malvani 4
TRANSCRIPT
-
7/29/2019 Malvani 4
1/7
CHAPTER 4
CASE STUDY III
ADDRESS: Malvani no.8, beside Malvani Agar bus depot, Malad (W)
DATE OF VISIT:25/01/2013Description:Before commencement of the construction work, plot was empty. G+7 storied
residential building has to be constructed.
Surrounding detailsThe surrounding buildings were constructed on shallow foundation as it was slum
area. So it was economical for the surrounding buildings to rest on shallow
foundation. Residential houses were present nearby site. Bus depot was just
adjacent to the site.Site detailsThe piling work was started from January. Total 8 piles have been constructed up
to 24th of January.
Piling was carried out with Percussion drilling (Traditional bailer & chisel
method).
Percussion drilling (Traditional bailer & chisel method)Adoptable in the areas where rock strata was available at lesser depths.
Efficiency is 1 pile per day.
Cheaper method as compared to rotary method.
Some important points Piles are resting on brown completely weathered tuffaceous breccias.
Diameter of pile varying from 600mm.
Depth at site varying from 9 to 12m.
Spacing between two piles: 3 times the diameter of pile.
Piles are bored in cast situ piles.
Designed as percole & stroud approach (N.V NAYAK)
Concrete having good workability i.e. having slump value about 150 to
200mm.
Initial setting time about 1 hour (by using retarders)
-
7/29/2019 Malvani 4
2/7
Tests carried out on piles : a) Pile integrity test
b) Dynamic load test
Concrete was poured by trimie method of concreting.
End bearing piles.
The details regarding the total depth of each bore hole and the level at which the rock is first
struck, are given in Table -1 below.
Table -1
Table 2
STANDARD PENETRATION TESTS
Bore Hole
No.
Depth of Test (m) N Value
(Blows / 30 cm)
Remarks
1 3.00 3.60 8 Yellowish soft clay
1 4.50 5.10 13 Yellowish medium clay
1 6.00 6.60 27 Yellowish stiff clay
2 4.50 5.10 10 Yellowish medium clay2 6.00 6.60 12 Yellowish medium clay
3 6.00 6.45 27 Yellowish stiff clay
SUB - SURFACE STRATIFICATION AND ENGINEERING PROPERTIES
The sub soil profile as revealed by drilled holes can be divided in the following layers.
Layer I: DEBRIS FILL
This layer extends up to a depth varying from 1.50 m below ground level. It is composed ofrecent loose debris material deposited at the site to raise the plot ground level.
Layer II: YELOWISH BROWN SOFT TO MEDIUM CLAY
This layer extends from 1.50m to 5.0m below ground level. It is yellowish brown soft to
medium clay. It is a highly plastic residual soil having SPT blow count, N, ranging between 8
-13 along the depth.
Bore Hole No. Depth to Rock Top, m Total Depth, m
1 8.50 15.00
2 8.50 15.00
3 9.50 15.00
-
7/29/2019 Malvani 4
3/7
Layer III: YELLOW STIFF TO VERY STIFF SANDY CLAY
This layer underlies Layer II and extends from 5.00m to 7.00m below ground level. It is
yellow stiff to very stiff sandy clay having high plasticity. The SPT blow count, N, of this
layer is 28.
Layer IV: BROWN COMPLETELY WEATHERED TUFFACEOUS BRECCIA
This layer underlies Layer-III and extends from 7.00m to 8.50m at bore hole no. 1 and 2 and to
9.0m at bore hole no.3below ground level. It is brown completely weathered tuffaceous
breccia. The core recovery is less than 10 % and RQD is 0 %.
Layer V: REDDISH BROWN HIGHLY WEATHERED TUFFACEOUS BRECCIA
This layer underlies Layer-IV and extends from 8.50m to 15.00m below ground level. It is
reddish brown highly weathered tuffaceous breccia. The core recovery ranges between 8 -
42% and RQD is 0 - 30%.
GROUND WATER TABLE
The ground water table is observed at a depth of4.50m below ground level.
-
7/29/2019 Malvani 4
4/7
SITE:Proposed residential building at Gaikwad Nagar, MHADA
layout, Malvani, Malad(W) Mumbai.
CLIENT: M/s RASHMIN CONSTRUCTION CO. Andheri(E).
CONTRACTOR: M/s Advanced Geo-Tech Solutions, Mumbai.
BORE HOLE NO.: 1
DATE OF EXECUTION : 03/ 10/ 11 to 05/10/11
CASING : 4.0 M
METHOD OF BORING : ROTARY WASH
TYPE OF BIT : DIAMOND BIT
0.00
DIA
OFBORE
HOLE
VISUAL SOIL / ROCKDESCRIPTION G
RAPH
LOG L
AYER
SAMPLESPENETRATION TEST,
(Blows / 30 cm)
CORE
RECOVERY
%
RQD
IN
ROCK
%DEPTH TYPE-NO 15 30 45 60 N
100
MmDebris fill I
1.00
2.00
brown soft to medium clay of
high plasticityII
3.00
3.00m-
3.60mSPT-1 3 3 5 7 8
4.00
76mm 4.50 to5.10m
SPT-2 3 5 8 12 13GWT
5.00
Yellowish brown stiff to verystiff sandy clay with gravel
III6.00
6.00m-
6.60mSPT-3 7 12 15 31 27
7.00
brown completely weatheredtuffaceous breccia
IV8.00
9.00
Reddish brown highlyweathered tuffaceous breccia
V
C.P.10.00 26.7 20.0
11.00C.P. 8.7 0.0
12.00
C.P.13.00 42.0 16.7
C.P.
