lingk. 1
DESCRIPTION
jalanTRANSCRIPT
REKAPR E K A P I T U L A S IRENCANA ANGGARAN BIAYA ( RAB )UNIT
KERJA:DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI SULAWESI
BARATPEKERJAAN:PENGEMBANGAN KAWASAN PERMUKIMANLOKASI:PENINGKATAN
KUALITAS PERMUKIMAN KUMUH KAWASAN SIDODADISUMBER DANA:DUSUN. I KEL.
SIDODADI KEC. WONOMULYO KAB. POLMANTAHUN ANGGARAN:2015NO.U R A I A
NJUMLAH HARGA (Rp.)abcI.PEKERJAAN
PERSIAPAN58,840,391.22II.PEKERJAAN TANAH56,759,103.88III.PEKERJAAN
PONDASI16,043,463.42IV.PEKERJAAN PASANGAN25,453,665.78V.PEKERJAAN
BETON412,841,354.70A.JUMLAH REAL COST569,937,979.00B.PPN 10% x
A56,993,797.90C.JUMLAH = A +
B626,931,776.91D.DIBULATKAN626,900,000.00TERBILANG:ENAM RATUS DUA
PULUH ENAM JUTA SEMBILAN RATUS RIBU RUPIAH,-Mamuju, MEI 2015
Dibuat Oleh
:....................................Direktur
RABDAFTAR KUANTITAS DAN HARGAUNIT KERJA:DINAS PEKERJAAN UMUM
DAN PERUMAHAN RAKYAT PROVINSI SULAWESI BARATKEGIATAN:PENGEMBANGAN
KAWASAN PERMUKIMANNAMA PAKET:PENINGKATAN KUALITAS PERMUKIMAN KUMUH
KAWASAN SIDODADILOKASI PEKERJAAN:DUSUN. I KEL. SIDODADI KEC.
WONOMULYO KAB. POLMANTAHUN ANGGARAN:2015NO.U R A I A
NANALISAVOLUMEHARGA SATUAN (Rp.)JUMLAH HARGA (Rp.)abcdef = d x
eI.PEKERJAAN
PERSIAPAN(428,900,000.00)1Mobilisasi1.00Ls17,400,000.0017,400,000.002Pembersihan
Lapangan dan Perataan0932.75M212,650.0011,799,287.503Pengukuran dan
Pemasangan BouwplankSNI-1.6.440.00M193,472.463,738,898.404Pembuatan
Gudang Semen dan
Peralatan20.00M21,282,191.9325,643,838.505Pembuatan Bak Adukan
ukuran 40 cm x 50 cm x 25
cm1.00M2258,366.82258,366.8258,840,391.22II.PEKERJAAN TANAH1Pek.
Galian Tanah Biasa03.92M362,675.00245,372.632Pek. Urugan
Kembali01.31M344,850.0058,529.253Pek. Urugan
Pasir04.00M3210,300.50841,202.004Pek. Urugan Pilihan ( Leveling
)0208.00M3222,525.0046,285,200.00(428,900,000.00)5Pek. Pemadatan
Tanah0208.00M344,850.009,328,800.0056,759,103.88III.PEKERJAAN
PONDASI1Pek. Pondasi Batu Kosong016.38M3424,258.236,949,349.812Pek.
Pas. Pondasi Batu Kali 1 Pc : 3
Ps010.24M3888,313.919,094,113.6216,043,463.42IV.PEKERJAAN
PASANGAN1Pek. Pipa Beton 80 cm0- 0M1353,189.04- 02Pek. Pasangan
bata merah tebal 1/2 bata, 1 Pc : 4 Ps0- 0M2112,611.59- 03Pek.
Plesteran 1 Pc : 3 Ps, tebal 15
mm218.40M256,372.3412,311,718.784Pek. Pemasangan acian-
0218.40M260,173.7513,141,947.0025,453,665.78V.PEKERJAAN BETON1Pek.
Pembesian 1 kg dengan besi polos atau besi
ulir355.21Kg15,047.185,344,967.222Pek. Pemasangan Bekisting untuk
Pondasi- 0M2246,240.30- 03Pek. Pemasangan Bekisting untuk Sloof-
0M2267,289.90- 04Pek. Pemasangan Bekisting untuk Kolom-
0M2427,284.80- 05Pek. Pemasangan Bekisting untuk Balok-
0M2450,279.05- 06Pek. Pemasangan Bekisting untuk
Lantai0.45M2433,034.80194,865.667Pek. Pemasangan Bekisting untuk
Dinding- 0M2472,863.52- 08Pek. Beton mutu fc = 14,5 MPa (K
175)0146.40M31,146,652.95167,869,992.2315711694.252.29Pek. Beton
mutu fc = 21,7 MPa (K
250)0195.20M31,226,595.95239,431,529.59157116125.669.610Pek. Beton
mutu fc = 26,4 MPa (K 300)0- 0M31,263,842.89-
0412,841,354.70A.JUMLAH REAL COST569,937,979.00
AnalisaAnalisis Harga Satuan Pekerjaan (AHSP) 2013Bidang Cipta
KaryaA.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPANA. 2.2.1.9.
Pembersihan 1 m2 lapangan dan
perataanNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.100Rp 70,000.00Rp
7,000.00MandorL.04OH0.050Rp 80,000.00Rp 4,000.00JUMLAH TENAGA
KERJARp 11,000.00BBAHANRp - 0JUMLAH HARGA BAHANRp - 0CPERALATANRp -
0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp 11,000.00EOverhead &
Profit (Contoh 15 %)15% x DRp 1,650.00FHarga Satuan Pekerjaan
(D+E)Rp 12,650.00A. 2.2.1.4. Pengukuran dan pemasangan 1 m
BouwplankNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.100Rp 70,000.00Rp 7,000.00Tukang
KayuL.02OH0.100Rp 80,000.00Rp 8,000.00Kepala TukangL.03OH0.010Rp
85,000.00Rp 850.00MandorL.04OH0.005Rp 80,000.00Rp 400.00JUMLAH
TENAGA KERJARp 16,250.00BBAHANKayu Balok 5/7 Klas IIIM0.012Rp
3,260,400.00Rp 39,124.80Paku biasa 5" - 10"Kg0.020Rp 14,000.00Rp
280.00Kayu papan 3/20 Klas IIIM0.007Rp 3,660,800.00Rp
25,625.60JUMLAH HARGA BAHANRp 65,030.40CPERALATANRp - 0JUMLAH HARGA
ALATRp - 0DJumlah (A+B+C)Rp 81,280.40EOverhead & Profit (Contoh
15 %)15% x DRp 12,192.06FHarga Satuan Pekerjaan (D+E)Rp 93,472.46A.
2.2.1.10. Pembuatan 1 m2 steger/perancah dari
bambuNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH1.000Rp 70,000.00Rp
70,000.00Tukang KayuL.02OH2.000Rp 80,000.00Rp 160,000.00Kepala
TukangL.03OH0.200Rp 85,000.00Rp 17,000.00MandorL.04OH0.050Rp
80,000.00Rp 4,000.00JUMLAH TENAGA KERJARp 251,000.00BBAHANBambu
diameter 6-8/600 cmBatang1.250Rp 16,000.00Rp 20,000.00Tali
ijukM0.186Rp 17,400.00Rp 3,236.40JUMLAH HARGA BAHANRp
23,236.40CPERALATANRp - 0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp
274,236.40EOverhead & Profit (Contoh 15 %)15% x DRp
41,135.46FHarga Satuan Pekerjaan (D+E)Rp 315,371.86A. 2.2.1.7.
