L'actualité 2014 des énergies renouvelables et du stockage énergétique
Mercredi 26 mars 2014 - Axisparc, Louvain-la-Neuve
2
DISCLAIMER
This presentation has been prepared by 3W Power S.A./ AEG Power
Solutions for information purposes only.
This presentation contains forward-looking statements. The words
“believe,” “expect,” “anticipate,” “intend” and “plan” and similar
expressions identify forward-looking statements. All statements
other than statements of historical facts included in this
presentation, including, without limitation, those regarding 3W
Power's and/or AEG Power Solutions‘ financial position, business
strategy, plans and objectives, are forward-looking statements.
Such forward-looking statements are based on our current
expectations and assumptions regarding our business, the
economy and other future conditions. Because forward-looking
statements relate to the future, by their nature, they are subject to
inherent uncertainties, risks and changes in circumstances that are
difficult to predict. Our actual results may differ materially from
those contemplated by forward-looking statements. We caution
you, therefore, that you should not rely on any of these forward-
looking statements as statements of historical fact or as guarantees
or assurances of future performance. Important factors that could
cause actual results to differ materially from those in the forward-
looking statements include regional, national or global political,
economic, business, competitive, market and regulatory conditions.
The forward-looking statements in this document speak only as at
the date of this presentation and 3W Power assumes no obligation
to update such forward-looking statements.
Certain information contained in this presentation is still in draft
form and the contents of this presentation have not been legally
verified. In particular, it should be noted that the financial
information contained herein has not been audited.
No representation or warranty, express or implied, is given by or on
behalf of 3W Power, AEG Power Solutions or any of such persons'
directors, officers or employees or any other person as to the
accuracy or completeness of the information or the opinions
contained in this document and no liability is accepted for any such
information or opinions.
Unless otherwise stated in this document, the information
contained herein is based on 3W Power information and estimates.
The information and opinions contained in this presentation are
provided as at the date of this document and are subject to change
without notice.
This presentation does not constitute an offer to sell, or a
solicitation of an offer to purchase, any securities to any person in
any jurisdiction. This document is not intended for distribution to,
or use in any jurisdiction or country where such distribution or use
would be contrary to local law or regulation.
3
EMIL
RATHENAU
(*1838, †1915)
Founder of AEG
AEG Power Solutions still incorporates the fundamental ideas of
famous AEG founder Emil Rathenau
AEG Power Solutions …
... is a leader for innovative
power management solutions
in the green energy revolution
"Never ending technological
progress in the service of mankind"
3W
PO
WE
R / A
EG
PO
WE
R S
OL
UT
ION
S –
TH
E C
OM
PA
NY
4
Corporate history of AEG Power Solutions
2009
Going public
Listed as
3W Power
operating as
AEG Power
Solutions
Opening of a
new factory
in India
(Bangalore)
2011 2012
Opening of a
new factory in
South Africa
(Cape Town)
AEG Power Solutions: a long tradition in power electronics
Foundation of
AEG (Ger.)
1945 1995 2005 2008 1887 & 1918 1947 1998 2002
Heritage Time with Alcatel Independent & AEG
3W Power I AEG Power Solutions PUBLIC
Foundation
of AEG SVS
Power
Supply
Systems
Foundation
of SAFT
Power
Systems
Acquisition
of Harmer &
Simmons
Acquisition of
SAFT Power
Systems
by Ripplewood
from Alcatel
Acquisition of
AEG SVS
Power Supply
Systems by
SAFT Power
Systems
Rebranding
SAFT Power
Systems to
AEG Power
Solutions1
Merger of
SAFT Power
Systems with
Alcatel
Converters
Foundation
of Saft
(battery, Fr)
3W
PO
WE
R / A
EG
PO
WE
R S
OL
UT
ION
S –
TH
E C
OM
PA
NY
5
EES – INDUSTRIAL
3W
PO
WE
R / A
EG
PO
WE
R S
OL
UT
ION
S –
IND
US
TR
IAL
EE
S
7
Agenda
- Applications
- AEG PS solutions
- Summary
Battery Energy Storage System - BESS
ON- & OFF- Grid Solutions
8
AEG BESS ON - & OFF - Grid Solutions
Applications:
1 – PV (& Wind): 3 - Grid Services: 5 – Local Micro Grid:
- Ramp Control - Frequency control - Load levelling
- Generation smoothing - Peak shaving
9
1.) Principal Storage Converter & PV Configuration
Similar arrangement:
- Battery
- Storage Converter
- MV Trafo
however, different:
- Controls
- Communication
- BMS
due to:
- Client and grid
requirements !
