Mantychore Oct 2010 WP 7. Andrew Mackarel. Agenda. 1.      Scope of the WP 2.      Mm distribution 3.      The WP plan 4.      Objectives 5.      Deliverables 6.      Deadlines 7.      Partners Responsibilities distribution - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Mantychore  Oct 2010 WP  7

Mantychore Oct 2010WP 7

Andrew Mackarel

Page 2: Mantychore  Oct 2010 WP  7

Agenda

1. Scope of the WP2. Mm distribution3. The WP plan4. Objectives5. Deliverables6. Deadlines7. Partners Responsibilities distribution8. Extra needs identified or topics to be

discussed and approved by the whole team.

Page 3: Mantychore  Oct 2010 WP  7

Scope of the WP

• MANTYCHORE-GSN collaboration has the objective to design necessary experiments and tests which eventually check the viability of this movement of services (virtual machines (VMs), flexible device configuration utilities, etc...).

• What are the Tests? ( Experiments, demos or more)

• Are all features identified with a plan for availability– How will no resources available be tolerated?

Page 4: Mantychore  Oct 2010 WP  7

Mm Distribution

• Participants: Months– i2CAT, 5 – HEAnet, 2.5– NORDUnet, 5.0– TID 2.5

• Leader HEAnet• Task 1 Start: M7, Apr 2011 End: M25 Oct 2012• Task 2 Start: M17, Feb 2012 End: M25 Oct 2012• => Terena 2012

– SC2010– CANARIE and others already running demos

Page 5: Mantychore  Oct 2010 WP  7

Role of Partners i2CAT

T7.1 will contribute on performing the integration between GSN and MANTYCHORE (physical integration between the GSN and the NRENs infrastructure and also the services integration).

• In T7.2 i2CAT will participate in implementing the necessary algorithms and mechanisms to integrate the Zero-carbon emissions virtual infrastructures into MANTYCHORE services.

Page 6: Mantychore  Oct 2010 WP  7

Role of Partners HEAnet

HEAnet is leading and coordinating this activity . T7.2 being responsible for the joint experimenting on moving

virtual resources based on renewable energy availability.

– Modifying the GEANT Stitching Framework is their responsible and should highlight the most relevant parameters and the interaction of their attributes to assist in the physical implementations.

– HEAnet will also contribute in T7.1 contributing to the physical integration between MANTYCHORE and GSN infrastructures

Page 7: Mantychore  Oct 2010 WP  7

Role of Partners NORDUnet

Leads T7.1 • In T7.1 NORDUnet will focus in performing the

physical integration between MANTYCHORE and GSN infrastructures and also the services integration.

• Finally, in T7.2 NORDUnet will be the responsible for ensuring that the algorithms are optimised to perform network migrations.

Page 8: Mantychore  Oct 2010 WP  7

Role of Partners TID

• TID will contribute in T7.1 offering part of its infrastructure to integrate MANTYCHORE and GSN.

• TID will also contribute in T7.2 performing some experiments over part of its infrastructure to ensure that the migration of entire virtual networks works correctly.

Page 9: Mantychore  Oct 2010 WP  7

The WP plan

• Determine Energy Expense for each nodes components

• Details of Current Addressing plan• Details of Layer 3 Addressing Plan work out address

ranges• Plans for testing network connectivity• Matrix of all hardware being used by each NREN

– Determine if this is selected to match CANARIE suggestion– How does it reflect deployments in Current Networks– How will deliverables for this work tie in with

MANTYCHORE Deliverables

Page 10: Mantychore  Oct 2010 WP  7

The WP plan 2

• Need to work out or see plans of proposed work by GSN• Need to establish schedule delivery dates from GSN• Establish common interface strategies which tie to

software deliverables• Need to agree task assignments and have buy-in from all

participants and their team Leaders• Plan Deployments of Nodes• Plan Testing stages

Check to see that this aligns with Total Project

Page 11: Mantychore  Oct 2010 WP  7

Objectives 7.2

Goals to achieve within this task are:• Search and design algorithms which will select different policies and an

optimised set of options• Every MANTYCHORE device has an energy expense will be measured using

different techniques. This subtask will search different possibilities to study the electrical consumption of each device and to integrate measuring and reporting algorithms into the MANTYCHORE application.

• Time is an important dimension in making energy measurements, which will require data capture , logging and historical analysis and comparison features

• Different options for migrating services are evaluated by conducting trials and experiments to highlight the full capability of these services. GSN will profit from MANTYCHORE’s architecture to increase the flexibility of testing and modelling services.

• The GEANT Stitching Framework [54] will be extended to characterise and highlight the attributes and energy consumption parameters to allow for easier integration into emerging solutions.

Page 12: Mantychore  Oct 2010 WP  7

Deliverables 7.1

• Integration between MANTYCHORE and GSN report: This deliverable will provide all relevant

• information related with the new installed resources. It includes all the information to the connection between

• MANTYCHORE-GSN including information about physical and software components. It is intended to be the

• comprehensive reference for building MANTYCHORE-GSN infrastructure [month 16]

Page 13: Mantychore  Oct 2010 WP  7

Deliverables 7.2

Definition of Teams interpretation of Zero Carbon Month 3• Networks migration tests report:

All experimental algorithms are presented in this deliverable, which details all the algorithms evaluated. Final experimental conclusions will show the viability of those algorithms selected. As each algorithm is described, full details of implementation features, and their interaction are fully explained (of both the optimal and other algorithms which were researched). [month 25] => Multiple Iterations of Document

Þ Need agreement of Content & Schedule for each Iteration.

Page 14: Mantychore  Oct 2010 WP  7

Partners Responsibilities Distribution 1

• Agreement on WP Breakdown from T7.1

• Tie in to WP 2 Dissemination of Activity

• Plan for staged implementation for WP5 and ensure awareness and compliance to this task.

Page 15: Mantychore  Oct 2010 WP  7

Partners Responsibilities Distribution 2

• Plan for Demos and Tests• List of kit available to test• Schematics / network diagrams of interconnection• Matrix / list of whole solution and interdependencies

– Hardware Revision– Driver version– Operating system

• Utilities required identify specific versions and the Inter relationships

• List of times when kit is available • Special Version of the Stitching Framework with

relevant parameters HEAnet and Volunteer

Page 16: Mantychore  Oct 2010 WP  7

Extra Scope

• Availability of Test Solutions• Access control for users to all Nodes• Support for GSN Planned Demonstrations• Template for documents for test station setup

for each NREN or partner• Documentation for all group Demos• Agreement / rules for partners who are not

members of both MANTYCHORE and GSN

Page 17: Mantychore  Oct 2010 WP  7

GSN Node & Network

Page 18: Mantychore  Oct 2010 WP  7

HEAnet GSN Nodes

Page 19: Mantychore  Oct 2010 WP  7

IBBT GSN Node

Page 20: Mantychore  Oct 2010 WP  7

i2CAT GSN Green Nodei2CAT Rural Node Plan:

• Rural location• Connectivity via a

radiofrequency link.

• Solar Panel setup• Capacity: 2000W

• Dual switch / Power Device Unit configuration

• Green Power for experimentation

• Regular grid for maintenance and operation

Page 21: Mantychore  Oct 2010 WP  7

GSN Sept 2010 Demo