Pembuatan 1 m2 gudang semen dan
peralatanNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH1.000Rp 70,000.00Rp
70,000.00Tukang KayuL.02OH2.000Rp 80,000.00Rp 160,000.00Kepala
TukangL.03OH0.200Rp 85,000.00Rp 17,000.00MandorL.04OH0.050Rp
80,000.00Rp 4,000.00JUMLAH TENAGA KERJARp 251,000.00BBAHANDolken
kayu galam ( 810)cm P : 4 mBatang1.700Rp 125,000.00Rp
212,500.00KayuM0.210Rp 2,500,000.00Rp 525,000.00Paku BiasaKg0.300Rp
14,000.00Rp 4,200.00Semen PortlandKg10.500Rp 1,300.00Rp
13,650.00Pasir BetonM0.030Rp 166,900.00Rp 5,007.00Koral
BetonM0.050Rp 199,850.00Rp 9,992.50Seng GelombangLbr1.500Rp
59,500.00Rp 89,250.00Seng PlatLbr0.250Rp 17,400.00Rp 4,350.00JUMLAH
HARGA BAHANRp 863,949.50CPERALATANRp - 0JUMLAH HARGA ALATRp -
0DJumlah (A+B+C)Rp 1,114,949.50EOverhead & Profit (Contoh 15
%)15% x DRp 167,242.43FHarga Satuan Pekerjaan (D+E)Rp
1,282,191.93A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm
x 50 cm x 25 cmNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGATukang KayuL.02OH0.300Rp 80,000.00Rp
24,000.00Kepala TukangL.03OH0.030Rp 85,000.00Rp 2,550.00JUMLAH
TENAGA KERJARp 26,550.00BBAHANKayu papan 3/20 Klas IIIM0.036Rp
3,660,800.00Rp 131,788.80Kayu Balok 5/7 Klas IIIKg0.020Rp
3,260,400.00Rp 65,208.00Paku BiasaM0.080Rp 14,000.00Rp
1,120.00JUMLAH HARGA BAHANRp 198,116.80CPERALATANRp - 0JUMLAH HARGA
ALATRp - 0DJumlah (A+B+C)Rp 224,666.80EOverhead & Profit
(Contoh 15 %)15% x DRp 33,700.02FHarga Satuan Pekerjaan (D+E)Rp
258,366.82A.2.3.1 HARGA SATUAN PEKERJAAN TANAHA.2.3.1.1. Penggalian
1 m3 tanah biasa sedalam 1 mNoUraianKodeSatuanKoefisienHarga
SatuanJumlah Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.750Rp 70,000.00Rp
52,500.00MandorL.04OH0.025Rp 80,000.00Rp 2,000.00JUMLAH TENAGA
KERJARp 54,500.00BBAHANRp - 0JUMLAH HARGA BAHANRp - 0CPERALATANRp -
0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp 54,500.00EOverhead &
Profit (Contoh 15 %)15% x DRp 8,175.00FHarga Satuan Pekerjaan
(D+E)Rp 62,675.00A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2
mNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.900Rp 70,000.00Rp
63,000.00MandorL.04OH0.045Rp 80,000.00Rp 3,600.00JUMLAH TENAGA
KERJARp 66,600.00BBAHANRp - 0JUMLAH HARGA BAHANRp - 0CPERALATANRp -
0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp 66,600.00EOverhead &
Profit (Contoh 15 %)15% x DRp 9,990.00FHarga Satuan Pekerjaan
(D+E)Rp 76,590.00A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 3
mNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH1.050Rp 70,000.00Rp
73,500.00MandorL.04OH0.067Rp 80,000.00Rp 5,360.00JUMLAH TENAGA
KERJARp 78,860.00BBAHANRp - 0JUMLAH HARGA BAHANRp - 0CPERALATANRp -
0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp 78,860.00EOverhead &
Profit (Contoh 15 %)15% x DRp 11,829.00FHarga Satuan Pekerjaan
(D+E)Rp 90,689.00A.2.3.1.9. Pengurugan kembali 1 m3 galian
tanahNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.500Rp 70,000.00Rp
35,000.00MandorL.04OH0.050Rp 80,000.00Rp 4,000.00JUMLAH TENAGA
KERJARp 39,000.00BBAHANRp - 0JUMLAH HARGA BAHANRp - 0CPERALATANRp -
0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp 39,000.00EOverhead &
Profit (Contoh 15 %)15% x DRp 5,850.00FHarga Satuan Pekerjaan
(D+E)Rp 44,850.00A.2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20
cm)NoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.500Rp 70,000.00Rp
35,000.00MandorL.04OH0.050Rp 80,000.00Rp 4,000.00JUMLAH TENAGA
KERJARp 39,000.00BBAHANRp - 0JUMLAH HARGA BAHANRp - 0CPERALATANRp -
0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp 39,000.00EOverhead &
Profit (Contoh 15 %)15% x DRp 5,850.00FHarga Satuan Pekerjaan
(D+E)Rp 44,850.00A.2.3.1.11. Pengurugan 1 m3 dengan pasir
urugNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.300Rp 70,000.00Rp
21,000.00MandorL.04OH0.010Rp 80,000.00Rp 800.00JUMLAH TENAGA
KERJARp 21,800.00BBAHANPasir UrugM31.200Rp 134,225.00Rp
161,070.00JUMLAH HARGA BAHANRp 161,070.00CPERALATANRp - 0JUMLAH
HARGA ALATRp - 0DJumlah (A+B+C)Rp 182,870.00EOverhead & Profit
(Contoh 15 %)15% x DRp 27,430.50FHarga Satuan Pekerjaan (D+E)Rp
210,300.50A.2.3.1.14. Pengurugan 1 m3 sirtu
padatNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.250Rp 70,000.00Rp
17,500.00MandorL.04OH0.025Rp 80,000.00Rp 2,000.00JUMLAH TENAGA
KERJARp 19,500.00BBAHANSirtuM31.200Rp 145,000.00Rp 174,000.00JUMLAH
HARGA BAHANRp 174,000.00CPERALATANRp - 0JUMLAH HARGA ALATRp -
0DJumlah (A+B+C)Rp 193,500.00EOverhead & Profit (Contoh 15
%)15% x DRp 29,025.00FHarga Satuan Pekerjaan (D+E)Rp
222,525.00A.3.2.1 HARGA SATUAN PEKERJAAN PONDASIA.3.2.1.9.
Pemasangan 1 m3 batu kosong
(anstamping)NoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.780Rp 70,000.00Rp
54,600.00Tukang KayuL.02OH0.390Rp 80,000.00Rp 31,200.00Kepala
TukangL.03OH0.039Rp 85,000.00Rp 3,315.00MandorL.04OH0.039Rp
80,000.00Rp 3,120.00JUMLAH TENAGA KERJARp 92,235.00BBAHANBatu
belahM3OH1.200Rp 182,250.00Rp 218,700.00Pasir
urugM3OH0.432134,225.00Rp 57,985.20JUMLAH HARGA BAHANRp
276,685.20CPERALATANRp - 0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp
368,920.20EOverhead & Profit (Contoh 15 %)15% x DRp
55,338.03FHarga Satuan Pekerjaan (D+E)Rp 424,258.23A.3.2.1.7.
Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3
PPNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH1.500Rp 70,000.00Rp
105,000.00Tukang KayuL.02OH0.750Rp 80,000.00Rp 60,000.00Kepala
TukangL.03OH0.075Rp 85,000.00Rp 6,375.00MandorL.04OH0.075Rp
80,000.00Rp 6,000.00JUMLAH TENAGA KERJARp 177,375.00BBAHANBatu
BelahM31.200Rp 182,250.00Rp 218,700.00Semen PortlanKg202.000Rp
1,300.00Rp 262,600.00Pasir PasangM30.485149,375.00Rp
72,446.88JUMLAH HARGA BAHANRp 553,746.88CPERALATANRp - 0JUMLAH
HARGA ALATRp - 0DJumlah (A+B+C)Rp 772,446.88EOverhead & Profit
(Contoh 15 %)15% x DRp 115,867.03FHarga Satuan Pekerjaan (D+E)Rp
888,313.91PEKERJAAN PASANGANA.5.1.1.36. Pemasangan 1 m pipa beton
diameter 30 100 cmNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.380Rp 70,000.00Rp
26,600.00Tukang KayuL.02OH0.190Rp 80,000.00Rp 15,200.00Kepala
TukangL.03OH0.019Rp 85,000.00Rp 1,615.00MandorL.04OH0.019Rp
80,000.00Rp 1,520.00JUMLAH TENAGA KERJARp 44,935.00BBAHANPipa Tanah
80 cmBh1.100Rp 125,000.00Rp 137,500.00Batu MerahM30.550Rp 650.00Rp
357.50Semen PortlanKg10.300Rp 1,300.00Rp 13,390.00Pasir
PasangM30.061Rp 149,375.00Rp 9,111.88Pasir UrugM30.069134,225.00Rp
9,261.53JUMLAH HARGA BAHANRp 169,620.90CPERALATANRp - 0JUMLAH HARGA
ALATRp - 0DJumlah (A+B+C)Rp 307,120.90EOverhead & Profit
(Contoh 15 %)15% x DRp 46,068.14FHarga Satuan Pekerjaan (D+E)Rp
353,189.04A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm
tebal batu campuran 1SP :4PPNoUraianKodeSatuanKoefisienHarga
