TEKNOLOGI DALAM ARSITEKTUR
Kuliah program Magister Teknik Arsitektur
Fakultas Teknik
Universitas Sumatera Utara
Prof Dr.-Ing. Johannes Tarigan 1
![Page 2: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/2.jpg)
Prof Dr.-Ing. Johannes Tarigan 2
Perancangan
Disain optimal
Fungsi Disain
struktur Tampak
Ekonomis Cara Membangun
pelaksanaan
Bangunan Arsitek Insinyur
Berdasarkan, Kotulla, Bernhard / Urlau-Clever, Bernd P. / Kotulla, Peter:
1994· Industrielles Bauen, II: Expert Verlag ISBN-13: 978-3-8169-1145-6 ISBN-10: 3-8169-1145-5
![Page 3: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/3.jpg)
Struktur Bangunan
Fisika Bangunan
Disain Pelaksanaan
Panas Api Hujan Bunyi
Perhitungan Struktur Faktor Keamanan dll
Sistem pelaksanaan Crane Transport
Prof Dr.-Ing. Johannes Tarigan 3
![Page 4: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/4.jpg)
JENIS ELEMEN KONSTRUKSI
Dimensi satu
Kolom,balok, portal
Dimensi dua
Pelat, dinding geser, shall
Dimensi tiga
Bangunan reaktor, pondasi besar
Prof Dr.-Ing. Johannes Tarigan 4
![Page 5: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/5.jpg)
Metode konstruksi pada bangunan
1. Cast In Situ
2. Pre cast dan pre stress
3. Top down
4. Lift slab
Prof Dr.-Ing. Johannes Tarigan 5
![Page 6: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/6.jpg)
1. Cast Insitu
Beton di cor ditempat/
Konvensional
Prof Dr.-Ing. Johannes Tarigan 6
![Page 7: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/7.jpg)
2. Pre-cast dan Pre-stress
Prof Dr.-Ing. Johannes Tarigan 7
![Page 8: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/8.jpg)
Pre Cast
• Kolom
• Balok
• Lantai
• Dinding
• Pondasi
• DLL
Prof Dr.-Ing. Johannes Tarigan 8
![Page 9: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/9.jpg)
Pabrik dari pre cast
Prof Dr.-Ing. Johannes Tarigan 9
![Page 10: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/10.jpg)
Ware House/Pre cast
Prof Dr.-Ing. Johannes Tarigan 10
![Page 11: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/11.jpg)
Prof Dr.-Ing. Johannes Tarigan 11
![Page 12: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/12.jpg)
Ware house precast
Prof Dr.-Ing. Johannes Tarigan 12
![Page 13: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/13.jpg)
Prof Dr.-Ing. Johannes Tarigan 13
![Page 14: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/14.jpg)
Prof Dr.-Ing. Johannes Tarigan 14
![Page 15: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/15.jpg)
Prof Dr.-Ing. Johannes Tarigan 15
![Page 16: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/16.jpg)
Prof Dr.-Ing. Johannes Tarigan 16
![Page 17: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/17.jpg)
Prof Dr.-Ing. Johannes Tarigan 17
![Page 18: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/18.jpg)
Product Index
Septic Tanks 1
Pump Tanks 2
Holding Tanks 3
Siphon Tanks 4
Recharge Tanks 5
Distribution Boxes 6
Aerobic Tanks 7
Treatment Tanks 8
Grease Traps & Interceptors 9
Lids & Extensions 10
Manholes 11
Inlets 12
Inlet Tops 13
Headwalls 14
Reinforced Concrete Pipe 15
Miscellaneous 16
Prof Dr.-Ing. Johannes Tarigan 18
![Page 19: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/19.jpg)
Prof Dr.-Ing. Johannes Tarigan 19
![Page 20: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/20.jpg)
Prof Dr.-Ing. Johannes Tarigan 20
![Page 21: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/21.jpg)
100 ton
Prof Dr.-Ing. Johannes Tarigan 21
![Page 22: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/22.jpg)
Reservoir
Prof Dr.-Ing. Johannes Tarigan 22
![Page 23: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/23.jpg)
Ukuran Elemen Pre Cast
Persyaratan khusus b h L
Tidak perlu < 250 cm < 400 cm < 1800 cm
Perlu, tanpa perlindungan polisi di Jalan Propinsi
< 350 cm Berdasarkan tinggi Di jembatan
<2400 cm
Perlu, tanpa perlidungan polisi di Tol
< 450 cm Berdasarkan tinggi di jembatan
< 2800 cm
Prof Dr.-Ing. Johannes Tarigan 23
![Page 24: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/24.jpg)
Toleransi dalam pre cast
Dalam pabrikasi, perlu ada toleransi yang dihitung dengan statistik.