10
Example Solar: Ramp Control Batte
ry T
ech
no
log
ies fo
r Ele
ctric
al E
nerg
y S
tora
ge A
pp
licatio
ns
Sunny Day
Cloudy Day
• Rolling Clouds on a sunny day cause
“sudden” interruptions of significant
amount of generated power
Severe effects on grid voltage balance
11
Negative Ramp Rate Control in Case of Decreasing of Power
P
t
Daily PV Power Output
(with clouds)
P [MW]
t [min]
Minimum
5MW/1min
From BESS Batteries
(Discharging)
25
35
0 2
Power decrease
without interaction
12
Positive Ramp Rate Control in Case of Increasing of Power
P
t
Daily PV Power Output
(with clouds)
P [MW]
t [min]
Maximum
5MW/1min
Charging BESS Batteries
25
35
0 2
Power increase
without interaction
Load Shedding of PV Power Plant
13
PV Generation smoothing to enable constant production
French Island requirements
14
3.) Grid services
• Frequency stabilization
• Inertia / Kinetic energy
• Primary reserve
• Voltage stabilization
• Q – reactive power availability
• Short circuit power
• Operations
• Operation schedule / active grid control
• IT & DP / process and protection technology
• Grid re-establishment
• Black-start capabilities
• Island operation
Source: Holttinen (2004a)
15
Grid services: Frequency control
Timeline of the mains frequency:
- Charging
- Dis-charging
16
Grid Services: Frequency Control - Primärregelleistung
Frequency Control:
• Required approx. 550 – 600 MW in Germany, 3.000 MW in Europe
• Weekly auction for the following week
• Till today just a few provider, manly power plant owners
• Min. volume: 1 MW, prequalification required
Datenquelle: www.regelleistung.net
Upward trendline:
2.500 to 3.000€ MW/week
Ap
plic
atio
ns a
nd
Op
era
tion
al S
ce
na
rios fo
r BE
SS
in in
du
stria
l Mic
ro G
rids
17
5.) Case Study “AEG Campus Project“ – Simplified Micro Grid Overview
Ap
plic
atio
ns a
nd
Op
era
tion
al S
ce
na
rios fo
r BE
SS
in in
du
stria
l Mic
ro G
rids
Energy sources: • Combined Heat and Power Plant • Photovoltaic Power Plant
Energy storage: • AEGs’ BESS
18
Peak load shaving: Daily profile with Renewable Energy and BESS
Ap
plic
atio
ns a
nd
Op
era
tion
al S
ce
na
rios fo
r BE
SS
in in
du
stria
l Mic
ro G
rids
-0,4 -0,3 -0,2 -0,1 0,0 0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1,0 1,1 1,2
00
:00
02
:00
04
:00
06
:00
08
:00
10
:00
12:0
0
14
:00
16
:00
18
:00
20
:00
22
:00
P/PRef
Time
Battery Discharging
Mains supply
CHP Generation
PV Generation
Battery Charging
BESS allows to cut energy hikes and limits grid expenses
”peak load shaving“
Safety margin
computer simulation with measurements data from 26.10.2012
19
Agenda
- Applications
- AEG PS solutions
- Summary
AEG BESS ON- & OFF- Grid Solutions
20
AEG PS offers solutions and competence in power electronics and power
control
RES – RENEWABLE ENERGY SOLUTIONS EES – ENERGY EFFICIENCY SOLUTIONS
SGS – SMART GRID & STORAGE
SOLAR
• String inverters
• Central inverters
• Monitoring & Control (Skytron)
POWER CONTROLLERS (POC)
• Modules
• Industrial Systems
INDUSTRIAL (IND)
• Oil & Gas
• Transportation
• Power Generation
• General Industries
COMMERCIAL (COM)
• Office solutions
• Data/IT
• Short-term storage (BESS)
• Long-term storage (PTG)
3W
PO
WE
R / A
EG
PO
WE
R S
OL
UT
ION
S –
TH
E C
OM
PA
NY
• Grid Stabilisation / Power quality
• Microgrid solutions
EU
E
Batter
ie
G
R
W
R
MV
1.000 kW
MV
1.000 kW
MV
1.000 kW
V kW Hz cos phi
Arbeitstation
Utility Operator: - U, P,
Q, f
System Operator: - Performance
- Reporting
- Monitoring
MV - Medium Voltage grid:10 / 20 / 33 kV
21
Components of BESS
Battery:
- Lead Acid
- Valve Regulated
- Low Maintenance
- NiCd
- Li-Ion
- Vanadium Redox Flow
- … Storage Converter:
- Based on PV.Inverter technology
- Proven concept
SCADA – DSO/TSO:
- Applications
- Grid services
- Ramp control
- …
- Fulfilment of grid codes
What is new: - New Battery requirements - LA : “Shallow” cycling versus UPS stand-by
- Enhanced BMS
- Balancing of cells
- Battery infrastructure: - pumps, etc.