SatuanJumlah Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.300Rp 70,000.00Rp
21,000.00Tukang KayuL.02OH0.100Rp 80,000.00Rp 8,000.00Kepala
TukangL.03OH0.010Rp 85,000.00Rp 850.00MandorL.04OH0.015Rp
80,000.00Rp 1,200.00JUMLAH TENAGA KERJARp 31,050.00BBAHANBatu
MerahM370.000Rp 650.00Rp 45,500.00Semen PortlanKg11.500Rp
1,300.00Rp 14,950.00Pasir PasangM30.043Rp 149,375.00Rp
6,423.12JUMLAH HARGA BAHANRp 66,873.13CPERALATANRp - 0JUMLAH HARGA
ALATRp - 0DJumlah (A+B+C)Rp 97,923.13EOverhead & Profit (Contoh
15 %)15% x DRp 14,688.47FHarga Satuan Pekerjaan (D+E)Rp
112,611.59A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal
15mm.NoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.300Rp 70,000.00Rp
21,000.00Tukang KayuL.02OH0.150Rp 80,000.00Rp 12,000.00Kepala
TukangL.03OH0.015Rp 85,000.00Rp 1,275.00MandorL.04OH0.015Rp
80,000.00Rp 1,200.00JUMLAH TENAGA KERJARp 35,475.00BBAHANSemen
PortlanKg7.776Rp 1,300.00Rp 10,108.80Pasir PasangM30.023Rp
149,375.00Rp 3,435.63JUMLAH HARGA BAHANRp 13,544.43CPERALATANRp -
0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp 49,019.43EOverhead &
Profit (Contoh 15 %)15% x DRp 7,352.91FHarga Satuan Pekerjaan
(D+E)Rp 56,372.34A.4.4.2.27. Pemasangan 1 m2
acian.NoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.200Rp 70,000.00Rp
14,000.00Tukang KayuL.02OH0.100Rp 80,000.00Rp 8,000.00Kepala
TukangL.03OH0.010Rp 85,000.00Rp 850.00MandorL.04OH0.010Rp
80,000.00Rp 800.00JUMLAH TENAGA KERJARp 23,650.00BBAHANSemen
PortlanKg3.250Rp 1,300.00Rp 4,225.00JUMLAH HARGA BAHANRp
28,675.00CPERALATANRp - 0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp
52,325.00EOverhead & Profit (Contoh 15 %)15% x DRp
7,848.75FHarga Satuan Pekerjaan (D+E)Rp 60,173.75A.4.1.1 HARGA
SATUAN PEKERJAAN BETONA. A.4.1.1.5. Membuat 1 m3 beton mutu fc =
14,5 MPa (K 175), slump (12 2) cm, w/c =
0,66NoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH1.650Rp 70,000.00Rp
115,500.00Tukang BatuL.02OH0.275Rp 80,000.00Rp 22,000.00Kepala
TukangL.03OH0.028Rp 85,000.00Rp 2,380.00MandorL.04OH0.083Rp
80,000.00Rp 6,640.00JUMLAH TENAGA KERJARp 146,520.00BBAHANSemen
Portlandkg326.000Rp 1,300.00Rp 423,800.00Pasir Betonkg760.000Rp
119.21Rp 90,602.86Kerikil (Maks 30mm)kg1029.000Rp 222.22Rp
228,666.67AirLiter215.000Rp 500.00Rp 107,500.00JUMLAH HARGA BAHANRp
850,569.52CPERALATANRp - 0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp
997,089.52EOverhead & Profit (Contoh 15 %)15% x DRp
149,563.43FHarga Satuan Pekerjaan (D+E)Rp 1,146,652.95A.4.1.1.8.
Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c
= 0,56NoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH1.650Rp 70,000.00Rp
115,500.00Tukang BatuL.02OH0.275Rp 80,000.00Rp 22,000.00Kepala
TukangL.03OH0.028Rp 85,000.00Rp 2,380.00MandorL.04OH0.083Rp
80,000.00Rp 6,640.00JUMLAH TENAGA KERJARp 146,520.00BBAHANSemen
Portlandkg384.000Rp 1,300.00Rp 499,200.00Pasir Betonkg692.000Rp
119.21Rp 82,496.29Kerikil (Maks 30mm)kg1039.000Rp 222.22Rp
230,888.89AirLiter215.000Rp 500.00Rp 107,500.00JUMLAH HARGA BAHANRp
920,085.17CPERALATANRp - 0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp
1,066,605.17EOverhead & Profit (Contoh 15 %)15% x DRp
159,990.78FHarga Satuan Pekerjaan (D+E)Rp 1,226,595.95A.4.1.1.10.
Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c
= 0,52NoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH1.650Rp 70,000.00Rp
115,500.00Tukang BatuL.02OH0.275Rp 80,000.00Rp 22,000.00Kepala
TukangL.03OH0.028Rp 85,000.00Rp 2,380.00MandorL.04OH0.083Rp
80,000.00Rp 6,640.00JUMLAH TENAGA KERJARp 146,520.00BBAHANSemen
Portlandkg413.000Rp 1,300.00Rp 536,900.00Pasir Betonkg681.000Rp
119.21Rp 81,184.93Kerikil (Maks 30mm)kg1021.000Rp 222.22Rp
226,888.89AirLiter215.000Rp 500.00Rp 107,500.00JUMLAH HARGA BAHANRp
952,473.82CPERALATANRp - 0JUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp
1,098,993.82EOverhead & Profit (Contoh 15 %)15% x DRp
164,849.07FHarga Satuan Pekerjaan (D+E)Rp 1,263,842.89A.4.1.1.17
Pembesian 1 kg dengan besi polos atau besi
ulirNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.0070Rp 70,000.00Rp 490.00Tukang
BesiL.02OH0.0070Rp 80,000.00Rp 560.00Kepala TukangL.03OH0.0007Rp
85,000.00Rp 59.50MandorL.04OH0.0004Rp 80,000.00Rp 32.00JUMLAH
TENAGA KERJARp 1,141.50BBAHANBesi beton (polos/ulir)kg1.050Rp
9,950.00Rp 10,447.50Kawat betonkg0.015Rp 23,600.00Rp 354.00JUMLAH
HARGA BAHANRp 11,943.00CPERALATANJUMLAH HARGA ALATRp - 0DJumlah
(A+B+C)Rp 13,084.50EOverhead & Profit (Contoh 15 %)15% x DRp
1,962.68FHarga Satuan Pekerjaan (D+E)Rp 15,047.18A.4.1.1.20
Pemasangan 1 m2 bekisting untuk
pondasiNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.520Rp 70,000.00Rp
36,400.00Tukang KayuL.02OH0.260Rp 80,000.00Rp 20,800.00Kepala
TukangL.03OH0.026Rp 85,000.00Rp 2,210.00MandorL.04OH0.026Rp
80,000.00Rp 2,080.00JUMLAH TENAGA KERJARp 61,490.00BBAHANKayu kelas
IIIM0.040Rp 3,660,800.00Rp 146,432.00Paku 5 cm 12 cmKg0.300Rp
14,000.00Rp 4,200.00Minyak bekistingLiter0.100Rp 20,000.00Rp
2,000.00JUMLAH HARGA BAHANRp 152,632.00CPERALATANJUMLAH HARGA
ALATRp - 0DJumlah (A+B+C)Rp 214,122.00EOverhead & Profit
(Contoh 15 %)15% x DRp 32,118.30FHarga Satuan Pekerjaan (D+E)Rp
246,240.30A.4.1.1.21 Pemasangan 1 m2 bekisting untuk
sloofNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.520Rp 70,000.00Rp
36,400.00Tukang KayuL.02OH0.260Rp 80,000.00Rp 20,800.00Kepala
TukangL.03OH0.026Rp 85,000.00Rp 2,210.00MandorL.04OH0.026Rp
80,000.00Rp 2,080.00JUMLAH TENAGA KERJARp 61,490.00BBAHANKayu kelas
IIIM0.045Rp 3,660,800.00Rp 164,736.00Paku 5 cm 12 cmKg0.300Rp
14,000.00Rp 4,200.00Minyak bekistingLiter0.100Rp 20,000.00Rp
2,000.00JUMLAH HARGA BAHANRp 170,936.00CPERALATANJUMLAH HARGA
ALATRp - 0DJumlah (A+B+C)Rp 232,426.00EOverhead & Profit
(Contoh 15 %)15% x DRp 34,863.90FHarga Satuan Pekerjaan (D+E)Rp
267,289.90A.4.1.1.22 Pemasangan 1 m2 bekisting untuk
kolomNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.660Rp 70,000.00Rp
46,200.00Tukang KayuL.02OH0.330Rp 80,000.00Rp 26,400.00Kepala
TukangL.03OH0.033Rp 85,000.00Rp 2,805.00MandorL.04OH0.033Rp
80,000.00Rp 2,640.00JUMLAH TENAGA KERJARp 78,045.00BBAHANKayu kelas
IIIM0.040Rp 3,660,800.00Rp 146,432.00Paku 5 cm 12 cmKg0.400Rp
14,000.00Rp 5,600.00Minyak bekistingLiter0.200Rp 20,000.00Rp
4,000.00Balok kayu kelas IIM0.015Rp 6,665,000.00Rp 99,975.00Plywood
tebal 9 mmLbr0.350Rp 100,000.00Rp 35,000.00Dolken kayu galam (
810)cm P : 4 mBatang2.000Rp 1,250.00Rp 2,500.00JUMLAH HARGA BAHANRp
293,507.00CPERALATANJUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp
371,552.00EOverhead & Profit (Contoh 15 %)15% x DRp
55,732.80FHarga Satuan Pekerjaan (D+E)Rp 427,284.80A.4.1.1.23
Pemasangan 1 m2 bekisting untuk
balokNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.660Rp 70,000.00Rp