Prof Dr.-Ing. Johannes Tarigan 24
![Page 25: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/25.jpg)
Modul dalam bangunan
• 3 M = 300 mm
• 6 M = 600 mm
• 12 M = 1200 mm
Prof Dr.-Ing. Johannes Tarigan 25
![Page 26: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/26.jpg)
Prof Dr.-Ing. Johannes Tarigan 26
![Page 27: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/27.jpg)
Jenis-jenis panel
1. Solid Panels
2. Insulated (sandwich) Panels
3. Ribbed Panels
4. Hollow-core Panels
5. Sculptured Panels
Prof Dr.-Ing. Johannes Tarigan 27
![Page 28: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/28.jpg)
Solid Panel
Prof Dr.-Ing. Johannes Tarigan 28
![Page 29: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/29.jpg)
HOLLOW
Prof Dr.-Ing. Johannes Tarigan 29
![Page 30: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/30.jpg)
Ribbed Panel
Prof Dr.-Ing. Johannes Tarigan 30
![Page 31: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/31.jpg)
Insulated (sandwich) Panels
Prof Dr.-Ing. Johannes Tarigan 31
![Page 32: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/32.jpg)
Prof Dr.-Ing. Johannes Tarigan 32
![Page 33: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/33.jpg)
Desain dinding Panel
Prof Dr.-Ing. Johannes Tarigan 33
Dinding Panel : 1. Beton Bertulang/RC (Reinforced Concrete)/Stahlbeton 2. Beton Pratekn/PSC(Pre Stress Concrete/Spannbeton
![Page 34: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/34.jpg)
Prof Dr.-Ing. Johannes Tarigan 34
b
heff
![Page 35: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/35.jpg)
Klasifikasi Panel
1. Non-Load-Bearing Panel (cladding)
2. Load-Bearing Panel
Prof Dr.-Ing. Johannes Tarigan 35
![Page 36: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/36.jpg)
KEUNTUNGAN PRE CAST
• Cepat dipasang
• Harga lebih murah
Prof Dr.-Ing. Johannes Tarigan 36
![Page 37: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/37.jpg)
PERENCANAAN PRE CAST
• Arsitek dan insinyur Sipil
Prof Dr.-Ing. Johannes Tarigan 37
![Page 38: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/38.jpg)
ORGANISASI
Prof Dr.-Ing. Johannes Tarigan 38
![Page 39: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/39.jpg)
Perencanaan pre cast
1. Dimensinya elemen bangunannya sama
2. Slabnya rata
Prof Dr.-Ing. Johannes Tarigan 39
![Page 40: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/40.jpg)
Pemasangan Slab
Prof Dr.-Ing. Johannes Tarigan 40
![Page 41: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/41.jpg)
Crane
Prof Dr.-Ing. Johannes Tarigan 41
![Page 42: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/42.jpg)
Pemasangan kolom
Prof Dr.-Ing. Johannes Tarigan 42
![Page 43: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/43.jpg)
Sambungan antar dinding
Prof Dr.-Ing. Johannes Tarigan 43
![Page 44: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/44.jpg)
Sambungan antar kolom dan balok
Prof Dr.-Ing. Johannes Tarigan 44
![Page 45: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/45.jpg)
Sambungan antar kolom dan pondasi
Prof Dr.-Ing. Johannes Tarigan 45
![Page 46: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/46.jpg)
Sambungan antar balok
Prof Dr.-Ing. Johannes Tarigan 46
![Page 47: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/47.jpg)
Sambungan kolom balok
Prof Dr.-Ing. Johannes Tarigan 47
![Page 48: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/48.jpg)
pemasangan
Prof Dr.-Ing. Johannes Tarigan 48
![Page 49: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/49.jpg)
Pre Stress
• Salah satu bagian dari pre cast
Prof Dr.-Ing. Johannes Tarigan 49
![Page 50: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/50.jpg)
Material Sifat
Beton • bahan campuran Semen, Agregat dan Air
• tegangan tekan tinggi
• tegangan tarik rendah
• harga murah
Tulangan • tegangan tekan dan tarik tinggi
• harga mahal
• bahaya terhadap korosi/karat
Kabel pratekan
• tegangan tarik sangat tinggi
• harga sangat mahal
• sangat bahaya terhadap korosi.
