    GOVERNMENT OF ANDHRA PRADESH

    PANCHAYAT RAJ ENGINEERING DEPARTMENT

    PRADHAN MANTRI GRAM SADAK YOJANA

    RIAD - PHASE -

    KHAMMAM DISTRICT

    PACKAGE NO AP

  • 8/14/2019 Main Est-Formats-puligundala

    2/173

    PRADHAN MANTRI GRAM SADAK YOJANA

    SUMMARY SHEET

    Unconnected habitations Package No.

    >1000 500-1000 250-500

  • 8/14/2019 Main Est-Formats-puligundala

    3/173

    PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)Roads Proposed in PMGSY for Rural Connectivity (Pavement Layers)

    District KHAMMAM Block : CHARLA

    Details of Thickness & Cost for pavement Layers

    From To Details Earthwork WBM2 WBM3

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 11 R&B Road Puligundala U D 8.360 -- 450-600 170 75 75

    Cost (Rs.) 1.70 29.01 33.32 19.96 28.23 34.79 6.95 2.44 1.78 11

    sst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle - Khammam

    Sl.No.

    Name ofPlaces/Villages

    Connected by road Newconstruction/upgradation (use

    N/U)

    Facilityaccessed (Use

    A/B/C/D)

    Proposed RoadLength(Km)

    ExistingSurface

    Type Cleaning&

    GrubbingSubgrade

    Preparation

    GravelShoulde

    rs

    PrimeCoat

    Tackcoat

    Roadfurniture

    Croavet

    tslo

    WBM/Earthen

    Thickness(mm)

    22

    Format-2a

  • 8/14/2019 Main Est-Formats-puligundala

    4/173

    PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)

    ROADS PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (CROSS DRAINAGE STRUCTURES)District KHAMMAM BLOCK: MANUGURU

    Name of the Road

    Existing CD Structure by Type Details of Proposed CD Structure by Type

    Minor Bridge

    Details

    Side Drain

    No. Dia No. Length No. Length No. Dia No. Length No. Length

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

    1 U 8.36 5 600 2 2 - 10 600 1 260 8 222.00 64.97

    Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle - Khammam

    Sl.No.

    NewConstruction/Upgra

    dation(Use N/U)

    ProposedRoad

    Length(KM)

    Hume PipeCulvert

    Box/ArchCulvert/Pave

    d Dips

    Hume PipeCulvert

    MinorBridge/Paved

    DipsTotal Cost ofProposed CD

    Structures

    R/F R&B Road toPuligundala

    30+34=64

    27.0+1.0=28.00

  • 8/14/2019 Main Est-Formats-puligundala

    5/173

    PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)DETAILS OF EXISTING ROADS (FOR UPGRADATION)

    Bloc CHARLA District: KHAMMAM District: KHAMMAM.

    Name of the road

    Traffic per day Existing Road Details

    WBM Layer Bituminous Layer

    Type Width (m)

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    1 8.360 Puligundala D 71 12 9 to 12 4.20 0.45/0.60 5.00 3.75 50 mm - - -

    Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer PR-Charla PRSD-Venkatapuram PR Division-Bhadrachalam PR Circle - Khammam

    Sl.No.

    RoadLength

    Roadconnecting

    to

    Facilitiesaccessed

    (UseA/B/C/D)

    TotalMotorised

    TotalTruck/Tractor

    LandWidth

    (m)

    RoadWidth

    (m)

    Embankment(Formation)

    Height(m)

    Width(m)

    Width(m)

    Thickness (mm)

    Thickness (mm)

    R/F R&B Road toPuligundala

    Format- 4

  • 8/14/2019 Main Est-Formats-puligundala

    6/173

    PRADHAN MANTRI GRAM SADAK YOJANA

    SUMMARY SHEET

    Sl No Package

    Primary New Work

    PCI

    No

    1 2 3 4 5 6 7 8 9 10 11

    1 AP L026 Peddabandirevu(550) 1 14 Yrs U Y Peddabandirevu(550)

    Mulkanapally(215) Mulkanapally(215)

    Puligundala(282) Puligundala(282)

    Bakkachintalapadu(90) Bakkachintalapadu(90)

    Kondavai(90) Kondavai(90)

    Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle - Khammam

    AssociatedThrough

    Route( ATR)

    Age ofthe road

    Whetherproposed

    underupgradation(U)/Renewal ( R )

    Other newsubsidery

    to ATR

    Whetherincludes

    inpackage

    (Y/N)

    Habitations served withpopulations

    Habitations served withpopulations

    Format-4a

  • 8/14/2019 Main Est-Formats-puligundala

    7/173

    PRADHAN MANTHRI GRAM SADAK YOJANA(Package Summary)

    PROFO

    Name of the BlockName of the Road

    From To

    1 2 3 4 5 6 7 8 9 10 11

    1 Charla R&B Road Puligundala U 8.360 217.37 18 64.97 282.34 33.77

    Total Estimate Cost of the Package: Rs. 282.34 Lakhs

    * N - New Connectivity U - Upgradetion Total Rs. 282.34 Lakhs

    Prepared By:

    Signature : Technical Scrutiny Done By :Name : Sri R.Venkateswara Rao. Signature:

    Designation: AEE , P.R , Charla (M) Name:

    Checked By: Co ordinator: STA :

    Signature : Signature:

    Name : Sri A.Rambabu Name:

    Designation: Dy.Executive Engineer, P.R.Sub-Division, Venkatapuram

    Checked By:

    Signature :

    Name : Sri G.Kondal Reddy

    Designation: Executive Engineer, P.R.Division-Bhadrachalam

    Scrutinized By:Signature :Name : Sri M.A KhadeerDesignation: Superintending Engineer P.R.Circle Khammam

    Sl.No.

    Type ofProposal

    *N/U

    ProposedLength in Km

    Cost ofPavement

    Rs,

    No.of CDworks

    Cost of CDworks Rs.

    Total EstimateCost Rs.

    Average Costper Km Rs.

  • 8/14/2019 Main Est-Formats-puligundala

    8/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    1 Location: Puligundala State: Andhra Pradesh District: Khammam Block: Charla

    2Package.No. AP

    3 Name of the Road: From R&B Road to: Puligundala

    4 Length( In Km): Total : 8.36 Km In Build up 1.30 In Open area: 7.060

    5 Estimate Cost Rs: 282.34 Lakhs Cost per Km Rs. : 33.77 Lakhs

    Pavement : 215.59

    Drianage work : 6.95

    Total : 222.54

    6Type of Proposal:- New Connectivity / Upgradetion : Upgradetion

    If the Proposed road is a new Connctivity is the road a part of Corenet work Yes

    If Yes Through/ Link Route Number L 026

    Name of the Unconnected habitation(s) ( to be cross checked with CN-6) :

    Population sub served by the Proposed road : 1227

    Y E S

    Does the Proposed road connect the unconnected Habitation to

    a). Another Habitation having all - weather road(a) (b)

    b) Di t l t ll W th d

    Does the Proposed Road lead up to the Habitation for which it is supposed to provideconnectivity ( In other words are you sure that he road is not being made partially?)

  • 8/14/2019 Main Est-Formats-puligundala

    9/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    CROSS SECTION DETAILS

    A Cross Section of the existing road showing different component layers:

    4.5 ts

    4.00 Mts

    B. Cross Section of the proposed road showing different component layers:

    Km 3/880 to Km 8/360 Km 0/00 to Km 3/880

  • 8/14/2019 Main Est-Formats-puligundala

    10/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    Chainage 0/0to1/0 1/0to2/0 2/0to3/0 3/0to4/0 4/0to5/0 5/0to6/0 6/0to7/0 7/0to8/0 8/0to9/0

    CBR(%)

    11 Cost Details

    a) Clearing and grubbing Cost for Rs. 1.70

    b) Pavement Components

    Description of Layer Thickness (MM) Cost (Rs.)

    Earth work Widening 29.01Sub Grade Preparation (GSB) 100.00 33.32

    Grade - II 75.00 28.23

    Grade - III 75.00 34.79

    Primer Coat/Tack coat 9.39

    OGPC 20.00 33.76

    Seal coat 6.00 13.76

    Shoulders 170.00 19.96

    Protection works: 11.67

    12 CD works No.of Existing CD works Do they require any improvement 6 Nos Rs 7.20 LaIf yes Cost of improvement No.of proposed CD works

    Cost of Proposed CD works 18 Nos Rs. 50.82La

  • 8/14/2019 Main Est-Formats-puligundala

    11/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    field that information provided is true

    To be filled by S.T.A.

    Name of the STA: NIT Warangal.

    15 Is the proposed road entered on the OMMS Yes / No

    16 If the proposals is for new connectivityYes / No

    Yes / No

    * Does the Proposal ensure full connectivity of target Hatibation Yes / No

    a. If No. the name of the unconnection habitations upto

    which it is conntected

    b. In such unconnected Habitation eligible under PMGSY Yes / No

    17 Are you satisfied with the following

    * Engineering Serveys Yes / No

    Prepared ByAssistant Exe

    Engineer,P.R.

    Checked ByDy.Executive

    Engineer,P.R.

    Checked ByExecutive Engineer,

    P.R.Bhadrachalam

    Scrutinized By:Superintending

    Engineer,P.R.Khammam

    * Have you satisfied yourself that the proposed Road is a part ofthe Core New work

    * Is the unconnected habitation(s) part of list of unconnectedHabitations as per CN - VI

  • 8/14/2019 Main Est-Formats-puligundala

    12/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    # KM / HM Stones Yes / No

    # Guard Stones ( Where necessary ) Yes / No

    # Traffic Sign Boards ( As Necessary ) Yes / No

    20 Specific remarks if any by STA

    Certified that the Design and Estimation for the proposed Road work are based on the data and SSR

    are provided by Engineers. The Proposal after final correction is entered on the OMMS. The Proposal

    may be considered for clearance

    Technical Scrutiny: Coordinator

  • 8/14/2019 Main Est-Formats-puligundala

    13/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    INDEX MAP

    Name of the work :: Providing B.T. to Road fro

    M.P. Charla

    Km 4/0

    km 3/660

    G.P Pally 3/480 - Road dam of 30 mts length (Prop)

    (km3/540 to 3

    3/240- Road dam of 16 mts length(Prop)

    3/090- 1Vx600 mm dia., HP culvert (Prop)

    Veera m 3/0(km 2/760 to

    2/770 - 1 Vx 600 mm dia., HP cuvlert(Prop)

  • 8/14/2019 Main Est-Formats-puligundala

    14/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    Lingap m 0/0

    R

    CHAR&

    HQRSB

    R

    WAY TO PWD ROAD ( BCM O

    A

    D

    B

    K C

    O M

    T

  • 8/14/2019 Main Est-Formats-puligundala

    15/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    Km

  • 8/14/2019 Main Est-Formats-puligundala

    16/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    17/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    hs

    hs

  • 8/14/2019 Main Est-Formats-puligundala

    18/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    19/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    20/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    INDEX MAP

    Km 4/0

    km 3/660

    G.P Pally 3/480 - Road dam of 30 mts length (Prop)

    (km3/540 to 3/660)

    3/240- Road dam of 16 mts length(Prop)

    3/090- 1Vx600 mm dia., HP culvert (Prop)

    Veera m 3/0(km 2/760 to 2/970)

    2/770 - 1 Vx 600 mm dia., HP cuvlert(Prop)

  • 8/14/2019 Main Est-Formats-puligundala

    21/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

    Lingap m 0/0

    R

    CHA&

    HQRSB

    R

    WAY TO PWD ROAD ( BC O

    A

    D

    B

    K CO M

    T

  • 8/14/2019 Main Est-Formats-puligundala

    22/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    23/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    24/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    25/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    26/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    27/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    28/173

    To be filled by PIU

    PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)CHECK SLIP FOR P.I.U S.T.A.