46,200.00Tukang KayuL.02OH0.330Rp 80,000.00Rp 26,400.00Kepala
TukangL.03OH0.033Rp 85,000.00Rp 2,805.00MandorL.04OH0.033Rp
80,000.00Rp 2,640.00JUMLAH TENAGA KERJARp 78,045.00BBAHANKayu kelas
IIIM0.040Rp 3,660,800.00Rp 146,432.00Paku 5 cm 12 cmKg0.400Rp
14,000.00Rp 5,600.00Minyak bekistingLiter0.200Rp 20,000.00Rp
4,000.00Balok kayu kelas IIM0.018Rp 6,665,000.00Rp
119,970.00Plywood tebal 9 mmLbr0.350Rp 100,000.00Rp 35,000.00Dolken
kayu galam ( 810)cm P : 4 mBatang2.000Rp 1,250.00Rp 2,500.00JUMLAH
HARGA BAHANRp 313,502.00CPERALATANJUMLAH HARGA ALATRp - 0DJumlah
(A+B+C)Rp 391,547.00EOverhead & Profit (Contoh 15 %)15% x DRp
58,732.05FHarga Satuan Pekerjaan (D+E)Rp 450,279.05A.4.1.1.24
Pemasangan 1 m2 bekisting untuk
lantaiNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.660Rp 70,000.00Rp
46,200.00Tukang KayuL.02OH0.330Rp 80,000.00Rp 26,400.00Kepala
TukangL.03OH0.033Rp 85,000.00Rp 2,805.00MandorL.04OH0.033Rp
80,000.00Rp 2,640.00JUMLAH TENAGA KERJARp 78,045.00BBAHANKayu kelas
IIIM0.040Rp 3,660,800.00Rp 146,432.00Paku 5 cm 12 cmKg0.400Rp
14,000.00Rp 5,600.00Minyak bekistingLiter0.200Rp 20,000.00Rp
4,000.00Balok kayu kelas IIM0.015Rp 6,665,000.00Rp 99,975.00Plywood
tebal 9 mmLbr0.350Rp 100,000.00Rp 35,000.00Dolken kayu galam (
810)cm P : 4 mBatang6.000Rp 1,250.00Rp 7,500.00JUMLAH HARGA BAHANRp
298,507.00CPERALATANJUMLAH HARGA ALATRp - 0DJumlah (A+B+C)Rp
376,552.00EOverhead & Profit (Contoh 15 %)15% x DRp
56,482.80FHarga Satuan Pekerjaan (D+E)Rp 433,034.80A.4.1.1.25
Pemasangan 1 m2 bekisting untuk
dindingNoUraianKodeSatuanKoefisienHarga SatuanJumlah
Harga(Rp)(Rp)ATENAGAPekerjaL.01OH0.660Rp 70,000.00Rp
46,200.00Tukang KayuL.02OH0.330Rp 80,000.00Rp 26,400.00Kepala
TukangL.03OH0.033Rp 85,000.00Rp 2,805.00MandorL.04OH0.033Rp
80,000.00Rp 2,640.00JUMLAH TENAGA KERJARp 78,045.00BBAHANKayu kelas
IIIM0.030Rp 3,660,800.00Rp 109,824.00Paku 5 cm 12 cmKg0.400Rp
14,000.00Rp 5,600.00Minyak bekistingLiter0.200Rp 20,000.00Rp
4,000.00Balok kayu kelas IIM0.020Rp 6,665,000.00Rp
133,300.00Plywood tebal 9 mmLbr0.350Rp 100,000.00Rp 35,000.00Dolken
kayu galam ( 810)cm P : 4 mBatang3.000Rp 1,250.00Rp 3,750.00Penjaga
Jarak Bekisting/SpacerBuah4.000Rp 10,416.67Rp 41,666.67JUMLAH HARGA
BAHANRp 333,140.67CPERALATANJUMLAH HARGA ALATRp - 0DJumlah
(A+B+C)Rp 411,185.67EOverhead & Profit (Contoh 15 %)15% x DRp
61,677.85FHarga Satuan Pekerjaan (D+E)Rp 472,863.52
HRG. SATUANDAFTAR HARGA SATUAN UPAH DAN BAHANUNIT KERJA:DINAS
PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI SULAWESI
BARATPEKERJAAN:PENGEMBANGAN KAWASAN PERMUKIMANLOKASI:PENINGKATAN
KUALITAS PERMUKIMAN KUMUH KAWASAN SIDODADISUMBER DANA:DUSUN. I KEL.
SIDODADI KEC. WONOMULYO KAB. POLMANTAHUN
ANGGARAN:2015NO.URAIANSATUANHARGA SATUAN (Rp.)1234I.UPAH TENAGA
KERJA1Kepala TukangOr/Hr85,000.002Tukang
Kayu/Batu/Kaca/Besi/ListrikOr/Hr80,000.003Pekerja / Buruh
TerlatihOr/Hr70,000.004Buruh tak
terlatihOr/Hr64,000.005MandorOr/Hr80,000.006Operator Alat
BeratOr/Hr150,000.007Pembantu OperatorOr/Hr100,000.00II.MATERIAL /
BAHANII.1.Bahan Dasar1Batu GunungM3182,250.002Batu Pecah- Batu
Pecah 10 - 15 cmM3200,000.00- Batu Pecah 7 - 10 cmM3225,000.00-
Batu Pecah 5 - 7 cmM3269,800.00- Batu Pecah 3 - 5 cmM3285,450.00-
Batu Pecah 2 - 3 cmM3300,000.00- Batu Pecah 0.5 - 1
cmM3338,000.003Kerikil SungaiM3199,850.004Pasir- Timbunan /
UruganM3134,225.00- PasanganM3149,375.00-
BetonM3166,900.005SirtuM3145,000.006Tanah Timbunan
PilihanM3145,000.007Tanah Timbunan BiasaM3107,350.008Kapur
PasanganZak35,000.009Semen PC Tonasa 50 Kg- Portland
CementKg1,300.00- PutihKg1,760.0010Batu MerahBuah650.0011Minyak
bekistingLtr20,000.0012Air KerjaM3500.00II.2.Bahan Kayu1Kayu Klas
I- BalokM37,250,000.00- PapanM36,900,000.002Kayu Klas II-
BalokM36,665,000.00- PapanM36,968,000.003Kayu Klas III-
BalokM33,260,400.00- PapanM33,660,800.004Kayu Klas
IV1,257.141,414.291,571.43-
BalokM32,500,000.001,250.001,400.001,550.00-
PapanM32,750,000.0089104Kayu
DolkenBatang125,000.001.011.131.265Batang Kelapa + Ongkos
AngkutBatang200,000.0099.4388.3879.556Bambu
SedangBatang16,000.007Plywood 9 mmLembar100,000.008Plywood 4
mmLembar65,000.009Tali Ijuk/RotanM317,400.00II.3.Bahan Besi Dan
PakuBerat Jenis Besi (Kg/m)Panjang Besi/btg (m)Berat/btg (kg)Harga
Besi /btg (kg)* Tambahan Catatan Berat Jenis untuk tiap 1Besi Beton
Polos- 6 mmBatang31,500.0031,500- 6
mm0.22212.002.6611,827.5211,800.00- 8 mmBatang56,500.0056,500- 8
mm0.39512.004.7311,933.12Harga Tertinggi11,900.00- Besi Beton 20
mm=2.465- 10 mmBatang81,500.0081,500- 10
mm0.61712.007.4011,016.4911,000.00- Besi Beton 22 mm=2.980- 12
mmBatang106,500.00106,500- 12 mm0.88812.0010.659,997.079,950.00-
Besi Beton 28 mm=4.830- 14 mmBatang131,500.00131,500- 14
mm1.20812.0014.509,068.929,050.00- Besi Beton 25 mm=3.850- 16
mmBatang156,500.00156,500- 16 mm1.57812.0018.948,263.428,250.00- 18
mmBatang181,500.00181,500- 18 mm1.99712.0023.977,572.127,550.00- 19
mmBatang206,500.00206,500- 19 mm2.22612.0026.717,732.127,700.00- 20
mmBatang231,500.00231,500- 20 mm2.46612.0029.597,823.067,800.00- 22
mmBatang256,500.00256,500- 22 mm2.98412.0035.817,163.547,150.00- 25
mmBatang281,500.00281,500- 25
mm3.85312.0046.246,088.136,050.002Kawat BetonKg23,600.003Paku
Biasa- Paku Biasa 2 - 3 cmKg28,000.00- Paku Biasa 5 - 10
cmKg14,000.00- Paku Seng UlirKg44,200.00- Paku Beton
PutihDos23,700.00- Paku Beton HitamDos24,500.00- Paku
GypsumDos36,900.004.Gorong-gorong Beton / Buis Beton- Gorong-gorong
Beton 100 cmBuah165,000.00- Gorong-gorong Beton 80
cmBuah125,000.00- Gorong-gorong Beton 60 cmBuah100,000.00-
Gorong-gorong Beton 20 cmBuah40,000.005.Seng Gelombamg-
BesarLembar59,500.00- KecilLembar52,500.006.Seng Plat BJLS
020Lembar68,400.00
MobilisasiITEM PEMBAYARAN NO.: 1JENIS PEKERJAAN: MOBILISASI%
TERHADAP TOTAL BIAYA PROYEK =45.5347%FASILITAS LABORATORIUMLembar
1.2-1HARGAJUMLAHSATUAN PENGUKURAN:Lump sumNo.U R A I A
NSATUANVOL.SATUANHARGAHARGA
SATUAN:Rp.779,940,000.00(Rp.)(Rp.)NO.URAIANSATUANVOLUMEHARGATOTALKETERANGANSATUANA.Sewa
TanahM2- 0- 0- 0I.Laboratory Building1.Laboratory
Buildingm2108.0055,000.005,940,000.00B.PERALATANSUB
TOTAL5,940,000.00Periksa lembar 1.2-24,100,000.00II.Soil &
Aggregate Testing1.Compaction
TestSet1.0015,000,000.0015,000,000.00BeliC.FASILITAS
KONTRAKTOR2.CBR TestSet1.0020,000,000.0020,000,000.00Beli1Base
CampM2200.0025,000.005,000,000.003Specifc
GravitySet1.005,000,000.005,000,000.00Beli2KantorM2- 0- 0-
04Atterberg LimitsSet1.005,000,000.005,000,000.00Beli3BarakM2- 0-
0- 05Grain Size
AnalysisSet1.0012,500,000.0012,500,000.00Beli4BengkelM2- 0- 0-
06Field Density Test by Sand Cone
MethodeSet2.006,500,000.0013,000,000.00Beli5Gudang, dan
lain-lainM2- 0- 0- 07Moisture
ContentSet2.006,000,000.0012,000,000.00Beli6. . . . . . . . . . . .
