V.3 FOUNDATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
54 MANAGING SOFTWARE REQUIREMENTS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
55 PRIMAVERA P6 PROFESSIONAL FUNDAMENTAL 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
56 PROJECT MANAGEMENT based on PRINCE2 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
57 PROJECT MANAGEMENT USING MICROSOFT PROJECT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
58 SOFTWARE PROJECT MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
59 SOFTWARE QUALITY ASSURANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
60 SOFTWARE TESTING FOUNDATION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
61 SYSTEMS ANALYSIS AND DESIGN WITH UML 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
62 SYSTEMS ANALYSIS AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
63 ISO 27001: INFORMATION SECURITY MANAGEMENT SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
64 ISO 31000 - RISK MANAGEMENT : PRINCIPLES AND GUIDELINES 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
65 ISO/IEC 9000 : 2008 QUALITY MANAGEMENT SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
66 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
67 ISO/IEC 20000: IT SERVICE MANAGEMENT 3 22-24 5-7 26-28 16-18 14-16 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
68 ISO/IEC 38500: IT-GOVERNANCE 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
69 ASME PTC 4 – 1 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
70 BASIC GAS ENGINE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
71 ENERGY CONSERVATION TECHNIC ON BUILDING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
72 MAINTENANCE OF MACHINE TOOLS 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
73 SCADA FOR ENGINEER 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
74 SCADA FOR OPERATOR & TEKNICIAN 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
75 VECHICLE MAINTENANCE TECHNIC (PREVENTIVE
MAINTENANCE) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
76 ISO 9001 : 2015 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
51 TURBIN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 14-16 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 STEAM TURBINE: OPERATION, MAINTENANCE AND
TROUBLESHOOTING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 BOILER AND TURBIN UAP: OPERATION, MAINTENANCE DAN
TROUBLESHOOTING 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 BOILER, TURBIN (STEAM) : OPERATION MAINTENANCE AND
TROUBLESHOOTING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
5 CENTRIFUGAL COMPRESSOR & STEAM TURBINE
PERFORMANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 GAS TURBINE: OPERATION, MAINTENANCE AND
TROUBLESHOOTING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000
7 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
8 STEAM GENERATOR AND TURBINE: OPERATION AND
MAINTENANCE 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
9 TURBIN & GENERATOR OPERATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
10 GAS AND STEAM TURBINE : OPERATION, MAINTENANCE AND
TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
11 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
52 VECHICLE / ENDARAAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 VECHICLE MAINTENANCE TECHNIC (PREVENTIVE
MAINTENANCE) 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 TRANSPORTATION MANAGEMENT 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY
CHAIN 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
53 VIBRATION / GETARAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000
2 BASIC MACHINERY VIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
3 BASIC VIBRATION ANALYSIS 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 VIBRATION ANALISIS IN ROTARY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
54 WAREHOUSE / GUDANG
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 AIR AND SEA CARGO HANDLING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 DANGEROUS GOODS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 INVENTORY AND WAREHOUSE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 MATERIAL HANDLING & APLICATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
6 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 WAREHOUSE COMPUTERISATION 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 WASTE HANDLING & TREATMENT IN THE OIL & GAS
INDUSTRIES 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23
10-12 6.500.000
55 WATER / AIR
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BOILER WATER TREATMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
2 EFFLUENT PRODUCED WASTE WATER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 PRODUCED WATER TREATMENT FOR RE-INJECTION 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5
WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL
GATHERING
(PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)
3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 WATER TREATING AND CHEMICALS 3 22-24 5-7 26-28 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
56 WELDING / ENGELASAN
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 BASIC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
2 METALLURGY IN WELDING 3 8-10 19-21 7-9 24-26 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 OXY ACETYLENE WELDING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 OXY ACETYLENE WELDING (LAS ASETILIN) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
6 TIG AND MIG WELDING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000
7 WELDING INSPECTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
8 WELDING METALLURGY 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
9 ARC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
10 MANUAL METAL ARC WELDING (LAS LISTRIK) 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
11 GAS METAL ARC WELDING (LAS MIG/MAG) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
12 GAS TUNGSTEN ARC WELDING (LAS TIG) 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
57 OIL REFINERY
No Topic Day JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Harga
1 RESEVOIR ENGINEERING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
2 PRODUCTION AND STIMULATION 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 DRILLING DAN WELL CONTROL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000
4 COMPLETION, WORKOVER DAN KERJA ULANG SUMUR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
s