    (Individual road works)PROFORMA - C

  • 8/14/2019 Main Est-Formats-puligundala

    29/173

    FIELD DATA SHEET FOR TRAFFIC CENSUS (BOTH DIRECTIONS)

    Name of the Road R&B Road to Puligundala

    Location of Road Pedda BandirevuDistrict : Khammam Date: 05-02-2008 Day - 1State : Andhra Pradesh

    Hour

    Vehicle class

    Trucks BusesCycles

    Laden Unladen Laden Unladen Laden Unladen Laden Unladen1 2 3 4 5 6 7 8 9 10 11 12 13 14 1

    From: 8.00 Hrs10 13 0 0 0 0 6 0 0 0 12 0 8

    To 14.00 Hrs

    From: 14.00 Hrs11 15 0 0 0 0 5 0 0 0 10 0 10

    To 20.00 Hrs

    From: 20.00 Hrs3 4 0 0 0 0 0 0 0 0 0 0 0

    To 2.00 Hrs

    From: 2.00 Hrs5 5 0 0 0 0 0 0 0 0 5 0 5

    To 8.00 Hrs

    Day Total: 29 37 0 0 0 0 11 0 0 0 27 0 23

    Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle

    Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending EngineePR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle Khammam

    RemSeaso

    HarvManWea

    Cars, Jeeps,Vans, Three

    wheelers

    MotorisedTwo

    wheelers

    Light CommercialVehicles

    Agricultural Tractors/ Trailers Cycle

    Rickshaws

    AnimalDrawn

    vehicles

  • 8/14/2019 Main Est-Formats-puligundala

    30/173

    FIELD DATA SHEET FOR TRAFFIC CENSUS (BOTH DIRECTIONS)

    Name of the Road R&B Road to Puligundala

    Location of Road Pedda BandirevuDistrict : Khammam Date: 06-02-2008State : Andhra Pradesh

    Hour

    Vehicle class

    Trucks BusesCycles

    Laden Unladen Laden Unladen Laden Unladen Laden Unladen1 2 3 4 5 6 7 8 9 10 11 12 13 14 1

    From: 8.00 Hrs9 8 0 0 0 0 12 0 0 0 9 0 6

    To 14.00 Hrs

    From: 14.00 Hrs8 10 0 0 0 0 1 1 0 0 8 0 10

    To 20.00 Hrs

    From: 20.00 Hrs4 2 0 0 0 0 0 0 0 0 0 0 0

    To 2.00 Hrs

    From: 2.00 Hrs5 6 0 0 0 0 1 1 0 0 2 0 4

    To 8.00 Hrs

    Day Total: 26 26 0 0 0 0 14 2 0 0 19 0 20

    Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle

    Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle Khammam

    RemSeaso

    HarvManWea

    Cars, Jeeps,Vans, Three

    wheelers

    MotorisedTwo

    wheelers

    Light CommercialVehicles

    Agricultural Tractors/ Trailers Cycle

    Rickshaws

    AnimalDrawn

    vehicles

  • 8/14/2019 Main Est-Formats-puligundala

    31/173

    FIELD DATA SHEET FOR TRAFFIC CENSUS (BOTH DIRECTIONS)

    Name of the Road R&B Road to Puligundala

    Location of Road Pedda BandirevuDistrict : Khammam Date: 07-02-2008State : Andhra Pradesh

    Hour

    Vehicle class

    Trucks BusesCycles

    Laden Unladen Laden Unladen Laden Unladen Laden Unladen1 2 3 4 5 6 7 8 9 10 11 12 13 14 1

    From: 8.00 Hrs8 9 0 0 0 0 9 0 0 0 12 0 7

    To 14.00 Hrs

    From: 14.00 Hrs8 9 0 0 0 0 1 0 0 0 8 0 9

    To 20.00 Hrs

    From: 20.00 Hrs3 2 0 0 0 0 0 0 0 0 0 0 0

    To 2.00 Hrs

    From: 2.00 Hrs5 6 0 0 0 0 0 2 0 0 6 0 3

    To 8.00 Hrs

    Day Total: 24 26 0 0 0 0 10 2 0 0 26 0 19

    Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle

    Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle Khammam

    RemSeaso

    HarvManWea

    Cars, Jeeps,Vans, Three

    wheelers

    MotorisedTwo

    wheelers

    Light CommercialVehicles

    Agricultural Tractors/ Trailers Cycle

    Rickshaws

    AnimalDrawn

    vehicles

  • 8/14/2019 Main Est-Formats-puligundala

    32/173

    SUMMARY OF 3 - DAY COUNT

    Name of the Road R&B Road to Puligundala

    Location of Road Pedda Bandirevu

    District : KhammamState : Andhra Pradesh

    Hour

    Vehicle class

    TotalTrucks Buses Cycles

    1 2 3 4 5 6 7 8 9 10 11

    Day 1 ( Date ) 29 37 0 0 11 0 27 0 23 127

    Day 2 ( Date ) 26 26 0 0 14 0 19 0 20 105

    Day 3 ( Date ) 24 26 0 0 10 0 26 0 19 105

    Total 79 89 0 0 35 0 72 0 62 337

    Average daily Traffic 26.00 30.00 0.00 0.00 12.00 0.00 24.00 0.00 21.00 112.00

    PCU Factor 1 0.5 1.5 3 1.5 3 0.5 2 --

    26.00 15.00 0.00 0.00 18.00 0.00 12.00 0.00 126.00 71.00

    Seasonality Factor used:

    Expected AADT 12 PCU

    22 CVPD

    Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle Khammam

    Cars, Jeeps,Vans, Three

    wheelers

    MotorisedTwo

    wheelers

    LightCommercial

    Vehicles

    AgriculturalTractors /Trailers

    CycleRickshaws

    Animal Drawnvehicles

    4.0 HorseDrawn 6.0 forBullock drawn

    Average daily TrafficPCUs

  • 8/14/2019 Main Est-Formats-puligundala

    33/173

    FLEXIBLE PAVEMENT DESIGN

    Name of the work :: R/F R&B Road to Puligundala of Charla (M)

    From km 27/060 to 13/500

    Existing surface : : W.B.M/EarthenType of soils : : B.C.Soils.C.B.R. Percentage as per the test result : : 3.65%Computation of design traffic : : A=P(1+r)^n+xWhere A=No of commercial vehicles per day for design

    P=No of commercial vehicles per dayat last count for designr =Annuval growth rate of commertial traffic.N=No of years between last count and year of completion of construction.

    Cars, Jeeps, Vans, Three wheelers : 26.00

    Motorised Two wheelers : 30.00

    Light Commercial Vehicles : 0.00Trucks : 0.00Agricultural Tractors / Trailers : 12.00Buses : 0.00

    Cycles : 24.00Cycle Rickshaws : 0

    Animal Drawn vehicles : 21.00116

    Commercial wehicles which exceeds 3T/Day at last count : 12 nos

    Design for ten years:P(1+r)^n+x

    = P (1+.06)^(n +x)= 12 (1+.06)^10= 12 1.791= 21.49 or say 22 CVPD

    From fig 5.10 CBR curves

    0/000 1/500 &

  • 8/14/2019 Main Est-Formats-puligundala

    34/173

    PR-Charla (M) P.R.S.D.Venkatapuram P.R.Divn.Bhadrachalam P.R.Circle , Khammam

  • 8/14/2019 Main Est-Formats-puligundala

    35/173

    1.7908

  • 8/14/2019 Main Est-Formats-puligundala

    36/173

  • 8/14/2019 Main Est-Formats-puligundala

    37/173

    STRIP LS PLAN

    Name of work : R/F R&B Road to Puligundala of Charla Mandal.

    9/0

    Puligundala 8/2 to 8/4 Proposed Road dam 30 mts length

    (7/8 to 8/4) 8/0 to 8/2 Proposed 1V x 0.60 mts pipe culvert

    (282) 8/0

    7/8 to 8/0 Proposed Road dam of 30 mts

    7/4 to 7/6 Proposed 2V x 0.60 mts pipe cuvlert

    7/4 to 7/6 Proposed 1V x 0.60 mts pipe cuvlert

    7/0 to 7/2 Proposed 1V x 0.60 mts pipe cuvlert

    7/0 to 7/2 Proposed 1V x 0.60 mts pipe cuvlert

    7/0

    Paddy

    6/8 to 7/0 Proposed Road dam of 40 mts

    6/0

    Mulkalapally 5/8 to 6/0 Proposed 1V x 0.60 mts Pipe culvert

    (km 5/840) 5/6 to 5/8 Proposed Road dam of 30 mts

    (215) 5/4 to 5/6 Proposed Road dam of 30 mts5/2 to 5/4 Proposed 1V x 0.60 mts pipe culvert

    5/0 to 5/2 Proposed Road dam of 16 mts

    0

    Existing Earthen surface k3/880to8/360

  • 8/14/2019 Main Est-Formats-puligundala

    38/173

    1/4 to 1/6 Existing 1V x 0.30 mts pipe culvert

    1/2 to 1/4 Proposed 1V x 0.60 mts pipe culvert

    1/0

    0/8 to 1/0 Existing Road dam of 34 mts.

    0/6 to 0/8 Existing 1V x 0.60 mts pipe culvert

    0/4 to 0/6 Existing 1V x 0.60 mts pipe culvert

    0/2 to 0/4 Existing 1 V x 045 mts pipe culvert

    0/0 to 0/2 Proposed Road dam of 30 mts length.