. . . . . . . . . .. . . .8Abrasion of Aggregate by Los Angeles
MachineBln2.005,000,000.0010,000,000.00SewaSUB
TOTAL92,500,000.00D.FASILITAS LABORATORIUMIII.Bituminous
Testing1Ruang LaboratoriumM2- 0- 0- 01.Marshall Asphalt
TestSet1.0020,000,000.0020,000,000.00Beli2Peralatan
Laboratoriumset- 0- 0- 02.Extraction Test, Centrifuge/Reflux
MethodSet1.009,000,000.009,000,000.00Beli3Perabotan &
Layananset- 0- 0- 03Specific Gravity of Coarse
AggregateSet1.009,000,000.009,000,000.00Beli4Uji
Laboratoriumset1.003,000,000.003,000,000.004Specific Gravity of
Fine AggregateSet1.009,000,000.009,000,000.00Beli5. . . . . . . . .
. . . . . . . . . . . . .. . . .5Mix Air Viod Content (Accurate
Method)Set1.0015,000,000.0015,000,000.00Beli6. . . . . . . . . . .
. . . . . . . . . . .. . . .6Core
DrillSet1.0015,000,000.0015,000,000.00Beli7. . . . . . . . . . . .
. . . . . . . . . .. . . .7Metal
ThermometerSet1.001,000,000.001,000,000.00Beli8Accessories and
TollsSet1.005,000,000.005,000,000.00Beli9Penetration
TestBln6.001,000,000.006,000,000.00BeliE.MOBILISASI
LAINNYA10Softening
PointSet1.006,000,000.006,000,000.00BeliE.I.PEKERJAAN
DARURAT11Refusal Density
CompactorSet1.0015,000,000.0015,000,000.00Beli1Perkuatan Jembatan
LamaLS- 0- 0- 0SUB TOTAL110,000,000.002Pemeliharaan Jalan Kerja /
SampingLS- 0- 0- 03Pekerjaan Jembatan SementaraLS- 0- 0-
0IV.Concrete Testing4. . . . . . . . . . . . . . . . . . . . . .LS-
0- 0- 01Slump ConeSet1.00500,000.00500,000.00Beli5. . . . . . . . .
. . . . . . . . . . . . .. . . .2Cylinder/Cube Mould for
Compressive StrengthSet1.0010,000,000.0010,000,000.00Beli6. . . . .
. . . . . . . . . . . . . . . . .. . . .3Beam Mould for Flexural
StrengthSet1.0010,000,000.0010,000,000.00Beli4Crushing
MachineSet1.0050,000,000.0050,000,000.00BeliE.II.LAIN-LAINSUB
TOTAL70,500,000.001Papan
ProyekSet1.00300,000.00300,000.002Pengaturan Lalu LintasLs- 0- 0-
0V.Peralatan pendukung3Alat Ukur (waterpass + Theodolite)Set- 0- 0-
01Mobil Pick UpUnit2.00100,000,000.00200,000,000.00Beli4As Built
DrawingSet- 0- 0- 02Komputer +
PrinterSet1.0010,000,000.0010,000,000.00Beli5Shop DrawingSet- 0- 0-
03FurnitureSet1.0015,000,000.0015,000,000.00Beli6Foto
DokumentasiLs- 0- 0- 07Mobilisasi Bahan
BakarLs1.002,000,000.002,000,000.008. . . . . . . . . . . . . . . .
. . . . . .. . . .- 0- 0- 0SUB
TOTAL225,000,000.00VI.OperasionalF.DEMOBILISASILS1.003,000,000.003,000,000.00Teknisi
LaboratoriumBln12.008,000,000.0096,000,000.00Tenaga Kerja
TerampilBln60.003,000,000.00180,000,000.00SUB
TOTAL276,000,000.00Total Biaya Mobilisasi17,400,000.00VII.Test
LuarCatatan :Jumlah yang tercantum pada masing-masing item
mobilisasi di atas sudah termasuk over-head dan labaTest Luar,
sesuai kebutuhan atau atasLs1.000.000.00serta seluruh pajak dan bea
(kecuali PPn), dan pengeluaran lainnya.perintah DireksiSUB
TOTAL0.00ITEM PEMBAYARAN NO.: 1JENIS PEKERJAAN: MOBILISASILembar
1.2-2KODEHARGAJUMLAHNo.JENIS ALATALATSATUANVOL.SATUANHARGATOTAL
HARGA ( I - VII )Rp779,940,000.00(Rp.)(Rp.)B.PERALATANCatatan
:1ASPHALT MIXING PLANTE01Unit- 0- 0- 01.Biaya satuan sudah termasuk
pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak
termasuk PPN2ASPHALT FINISHERE02Unit- 0- 0- 0yang dibayar kontrak)
dan biaya lain-lainnya.3ASPHALT SPRAYERE03Unit- 0- 0- 02.Test luar
adalah test ke lembaga pengujian yang disetujui oleh Konsultan
Pengawas.4BULLDOZER 100-150 HPE04Unit- 0- 0- 05COMPRESSOR 4000-6500
L\ME05Unit- 0- 0- 06CONCRETE MIXER 0.3-0.6
M3E06Unit3.00100,000.00300,000.007CRANE 10-15 TONE07Unit- 0- 0-
08DUMP TRUCK 3.5 TONE08Unit6.00350,000.002,100,000.009DUMP TRUCK 10
TONE09Unit- 0- 0- 010EXCAVATOR 80-140 HPE10Unit- 01,500,000.00-
011FLAT BED TRUCK 3-4 M3E11Unit- 0- 0- 012GENERATOR SETE12Unit- 0-
0- 013MOTOR GRADER >100 HPE13Unit- 01,500,000.00- 014TRACK
LOADER 75-100 HPE14Unit- 0- 0- 015WHEEL LOADER 1.0-1.6 M3E15Unit-
01,500,000.00- 016THREE WHEEL ROLLER 6-8 TE16Unit- 01,500,000.00-
017TANDEM ROLLER 6-8 T.E17Unit- 01,500,000.00- 018TIRE ROLLER 8-10
T.E18Unit- 0- 0- 019VIBRATORY ROLLER 5-8
T.E19Unit1.001,500,000.001,500,000.0020CONCRETE
VIBRATORE20Unit1.00100,000.00100,000.0021STONE CRUSHERE21Unit- 0-
0- 022WATER PUMP 70-100 mmE22Unit- 0- 0- 023WATER TANKER 3000-4500
L.E23Unit- 0200,000.00- 024PEDESTRIAN ROLLERE24Unit- 0- 0-
025TAMPERE25Unit1.00100,000.00100,000.0026JACK HAMMERE26Unit- 0- 0-
027FULVI MIXERE27Unit- 0- 0- 028CONCRETE PUMPE28Unit- 0- 0-
029TRAILER 20 TONE29Unit- 0- 0- 030PILE DRIVER + HAMMERE30Unit- 0-
0- 031CRANE ON TRACK 35 TONE31Unit- 0- 0- 032WELDING SETE32Unit- 0-
0- 033BORE PILE MACHINEE33Unit- 0- 0- 034ASPHALT LIQUID
MIXERE34Unit- 0- 0- 035TRONTONE35Unit- 0- 0- 036COLD MILLING
MACHINEE37Unit- 0- 0- 037ROCK DRILL BREAKERE36Unit- 0- 0- 038COLD
RECYCLERE38Unit- 0- 0- 039HOT RECYCLERE39Unit- 0- 0- 040AGGREGAT
(CHIP) SPREADERE40Unit- 0- 0- 041ASPHALT DISTRIBUTORE41Unit- 0- 0-
042SLIP FORM PAVERE42Unit- 0- 0- 043CONCRETE PAN MIXERE43Unit- 0-
0- 044CONCRETE BREAKERE44Unit- 0- 0- 045ASPAHLT TANKERE45Unit- 0-
0- 046CEMENT TANKERE46Unit- 0- 0- 047CONDRETE MIXER (350)E47Unit-
0- 0- 048VIBRATING RAMMERE48Unit- 0- 0- 049TRUK MIXER
(AGITATOR)E49Unit- 0- 0- 050BORE PILE MACHINEE50Unit- 0- 0-
051CRANE ON TRACK 75-100 TONE51Unit- 0- 0- 05253Total untuk Item B
pada Lembar 14,100,000
TERBILANGRp 626,900,000.00ENAM RATUS DUA PULUH ENAM JUTA
