method statement for waterproofing system of prefabricated bathroom
DESCRIPTION
good method statementTRANSCRIPT
-
TOP BUILDERS INTERNATIONAL CO. LTD.
Method Statement For
Waterproofing System (WP2)
Project: Venetian Macau in Cotal, Macau Re: Work Package 5115 (Top Builders), Prefabricated Bathroom Revision: B Date: 2006/06/19
-
Method Statement for Waterproofing System (WP2)
Page 2 of 5
Table of Content
Content .. 2 Scope of work .. 3 Relevant submission .. 3 Application of waterproofing .. 3 - 5
Preparation work .. 3
Concerns .. 3 Installation .. 4
Field quality control .. 4 Protection ... 5 Cleaning ... 5 Appendix i iii Demarcation Plan i Hazard identification ii Risk assessment iii
-
Method Statement for Waterproofing System (WP2)
Page 3 of 5
Scope of work Trade contractor of this project will be responsible for the execution of the work in accordance with the specifications and relevant approved documentations. The scope of work includes supply and installation of waterproofing system (WP2) including PCI gisogrund protective primer, PCI lastogum waterproof coating, and PCI pecitape fabric tape system at the L33 to L37 tower suite bathroom areas. Relevant submission
Material Submission of the wash and protective primer PCI gisogrund for walls and floors.
Material Submission of the waterproof, flexible protective coating PCI lastogum under marble panels in toilets, shower and bathrooms with official test certificates.
Material Submission of the special fabric tape system PCI pecitape for waterproof corner and perimeter joints, pipe culverts and floor drains.
Application of waterproofing system Preparation work
1. Site Cleaning 2. Site surveying and setting out 3. Erect working platform if necessary and according site safety
regulations.
Concerns
1. Working at Height Working platform will be provided if higher than 2m and erected by experience competent worker and inspected by the appointed professional person signing and certifying Form 4 & 5 before use and re-inspection on 7-14 days.
2. Substrate Preparation Substrate must be solid, dry, clean and free from oil. The surface must not have any pockets, gaping cracks or ridges.
3. Factor affecting Evaporation Time for Lastogum Higher temperatures reduce and lower temperatures increase these times. The airflow will affect the evaporation time as well.
4. Quality of drywall The surface of the board, the workmanship of the joints between boards and wall to floor joint alignment should be inspected before application.
-
Method Statement for Waterproofing System (WP2)
Page 4 of 5
y Installation
1. Remove all debris on wall and floor surface. 2. Absortive mineral substrates are to be primed with PCI gisogrund
with 1:1 water. 3. Wait the primer to completely dry for at least 3 hours.
4. Application of PCI lastogum liquid applied waterproofing membrane.
5. The first coat should be applied with PCI lastogum red. Evaporation
time after first coat is minimum 3 hours at 23 degree and 50% relative humidity.
6. Sealing the corner and wall to floor and wall to wall joints by pressing
PCI pecitape 120 sealing tape onto the fresh first coat at corner or joints. Cut the tape to fit corners.
7. Sealing the pipe penetrations by using the fingers, stretch a PCI
pecitape 10X10 sealing gasket to give tight fit over the pipe. Place it in position, bedding it onto the fresh first coat.
8. Sealing a floor drain by cutting PCI pecitape 35X35 sealing gasket to suit drain system to be used. Place it in position, bedding it onto the fresh first coat. Insert loose flange of the floor outlet and screw down.
9. For wall application, apply the second coat of PCI lastogum gery
which is a one-component system. Or floor application, apply second coat of PCI lastogum grey, which is a two-component system.
10. Ensure the cured waterproofing membrane is dry and has not been
damaged before fixing marble.
11. Water testing as per requested in the specification, please refer to field quality control section.
12. Waterproofing need to be protected after water test.
Field quality control 1. Visual inspection
z Visually inspect waterproofing system installation thoroughly in presence of contractors representative for mock-up trail and bubbles formed in the waterproofing system or any defects will be made good as recommended by manufacturer.