    0/0

    Charla R&B Road Bhadrachalam

    INDEX

    Reaches

    Km 0/0 to 1/0 4.80 9 to 12

    Km 1/0 to 2/0 4.00 9 to 12

    Km 2/0 to 3/0 4.20 12 to 14

    Km 3/0 to 4/0 4.20 12 to 14

    Km 4/0 to 5/0 - 12 to 14

    Km 5/0 to 6/0 - 12 to 14

    Km 6/0 to 7/0 - 12 to 14Km 7/0 to 8/0 - 9 to 12

    Km 8/0 to 9/0 - 9 to 12

    Existingformation width

    Landwidth

    Existing WBMkm 0/0 to 1/6

  • 8/14/2019 Main Est-Formats-puligundala

    39/173

    PRADHAN MANTRI GRAM SADAK YOJANA

    DISTRICT : KHAMMAM

    I N D E X

    VOLUME - I

    1 Executive Summary

    2 Format F1 to F9

    3 Chapter - 1 - Introduction

    4 Chapter - 2 - Alignment

    5 Chapter - 3 - Land Acquisition

    6 Chapter - 4 - Topography Survey

    7 Chapter - 5 - Geometric Design Standard

    8 Chapter - 6 - Soil and Material Survey

    9 Chapter - 7 - Traffic Survey

    10 Chapter - 8 - Pavement Design

    11 Ch t 9 H d l i l S

    TYPICAL CROSS-SECTION

  • 8/14/2019 Main Est-Formats-puligundala

    40/173

    TYPICAL CROSS SECTION

    Name of work :- R/F R&B Road to Puligundala of Charla Mandal

    From km 0/0 to 1/500 & 1/760 to 3/880

    1.875 1.875

    a

    Prop. Gravel Shoulder 170mm thickProp. B.T. 20mm thick

    PROPOSED B.T. Prop.Gr II & III WBM 75mm thick each

    PROPOSED WBM Proposed GSB 100mm thcik

    EXISTING WBM Existing WBM 50 mm thick

    EXISTING GRAVEL Existing Gravel sub base 80 mm thick.

    PROPOSED GRAVELPROPOSED GRAVEL SHOULDERS

    EXISTING EARTHWORK

    3.75M

    7.50M

    1:2 1:2

    0.

    10.70m

    Asst.Exe.Engineer Dy.Exe.EngineerPRSD-Venkatapuram

    Executive EngineerPR Divn - Bhadrachalam

    Supdt. EngineerPR Circle -Khammam

    0.45 m

    4.0 M

    -

  • 8/14/2019 Main Est-Formats-puligundala

    41/173

  • 8/14/2019 Main Est-Formats-puligundala

    42/173

    TYPICAL CROSS-SECTION

    Name of work :- R/F R&B Road to Puligundala of Charla Mandal

    From km 3/880 to 8/360

    Prop. Gravel Berm 170mm thickProp. B.T. 20mm thick

    PROPOSED B.T. Prop. WBM 75mm thick each

    PROPOSED WBM Proposed WBM 100mm thcik

    PROPOSED GRAVEL Proposed Gravel sub base 150mm thick

    PROPOSED EARTH WORK

    PROPOSED GRAVEL BERMS

    PROPOSED EMBANKMENT

    1:2

    3.75M

    7.50M

    1:1,5 1:1,5

    0

    10.70m

    Asst.Exe.EngineerPR-Charla

    Dy.Exe.EngineerPRSD-Venkatapuram

    Executive EngineerPR Divn - Bhadrachalam

    Supdt. EngineerPR Circle -Khammam

    1.00 1.00

    0.45m4.0 M

  • 8/14/2019 Main Est-Formats-puligundala

    43/173

    TYPICAL CROSS-SECTION

    Name of work :- R/F R&B Road to Puligundala of Charla Mandal

    From km 1/500 to 1/760

    EXISTING C.C Prop. Gravel Berm 170mm thickProp. B.T. 20mm thick

    PROPOSED B.T. Prop. WBM 75mm thick each

    EXISTING WBM EXST WBM 50mm thcik

    PROPOSED WBM EXST. Gravel sub base 80mm thick

    EXISTING GRAVEL EXST. CC Road of 200 mm thick

    PROPOSED GRAVEL

    PROPOSED GRAVEL BERMS

    EXISTING EARTHWORK

    4.0 mts

    3.75M

    7.50M

    1:2 1:2

    0

    10.70m

    Asst.Exe.Engineer Dy.Exe.Engineer Executive Engineer

    Supdt. Engineer

    1.00 1.00

    0.45m

    - ar a PRSD-Venkatapuram

    - -

  • 8/14/2019 Main Est-Formats-puligundala

    44/173

  • 8/14/2019 Main Est-Formats-puligundala

    45/173

    TYPICAL LONGITUDINAL SECTION

    Name of the work: R/F R&B Road to Puligundala of Charla Mandal.

    0/0 1/0 2/0 3/0 4/0 5/0 6/0 7/0 8/0 8/360

    EXISTING C.C

    EXISTING B.T PROPOSED B.T. 20mm thick

    EXISTING WBM PROPOSED WBM

    EXISTING GRAVEL SUB BASE PROPOSED GRAVEL SUB BASE

    Pedda bandirevu

    Asst.Exe.EngineerPR-Charla Dy.Exe.Engineer

    PR-Venkatapuram

    Superintending EngineerPR Circle - KhammamEexecutive Engineer

    PR-Bhadrachalam

    Mulkalapally PuligundalaExisting WBM

    km1/5

    km1/760

    Existing C.C

    km3/8803/880

    Existing WBMEarthen surface

    KEY MAP

    Name of the work: R/F R&B Road Seethanagaram to Puligundala of Charla Mandal

  • 8/14/2019 Main Est-Formats-puligundala

    46/173

    Name of the work: R/F R&B Road Seethanagaram to Puligundala of Charla Mandal

    V

    P

    G R

    O M

    DA

    V

    A

    RI

    TALIPERU VAGU

    R

    I

    V

    E S.N.Puram

    R km 43/0 R

    &

    B

    parnasala

    CHARLAMANDALHQRSKM 54/0

    Km34/0

    - -

  • 8/14/2019 Main Est-Formats-puligundala

    47/173

  • 8/14/2019 Main Est-Formats-puligundala

    48/173

    - -

  • 8/14/2019 Main Est-Formats-puligundala

    49/173

    QUARRY CHART

  • 8/14/2019 Main Est-Formats-puligundala

    50/173

    ame of the work: R/F R&B Road Seethanagarma to Puligundala of Charla Mandal

    Sand Metal HBG Metal M/C Gravel

    9/0 MR 14.50 15.50 56.50 12.50CT 0.00 0.00 0.00 0.00

    WM 0.50 0.50 0.50 0.50

    Total 15.00 16.00 57.00 13.00

    8/0 MR 13.50 14.50 55.50 11.50

    CT 0.00 0.00 0.00 0.00

    WM 0.50 0.50 0.50 0.50

    Total 14.00 15.00 56.00 12.007/0 MR 12.50 13.50 54.50 10.50

    CT 0.00 0.00 0.00 0.00

    WM 0.50 0.50 0.50 0.50

    Total 13.00 14.00 55.00 11.00

    6/0 MR 11.50 12.50 53.50 9.50

    CT 0.00 0.00 0.00 0.00

    WM 0.50 0.50 0.50 0.50

    Total 12.00 13.00 54.00 10.00

    5/0 MR 10.50 11.50 52.50 8.50

    CT 0.00 0.00 0.00 0.00

    WM 0.50 0.50 0.50 0.50

    Total 11.00 12.00 53.00 9.00

    4/0 MR 9.50 10.50 51.50 7.50

    CT 0.00 0.00 0.00 0.00

    WM 0.50 0.50 0.50 0.50Total 10.00 11.00 52.00 8.00

    3/0 MR 8.50 9.50 50.50 6.50

    CT 0 00 0 00 0 00 0 00

    PR-Charla - en atapuram

    rc e - ammam

    - a rac a am

  • 8/14/2019 Main Est-Formats-puligundala

    51/173

    QUARRY MAP

  • 8/14/2019 Main Est-Formats-puligundala

    52/173

    Name of the work: R/F R&B Road to Puligundala of Charla Mandal.

    34/0

    CH

    ARLA

    VER

    Seethanagaram km0/0 Puligundala

    km 32/0 km9/0

    MetalHBG

    Charla

    MandalHQRS

    km 4.50

    Parnasala

    TALIPERU VAGU

    Gravel

    km 7.50

  • 8/14/2019 Main Est-Formats-puligundala

    53/173

    DISCHARGE CALCULATIONS

  • 8/14/2019 Main Est-Formats-puligundala

    54/173

    Name of work : C/O of Road dam of 30 mts length on R/F R&B Road to Puligundala of Charla Mandal.

    Hydraulic Data

    Bed Level = 98.20

    O.F.L./RTL = 98.70 Height of HFL 0.80 mts

    H.F.L. = 99.00 Height of OFL 0.50 mts

    Bed width = 30.00 mts

    Discharge calculation: Discharge at HFL:

    Difference

    -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45

    97.00

    97.50

    98.00

    98.50

    99.00

    99.50

    100.00

    Chainage

    R.L.

  • 8/14/2019 Main Est-Formats-puligundala

    55/173

    Chainage G.L. H.F.L. Length

    25 98.200 99.00 0.80 - - - -10 98.100 99.00 0.90 0.85 15 12.75 15

    5 98.200 99.00 0.80 0.85 5 4.25 5

    0 98.200 99.00 0.80 0.80 5 4.00 5

    5 98.200 99.00 0.80 0.80 5 4.00 5

    10 98.285 99.00 0.72 0.76 5 3.79 5

    15 98.260 99.00 0.74 0.73 5 3.64 5

    20 98.200 99.00 0.80 0.77 5 3.85 5

    25 98.200 99.00 0.80 0.80 5 4.00 5

    30 99.000 99.00 0.00 0.40 5 2.00 5

    17.28 25.00

    Calculation of scour depth :

    Hydraulic mean depth : R = Wetted area / Wetted Perimeter

    = 42.28 55.00= 0.77 mts

    V = (1.07 x0.0816 ) / 0.045 = 1.940 m/sec.

    Discharge ( Q ) = A x V = 42.28 x1.94 = 82.01

    Maximum Discharge Qmax ) = 1.30 x Q

    = 1.30 x 82.01 = 106.62

    Differencebetween H.F.L.

    & G.L.