SEMBILAN RATUS RIBU
RUPIAH,-93006269000006269000001SATU02DUA0MILYARAN3TIGARIBU626JUTAAN4EMPAT0900RIBUAAN5LIMASEMBILAN
RATUS000RATUSAN6ENAMENAM JUTA7TUJUHDUA PULUH8DELAPANENAM
RATUS9SEMBILAN000
Volume569,937,979.00REAL
COST56,993,797.90PPN626,931,776.91626,900,000.00EE29.00198,000,000.00PAGU(428,900,000.00)SISANO.U
R A I A NVOLUMEHARGA SATUAN (Rp.)JUMLAH HARGA
(Rp.)SEG.1SEG.2SEG.3SEG.4SEG.5Panjang
Target58.0058.00157.00273.00Lebar2.753.004.50I.PEKERJAAN
PERSIAPAN1Mobilisasi2Pembersihan Lapangan dan Perataan273.00Lebar
Rata23.4166666667932.75M212,650.0011,799,287.503Pengukuran dan
Pemasangan BouwplankPANJANG
KAYU4.00X10.0040.00M193,472.463,738,898.404Pembuatan Gudang Semen
dan Peralatan4.00x5.0020.00M21,282,191.9325,643,838.505Pembuatan
Bak Adukan ukuran 40 cm x 50 cm x 25
cm0.40x0.50x0.251.00M2258,366.82258,366.82=0.20M2x5.00Bh=1.00M341,440,391.22II.PEKERJAAN
TANAH1Pek. Galian Tanah
BiasaSTAPJGLBRTBLVLM3.92M362,675.00245,372.6358.000.450.151.961.962Pek.
Urugan Kembali1.31M344,850.0058,529.253Pek. Urugan
PasirSTAPJGLBRTBLVLM4.00M3210,300.50841,202.00dibawah pondasi plat
tipe.18.005.000.104.00dibawah pondasi plat tipe.24.004Pek. Urugan
Sirtu / Tanah Pilihan ( Leveling
)STAPJGLBRTBLVLM208.00M3222,525.0046,285,200.000+00025.004.500.2022.500+02525.004.500.2022.500+05025.004.500.2022.500+07525.004.500.2022.500+10025.004.500.2022.500+12525.004.500.2022.500+1507.004.500.206.300+1570+15718.003.000.2010.800+17525.003.000.2015.000+20015.003.000.209.000+2150+21510.002.750.205.500+22525.002.750.2013.750+25023.002.750.2012.650+273273.00208.005Pek.
Pemadatan
TanahSTAPJGLBRTBLVLM208.00M344,850.009,328,800.000+00025.004.500.2022.500+02525.004.500.2022.500+05025.004.500.2022.500+07525.004.500.2022.500+10025.004.500.2022.500+12525.004.500.2022.500+1507.004.500.206.300+157157.000+15718.003.000.2010.800+17525.003.000.2015.000+20015.003.000.209.000+21558.000+21510.002.750.205.500+22525.002.750.2013.750+25023.002.750.2012.650+27358.00273.00208.0056,759,103.88III.PEKERJAAN
PONDASIPJGLBRTBLVLM1Pek. Pondasi Batu
Kosong273.000.200.158.1916.38M3424,258.236,949,349.812Pek. Pas.
Pondasi Batu Kali 1 Pc : 3
PsPJGLBRTBLVLM10.24M3888,313.919,094,113.62273.000.250.155.123Pek.
Gorong-gorong 60 cm - 80 cmM1353,189.04- 04Pek. Pasangan bata merah
tebal 1/2 bata, 1 Pc : 4 PsM2112,611.59- 0PJGLBRTBLVLM5Pek.
Plesteran 1 Pc : 3 Ps, tebal 15
mm273.000.250.15109.20218.40M260,173.7513,141,947.0029,185,410.42IV.PEKERJAAN
BETON1Pek. Beton Mutu ' = 7,4 Mpa ( K.100 )STAPJGLBRTBLVLM- 0M3- 0-
00+00025.000.000.000.000+02525.000.000.000.000+05025.000.000.000.000+07525.000.000.000.000+10025.000.000.000.000+12525.000.000.000.000+15025.000.000.000.000+17525.000.000.000.000+20025.000.000.000.000+22525.000.000.000.000+25025.000.000.000.000+27525.000.000.000.000+30025.000.000.000.000+32525.000.000.000.000+35025.000.000.000.000+37525.000.000.000.000+4000.002K
175STAPJGLBRTBLVLM195.35M31,146,652.95223,998,654.250+00025.004.500.2022.500+02525.004.500.2022.500+05025.004.500.2022.500+07525.004.500.2022.500+10025.004.500.2022.500+12525.004.500.2022.500+1507.004.500.206.300+1570+15718.003.000.2010.800+17525.003.000.2015.000+20015.003.000.209.000+2150+21510.002.750.205.500+22525.002.750.2013.750+25023.002.750.2012.650+2733Pek.
Beton Mutu ' = 12,2 Mpa ( K.150 )PJGLBRTBLVLM- 0M31,226,595.95-
00+05050.000.000.000.000+10050.000.000.000.000+15050.000.000.000.000+20050.000.000.000.000+25050.000.000.000.000+30050.000.000.000.000+35050.000.000.000.000+40050.000.000.000.000+45050.000.000.000.000+50050.000.000.000.000+55050.000.000.000.000+60050.000.000.000.000+65050.000.000.000.000+70050.000.000.000.000+75050.000.000.000.000+80050.000.000.000.000+8500+9000.004Pek.
Beton Mutu ' = 14,5 Mpa ( K.175 )STAPJGLBRTBLVLM- 0M31,263,842.89-
00+00025.000.000.000.000+02525.000.000.000.000+05025.000.000.000.000+07525.000.000.000.000+10025.000.000.000.000+12525.000.000.000.000+15025.000.000.000.000+17525.000.000.000.000+20025.000.000.000.000+22525.000.000.000.000+25025.000.000.000.000+27525.000.000.000.000+30025.000.000.000.000+32525.000.000.000.000+35025.000.000.000.000+37525.000.000.000.000+4000.005Pek.
Pas. Pondasi Batu Kali 1 Pc : 3 PsSTAPJGLBRTBLVLM- 0M3888,313.91-
00+00025.000.000.000.000+02525.000.000.000.000+05025.000.000.000.000+07525.000.000.000.000+10025.000.000.000.000+12525.000.000.000.000+15025.000.000.000.000+17525.000.000.000.000+20025.000.000.000.000+22525.000.000.000.000+25025.000.000.000.000+27525.000.000.000.000+30025.000.000.000.000+32525.000.000.000.000+35025.000.000.000.000+37525.000.000.000.000+4000.006Pek.
Plesteran 1 Pc : 3 Ps, tebal 15 mmSTAPJGLBRTBLVLM- 0M260,173.75-
00+00025.000.000.100.000+02525.000.000.100.000+05025.000.000.100.000+07525.000.000.100.000+10025.000.000.100.000+12525.000.000.100.000+15025.000.000.100.000+17525.000.000.100.000+20025.000.000.100.000+22525.000.000.100.000+25025.000.000.100.000+27525.000.000.100.000+30025.000.000.100.000+32525.000.000.100.000+35025.000.000.100.000+37525.000.000.100.000+4000.00-
0273.00195.35
Sheet2TYPE. 1VOLUME PASANGAN BATUVOLUME
BETONNo.SKETSATULANGANKETERANGANBAGIAN 1PLATJARAKJUMLAHPANJANG
BATANGTOTAL PANJANGBERATTOTAL BERATPANJANG3.00MPANJANG3.00M( mm )(
Cm' )( Btg )( Cm' )( M' )( Kg/M' )( Kg
)LEBAR0.40+0.50LEBAR1.00M2TEBAL0.15M1TULANGAN BALOK ( 2 Bh )L.