14.00
C.P.15.00 41.0 13.0
-
7/29/2019 Malvani 4
5/7
REMARKS:UDS UNDISTURBED SAMPLE SPT - STANDARD PENETRATION TESTDS DISTURBED SAMPLE C.P. - CORE PIECES
SITE:Proposed residential building at Gaikwad Nagar, MHADA
layout, Malvani, Malad(W) Mumbai.
CLIENT: M/s RASHMIN CONSTRUCTION CO. Andheri(E).
CONTRACTOR: M/s Advanced Geo-Tech Solutions, Mumbai.
BORE HOLE NO.: 2
DATE OF EXECUTION : 05/ 10/ 11 to 08/10 / 11
CASING : 4.0 M
METHOD OF BORING : ROTARY WASH
TYPE OF BIT : DIAMOND BIT
0.00
DIA
OF
BORE
HOLE
VISUAL SOIL / ROCK
DESCRIPTION GRAPH
LOG
L
AYER
SAMPLESPENETRATION TEST,
(Blows / 30 cm)
CORE
RECO
VERY
%
RQD
IN
ROCK
%DEPTH TYPE-NO 15 30 45 60 N
100Mm
Debris fill I1.00
2.00
brown soft to medium clay ofhigh plasticity
II
3.00
4.00
76mm4.50 to5.10m SPT-1 3 4 6 8 10
GWT
5.00
Yellowish brown stiff to very
stiff sandy clay with gravelIII
6.00
6.00m-
6.60mSPT-2 4 5 7 11 12
7.00
brown completely weatheredtuffaceous breccia
IV8.00
C.P.9.00
Reddish brown highlyweathered tuffaceous breccia
V
C.P.10.00 19.3 9.3
11.00
C.P. 18.0 0.0
12.00
C.P.13.00 22.7 0.0
C.P.14.00
C.P.
-
7/29/2019 Malvani 4
6/7
15.00 16.0 9.0
REMARKS:UDS UNDISTURBED SAMPLE SPT - STANDARD PENETRATION TEST
DS DISTURBED SAMPLE C.P. - CORE PIECES
SITE:Proposed residential building at Gaikwad Nagar, MHADAlayout, Malvani, Malad(W) Mumbai.
CLIENT: M/s RASHMIN CONSTRUCTION CO. Andheri(E).
CONTRACTOR: M/s Advanced Geo-Tech Solutions, Mumbai.
BORE HOLE NO.: 3
DATE OF EXECUTION : 08/ 10/ 11 to 11/10/11
CASING : 4.0 M
METHOD OF BORING : ROTARY WASH
TYPE OF BIT : DIAMOND BIT
0.00
DIA
OF
BORE
HOLE
VISUAL SOIL / ROCK
DESCRIPTION GRAPH
LOG L
AYER
SAMPLESPENETRATION TEST,
(Blows / 30 cm)
CORE
RECO
VERY
%
RQD
IN
ROCK
%DEPTH TYPE-NO 15 30 45 60 N
100Mm
Debris fill I1.00
2.00
brown soft to medium clay ofhigh plasticity
II
3.00
4.00
76mm GWT
5.00
Yellowish brown stiff to verystiff sandy clay with gravel
III6.00
6.00m-
6.45mSPT-1 6 4 23 - 27
7.00
brown completely weathered
tuffaceous brecciaIV
8.00
9.00
Reddish brown highly
weathered tuffaceous brecciaV
C.P.10.00
11.00 19.3 10.7
C.P.
12.00
C.P.21.3 0.0
13.00
14.00 27.3 24.0
C.P.
C.P.
15.00 30.0 30.0
-
7/29/2019 Malvani 4
7/7
REMARKS:UDS UNDISTURBED SAMPLE SPT - STANDARD PENETRATION TESTDS DISTURBED SAMPLE C.P. - CORE PIECES
DESIGN OF PILE:By COLE & STROUD APPROACH
Formula,
Qap = (CuNc/FOS) x (D2/4) + (aCu1FOS) x (DL)
Where,
Qap=stress on pile due to applied or allowable or design load
Cu=shear strength of rock below the base of pile
Nc=bearing capacity factor taken as 9
FOS=factor of safety taken as 3
a/FOS=0.3
Cu1=average shear strength of rock adjacent to the shaft in the socket length
L=length of socket (3D)
Grade of concrete=M30
Diameter of pile=600mm
Socket length=3x0.6=1.8m
Using formula,
Qap= {(600x9xx0.62) / 12 }+{0.3x600xx0.6x1.8}
=1119.66 KN=114.14 t
Structural capacity=0.25x2500x3.14x0.62
As, Qap < structural capacity of pile
Therefore provide group piles
Provide 2 piles in group.