    MeanDifference

    Wetterarea

    WettedPerimeter

    Velocity = ( R2/3 x S1/2 ) / 0.045 = ( 1.122/3 x0.00671/2 ) / 0.045

    m3 / sec

    m3 / sec

    /

    - -

    -

  • 8/14/2019 Main Est-Formats-puligundala

    56/173

  • 8/14/2019 Main Est-Formats-puligundala

    57/173

    HYDRAULIC PARTICULARS

    1 V 600 MM DIA PIPE CULVERT

    Catchment area = 7 Acres

    = 7 x 4046.86 sqm

    = 28328.02 or say 0.03 sq.km

    Maximum discharge Q = CM^3/4(As per Dicken's formula)

    Where C= Constatn depends upon the intensity of rainfallC = 11M = Area of catchment in sq.km

    Q = 0.31 cumecs

    Assumed velocity of flow = 1.2 m/sec

    Area of the vent way = Discharge /Velocity

    A = 0.26 sqmts

    Provide 1 V of 600 mm dia., RCC NP3 class pipe D= 0.6 mts

    Area of ventage provide A = 0.28 sqm > 0.26 sqm

    Name of work : C/O of Road dam of 30 mts length on R/F R&B Road to Puligundala of CharlaMandal.

  • 8/14/2019 Main Est-Formats-puligundala

    58/173

    HYDRAULIC PARTICULARS

    2 V 600 MM DIA PIPE CULVERT

    Catchment area = 11 Acres

    = 11 x 4046.86 sqm

    = 44515.46 or say 0.04 sq.km

    Maximum discharge Q = CM^3/4(As per Dicken's formula)

    Where C= Constatn depends upon the intensity of rainfallC = 11

    M = Area of catchment in sq.km

    Q = 0.49 cumecs

    Assumed velocity of flow = 1.2 m/sec

    Area of the vent way = Discharge /Velocity

    A = 0.41 sqmts

    Name of work : C/O of Road dam of 30 mts length on R/F R&B Road to Puligundala of CharlaMandal.

  • 8/14/2019 Main Est-Formats-puligundala

    59/173

    FORMAT 7RATE ANALYSIS

    Name of the work :- R/F R&B Road to Puligundala of Charla Mandal.

  • 8/14/2019 Main Est-Formats-puligundala

    60/173

    Page 60 of 173

    Description Unit

    1 2 3 4 5 61

    1sqm 2.90

    2

    1cum 81.05

    3

    1cum 112.75

    4

    Sl.No.

    Reference toMORD

    Specifications

    Amount inRs.

    Clearind and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesof girth up to 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials andstacking of serviceable material to be used or auctioned upto a lead of 1000m including disposal of top organicsoil not exceeding 150 mm in thickness as per technical specification clause 201-1 of MORD.

    Construction and widening of existing embankment with approved materails deposited at site materail obtainedfrom roadway cutting including breaking clods, ramming, spreading, sectioning, grading, compacting with 8-10

    Tonnes power roller to OMC compaction including to a top width of 7.50M and raising to required heightincluding seigniorage charges complete etc., as per the requirement of Table 300-1 and 300-2 as per technicalspecification clause 301.5 of MORD.

    Earth work excavation and depositing on the bank for widening of existing embankment using cutted earthmaterial with carting in all soils upto soft disintegrated rock and stone matrix with in a radius of 5 M includingbreaking clods, benching, ramming and sectioning the embankment and formation to a top width of 7.50 m upto95% proctors density etc. complete including seigniorage charges for raising and widening the embankmentusing machinery as per SS 20A and technical specification APDSS 302 & 303 with a least lead of 500 m (carted

    earth)

    Construction of granular sub base by providing well graded meterial (i.e Stone aggregates of 9.5 mm to 4.75 mmsize Gravel of 66% and sand of size < 2.6mm @ 34% )having soaked CBR not less than 15% and Plasticity Index< 6 and stacking at site to the departmentel gauge for pre measurements and mixing them and spreading thesame with motor grader in uniform layers of loose thickness of not more than 225mm including mixing by mix inplace method with rotavator to OMC and compacting with three wheeled power roller of 8 to 10 Tonnes capacityto achieve the desired density, complete as per IRC technical specification clause 402 of MORD.

    FORMAT 7

    Description UnitSl.No.

    Reference toMORD

    Specifications

    Amount inRs.

  • 8/14/2019 Main Est-Formats-puligundala

    61/173

    Page 61 of 173

    1cum 389.15

    5

    1cum 389.15

    6

    1cum 1258.75

    7

    1550.90

    8

    1sqm 23.25

    Construction of Granualar shoulder by providing well graded meterial (i.e 66% gravel and 34% sand) havingsoaked CBR not less than 15% and Plasticity Index < 6 and stacking at site to the departmentel gauge for pre

    measurements and mixing them and spreading the same with motor grader in uniform layers of loose thicknessof not more than 225mm including mixing by mix in place method with rotavator to OMC and compacting withthree wheeled power roller of 8 to 10 Tonnes capacity to achieve the desired density, complete as per IRCtechnical specification clause 402 of MORD.

    Providing, Water Bound Macadam base for a compacted thickness of 75mm using Grade-II HBG crushed stoneaggregates (63 mm to 45 mm size), screenings and binder confirming to table 400-8 of MORD "StandardSpecifications for the rural roads) including cost, seigniorage and conveyance of all materials, spreading inuniform thickness, hand packing, rolling with static power roller of 8-10 tons in stages to proper grade andcamber, applying and brooming requisite type of screening binding materials to fill up the interstices of coarse

    aggregate, watering and compacting to the required density or finished item of work as directed by theEngineer-in-Charge as per MORD clause No.405

    Providing, Water Bound Macadam base for a compacted thickness of 75mm using Grade-III HBG crushed stoneaggregates ( 53 mm to 22.40 mm size), screenings and binder confirming to table 400-8 of MORD "StandardSpecifications for rural roads) including cost, seigniorage and conveyance of all materials, spreading in uniformthickness, hand packing, rolling with static power roller of 8-10 tons in stages to proper grade and camber,applying and brooming requisite type of screening binding materials to fill up the interstices of coarseaggregate, watering and compacting to the required density or finished item of work as directed by the

    Engineer-in-Charge as per MORD clause No.405

    Providing and applying Prime Coat with butimen emulsion (Medium Setting- SS-1) on prepared surface ofgranular base incliding cleaning of road surface and spraying primer at the rate of 0.85Kg/Sqm usingmechanical means as clause 502 of MORD.

    FORMAT 7

    Description UnitSl.No.

    Reference toMORD

    Specifications

    Amount inRs.

  • 8/14/2019 Main Est-Formats-puligundala

    62/173

    Page 62 of 173

    9

    1sqm 8.1510

    1sqm 112.90

    11

    1sqm 46.00

    12

    I. P.C.C grade M 10

    (i) Nominal mix 1:3:6

    Unit = cum1cum 2,914.78

    Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using emulsion distributor @0.275 kg per sqm on prepared surface incliding cleaning of road surface and spraying primer at the rate of0.275Kg/Sqm using mechanical means as clause 503 of MORD.

    Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20 mm thick composed of 13.20mm to 5.60 mm size machine crushed hard blasted granite chips using bitumen of 60/70 grade at the rate of14.60 kgs per 10 sqm area of road surface over tack coat to required line, level, grade to serve as wearingcourse on previously prepared base including mixing in a Hot Mix Plant of 30/40 TPH, laying with mechanicalpaver finisher and rolloing with three wheeled 8-10 Tonnes capacity power roller and finishing to required leveland grades including cost and conveyance of all materials from approved sources, seigniorage, labour chargesand hire and operational charges of power road roller and all other machinery, tools and plants, providingbarricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete forfinished item of work as per clause 508 of MORD.

    Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of bitumuneous binder followedby a cover of stone chipping of grading as defined in table 500.16 of MOST at 0.09 cum/10sqm of chips to be laidsimultaneously along with the bitumunous course using 9.80 kgs of bitumen 60/70 grade for 10 sqm and rollingwith power roller including of required line, level, grade to serve as wearing course on previously preparedsurface and finishing to rquired level and grades including cost and conveyance of all materials from approvedsources and stacking at site to departmental gauge for premeasurements, seigniorage, labour charges and hireand operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants,providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc.,complete for finished item of work as per technical specification clause 510 of MORD.

    Providing concrete for plain/reinforced concrete in open foundations complete as per drawings andtechnical specifications Clause 802, 803, 1202 & 1203

    FORMAT 7

    Description UnitSl.No.

    Reference toMORD

    Specifications

    Amount inRs.

  • 8/14/2019 Main Est-Formats-puligundala

    63/173

    Page 63 of 173

    13 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row

    (B) 600 mm dia

    1 Each 2,342.10

    14 II. P.C.C grade M 15

    1cum 2,887.95

    15

    1cum 58.83

    19

    RCC M30

    1cum 4,304.57

    16

    Unit = cuma) Material

    f) 1M.T 42,597.53

    17

    Unit = Cuma)

    Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding ofgranular material in single row including fixing collar with cement mortar 1:2 but excludingexcavation, protection works, backfilling, concrete and masonry works in head walls and parapetsClause 1106.

    Earth work excavation and depositing on bank with an initial lead of 10 M and lift of 2 M in ordinarygravel soils, BC soils including seigniorage charges etc. complete for foundations

    Providing and laying Reinforced Cement Concrete in Super Structure as per Drawing and technical SpecificationClauses 800 ,1205.4 &1205.50

    Supplying, fitting, and placing HYSD bar reinforcement in superstucture complete as per drawing and technical

    specifications Clauses 1002,1010 and 1202.

    Providing and Laying Cement Concrete wearing Course M30 Grade excluding reinforcement complete as perdrawing and technical specifications Clauses 800 and 1206.30.

    FORMAT 7

    Description UnitSl.No.

    Reference toMORD

    Specifications

    Amount inRs.

  • 8/14/2019 Main Est-Formats-puligundala

    64/173

    Page 64 of 173

    1cum 6,803.08

    18

    1cum 577.91

    19

    1cum 247.91

    ./cum

    20

    1cum 257.93

    ./cum

    Asst.Executive Engineer Deputy Executive Engineer Executive Engineer

    PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam

    Superintending Engineer

    PR Circle - Khammam

    Providing and Laying Boulder apron for bed protection with stone boulders of minimum size and weight as pertable 1300.10 no fragment weighing not less than 25kg laid dry complete as per drawing and technical

    specification Clause 1301.

    Filling in between body walls with gravel including cost,conveyance and seignorage of all materials to site etc.,complete as per Clause 710.1.4 of IRC:78 and as per drawing and technical specifications for finished item ofwork.

    Sand filling in foundation including cost, seignorage and conveyance of all materials to site and watering andtamping etc., complete. For finished item of work .