RATA20.45MBEUGELA81527.0054.0056.0030.240.39511.945Kali
2TINGGI0.40MVOLUME :0.450MVOLUME1.080M2 SISIBALOKBESI
UTAMAB12154.00PANJANG3.00M8.00409.0032.720.88929.088Kali
2LEBAR0.15M2TULANGAN PLATBAGIAN
2TINGGI0.15MMEMANJANGA121527.00PANJANG3.00M2
LAPIS54.00114.0061.560.88954.727Kali 2LEBAR0.15+0.25VOLUME :0.135M2
SISI2MELINTANGB12157.00L. RATA20.200MLENING2
LAPIS14.00409.0057.260.88950.904Kali 2PANJANG0.00M3LENING 2
(BH)TINGGI0.35MLEBAR0.00MMEMANJANGA123014.00TINGGI0.00M28.0037.0010.360.8899.210Kali
2VOLUME0.420M2 SISIVOLUME0.000M2 SISIMELINTANGB122.00BAGIAN
34.00409.0016.360.88914.544Kali 2PANJANG3.00MTOTAL
VOLUME0.585MLEBAR1.40MJumlah Berat Besi Untuk 1
Unit170.418kgTINGGI0.15MVOLUME0.630MVOLUMEVOLUME :2.130MTYPE.
2PEMBESIAN PLAT DEUCKERVOLUME PASANGAN BATUVOLUME BETONBAGIAN
1PLATNo.SKETSATULANGANKETERANGANPANJANG5.00MPANJANG5.00MJARAKJUMLAHPANJANG
BATANGTOTAL PANJANGBERATTOTAL BERATLEBAR0.55+0.80LEBAR2.00M( mm )(
Cm' )( Btg )( Cm' )( M' )( Kg/M' )( Kg )2TEBAL0.20ML.
RATA20.68M1TULANGAN BALOK ( 2 Bh )BEUGELA81534.00TINGGI1.20MVOLUME
:2.000M68.0098.0066.640.39526.323Kali 2VOLUME8.100M2
SISIBALOKPANJANG5.00MBESI
UTAMAB12154.00LEBAR0.25M8.00409.0032.720.88929.088Kali 2BAGIAN
2TINGGI0.30M2TULANGAN
PLATPANJANG5.00MMEMANJANGA121527.00LEBAR0.45+0.55VOLUME :0.750M2
SISI2 LAPIS54.00114.0061.560.88954.727Kali 22L.
RATA20.50MLENINGMELINTANGB12157.00PANJANG2.00M2
LAPIS14.00409.0057.260.88950.904Kali 2TINGGI0.35MLEBAR0.20M3LENING
2 (BH)TINGGI0.30MMEMANJANGA123014.00VOLUME1.750M2
SISI28.0037.0010.360.8899.210Kali 2VOLUME0.240M2 SISIBAGIAN
3MELINTANGB122.00PANJANG5.00MTOTAL
VOLUME2.990M4.00409.0016.360.88914.544Kali 2LEBAR3.40MVOLUME
:5.980M2 SISITINGGI0.20MJumlah Berat Besi Untuk 1
Unit184.796kgVOLUME3.400MVOLUMEVOLUME :13.250M
PBJBACK UP DATA QUANTITYNAMA PAKET:PROP / KAB /
KODYA:KONTRAKTOR:KONSULTAN:3.3. PENYIAPAN BADAN JALANSTATION
(STA)SISILEBARL.
RATA2PANJANGLUASKETERANGANmmmm0+000L1.251.2525.0031.250+025L1.251.2525.0031.250+050L1.251.2525.0031.250+075L1.251.2525.0031.250+100L1.251.2525.0031.250+125L1.251.2525.0031.250+150L1.251.2525.0031.250+175L1.251.2525.0031.250+200L1.251.2525.0031.250+225L1.251.2525.0031.250+250L1.251.2525.0031.250+275L1.251.2525.0031.250+300L1.251.2525.0031.250+325L1.251.2525.0031.250+350L1.251.2525.0031.250+375L1.251.2525.0031.250+400L1.251.2525.0031.250+425L1.251.2525.0031.250+450L1.251.2525.0031.250+475L1.251.2525.0031.250+500L1.251.2525.0031.250+525L1.251.2525.0031.250+550L1.25JUMLAH550.00687.50TOTAL
I550.00687.50Disetujui Oleh :Diperiksa Oleh :Dibuat Oleh :Dinas
Pekerjaan Umum danKonsultan PengawasKontraktor PelaksanaPerumahan
RakyatCV.CV.Provinsi Sulawesi BaratAdi wijaya,
A.MdaddadasasasfssfvdvsdvsvsvsvsvsdvNip : 19800604 201101 1 009Site
EngineerDirektur
GLIAN BISBACK UP DATA QUANTITYNO. PACKAGE:PACKAGE
NAME:PROVINCE/ KABUPATEN:BIDDER NAME:KONSULTAN:COMMON
EXCAVATIONSECTION
IVSTA0+000X1.002.806.004.501.001,812.0858.1725Y128.46124.70124.70126.70128.461,795.740STA0+025X1.6002.8004.6004.6001.6001,658.9124.3296Y123.224120.655120.655122.000123.2241,650.253STA0+050X4.0002.8004.3007.0004.0002,170.80619.8585Y123.695114.756114.756122.000123.6952,131.089STA0+650X5.0007.60010.8009.0005.0003,623.81017.2256Y115.000108.604108.604113.000115.0003,589.359STA0+900X4.0007.20010.2006.0004.0002,605.59320.2710Y91.40291.40298.00096.66491.4022,565.051STA0+950X4.2007.2008.9006.0004.2002,292.4559.0046Y85.14785.14789.00087.99585.1472,274.446STA1+100X1.0002.6006.0004.5001.0001,010.42212.6149Y73.52768.76468.76472.00073.527985.192STA4+150`X3.8007.3009.0005.0003.8001,523.55413.1904Y58.30258.30262.67561.44158.3021,497.173STA4+200X4.0007.3009.00010.50014.3006.6004.0003,387.67632.7429Y60.49860.49864.65564.65570.76266.40060.4983,322.191STA4+250X4.0007.2009.10010.50013.9007.0004.0003,541.44837.7818Y62.77162.77167.29667.29674.38570.00062.7713,465.885STA4+300X4.2008.30010.00011.50014.0006.0004.2003,638.16536.8017Y62.31162.31167.00067.00071.69568.00062.3113,564.561STA4+350X4.0008.30010.00011.50014.0007.0004.0003,687.21731.8207Y62.43262.43267.00067.00071.51068.00062.4323,623.576STA4+400X4.0008.30010.00011.50013.9007.0004.0003,885.29335.1405BARU
LAGIY66.00066.00070.50070.50075.49672.01066.0003,815.012STA4+450X4.0007.20011.0006.0004.000-
0- 01,979.39120.6031Y66.68466.68473.11071.46966.684- 0-
01,938.185STA4+500X4.2007.20010.9006.0004.200- 0-
01,970.21327.3564Y64.87764.87773.48771.50164.877- 0-
01,915.500STA4+600X4.3007.30010.0006.4004.300- 0-
02,102.00715.9979Y71.83271.83277.87676.49171.832- 0-
02,070.011STA4+650X4.0007.20010.0006.0004.000- 0-
02,224.64817.6646Y78.40178.40184.79783.01078.401- 0-
02,189.319STA4+700X4.0007.20010.0006.0004.000- 0-
02,411.11819.5720Y84.89284.89291.97290.00084.892- 0-
02,371.974STA4+750X4.7007.30010.0008.0004.700- 0-
02,732.16811.4734Y87.89287.89293.93793.02087.892- 0-
02,709.222STA4+950X4.0007.30010.9007.0004.000- 0-
02,776.72824.4483Y90.31190.31199.45397.00090.311- 0-
02,727.831STA5+000X4.6007.20011.0007.5004.600- 0-
02,781.99618.5446Y87.84987.84995.16293.98787.849- 0-
02,744.907STA5+050X4.0007.20010.0006.0004.000- 0-
02,448.39119.7100Y86.27686.27693.19691.46286.276- 0-
02,408.971STA5+100X4.0007.20010.5006.0004.000- 0-
02,473.98024.1827Y84.49884.49895.00090.00084.498- 0-
02,425.615STA5+250X5.0007.70011.0009.5005.000- 0-
02,639.13217.7249Y82.49676.39576.39580.47382.496- 0-
02,603.682STA5+300X5.0007.80010.7008.8005.000- 0-
02,459.62814.7065Y79.36773.09673.09677.15679.367- 0-
02,430.215STA5+350X5.0007.70010.9009.0005.000- 0-
02,509.49221.1345Y80.78173.01073.01078.46280.781- 0-
02,467.223STA5+400X5.0007.80010.7009.0005.000- 0-
02,453.66817.6100Y78.56372.12772.12776.95178.563- 0-
02,418.448Disetujui Oleh :Diperiksa Oleh :Dibuat Oleh :Dinas
Pekerjaan Umum danKonsultan PengawasKontraktor PelaksanaPerumahan
RakyatCV.CV.Provinsi Sulawesi BaratAdi wijaya,
A.MdaddadasasasfssfvdvsdvsvsvsvsvsdvNip : 19800604 201101 1 009Site
EngineerDirektur
GLIAN BIS
GLIAN
BTN
TALUD
SAL
BACK UP DATA QUANTITYNAMA PAKET:PEMBANGUNAN JALANPROP / KAB /
KODYA:SULAWESI BARATKONTRAKTOR:CV.KONSULTAN:CV.3.1(1). GALIAN
BIASASTATION (STA)SISILEBARL.