-
Method Statement for Waterproofing System (WP2)
Page 5 of 5
2. Testing of horizontal installation
z After allowing waterproofing system installation to completely cure and set, flood test horizontal installations with a minimum of 50mm of water for 24 hours examine for identify and repair any leaks.
z Make joint inspection with architects, consultants and main
contractors representative throughout the test. Record the testing result on inspection forms, taking record photos where necessary.
3. Water spray test to waterproofing system applied to wall
z For wall exceeding 300mm high only, joint inspection with architects, consultants and main contractors representative for water spray test will be arranged at least 72 hours (in any case, as per the manufacturers advise) after waterproofing membrane is applied.
z Apply water using a common domestic telephone type shower head
fitted to a 13mm diameter supply pipe delivering water pressure of not less than 0.2N/mm2. Locate the pressure gauge at a distance not exceeding 1500mm from the shower head.
z Carefully make inspection of the other side of the waterproofed wall
surface to check any water seepage.
z Record the testing result, taking photo record where necessary. Protection
1. Ensure that all waterproofing are protected from traffic, weather and damage during construction. Repair or replace all damaged waterproofing before covering with other finish materials.
2. Protect all insulation from damage from wetting, loading or abuse until
they are under protective covering material or finish. 3. Protect adjacent surfaces and materials from damage and soiling by
the work of this section. Cleaning
1. Remove all debris after completion of the work of this section.
2. Clean adjacent surfaces and materials soiled by any work of this section.
-
WATERPROOFING LEGEND:UP TO SKIRTING
UP TO FALSE CEILING HEIGHTUP TO 2050mm A.F.F.L.UP TO 950mm A.F.F.L.
Stone Types:G-ST1 TURKISH BOTTICINOG-ST2 DARK EMPERADORG-ST3 RED DAMASCUSG-ST4 GIALLO SIENA
195
Bathtub Baoquan BT-9509A
WC Kohler K-3323
120120
195
Bas
in K
ohle
r K-2
211
195
Bas
in K
ohle
r K-2
211
100
882 152
80
20
20
225
180
490
1290
121
1740
150
600 150 150
150
150 2240 150
250
900
800
150
2156
EQ 1400 EQ
789
100
1500
150
100
100 100
850
150
150
727
100150
150
850 AA
J
D
A F
A
F
F
J
J
J
808
95
275
645
100
195
1500
150
1400
400
150
850
465
180
225
300
300
38
38
600Basin Kohler K-2211
195 195
WC
Koh
ler
K-3
323
35
1245 150 1481
232
900
170
1754
846
524
500
1279
1019
900
195
35030
0
DESCRIPTIONDATEREV. DRAFT
THE HEIGHT OF WALL WATERPROOFING2120 - 5115 - C-2(B) - DEMARCATION PLAN FOR
PDF
crea
ted
with
pdf
Fact
ory
Pro
trial
ver
sion
ww
w.p
dffa
ctor
y.co
m
-
Stone Types:G-ST1 TURKTSH BOTTICINOG-ST2 DARK EMPERADORG-ST3 RED DAMASCUSG-ST4 GTALLO STENA
310
400
W
C
K
o
h
l
e
r
K
-
3
3
2
3
S
u
p
p
l
i
e
d
b
y
o
t
h
e
r
s
I
n
s
t
a
l
l
e
d
b
y
T
B
I
600
3829
0
45
936 2134
75
7517
00
990 990
3046
550
2968
EQEQ
550
300 300 300 300
290
250
300
300
300
300
250
300
300 300
300
300
300
300
EQ
1E
Q1
Basin Kohler K-2211Supplied by othersInstalled by TBI
EQ5 EQ5
10
3838
EQ
EQ
90
WATERPROOFING LEGEND:UP TO SKIRTING
UP TO FALSE CEILING HEIGHTUP TO 2050mm A.F.F.L.UP TO 950mm A.F.F.L.