  • 8/14/2019 Main Est-Formats-puligundala

    65/173

    Data Sheet

  • 8/14/2019 Main Est-Formats-puligundala

    66/173

    S.No. Description of item Unit Qry Rate Amount

    cum 100.00 13.00 1300.00

    Seignorage Charges for earth cum 100.00 20.00 2000.00Total 6955.70

    d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 1147.69

    Rate for 100 cum 8103.39Rate per cum = (a+b+c+d)/100 81.05

    3

    Taking Out put = 100 Cuma) Labour

    Mate day 0.04 160.00 6.40

    Mazdoor day 1.00 130.00 130.00b) Machinery

    hour 0.50 2400.00 1200.00

    Excavation in all soils upto SDR& stonematrix with machinary with in a raidus of5 mts Basic rate as per SS20B as perG.O Ms. No 10 dt:25.11.2002.

    Earth work excavation and depositing on the bank for widening ofexisting embankment using cutted earth material with carting in all soilsupto soft disintegrated rock and stone matrix with in a radius of 5 Mincluding breaking clods, benching, ramming and sectioning theembankment and formation to a top width of 7.50 m upto 95% proctors

    density etc. complete including seigniorage charges for raising andwidening the embankment using machinery as per SS 20A and technicalspecification APDSS 302 & 303 with a least lead of 500 m (carted earth)

    Dozer D-50 for spreading @ 200 cum perh

    Data Sheet

  • 8/14/2019 Main Est-Formats-puligundala

    67/173

    S.No. Description of item Unit Qry Rate Amount

    Taking out put = 300 cum

    a) Labour

    Mate day 0.40 160.00 64.00Mazdoor (Skilled) day 2.00 130.00 260.00

    Mazdoor (Un-Skilled) day 8.00 130.00 1040.00

    b) Machinery

    hour 30.00 470.00 14100.00

    Water tanker 6kl capacity hour 5.00 300.00 1500.00

    Tractor with grader @ 25 cum per hour hour 12.00 300.00 3600.00Tractor with rotavator @ 25 cum per hour hour 12.00 300.00 3600.00

    c) Material

    Cost of materials9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 68.00 17340.00

    2.36 mm below @ 34% (Sand) cum 129.00 73.00 9417.00Sub-Total 50921.00

    Conveyence

    9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 124.50 31747.502.36 mm below @ 34% (Sand) cum 129.00 135.90 17531.10

    Grand Total 100199.60d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 16532.93

    Rate for 300 cum 116732.53

    R t ( +b+ +d)/300 389 15

    Three wheeled 80-100 kN power roller @

    10 cum per hour

    Well graded granular sub-base materialas per table 400.2

    Data Sheet

  • 8/14/2019 Main Est-Formats-puligundala

    68/173

    S.No. Description of item Unit Qry Rate Amount

    Tractor with rotavator @ 25 cum per hour hour 12.00 300.00 3600.00

    c) Material

    Cost of materials

    9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 68.00 17340.002.36 mm below @ 34% (sand) cum 129.00 73.00 9417.00

    Sub-Total 50921.00

    Conveyence

    9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 124.50 31747.502.36 mm below @ 34% (sand) cum 129.00 135.90 17531.10

    Grand Total 100199.60

    d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 16532.93Rate for 300 cum 116732.53

    Rate per cum = (a+b+c+d)/300 389.15

    6

    Well graded granular sub-base materialas per table 400.2

    Providing, Water Bound Macadam base for a compacted thickness of75mm using Grade-II HBG crushed stone aggregates (63 mm to 45 mmsize), screenings and binder confirming to table 400-8 of MORD "StandardSpecifications for the rural roads) including cost, seigniorage andconveyance of all materials, spreading in uniform thickness, handpacking, rolling with static power roller of 8-10 tons in stages to propergrade and camber, applying and brooming requisite type of screeningbinding materials to fill up the interstices of coarse aggregate, watering

    and compacting to the required density or finished item of work asdirected by the Engineer-in-Charge as per MORD clause No.405

    Data Sheet

  • 8/14/2019 Main Est-Formats-puligundala

    69/173

    S.No. Description of item Unit Qry Rate Amount

    Conveyence

    cum 435.60 154.40 67256.64

    cum 96.01 352.60 33853.13

    cum 28.80 352.60 10154.88

    Grand Total 388964.21

    d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 64179.09

    Rate for 360 cum 453143.30Rate per cum = (a+b+c+d)/360 1258.75

    7

    By manual Means

    63 mm to 45 mm size HBG aggregates@ 0.91 cum per 10 sqm for compactedthickness of 75 mm. (avg of 60-63mm,50-55mm & 40-45mm size)

    Type - B Screenings of 11.20 mm sizeHBG @ 0.20 cum per 10 sqm.

    Binding material @ 0.06 cum per 10 sqm(Stone dust)

    Providing, Water Bound Macadam base for a compacted thickness of75mm using Grade-III HBG crushed stone aggregates ( 53 mm to 22.40mm size), screenings and binder confirming to table 400-8 of MORD"Standard Specifications for rural roads) including cost, seigniorage andconveyance of all materials, spreading in uniform thickness, handpacking, rolling with static power roller of 8-10 tons in stages to propergrade and camber, applying and brooming requisite type of screeningbinding materials to fill up the interstices of coarse aggregate, wateringand compacting to the required density or finished item of work asdirected by the Engineer-in-Charge as per MORD clause No.405

    Data Sheet

  • 8/14/2019 Main Est-Formats-puligundala

    70/173

    S.No. Description of item Unit Qry Rate Amount

    cum 435.60 220.47 96035.28

    cum 86.40 352.60 30464.64

    Grand Total 479245.68

    d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 79075.54Rate for 360 cum 558321.22Rate per cum = (a+b+c+d+e)/360 1550.90

    8

    Taking out put = 1750 Sqma) Labour Charges

    Mate day 0.04 160.00 6.40

    Mazdoor (un-skilled) day 1.00 130.00 130.00b) Machinery

    Hydraulic broom @ 1250 sqm per hour hour 1.40 250.00 350.00

    Air compressor 210 cfm hour 1.40 320.00 448.00

    hour 1.00 600.00 600.00

    Water tanker 6 kL capacity per trip hour 0.50 300.00 150.00

    53 mm to 22.4 mm size HBG aggregates@ 0.91 cum per 10 sqm for compactedthickness of 75 mm. (avg of 50-55mm,40-45mm & 22.4mm size)

    Type - B Screenings of 11.20 mm sizeHBG @ 0.18 cum per 10 sqm.

    Providing and applying Prime Coat with butimen emulsion (MediumSetting- SS-1) on prepared surface of granular base incliding cleaning ofroad surface and spraying primer at the rate of 0.85Kg/Sqm usingmechanical means as clause 502 of MORD.

    Bitumen emulsion pressure ditributor @1750 sqm per hour

    Data Sheet

  • 8/14/2019 Main Est-Formats-puligundala

    71/173

    S.No. Description of item Unit Qry Rate Amount

    Hydraulic broom @ 1250 sqm per hour hour 1.40 250.00 350.00Air compressor 210 cfm hour 1.40 320.00 448.00

    hour 1.00 600.00 600.00

    c) Materials

    Cost of materials

    MT 0.48 21047.94 10103.01

    Sub-Total 11637.41

    Conveyence

    MT 0.48 1170.00 561.60

    Grand Total 12199.01

    d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 2012.84Rate for 1750 sqm 14211.85

    Rate per sqm = (a+b+c+d+e)/1750 8.1510

    Bitumen emulsion pressure ditributor @1750 sqm per hour

    Bitumen emulsion (RS-1) @ 0.275 kg persqm

    Bitumen emulsion (RS-1) @ 0.275 kg persqm

    Providing and laying Open Graded Premix Carpet (OGPC) surfacingmaterial of 20 mm thick composed of 13.20 mm to 5.60 mm size machinecrushed hard blasted granite chips using bitumen of 60/70 grade at therate of 14.60 kgs per 10 sqm area of road surface over tack coat torequired line, level, grade to serve as wearing course on previouslyprepared base including mixing in a Hot Mix Plant of 30/40 TPH, layingwith mechanical paver finisher and rolloing with three wheeled 8-10Tonnes capacity power roller and finishing to required level and grades

    including cost and conveyance of all materials from approved sources,seigniorage, labour charges and hire and operational charges of powerroad roller and all other machinery, tools and plants, providingbarricading for diversion of traffic erecting red flags other incidental and

  • 8/14/2019 Main Est-Formats-puligundala

    72/173

    Data Sheet

  • 8/14/2019 Main Est-Formats-puligundala

    73/173

    S.No. Description of item Unit Qry Rate Amount

    Conveyance

    cum 67.50 352.60 23800.50

    MT 7.35 1170.00 8599.50

    Grand total 295839.90d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 48813.58

    Rate for 7500 sqm 344653.48

    Rate per sqm = (a+b+c+d+e)/7500 46.00

    12

    I. P.C.C grade M 10

    (i) Nominal mix 1:3:6

    Unit = cuma) Material

    Cement t 0.250 4,380.00 1,095.00Coarse sand cum 0.480 256.30 123.0240 mm aggregate cum 0.576 576.80 332.24

    20 mm aggregate cum 0.288 1,260.60 363.0510 mm aggregate cum 0.096 985.60 94.62

    b) Labour

    Crushed stone chipping of 6.7 mm size100% passing through 11.2mm seive andretained on 2.36 mm sieve applied @0.09 cum per 10 sqm.

    Bitumen 60/70 grade @ 9.80 kgs per 10sqm.

    Providing concrete for plain/reinforced concrete in openfoundations complete as per drawings and technicalspecifications Clause 802, 803, 1202 & 1203

  • 8/14/2019 Main Est-Formats-puligundala

    74/173

    Data Sheet

    S No Description of item Unit Qr Rate Amo nt

  • 8/14/2019 Main Est-Formats-puligundala

    75/173

    S.No. Description of item Unit Qry Rate Amount

    Overheads & Contractors profit charges @ 16.5% on (a+b+c+d) 8.33

    Rate per cum = a+b+c+d+e+f 58.83

    16

    Unit = cuma) Material

    t 1.05 33000.00 34,650.00

    Binding Wire Kg 8.00 33000.00 264.00

    b) Labour for cutting, bending, tying and placing in PositionMate day 0.44 160.00 70.40Blacksmith day 3.00 180.00 540.00Mazdoor (Unskilled) day 8.00 130.00 1,040.00

    c) Overheads @ 16.5% on (a+b+c+d) 6,033.13

    f) Rate per cum = a+b+c+d+e+f 42,597.53

    17

    Supplying, fitting, and placing HYSD bar reinforcement in superstucturecomplete as per drawing and technical specifications Clauses 1002,1010

    and 1202.

    HYSD bars including 5 per cent for lapsand wastage

    Providing and Laying Cement Concrete wearing Course M30 Grade

    excluding reinforcement complete as per drawing and technicalspecifications Clauses 800 and 1206.30.