RATA2PANJANGLUASTEBALVOLUMEKETERANGANmmmmmm0+000L1.251.2510.0012.500.516.380+010L1.251.2510.0012.500.516.380+020L1.251.2510.0012.500.516.380+030L1.251.2510.0012.500.516.380+040L1.251.2510.0012.500.516.380+050L1.251.2510.0012.500.516.380+060L1.251.2510.0012.500.516.380+070L1.251.2510.0012.500.516.380+080L1.251.2510.0012.500.516.380+090L1.251.2510.0012.500.516.380+100L1.251.2510.0012.500.516.380+110L1.251.2510.0012.500.516.380+120L1.251.2510.0012.500.516.380+130L1.251.2510.0012.500.516.380+140L1.251.2510.0012.500.516.380+150L1.251.2510.0012.500.516.380+160L1.251.2510.0012.500.516.380+170L1.251.2510.0012.500.516.380+180L1.251.2510.0012.500.516.380+190L1.251.2510.0012.500.516.380+200L1.251.2510.0012.500.516.380+210L1.251.2510.0012.500.516.380+220L1.251.2510.0012.500.516.380+230L1.251.2510.0012.500.516.380+240L1.251.2510.0012.500.516.380+250L1.25JUMLAH250.00159.38TOTAL
I250.00159.38Disetujui Oleh :Diperiksa Oleh :Dibuat Oleh :Dinas
Pekerjaan Umum danKonsultan PengawasKontraktor PelaksanaPerumahan
RakyatCV.CV.Provinsi Sulawesi BaratAdi wijaya,
A.MdaddadasasasfssfvdvsdvsvsvsvsvsdvNip : 19800604 201101 1 009Site
EngineerDirektur
BACK UP DATA QUANTITYNAMA PAKET:PEMBANGUNAN JALANPROP / KAB /
KODYA:SULAWESI BARATKONTRAKTOR:CV.KONSULTAN:CV.PEKERJAAN BETON MUTU
K.175STATION (STA)SISILEBARL.
RATA2PANJANGLUASTEBALVOLUMEKETERANGANmmmmmm0+000L3.503.5025.0087.500.054.380+025L3.503.5025.0087.500.054.380+050L3.503.5025.0087.500.054.380+075L3.503.5025.0087.500.054.380+100L3.503.5025.0087.500.054.380+125L3.503.5025.0087.500.054.380+150L3.503.5025.0087.500.054.380+175L3.503.5025.0087.500.054.380+200L3.503.5025.0087.500.054.380+225L3.503.5025.0087.500.054.380+250L3.503.5025.0087.500.054.380+275L3.503.5025.0087.500.054.380+300L3.503.5025.0087.500.054.380+325L3.503.5025.0087.500.054.380+350L3.503.5025.0087.500.054.380+375L3.503.5025.0087.500.054.380+400L3.503.5025.0087.500.054.380+425L3.503.5025.0087.500.054.380+450L3.503.5025.0087.500.054.380+475L3.503.5025.0087.500.054.380+500L3.503.5025.0087.500.054.380+525L3.503.5025.0087.500.054.380+550L3.50JUMLAH550.0096.25TOTAL
I550.0096.25Disetujui Oleh :Diperiksa Oleh :Dibuat Oleh :Dinas
Pekerjaan Umum danKonsultan PengawasKontraktor PelaksanaPerumahan
RakyatCV.CV.Provinsi Sulawesi BaratAdi wijaya,
A.MdaddadasasasfssfvdvsdvsvsvsvsvsdvNip : 19800604 201101 1 009Site
EngineerDirektur
BACK UP DATA QUANTITYNAMA PAKET:PEMBANGUNAN JALANPROP / KAB /
KODYA:SULAWESI BARATKONTRAKTOR:CV.KONSULTAN:CV.7.9 PASANGAN BATU
(TALUD)STATION (STA)L/RD I M E N S
ILUASLUASRATA-RATAPANJANGVOLUMEKETERANGANabcdt.1(m)(m)(m)(m)(m)(m)(m)(m)(m)0+000L0.150.300.300.100.300.100.1010.000.970+010L0.150.300.300.100.300.100.1010.000.970+020L0.150.300.300.100.300.100.1010.000.970+030L0.150.300.300.100.300.100.1010.000.970+040L0.150.300.300.100.300.100.1010.000.970+050L0.150.300.300.100.300.100.1010.000.970+060L0.150.300.300.100.300.100.1010.000.970+070L0.150.300.300.100.300.100.1010.000.970+080L0.150.300.300.100.300.100.1010.000.970+090L0.150.300.300.100.300.100.1010.000.970+100L0.150.300.300.100.300.100.1010.000.970+110L0.150.300.300.100.300.10T
O T A L110.0010.7Disetujui Oleh :Diperiksa Oleh :Dibuat Oleh :Dinas
Pekerjaan Umum danKonsultan PengawasKontraktor PelaksanaPerumahan
RakyatCV.CV.Provinsi Sulawesi BaratAdi wijaya,
A.MdaddadasasasfssfvdvsdvsvsvsvsvsdvNip : 19800604 201101 1 009Site
EngineerDirektur
BACK UP DATA QUANTITYNAMA PAKET:PEMBANGUNAN JALANPROP / KAB /
KODYA:SULAWESI BARATKONTRAKTOR:CV.KONSULTAN:CV.2.2 PASANGAN BATU
DENGAN MORTARSTATION (STA)L/RD I M E N S ILUASLUAS
RATA-RATAPANJANGVOLUMEKETERANGANabcdt.1t.2(m)(m)(m)(m)(m)(m)(m)(m)(m)(m)3+388.2R0.850.800.490.690.691.000.320.329.903.223+398.1R0.850.800.490.690.691.000.320.3110.003.133+408.1R0.850.800.500.700.731.000.300.3110.003.083+418.1R0.850.800.510.710.711.000.310.3010.003.043+428.1R0.850.800.500.700.741.000.290.2910.002.943+438.1R0.850.800.500.700.741.000.290.3010.003.053+448.1R0.850.800.470.670.701.000.320.3110.003.083+458.1R0.850.800.460.660.721.000.300.3010.003.013+468.1R0.850.800.460.660.721.000.300.3010.003.013+478.1R0.850.800.460.660.721.000.300.3110.003.083+488.1R0.850.800.460.660.701.000.310.2910.002.853+498.1R0.850.800.450.650.791.000.260.2610.002.563+508.1R0.850.800.450.650.791.000.260.2810.002.753+518.1R0.850.800.500.700.741.000.290.2910.002.943+528.1R0.850.800.500.700.741.000.290.2810.002.763+538.1R0.850.800.530.730.801.000.26JUMLAH149.9044.51T
O T A L 1149.9044.51Disetujui Oleh :Diperiksa Oleh :Dibuat Oleh
:Dinas Pekerjaan Umum danKonsultan PengawasKontraktor
PelaksanaPerumahan RakyatCV.CV.Provinsi Sulawesi BaratAdi wijaya,
A.MdaddadasasasfssfvdvsdvsvsvsvsvsdvNip : 19800604 201101 1 009Site
EngineerDirektur
EXISTING
2.00 %
2.00 %
Penyiapan Badan Jalan
150
150
EXISTING
2.00 % 2.00 %
Penyiapan Badan Jalan
150 150
C
L
d
t.
b
c
t.
d
c
b
C
L
d
t.
b
c
t.
d
c
b
EXISTING
2.00 %
2.00 %
150
150
GALIAN BIASA
EXISTING
2.00 % 2.00 %
150 150
GALIAN BIASA
MORTAR
EXISTING
MORTAR
b
c
a
d
t.1
t.2
b
c
a
d
t.1
t.2
MORTAR
EXISTING
MORTAR
b
c
a
d
t.1
t.2
b
c
a
d
t.1
t.2
MBD00807C8C.unknown
MBD008190F0.unknown
MBD00819A7E.unknown
MBD0081586D.unknown
MBD003BAB49.unknown