THERMAL POWERINTEGRATED SOLUTIONS
Plant Engineering
ECO|RAMChanging market requirements like deregulation have generated a high cost pressure on power producers. Tomaintain competitiveness, it is necessary to find new measures to reduce costs and increase revenues, which can be
realised at the actual market conditions. ECO|RAM has been created to identify tangible improvement measures by
systematically analyzing the power plant. This results in a portfolio of improvement measures regarding plant
equipment, operation and maintenance.
MethodologyDuring the development of
ECO|RAM, technical material
regarding the design, theoperation and maintenance of a
plant have been prepared.
Comprehensive technical and
operational benchmark data as
well as a catalogue of potential
improvement measures support
the systematic analysis of plants.
For that purpose, key-data and
properties have been compiled in
the assessment documents.Linking the detailed cost structure
of a power plant to component
specific features of design,
operation and maintenance has
been another prerequisite for
establishing the methodology.
ProcessBefore the start of an ECO|RAM
project, the project goals and
criteria for financial evaluation aredefined by the customer
i.e. the desired payback period, the
parameters for financial evaluation
or the interest/discount rate. etc.
The project is carried out in close
cooperation with the customer in
a joint team. This makes sure that
all relevant boundary conditions of
the power plant and its operation
are considered and that thefeasibility of the proposed
improvement measures is secured.
The process is divided in two
phases: In Phase 1 the actual
status and performance of the
plant is determined by a site
assessment. New improvement
ideas are generated, which are
reviewed, grouped & selected as
Potentials.
Each Potential is investigated to
determine technical feasibility and
expected benefit. Based on the
results of Phase 1 the customer
decides which potentials shall be
further elaborated in the second
phase. Phase 1 is typically
executed within 8 to 10 weeks
In Phase 2, each selected potential
is analyzed in greater detail. A
comprehensive technical review is
undertaken. Costs and benefits -
including initial investment,
ongoing operating costs, projectedpayback and technical benefits
are quantified. In this way an
implementation/investment
decision can be prepared.
The time frame of Phase 2
strongly depends on the findings
of Phase 1, considering the
number and complexity of the
Potentials, and takes 16 to 20
weeks
Customer Benefits
Fast first results
Enhanced profitability
Comprehensive analysis
Identification of viable
improvement measures
-
7/30/2019 Leaflet - Ecoram - 2011 - En
2/2
Typical ResultsTypical potentials generated
include:
Modification of
components/systems
Optimisation of operation
modes
Alterations to maintenance
strategies.
Expected benefits are:
Improvement of availability
Increase of efficiency
Increase of capacity
Reduction of auxiliary power
consumptionn
Greater operational flexibility. Greater operational flexibility.
The improvement measures are
summarized and ranked based on
the specific boundary conditions
set by the customer e.g. budget,
outage schedule, and payback
period etc.
The improvement measures are
summarized and ranked based on
the specific boundary conditions
set by the customer e.g. budget,
outage schedule, and payback
period etc.
ProjectsrojectsTo date, 13 ECO|RAM projects
have been carried out at various
plants in Germany, Denmark,
South Africa, Serbia, Spain and
the United Kingdom.
To date, 13 ECO|RAM projects
have been carried out at various
plants in Germany, Denmark,
South Africa, Serbia, Spain and
the United Kingdom.
Of these projects, 8 have been
carried out to the conclusion of
Phase 2, each providing
demonstrable benefits for the
customer. Many of the
improvement measures could be
realized with minor investment
costs.
Of these projects, 8 have been
carried out to the conclusion of
Phase 2, each providing
demonstrable benefits for the
customer. Many of the
improvement measures could be
realized with minor investment
costs.
Overall, more than 450
improvement ideas have been
identified, of which more than 150
Potentials were both technically
and economically viable according
to the customers specific criteria
and were carried through to Phase
2 for detailed analysis.
Overall, more than 450
improvement ideas have been
identified, of which more than 150
Potentials were both technically
and economically viable according
to the customers specific criteria
and were carried through to Phase
2 for detailed analysis.
In total, a benefit of more than
400 Million could be identified forthe customers.
In total, a benefit of more than
400 Million could be identified forthe customers.
Our Experienceur ExperienceECO|RAM offers access to the
substantial know-how and
experience of ALSTOM:
ECO|RAM offers access to the
substantial know-how and
experience of ALSTOM:
Worldwide network of
experience in assessing power
plants covering all
technologies
Worldwide network of
experience in assessing power
plants covering all
technologies
Experience in operation and
maintenance of plants
worldwide covering all
technologies
Experience in operation and
maintenance of plants
worldwide covering all
technologies
Access to historical as well as
up-to-date plant equipment
costs and benchmark data
Access to historical as well as
up-to-date plant equipment
costs and benchmark data
Experienced engineering staff
with proven track record of
developing solutions for
existing equipment.
Experienced engineering staff
with proven track record of
developing solutions for
existing equipment.
Original DesignOriginal DesignOriginal Design
Maintenance ConceptMaintenance Concept
Operation HistoryOperation History
Actual ConditionActual Condition
PerformancePower Output, Efficiency
PerformancePower Output, Efficiency
Availability / ReliabilityPower Output, Operation
Availability / ReliabilityPower Output, Operation
Environmental ImpactEfficiency, SOx, NOx, Dust,
Noise, Waste Water
Environmental ImpactEfficiency, SOx, NOx, Dust,
Noise, Waste Water
FlexibilityOperation, Maintenance
FlexibilityOperation, Maintenance
Lifetime ExtensionDesign, Operation, Maintenance
Lifetime ExtensionDesign, Operation, Maintenance
Customer Technical Targets
Future OperationFuture Operation
Customer Economic TargetsMax Investment, NPV, Payback DurationCustomer Economic TargetsMax Investment, NPV, Payback Duration
Plant Basis Data
Remaining LifetimeRemaining Lifetime
GKWG903136 - ALSTOM 2011. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM. The other names
mentioned, registered or not, are the property of their respective companies. The technical and other data contained in this document is provided for information only.
Neither ALSTOM, its officers and employees accept responsibility for or should be taken as making any representation or warranty (whether express or implied) as to the
accuracy or completeness of such data or the achievement of any projected performance criteria where these are indicated. ALSTOM reserves the right to revise or change
this data at any time without further notice.
THERMAL POWERINTEGRATED SOLUTIONS