    Data Sheet

    S No Description of item Unit Qry Rate Amount

  • 8/14/2019 Main Est-Formats-puligundala

    76/173

    S.No. Description of item Unit Qry Rate Amount

    18

    Unit = Cum

    a) Materail

    Stone/ boulder (25kg minimum) Cum 1.20 274.30 329.16Stone Spalls Cum 0.20b) Labour

    Mate day 0.04 160.00 6.40Mason( 1st class) day 0.35 180.00 63.00Mazdoor (Un skilled) day 0.75 130.00 97.50

    d) Contractors profit @ 16.5% on (a+b+c) 81.85

    Rate per cum = (a+b+c+d) 577.91

    19

    Gravel

    Basic Rate of Quarry site Cum 1.00 68.00 68.00

    Conveyance charges of gravel Cum 1.00 124.50 124.50Cum 1.00 20.30 20.30

    Providing and Laying Boulder apron for bed protection with stoneboulders of minimum size and weight as per table 1300.10 no fragmentweighing not less than 25kg laid dry complete as per drawing andtechnical specification Clause 1301.

    Filling in between body walls with gravel including cost,conveyance andseignorage of all materials to site etc., complete as per Clause 710.1.4 ofIRC:78 and as per drawing and technical specifications for finished itemof work.

    Spreading charges including wateringand rolling with HRR to irrespectivethickness of layer

    Data Sheet

    S No Description of item Unit Qry Rate Amount

  • 8/14/2019 Main Est-Formats-puligundala

    77/173

    S.No. Description of item Unit Qry Rate Amount

    Asst.Executive Engineer Deputy Executive Engineer Executive Engineer PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachala

    Superintending EngineerPR Circle - Khammam

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

  • 8/14/2019 Main Est-Formats-puligundala

    78/173

    Lc = II Rc180

    Lc = Length of the curve.

    Rc = Radius of the curve

    = Interior angle of curve

    Ts = Rc Tan

    Ts = Tangent length.

    Rc = Radius of the curve

    Apex = Rc -Rc

    Cos

    For Plain Terrain

    Ruling design speed =50 K.M.PH.

    Minimum design speed = 40 K.M.PH.

    Radius of the curve.

    Ruling minimum radous = 60 Mts.

    Absolute minimum radius = 45 Mts

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

  • 8/14/2019 Main Est-Formats-puligundala

    79/173

    Lc = II Rc

    180

    = 22/7x 60 x 53 = 55.500 Mtrs

    180

    But it is the existing road , length of the curve available at site is only 15.00 mts.

    For Lc = 15 mts.

    Rc = 180 x Lc 180 x 15 = 16.22 mts

    3.14 x 3.14 x 53

    e = V^2 40 x 40 = 0.44 mts

    225 x Rc 225 x 16.22

    But maximum Super elevation is limited to 7% = 0.07

    V = R x 127 (e+f)

    = 16.22x127x(0.075+.15 Kmph 21.28 kmphVelocity is limited to 20 kmph

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

  • 8/14/2019 Main Est-Formats-puligundala

    80/173

    e = V^2 x100 = ( 40.00)^2x100 = 11.85

    225 x Rc 225x60

    Rate of attain of Superelevation is 1 in 150.

    2/3 e = 2/3x7 = 4.667

    1/3 e = 1/3 x7 = 2.333

    (7x3.75/2) / 100 x 150 x 2/3 = 13.13 Mtrs

    (7x3.75/2) / 100 x 150 x 1/3 = 6.56 Mtrs

    (2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

    For curve -2 at Km 0/890Interior angle of curve = 22

    F = e+f =7+15=22%.

    R ruling = V^2 / 127(e+f) = 57.27 Mtrs

    For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

    =60 Mtrs For the village roads.

    Hence provide Maxium Super Elevation of 7% as per clause 9.3. of I.R.C.73-1980 in plain and RollingTerrain.

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-2002

    ( 40 x 40 )/ 127 /0.22=

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

  • 8/14/2019 Main Est-Formats-puligundala

    81/173

    But maximum Super elevation is limited to 7% = 0.07

    V = R x 127 (e+f) R x 127 (e+f

    = 33.87 x 127 (0.07+0.1= 30.76

    Velocity is limited to 30 kmph

    Check for lateral skid:

    e+f > V^2/127 x R (0.075+0.15) > 30 x 30

    0.22 > 0.21 127x 33.87

    Hence O.K Due to lack of curve length speed is limited to 30 kmph.

    Extra widening as per table-18 of IRC 73-1980

    For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

    Extra widening should be provided only on the inside of the curve due to plain circular curve

    as per clause 9.6.5 of I.R.C. 73-1980.

    F = e+f =7+15=22%.

    V = (127 Rc F/100)^0.5

    2/3 of super elevation and extra widening should be provided on the straight section before starting of thecircular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

  • 8/14/2019 Main Est-Formats-puligundala

    82/173

    For curve - 3 at Km 1/190

    Interior angle of curve = 44

    F = e+f =7+15=22%.

    R ruling = V^2 / 127(e+f) = 57.27 Mtrs

    For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

    =60 Mtrs For the village roads.

    Rc = 60

    Ts = Rc Tan /2

    = 60x Tan 44 /2

    = 24.24 Mtrs

    Lc = II x Rcx

    180

    = 22/7x 60 x 44 = 46.070 Mtrs

    180

    Apex = Rc -Rc = 60 -60

    Cos /2 Cos 44 /2

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-2002

    ( 40 x 40 )/ 127 /0.22=

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    Hence provide Maxium Super Elevation of 7% as per clause 9 3 Of I R C 73 1980 in plain and Rolling

  • 8/14/2019 Main Est-Formats-puligundala

    83/173

    Rate of attain of Superelevation is 1 in 150.

    2/3 e = 2/3x7 = 4.667

    1/3 e = 1/3 x7 = 2.333

    (7x3.75/2) / 100 x 150 x 2/3 = 13.125

    (7x3.75/2) / 100 x 150 x 1/3 = 6.563

    (2.5 x3.75/2) / 100 x 150 = 7.031

    For curve - 4 at Km 1/370

    Interior angle of curve = 51

    F = e+f =7+15=22%.

    R ruling = V^2 / 127(e+f) = 57.27 Mtrs

    For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

    =60 Mtrs For the village roads.

    Rc = 60

    Ts = Rcx Tan /2

    Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and RollingTerrain.

    For the village roads Rolling Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-2002

    ( 40 x 40 )/ 127 /0.22=

  • 8/14/2019 Main Est-Formats-puligundala

    84/173

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

  • 8/14/2019 Main Est-Formats-puligundala

    85/173

    F = e+f =7+15=22%.

    R ruling = V^2/127(e+f)= 57.27 Mtrs

    For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

    =60 Mtrs For the village roads.

    Rc = 60

    Ts = Rc xTan /2

    = 60x Tan 30 / 2

    = 16.07 Mtrs

    Lc = IIx Rc x

    180

    = 22/7x 60 x 30 = 31.410 Mtrs

    180

    Apex = Rc -Rc = 60 - 60

    Cos /2 Cos 30 / 2

    = 2.16 Mtrs

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-2002

    ( 40 x 40 )/ 127 /0.22=

  • 8/14/2019 Main Est-Formats-puligundala

    86/173

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

  • 8/14/2019 Main Est-Formats-puligundala

    87/173

    V = (127 Rc F/100)^0.5

    = 40.944

    Rate of attaining super Elevation is 1 in 150.

    e = V^2 x100 = (40.00)^2x100 = 11.85

    225 Rc 225 x 60

    Rate of attain of Superelevation is 1 in 150.

    2/3 e = 2/3x7 = 4.667

    1/3 e = 1/3 x7 = 2.333

    (7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

    (7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

    (2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

    For curve -7 at Km 3/370

    Interior angle of curve = 70

    F = e+f =7+15=22%.

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-1980

    Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and RollingTerrain.

    For the village roads Plain Terrain minimum design speed is 40 K M P H as per table No-2 of I R C -SP-20-

  • 8/14/2019 Main Est-Formats-puligundala

    88/173

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    R ruling = V^2 / 127(e+f) = 57.27 Mtrs( 40 x 40 )/ 127 /

  • 8/14/2019 Main Est-Formats-puligundala

    89/173

    For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002=60 Mtrs For the village roads.

    Rc = 60

    Ts = Rc Tan /2

    = 60x Tan 19 /2

    = 10.04 Mtrs

    Lc = II Rc

    180

    = 22/7x 60 x 19 = 19.890 Mtrs

    180

    Apex = Rc -Rc = 60 -60

    Cos /2 Cos 19 /2

    = 0.83 Mtrs

    Extra widening as per table-18 of IRC 73-1980

    For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

    Extra widening should be provided only on the inside of the curve due to plain circular curve

    as per clause 9.6.5 of I.R.C. 73-1980.

    =

    2/3 of super elevation and extra widening should be provided on the straight section before starting of thecircular curve and balance on 1/3 on the curve portion as per clause 9 3 3 of I R C 73-1980

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    For curve - 9 at Km 3/910

  • 8/14/2019 Main Est-Formats-puligundala

    90/173

    For curve 9 at Km 3/910

    Interior angle of curve = 23F = e+f =7+15=22%.

    R ruling = V^2 / 127(e+f) = 57.27 Mtrs

    For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

    =60 Mtrs For the village roads.

    Rc = 60

    Ts = Rc Tan /2

    = 60x Tan 23/2

    = 12.2 Mtrs

    Lc = II x Rcx

    180

    = 22/7x 60 x 23 = 24.080 Mtrs

    180

    Apex = Rc -Rc = 60 -60

    Cos /2 Cos 23 /2

    = 1.22 Mtrs

    Extra widening as per table-18 of IRC 73-1980

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-

    ( 40 x 40 )/ 127 /=

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    2/3 e = 2/3x7 = 4.667

  • 8/14/2019 Main Est-Formats-puligundala

    91/173

    2/3 e 2/3x7 4.667

    1/3 e = 1/3 x7 = 2.333(7x3.75/2) / 100 x 150 x 2/3 = 13.125

    (7x3.75/2) / 100 x 150 x 1/3 = 6.563

    (2.5 x3.75/2) / 100 x 150 = 7.031

    For curve - 10 at Km 4/330

    Interior angle of curve = 21

    F = e+f =7+15=22%.

    R ruling = V^2 / 127(e+f) = 57.27 Mtrs

    For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

    =60 Mtrs For the village roads.

    Rc = 60

    Ts = Rcx Tan /2

    = 60 x Tan 21/2

    = 11.12 Mtrs

    Lc = II x Rc x

    For the village roads Rolling Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-2002

    ( 40 x 40 )/ 127 /=

  • 8/14/2019 Main Est-Formats-puligundala

    92/173

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    as per clause 9.6.5 of I.R.C. 73-1980.