- Auxiliary Power: A/C, fire suppression, etc.
- Communication towards the Battery
- Hardware Interface: RS485, Modbus TCP, CAN open, …
- Content (Software coding):
- State of Charge (SOC)
- State of Health (SOH)
22
Control and Communication Systems
Batte
ry S
tora
ge A
ide
d G
rid C
on
nectio
n o
f PV
Po
wer P
lan
ts
SC. EMS
SC. LMU
BMS
SCADA
Ethernet Power Utility Bus
23
BESS ON- / OFF-grid - Applications
ON – grid: Current source (similar to Solar Inverter), unit injects current !
OFF – grid: Only in parallel to GenSets ?
The unit isn’t building the grid!
Yes: ON – grid:
Current source !
No:
Voltage source !
Grid building
mode!
Unbalanced loads
Different grid trafo (“Z-type”)
Protection:
- Overload
- Inrush currents
- Fuse clearance
- Selectivity of protection
SC.EMS !
Both
24
BESS – main components:
Storage Converter: IEC: SC.250, SC.330, SC.500, SC.660 – ID – GER
UL: SC.300, SC.600 – ID – UL (complaince)
SC.LvS-1 / -2: Similar to PV.LvS-1 / -2
Trafo: 3 coils – On-Grid: as in PV; Off-Grid: t.b.d. similar to UPS
DiCa: Only for US market, due to UL requirements
BMS: i.e. Battery supplier
SC.LMU: Local Management Unit, based on PLC (Siemens S7)
SC.EMS: Energy Management Unit, based on PLC (Siemens S7)
25
BASIC BESS MODULE KEY DATA
• Nominal Power: up to 1,2 MW
• Nominal Capacity: “1 MWh”
• Grid Connection: 10 .. 33 kV
• Nominal DC Voltage: 660 V
• Battery technology: lead acid / on request
• Key to success: - Understand the market drivers and requirements
- Software implementation into the leading system
Key solution for demand driven energy supply from renewables !
1. PEAK SHAVING 2. PEAK DEMAND
SHIFTING
3. LOAD LEVELING 4. FREQUENCY
REGULATION &
GRID SERVICES
BESS ON- / OFF- Grid – Summary
3W
PO
WE
R / A
EG
PO
WE
R S
OL
UT
ION
S –
SM
AR
T G
RID
& S
TO
RA
GE
Key solution for 100 % converter based grid !
27
AEG Power Solutions
AEG Power Solutions…
3W
PO
WE
R / A
EG
PO
WE
R S
OL
UT
ION
S –
TH
E C
OM
PA
NY
…a wealth of complementary expertise
29
Battery Technology
Batte
ry S
tora
ge A
ide
d G
rid C
on
nectio
n o
f PV
Po
wer P
lan
ts
30
AEG PS Inverter technology provides international grid code compliance
Voltage stabilization: Q
Frequence stabilizing: P
Fault ride through – FRT (LVRT,OVRT,…)
+ Anti Islanding