Perbandingan sifat beton, tulangan dan kabel pra tekan
Prof Dr.-Ing. Johannes Tarigan 50
![Page 51: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/51.jpg)
BETON DALAM KEADAAN BELUM RETAK
Jika σb < f’c
Prof Dr.-Ing. Johannes Tarigan 51
![Page 52: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/52.jpg)
Beton dalam keadaan sudah retak
Prof Dr.-Ing. Johannes Tarigan 52
![Page 53: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/53.jpg)
Beton Pratekan
Prof Dr.-Ing. Johannes Tarigan 53
![Page 54: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/54.jpg)
Keunggulan Beton Pratekan dibanding Beton bertulang
1. Tampang lebih kecil
2. Lendutan lebih kecil
3. Bentang lebih panjang
4. Umur lebih panjang (bebas retak)
Prof Dr.-Ing. Johannes Tarigan 54
![Page 55: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/55.jpg)
Jenis-jenis Baja Pratekan
• Wires : diameter 7 mm
• Strands: gabungan dari beberapa wires
• Tendon: gabungan dari beberapa strands (dipakai pada post tensioning)
• Bar :high strength dengan diameter > 20 mm
Prof Dr.-Ing. Johannes Tarigan 55
![Page 56: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/56.jpg)
Jenis-jenis kabel pra tekan di pasaran
• Freyssinet
• BBRV (Birkenmaeier, Brandestini, Ros)
• Dywidag
Prof Dr.-Ing. Johannes Tarigan 56
![Page 57: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/57.jpg)
Metode pelaksanaan pratekan
• Pre-tensioning: kabel ditarik dulu baru kemudian beton dicor
• Post-tensioning: beton dicor dulu baru kabel ditarik
Prof Dr.-Ing. Johannes Tarigan 57
![Page 58: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/58.jpg)
Prof Dr.-Ing. Johannes Tarigan 58
![Page 59: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/59.jpg)
Prof Dr.-Ing. Johannes Tarigan 59
![Page 60: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/60.jpg)
3. Lift Slab Method
• Lift slab construction is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks, so being cheaper and faster as not requiring boxing and supports for casting in situ.
Prof Dr.-Ing. Johannes Tarigan 60
![Page 61: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/61.jpg)
Liftslab method
Prof Dr.-Ing. Johannes Tarigan 61
![Page 62: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/62.jpg)
4. Top Down Construction Method
Prof Dr.-Ing. Johannes Tarigan 62
![Page 63: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/63.jpg)
Top Down Construction Method lanjutan....
Prof Dr.-Ing. Johannes Tarigan 63
![Page 64: Kuliah 2 Metode Konstruksi](https://reader036.vdocuments.pub/reader036/viewer/2022082207/5695d3b61a28ab9b029ee764/html5/thumbnails/64.jpg)
Top Down Construction Method lanjutan.......
Prof Dr.-Ing. Johannes Tarigan 64