  • 8/14/2019 Main Est-Formats-puligundala

    93/173

    p

    F = e+f =7+15=22%.

    V = (127 Rc F/100)^0.5

    = 40.944

    Rate of attaining super Elevation is 1 in 150.

    e = V^2 x100 = (40.00)^2x100 = 15.8

    225 Rc 225 x 60

    Rate of attain of Superelevation is 1 in 150.

    2/3 e = 2/3x7 = 4.6671/3 e = 1/3 x7 = 2.333

    (7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

    (7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

    (2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

    F 12 t K 6/050

    2/3 of super elevation and extra widening should be provided on the straight section before starting of the

    circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-

    Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    Cos /2 Cos 15 / 2

  • 8/14/2019 Main Est-Formats-puligundala

    94/173

    = 0.51 MtrsExtra widening as per table-18 of IRC 73-1980

    For Single lane Radius of the curve 21 to 60 mtrs = 0.60 mts.of

    Extra widening should be provided only on the inside of the curve due to plain circular curve

    as per clause 9.6.5 of I.R.C. 73-1980.

    F = e+F =5+15=20%.

    V = (127 Rc F/100)^0.5

    = 40.944

    Rate of attaining super Elevation is 1 in 150.e = V^2 x100 = (40.00)^2x100 = 11.85

    225 Rc 225 x 60

    Rate of attain of Superelevation is 1 in 150.

    2/3 e = 2/3x7 = 4.667

    1/3 e = 1/3 x7 = 2.333

    (7 3 75/2) / 100 150 2/3 13 125 Mt

    2/3 of super elevation and extra widening should be provided on the straight section before starting of the

    circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-

    Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    180

  • 8/14/2019 Main Est-Formats-puligundala

    95/173

    = 22/7x 60 x 37 = 37.740 Mtrs

    180

    Apex = Rc -Rc = 60 -60

    Cos /2 Cos 37 / 2

    = 3.26 Mtrs

    Extra widening as per table-18 of IRC 73-1980

    For Single lane Radius of the curve 21 to 60 mtrs = 0.60 mts.of

    Extra widening should be provided only on the inside of the curve due to plain circular curve

    as per clause 9.6.5 of I.R.C. 73-1980.

    F = e+F =5+15=20%.

    V = (127 Rc F/100)^0.5

    = 40.944

    Rate of attaining super Elevation is 1 in 150.

    e = V^2 x100 = (40.00)^2x100 = 11.85225 Rc 225 x 60

    2/3 of super elevation and extra widening should be provided on the straight section before starting of thecircular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    Ts = Rcx Tan /2

  • 8/14/2019 Main Est-Formats-puligundala

    96/173

    = 60x Tan 61/2

    = 35.34 Mtrs

    Lc = II x Rc x

    180

    = 22/7x 60 x 61 = 63.870 Mtrs

    180

    But it is the existing road , length of the curve available at site is only 40.00 mts.

    For Lc = 40.00 mts.

    Rc = 180 x Lc 180 x 40 = 37.5 mts

    3.14 x 3.14 x 61

    e = V^2 40 x 40 = 0.19 mts

    225 x Rc 225 x 37.50

    But maximum Super elevation is limited to 7% = 0.07

    V = R x 127 (e+f)

    = 37.50 x 127 (0.07+0. = 32.36 kmph

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    e = V^2 x100 = (40.00)^2x100 = 11.85

  • 8/14/2019 Main Est-Formats-puligundala

    97/173

    225 Rc 225 x 60

    Rate of attain of Superelevation is 1 in 150.

    2/3 e = 2/3x7 = 4.667

    1/3 e = 1/3 x7 = 2.333

    (7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

    (7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

    (2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

    For curve -15 at Km 6/800

    Interior angle of curve = 45

    F = e+f =7+15=22%.

    R ruling = V 2 / 127 (e+f) = 57.27 Mtrs

    For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

    =60 Mtrs For the village roads.

    Rc = 60

    Ts = Rcx Tan /2

    Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-

    ( 40 x 40 )/ 127 /0.22=

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    V = R x 127 (e+f)

  • 8/14/2019 Main Est-Formats-puligundala

    98/173

    = 31.84 x 127 (0.07+0. = 29.82 kmph

    Velocity is limited to = 25 kmph

    Check for lateral skid:

    e+f > V^2/127 x R (0.075+0.15) > 25 x 25

    0.22 > 0.15 127x 31.84

    Hence O.K Speed is limited to 25 kmph

    Extra widening as per table-18 of IRC 73-1980

    For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

    Extra widening should be provided only on the inside of the curve due to plain circular curve

    as per clause 9.6.5 of I.R.C. 73-1980.

    F = e+f =7+15=22%.

    V = (127 Rc F/100)^0.5

    = 40.944

    Rate of attaining super Elevation is 1 in 150.

    e = V^2 x100 = (40.00)^2x100 = 11.85

    2/3 of super elevation and extra widening should be provided on the straight section before starting of thecircular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    Rc = 60

  • 8/14/2019 Main Est-Formats-puligundala

    99/173

    Ts = Rcx Tan /2

    = 60x Tan 43/2

    = 23.63 Mtrs

    Lc = II x Rc x

    180

    = 22/7x 60 x 43 = 45.020 Mtrs

    180

    Apex = Rc -Rc = 60 -60

    Cos /2 Cos / 2

    = Mtrs

    Extra widening as per table-18 of IRC 73-1980

    For Single lane Radius of the curve 21 to 60 mtrs = 0.60 mts.of

    Extra widening should be provided only on the inside of the curve due to plain circular curve

    as per clause 9.6.5 of I.R.C. 73-1980.

    F = e+F =5+15=20%.V = (127 Rc F/100)^0.5

    2/3 of super elevation and extra widening should be provided on the straight section before starting of thecircular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    R ruling = V ^ 2 / 127 (e+f) = 57 27 Mtrs

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-

    ( 40 x 40 )/ 127 /

  • 8/14/2019 Main Est-Formats-puligundala

    100/173

    R ruling = V 2 / 127 (e+f) = 57.27 Mtrs

    For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

    =60 Mtrs For the village roads.

    Rc = 60

    Ts = Rcx Tan /2

    = 60x Tan 23/2

    = 12.2 Mtrs

    Lc = II x Rc x

    180

    = 22/7x 60 x 23 = 24.080 Mtrs

    180

    Apex = Rc -Rc = 60 -60

    Cos /2 Cos / 2

    = 1.22 Mtrs

    Extra widening as per table-18 of IRC 73-1980

    For Single lane Radius of the curve 21 to 60 mtrs = 0.60 mts.ofExtra widening should be provided only on the inside of the curve due to plain circular curve

    ( 40 x 40 )/ 127 /

    0.22=

  • 8/14/2019 Main Est-Formats-puligundala

    101/173

    PRADHANA MANTRI GRAM SADAK YOJANAGEOMETRIC DESIGN OF HORIZONTAL CURVES

    Name of the work ::R/F R&B Road to Puligundala of Charla (M)

    Extra widening as per table-18 of IRC 73-1980

  • 8/14/2019 Main Est-Formats-puligundala

    102/173

    For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

    Extra widening should be provided only on the inside of the curve due to plain circular curve

    as per clause 9.6.5 of I.R.C. 73-1980.

    F = e+f =7+15=22%.

    V = (127 Rc F/100)^0.5= 40.944

    Rate of attaining super Elevation is 1 in 150.

    e = V^2 x100 = (40.00)^2x100 = 11.85

    225 Rc 225 x 60

    Rate of attain of Superelevation is 1 in 150.

    2/3 e = 2/3x7 = 4.667

    1/3 e = 1/3 x7 = 2.333

    (7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

    (7x3 75/2) / 100 x 150 x 1/3 = 6 563 Mtrs

    2/3 of super elevation and extra widening should be provided on the straight section before starting of thecircular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

    For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-

    Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and RollingTerrain.

    GENERAL ABSTRACT

    Name of the work : R/F R&B Road to Pulugundala of Charla (M)

  • 8/14/2019 Main Est-Formats-puligundala

    103/173

    Description of Item Amount in Rs

    1 Providing B.T on road in Km 0/000 to km 8/360 21559416.00

    2 Construction of pipe culvert of 1V x 600 mm dia., (Sub estimate -1) 840000.00

    3 Construction of pipe culvert of 2V x 600 mm dia., (Sub estimate -2) 302000.00

    4 Construction of Road dam fo 16mts length (Sub estimate-3) 620000.00

    5 Construction of Road dam of 30 mts length (Sub estimate-4) 2635000.00

    6 Construction of Road dam of 40 mts length (Sub estimate-5) 685384.00

    7 Constrction of side drain for village portion (Sub estimate-6) 695000.00

    8 Repairs to existing Road dam of 40 mts length (Sub estimate-7) 720000.00

    TOTAL 28056800.00

    7 Cost of preparation of DPRs @ Rs. 10000 / km 83600.00

    8 KM & HM t d th i f t t @ 10000/k 83600 00

    Sl.

    No.

  • 8/14/2019 Main Est-Formats-puligundala

    104/173

    PRADHAN MANTHRI GRAM SADAK YOJANACOST ESTIMATE FOR ROAD WORK

    Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

    Description Unit Quantity Rate Amount

    1 2 3 4 5 6

    ABSTRACT ESTIMATE

    Sl.No

  • 8/14/2019 Main Est-Formats-puligundala

    105/173

    1 2 3 4 5 6

    1

    1 Sqm 58520.00 2.90 169708.00

    sqm ./sqm

    2

    Using Side Earth 1 cum 21686.90 81.05 1757724.00

    cum /1cum

    3

    Clearind and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs,saplings and trees of girth up to 300mm, removal of stumps of such trees cut earlier and disposalof unserviceable materials and stacking of serviceable material to be used or auctioned upto alead of 1000m including disposal of top organic soil not exceeding 150 mm in thickness as pertechnical specification clause 201-1 of MORD.

    Construction and widening of existing embankment with approved materails deposited at sitematerail obtained from roadway cutting including breaking clods, ramming, spreading, sectioning,grading, compacting with 8-10 Tonnes power roller to OMC compaction including to a top width

    of 7.50M and raising to required height including seigniorage charges complete etc., as per therequirement of Table 300-1 and 300-2 as per technical specification clause 301.5 of MORD.