DESCRIPTIONDATEREV. DRAFT
THE HEIGHT OF WALL WATERPROOFING2120 - 5115 - DQ_K_K1 - DEMARCATION PLAN FOR
2120 - 5115 - DQ_K_K1SUITE - DEMARCATIONPLAN FOR THE HEIGHT OF WALL WATERPROOFING
DQ SUITE (LEFT) L33-L37K SUITE (LEFT) L33-L37K-1 SUITE (LEFT) L33-L37
PDF
crea
ted
with
pdf
Fact
ory
Pro
trial
ver
sion
ww
w.p
dffa
ctor
y.co
m
-
WATERPROOFING LEGEND:UP TO SKIRTING
UP TO FALSE CEILING HEIGHTUP TO 2050mm A.F.F.L.UP TO 950mm A.F.F.L.
Stone Types:G-ST1 TURKISH BOTTICINOG-ST2 DARK EMPERADORG-ST3 RED DAMASCUSG-ST4 GIALLO SIENA
208
614
600
195
120
600
120
195
195
150
BAOQUAN BT-9509A
Bas
in K
ohle
r K
-221
1
Bas
in K
ohle
r K
-221
1
300
300
300
300
300
300300300 300
G-S
T1
300
1999 150
348 1400 378
869
1906
250
712
1500
150
850
100
100
809 1902 809
1902
712
2097 126615
0640
0
J
J
F A
J
100
614
80
20 38
2038
278
260
278
260
100
200555
590
590
EQ EQ
300300200 300100300EQ EQ200 100
100
200
300
300
300
300
EQ
300
300
300
300
EQ
200
100
7575
EQEQ
EQ
EQ
75
75
120
195
600
614
Basin Kohler
K-2211
300
300
300
300
300
300 300
75
75
300
300
300
300
300
300
300
7575
G-S
T4
G-S
T1
G-S
T3
G-S
T1
18371501740
1806
806
150
195
318
150
600
1582
2450
200
900
472
A
J
F
300 EQEQ
EQ
EQ
300
300
300200
300
300
300
45
340
350
DESCRIPTIONDATEREV. DRAFT
THE HEIGHT OF WALL WATERPROOFING2120 - 5115 - C-2(C) - DEMARCATION PLAN FOR
PDF
crea
ted
with
pdf
Fact
ory
Pro
trial
ver
sion
ww
w.p
dffa
ctor
y.co
m
-
Review No. B Date: 07-06-2006 HAZARD IDENTICATION SHEET Page 1 of 2
Project: Venetia Cotai, Macau Prefabricated Bathroom Work Package Code: WP 5115 (Top Builders) Subject: Waterproofing system (WP2) Analysis by: Edward Leung Location: Hotel Tower
Item Job Task Hazard People Affected Cause of Hazard Worst Harm
Due to Hazard
Existing Control Measures Remark
1 General works Personal injury worker and affected people nearby
- Lack of site safety knowledge
- Inappropriate use of PPE
Severely injured
- Worker should attend Safety Induction Training provided by GAMMON.
- Provide appropriate PPE to workers.
- Keep stock of PPE to be maintained for issuing.
2 Manual handling and transporting of material
Twisted , slipping, tripping, hit by objects Muscle strain During manual handling
workers - Using improper lifting method to handle goods
- poor housekeeping
- Worker did not wear and use PPE
Severely injured
- Provide pre-work body exercise to minimize the risk of injury.
- Wear long sleeve safety shoes to protect the ankle and foot..
- Use the mechanical equipment if possible.
- Always keep the workplace dry and tidy.
3 Materials
storage
Fire worker and affected people nearby
- Poor Housekeeping
- Smoking at the workplace and storage yards.
- Insufficient Ventilation
Fatality
- Flammable materials and goods must be kept away from the workplace.
- Provide fire extinguishers at the workplace and storage yards.
- Clean all the rubbish, paper, scraps all the time.
- Display no smoking signage and no smoking is allowed at the workplace.
