LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017) 1 | FOTOGRAPH LOCATION : SECTION A FOTOGRAPH 1: ZONE 1 – MB 10-05 (3/4/17) Activity: Large diameter manhole construction FOTOGRAPH 2: ZONE 1 – MB 10-02 (13/4/17) Activity: Man-shield pipe jacking from MB 10-02 to MB 10-01 (1500 mm DN)

Upload: others

Post on 16-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOCATION : SECTION A

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017)

1 | F O T O G R A P H

LOCATION : SECTION A

FOTOGRAPH 1: ZONE 1 – MB 10-05 (3/4/17) Activity: Large diameter manhole construction

FOTOGRAPH 2: ZONE 1 – MB 10-02 (13/4/17) Activity: Man-shield pipe jacking from MB 10-02 to MB 10-01 (1500 mm DN)

Page 2: LOCATION : SECTION A

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017)

2 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 3: ZONE 2 – NPS 1 (20/4/17) Activity: Water tightness test of Temporary Treatment Plan

FOTOGRAPH 4: ZONE 2 - MB 1-104/10 Jacking Pit (31/3/17) Activity: Pipe Jacking from MB 1-104/10 to MB 1-104/9 (375 mm DN)

Page 3: LOCATION : SECTION A

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017)

3 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 5: ZONE 2 – NPS 1 (25/4/17) Activity: Secant pile guide wall installation

Page 4: LOCATION : SECTION A

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017)

4 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 6: ZONE 3A – MB 6-14 Jacking Pit (24/4/17) Activity: Pipe jacking from MB 6-14 to MB 6-13 (900 mm DN)

FOTOGRAPH 7: ZONE 3A – NPS 4 (24/4/17)

Activity: Open cut pipe laying from NPS 4 to MB 6-01 (400 mm DN)

Page 5: LOCATION : SECTION A

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017)

5 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 8: ZONE 3B - MB 1-15/7(31/3/17) Activity: Pit Construction

FOTOGRAPH 9: ZONE 3B - MB 1-15/9 (3/4/17) Activity: Pit Construction

Page 6: LOCATION : SECTION A

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017)

6 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 10: ZONE 3B – MB 1-17/2 Jacking Pit (14/4/17) Activity: Pipe Jacking from MB 1-17/2 to MB 1-17/1A (225 mm DN)

FOTOGRAPH 11: ZONE 3C – MB 5-02 Jacking Pit (10/4/17) Activity: Pipe Jacking from MB 5-02 to MB 5-03 (600 mm DN)

Page 7: LOCATION : SECTION A

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017)

7 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 12: ZONE 3C – SEKOLAH MENENGAH RAJA PEREMPUAN TAAYAH (25/4/17) Activity: Open cut pipe laying and manhole construction (225 mm DN)

Page 8: LOCATION : SECTION A

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017)

8 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 13: ZONE 3C – SEKOLAH MENENGAH YUK CHOY (19/4/17) Activity: Open cut pipe laying and manhole construction (225 mm DN)

Page 9: LOCATION : SECTION A

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.17 (sehingga 25/4/2017)

9 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 14: ZONE 3D - MB 1-66 Jacking Pit (5/4/17) Activity: Pipe Jacking from MB 1-66 to MB 1-69 (1200 mm DN)