Leading the Lean Charge:

Our Approach to Accelerated Innovation

Started : 2009

Charge Points Sold : >40,000

Valuation : c£100m

Staff : >100

Travel Shouldn’t Damage the Earth

Software MVP Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration 5Software

Hardware Specify Develop Validate

Lean Hardware Development

Launch

Waterfall

Lean

EV Charge Point MVP Requirements:

• Authenticate User

• Control Power

• Measure Power

• Data Connection

• Remotely updateable

Software MVP Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration 5Software

Hardware Specify Develop Validate

Lean Hardware Development

• Casing

• Layout

• Packaging

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Sta

rts w

ork

ing

he

re

Mechanic

al

Ele

ctr

onic

s

Ele

ctr

ical • RFID

• Comms

• Metering

• UX

• Power

• Switching

• Safety

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Software MVP Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration 5Software

Hardware Specify Develop Validate

Lean Hardware Development

• Casing

• Layout

• Packaging

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Sta

rts w

ork

ing

he

re

Mechanic

al

Ele

ctr

onic

s

Ele

ctr

ical • RFID

• Comms

• Metering

• UX

• Power

• Switching

• Safety

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Software MVP Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration 5Software

Hardware Specify Develop Validate

Lean Hardware Development

• Casing

• Layout

• Packaging

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Sta

rts w

ork

ing

he

re

Mechanic

al

Ele

ctr

onic

s

Ele

ctr

ical • RFID

• Comms

• Metering

• UX

• Power

• Switching

• Safety

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Software MVP Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration 5Software

Hardware Specify Develop Validate

Lean Hardware Development

• Casing

• Layout

• Packaging

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Sta

rts w

ork

ing

he

re

Mechanic

al

Ele

ctr

onic

s

Ele

ctr

ical • RFID

• Comms

• Metering

• UX

• Power

• Switching

• Safety

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Software MVP Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration 5Software

Hardware Specify Develop Validate

Lean Hardware Development

• Casing

• Layout

• Packaging

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Sta

rts w

ork

ing

he

re

Mechanic

al

Ele

ctr

onic

s

Ele

ctr

ical • RFID

• Comms

• Metering

• UX

• Power

• Switching

• Safety

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Software MVP Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration 5Software

Hardware Specify Develop Validate

Lean Hardware Development

• Casing

• Layout

• Packaging

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Sta

rts w

ork

ing

he

re

Mechanic

al

Ele

ctr

onic

s

Ele

ctr

ical • RFID

• Comms

• Metering

• UX

• Power

• Switching

• Safety

Specify Develop Validate

Specify Develop Validate

Specify Develop Validate

Really hard…….

Lean Hardware Development

V1 is really hard, and you don’t know what you are doing!

Mechanical

Electrical

Electronic

v1

V1 ends up being a bit rubbish…..

Launch

Feedback

Improve

Iterate one thing at a time.

Mechanical

Electrical

Electronic

Electrical

Electronic

Mechanical

v1 v2 v3 v4

Multiple Products – not like this:

So

loT

win

Mechanical

Electrical

Electronic

Mechanical

Electrical

Electronic

Mechanical

Electrical

Electronic

Mechanical

Electrical

v1

v2 v3v1

v2 v3 v4

Lean Charge Point Development – Like this…..

Solo

Tw

in

Mechanical

Electrical

Co

re T

ech

Mechanical

Electronic

Electrical

Electronic

Electrical

Electronic

v2 v3v1

Mechanical

Software is your friend.

Software MVP Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration 5Software

Hardware Specify Develop Validate

• Quick

• Cheep

• Easy to fix

• Slow

• Expensive

• Hard to fix

• Simple Hardware

• Clever stuff in software

Take Aways:

Integrated Hardware & Software start-ups are really hard.

Make v1 as simple as possible.

• It isn’t the culmination of your vision – it is your first iteration.

Design your systems and process enable lean

• Modular technology

• Do all the hard stuff in software

• Make it remotely upgradable

Make lots of (expensive) mistakes.

Iterate until you win.

It can be done!

Erik Fairbairn

CEO

Email: [email protected]