m4 presentation
DESCRIPTION
M4 PresentationTRANSCRIPT
MEASUREMENT 4 Bachelor Of Quantity Surveying Semester 4, March 2015
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH RUMAH KEDIAMAN KEKAL 3, TINGKAT DI ATAS NO LOT 29089 (GRN 140455) BANDAR SEREMBAN, DAERAH SEREMBAN, NEGERI SEMBILAN.
Tan Cheng WengJeffrey TanKhew sze haoQuinnie Tan Tan yong mingWong kim wan
MEASUREMENT 4Bachelor Of Quantity SurveyingSemester 4, March 2015
JOB SCOPETan Cheng Weng (Leader)
Building Works ElementsPilling / FoundationInternal Wall Finishes Internal Floor Finishes External Works ElementsFencing and Gates Other Parts of Tender Documents Content PageForm of non-collusionArrangement of whole tender documentAny other miscellaneous parts not allocated to other team membersOther DutiesAll correspondences with other consultants, internal memos to group members, allocation of duties, etc. Any other duties not allocated to other team members
JOB SCOPEJeffrey Tan
Building Works ElementsWork below lowest floor finishes Sanitary FittingsBuilders work in connection with servicesMechanical and Electrical Service including Plumbing Works (P.C.Sums)Miscellaneous workExternal Works ElementsSewarage WorksOther Parts of Tender DocumentsForm of Contract
JOB SCOPEKhew Sze Hao
Building Works Elements Frame ( including roof beams)Upper Floor SlabExternal Works ElementsRoads and Pavement Other Part of Tender DocumentsAll appendices of Tender Documents
JOB SCOPEQuinnie Tan
Building Works Elements RC Roof slab and Rain Water Down Pipe Staircase and Staircase Finishes External Works ElementsWater ReticulationsOther Part of Tender DocumentsPreambles Materials and workmanship
OthersPresent the projectJOB SCOPETan Yong Ming
Building Works Elements Window DoorInternal Ceiling FinishesExternal Works ElementsRefuse Chamber / Letter Boxes Miscellaneous (any other works not under element)
Other Part of Tender DocumentsPreliminariesJOB SCOPEWong Kim Wan
Building Works Elements External WallInternal Wall External FinishesExternal Works ElementsSurface Water Drainage Other Part of Tender DocumentsInstruction to Tendering and Conditions to tenderOther Duties Preparing the Power Point Presentation SlidesPROJECT INFORMATIONEMPLOYER Yap Kim Lian No 41, Taman Megah, 72100, Bahau, Negeri Sembilan
ARCHITECT Arkitek Zafwan Farid No 1920, Tingkat Atas Kedai Pejabat Taman Bukit Bayas Indah, Jalan Pasir Panjang, 21100, Kuala Terrenganu, Terrenganu Daurul Iman
CIVIL & STRUCTURAL ENGINEER Perundingan Delima Sdn.Bhd. Taman Tun Dr.Ismail, 60000 Kuala Lumpur.MECHNANICAL & ELECTRICAL ENGINEERM/S Juru Perundingan M & E Sdn Bhd. Wisma Hup Peng, No. 23, Block A, Tingkat 8, Jalan Damansara Baru, 46700 Petaling Jaya, Selangor Darul Ehsan.
QUANTITY SURVEYOR TANS Quantity Surveyor Sdn Bhd Block B2, Level 6 , East Wing , Lot-22 8, Jalan PJS 9 / 11 47152 Petaling Jaya, Selangor Darul Ehsan.PROJECT DETAILSBuilding Type: Three-Storey Bungalow (8 bedrooms, 6 washrooms)Location: Negeri SembilanClient: Private
SITE LOCATION
LOT 29089 (GRN 140455) BANDAR SEREMBAN, DAERAH SEREMBAN, NEGERI SEMBILAN.Front and Rear Elevation
Left and Right Elevation
Sectional Plan
Floor Plan
Drain Section
Door Section
Staircase Plan
Work Below Lowest Floor Level
Tender DocumentVolume I: Contract DocumentsVolume II: DrawingsVolume III: Taking OffVolume IV: CorrespondenceSchedule of Finishes
Example :Schedule of FinishesExample :
Thank You