    Earth work excavation and depositing on the bank for widening of existing embankment usingcutted earth material with carting in all soils upto soft disintegrated rock and stone matrix with in aradius of 5 M including breaking clods, benching, ramming and sectioning the embankment andformation to a top width of 7.50 m upto 95% proctors density etc. complete including seignioragecharges for raising and widening the embankment using machinery as per SS 20A and technicalspecification APDSS 302 & 303 with a least lead of 1000 m (carted earth)

    PRADHAN MANTHRI GRAM SADAK YOJANACOST ESTIMATE FOR ROAD WORK

    Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

    Description Unit Quantity Rate Amount

    1 2 3 4 5 6

    ABSTRACT ESTIMATE

    Sl.No

  • 8/14/2019 Main Est-Formats-puligundala

    106/173

    1 2 3 4 5 6

    1 cum 10143.55 112.75 1143685.00cum /1cum

    4 Picking old metalled surface 50-100 mm metal and sectioning ,labour charges etc., complete.

    1 Cum 12757.50 17.50 22326.00

    sqm /10 sqm

    5

    1 Cum 5312.76 389.15 2067462.00

    cum /1cum

    6

    1 Cum 3191.68 389.15 1242041.00

    cum /1cum

    Construction of granular sub base by providing well graded meterial (i.e Stone aggregates of 9.5mm to 4.75 mm size Gravel of 66% and sand of size < 2.6mm @ 34% )having soaked CBR notless than 15% and Plasticity Index < 6 and stacking at site to the departmentel gauge for premeasurements and mixing them and spreading the same with motor grader in uniform layers of

    loose thickness of not more than 225mm including mixing by mix in place method with rotavator toOMC and compacting with three wheeled power roller of 8 to 10 Tonnes capacity to achieve thedesired density, complete as per IRC technical specification clause 402 of MORD.

    1st layer 150 mm compact thickness.

    Construction of granular sub base by providing well graded meterial (i.e Stone aggregates of 9.5mm to 4.75 mm size Gravel of 66% and sand of size < 2.6mm @ 34% )having soaked CBR notless than 15% and Plasticity Index < 6 and stacking at site to the departmentel gauge for pre

    measurements and mixing them and spreading the same with motor grader in uniform layers ofloose thickness of not more than 225mm including mixing by mix in place method with rotavator toOMC and compacting with three wheeled power roller of 8 to 10 Tonnes capacity to achieve thedesired density, complete as per IRC technical specification clause 402 of MORD.

    2nd layer 100 mm compacted thickness.

  • 8/14/2019 Main Est-Formats-puligundala

    107/173

    PRADHAN MANTHRI GRAM SADAK YOJANACOST ESTIMATE FOR ROAD WORK

    Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

    Description Unit Quantity Rate Amount

    1 2 3 4 5 6

    ABSTRACT ESTIMATE

    Sl.No

  • 8/14/2019 Main Est-Formats-puligundala

    108/173

    11

    1 sqm 29905.27 23.25 695298.00

    sqm ./sqm

    12

    1 sqm 29905.27 8.15 243728.00

    sqm ./sqm13

    1 sqm 29905.27 112.90 3376305.00

    sqm ./sqm

    Providing and applying Prime Coat with butimen emulsion (Medium Setting- SS-1) on preparedsurface of granular base incliding cleaning of road surface and spraying primer at the rate of0.85Kg/Sqm using mechanical means as clause 502 of MORD.

    Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using emulsiondistributor @ 0.275 kg per sqm on prepared surface incliding cleaning of road surface andspraying primer at the rate of 0.275Kg/Sqm using mechanical means as clause 503 of MORD.

    Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20 mm thickcomposed of 13.20 mm to 5.60 mm size machine crushed hard blasted granite chips usingbitumen of 60/70 grade at the rate of 14.60 kgs per 10 sqm area of road surface over tack coat torequired line, level, grade to serve as wearing course on previously prepared base includingmixing in a Hot Mix Plant of 30/40 TPH, laying with mechanical paver finisher and rolloing withthree wheeled 8-10 Tonnes capacity power roller and finishing to required level and gradesincluding cost and conveyance of all materials from approved sources, seigniorage, labourcharges and hire and operational charges of power road roller and all other machinery, tools andplants, providing barricading for diversion of traffic, erecting red flags other incidental andoperational charges etc., complete for finished item of work as per clause 508 of MORD.

  • 8/14/2019 Main Est-Formats-puligundala

    109/173

    PRADHAN MANTHRI GRAM SADAK YOJANACOST ESTIMATE FOR ROAD WORK

    Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

    Description Unit Quantity Rate Amount

    1 2 3 4 5 6

    ABSTRACT ESTIMATE

    Sl.No

  • 8/14/2019 Main Est-Formats-puligundala

    110/173

    19 Sub-Estimate - 4 (C/O Road dam for 30 mts length) 5 No 527000.00 Each 2635000.00

    (at km 0/0-0/2, 5/4-5/6, 5/6-5/8, 7/8-8/0,8/2-8/4 )

    20 Sub-Estimate- 5 (C/O Road dam for 40 mts length ) 1 No 685384.00 Each 685384.00

    (at km 6/2-6/4 )

    21 Sub-Estimate - 6 (C/O side drain at village portion ) 1 No 695000.00 Each 695000.00

    22 Sub-Estimate - 7 (Repairs to existing CD works ) 1 No 720000.00 Each 720000.00(at km 0/4-0/6, 0/8-1/0, 0/8-1/0, 1/4-1/6, 1/6-1/8, 2/6-2/8 )

    6497384.00

    23 Cost of preparation of DPRs @ Rs. 10000.00 /km 8.36 10000.00 83600.00

    kms /1kg

    24 KM & HM stones and other infrastructure @ Rs. 10000.00 /km 8.36 10000.00 83600.00

    kms /1kg

    25 Inauguration and laying foundation stones 10000.00

    26 Add: LS for other unforeseen items 521.00

    TOTAL Rs. 28234000.00

    PRADHAN MANTHRI GRAM SADAK YOJANACOST ESTIMATE FOR ROAD WORK

    Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

    Description Unit Quantity Rate Amount

    1 2 3 4 5 6

    ABSTRACT ESTIMATE

    Sl.No

  • 8/14/2019 Main Est-Formats-puligundala

    111/173

    Asst.Exe.EngineerPR-Charla

    Deputy Executive EngineerPRSD-Venkatapuram

    Executive EngineerPR Divn-Bhadrachalam

    Superintending EngineerPR - Circle - Khammam

    PRADHANA MANTRI GRAM SADAK YOJANA

    COST ESTIMATE FOR ROAD WORK

    Deatailed Estimate

    Name of work : R/F R&B Road to Puligundala of Charla Mandal.

    Description of item Unit NoMeasurements

    QtyL B D

    1 2 3 4 5 6 7 8 9

    S.No

  • 8/14/2019 Main Est-Formats-puligundala

    112/173

    Page 112 of 173

    1

    Km 0/0 to 8/360 1 sqm 2 8360.00 2.50 - 41800.00

    Deduct for 40% voids 16720.00

    58520.00

    sqm

    2

    For widening and raising as per calculation sheet - - - - 21686.90(0/0 to 1/5 , 1/760 to 6/200 , 6/560 to 8/360 ) cum

    3

    For widening and raising as per calculation sheet. - - - - 10143.55

    ( 1/500 to 1/760 , 6/200 to 6/560 ) cum

    Clearind and grubbing road land including uprooting wild vegetation, grass, bushes,shrubs, saplings and trees of girth up to 300mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used orauctioned upto a lead of 1000m including disposal of top organic soil not exceeding 150mm in thickness as per technical specification clause 201-1 of MORD.

    Construction and widening of existing embankment with approved materailsdeposited at site materail obtained from roadway cutting including breaking clods,ramming, spreading, sectioning, grading, compacting with 8-10 Tonnes power roller toOMC compaction including to a top width of 7.50M and raising to required height includingseigniorage charges complete etc., as per the requirement of Table 300-1 and 300-2 as pertechnical specification clause 301.5 of MORD.

    Earth work excavation and depositing on the bank for widening of existingembankment using cutted earth material with carting in all soils upto soft disintegratedrock and stone matrix with in a radius of 5 M including breaking clods, benching, rammingand sectioning the embankment and formation to a top width of 7.50 m upto 95% proctorsdensity etc. complete including seigniorage charges for raising and widening theembankment using machinery as per SS 20A and technical specification APDSS 302 & 303with a least lead of 1000 m (carted earth)

    PRADHANA MANTRI GRAM SADAK YOJANA

    COST ESTIMATE FOR ROAD WORK

    Deatailed Estimate

    Name of work : R/F R&B Road to Puligundala of Charla Mandal.

    Description of item Unit NoMeasurements

    QtyL B D

    1 2 3 4 5 6 7 8 9

    S.No

  • 8/14/2019 Main Est-Formats-puligundala

    113/173

    Page 113 of 173

    4

    km 0/0 to 3/880 1 sqm 1 3800.00 3.75 - 14250.00

    Deduct CD works

    0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50

    0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50

    1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00

    1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25

    2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75

    2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.503/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00

    12757.50

    sqm5

    Km 3/880 to 8/360 1 cum 1 4480.00 4.00 0.150 5376.00

    Deduct CD works

    4/8 to 5/0 Road dam 1 cum 1 16.00 4.00 0.150 -9.605/4 to 5/6 Road dam 1 cum 1 30.00 4.00 0.150 -18.00

    5/6 to 5/8 Road dam 1 cum 1 30.00 4.00 0.150 -18.006/2 to 6/4 Road dam 1 cum 1 40.00 4.00 0.150 -24.00

    7/8 to 8/0 Road dam 1 cum 1 30.00 4.00 0.150 -18.00

    Picking old metalled surface 50-100 mm metal and sectioning ,labour charges etc.,complete.

    Construction of granular sub base by providing well graded meterial (i.e Stoneaggregates of 9.5 mm to 4.75 mm size Gravel of 66% and sand of size < 2.6mm @34% )having soaked CBR not less than 15% and Plasticity Index < 6 and stacking atsite to the departmentel gauge for pre measurements and mixing them and spreading thesame with motor grader in uniform layers of loose thickness of not more than 225mmincluding mixing by mix in place method with rotavator to OMC and compacting with threewheeled power roller of 8 to 10 Tonnes capacity to achieve the desired density, complete as

    per IRC technical specification clause 402 of MORD.1st layer 150 mm compact thickness.

    PRADHANA MANTRI GRAM SADAK YOJANA

    COST ESTIMATE FOR ROAD WORK

    Deatailed Estimate

    Name of work : R/F R&B Road to Puligundala of Charla Mandal.

    Description of item Unit NoMeasurements

    QtyL B D

    1 2 3 4 5 6 7 8 9

    S.No

    8/2 to 8/4 Road dam cum 1 30.00 4.00 0.150 -18.00

  • 8/14/2019 Main Est-Formats-puligundala

    114/173

    Page 114 of 173

    1Curves:

    For curve -9 at Km 3/910 1 Cum 1 24.08 0.60 0.150 2.17

    1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98

    1 Cum 2 13.13 (0+0.4)/2 0.150 0.79

    For curve -10 at Km 4/330 1 Cum