- Adequate ventilation
-
Review No. B Date: 07-06-2006 HAZARD IDENTICATION SHEET Page 2 of 2
Item Job Task Hazard People Affected Cause of Hazard Worst Harm
Due to Hazard
Existing Control Measures Remark
4 Waterproofing application
Eye contact and skin contact worker nearby
- Improper use of PPE during the work.
Eye or skin irritation
- Wear safety goggles and gloves when working. .
- After application, worker must wipe off left-out substance and clean with soap and water.
5 Water proofing application on wall
Collapse of working platform worker and affected
people nearby
- Platform erected by non-experience competent workers.
Serious injury - Appointed Registered professional inspect and sign for the workability of working platform of height above 1.8m.
6 Water proofing application on wall
Fall of person at height worker - Inadequate platform being used by workers.
- Workers did not wear and use PPE.
Fatality - 200mm high toe-board and fence at 450mm and 900mm to be installed. - Prohibit to move the working platform if
any worker on it.
7 Water proofing application on wall
Falling objects from the working platform
Worker and affected people nearby
- Worker working under the working platform.
- No Warning sign
Severely injured
- Working platform should be closely planked with 200mm toe-board equipped.
- No other works shall be carried out under the activities that are working above.
- Chain block shall be used to the materials that are heavy in weight and large in size.
- Fence off the working area with barrier and notice / warning sign should be provided.
-
Review No. B Date: 07-06-2006 RISK ASSESSMENT SHEET Page 1 of 2
Note: Probability or Likelihood Rating: Almost Certain ( 5 ) Probable ( 4 ) Possible ( 3 ) Remote (2 ) Impossible (1)
Consequence Rating: Very High ( 5 ) High ( 4 ) Medium ( 3 ) Low ( 2 ) Very Low ( 1)
Risk Level: ( RED ) ( ORANGE ) ( YELLOW ) (GREEN)
Works Related Projects/Department: Venetia Cotai, Macau Works Related Projects/Department Code: 5115 (Top Builders) Type of Activity Operation: Prefabricated Bathroom Analysis by: Edward Leung Location: Hotel Tower
Rating of Harm Item Risk Existing Control Measures
Probability1 Consequences2 Risk
Level3 Recommended Action Remark
1 Personal injury - Worker should attend Safety Induction Training provided by GAMMON.
- Provided appropriate PPE as job required.
- Keep minimum stock of PPE to be maintained for issuing.
3
1
3 (Green)
Safety Induction Training, Specific PPE required
2 Twisted , slipping, tripping, hit by objects Muscle strain During manual handling
- Provide pre-work body exercise to minimize the risk of injury.
- Wear long sleeve safety shoes to protect the ankle and foot.
- Use the mechanical equipment if possible.
- Always keep the workplace dry and tidy.
2 2 4 (Green)
Morning Pre-work exercise
3 Fire - Flammable materials and goods must be kept away from the workplace. - Provide fire extinguishers at the
workplace and storage yards. - Clean all the rubbish, paper, scraps all
the time. - Display no smoking signage and no
smoking is allowed at the workplace. - Adequate ventilation
1 5 5 (Green)
Fire equipments Training, Specific Training
-
Review No. B Date: 07-06-2006 RISK ASSESSMENT SHEET Page 2 of 2
Note: Probability or Likelihood Rating: Almost Certain ( 5 ) Probable ( 4 ) Possible ( 3 ) Remote (2 ) Impossible (1)
Consequence Rating: Very High ( 5 ) High ( 4 ) Medium ( 3 ) Low ( 2 ) Very Low ( 1)
Risk Level: ( RED ) ( ORANGE ) ( YELLOW ) (GREEN)
Rating of Harm Item Risk Existing Control Measures
Probability1 Consequences2 Risk
Level3 Recommended Action Remark
4 Eye contact and skin contact
- Worker should attend Safety Induction Training provided by GAMMON.
- Provided appropriate PPE as job required.
- Keep minimum stock of PPE to be maintained for issuing.
- Sanitary facility should be provided for workers.
3 1 3 (Green)
Use of PPE s training
5 Collapse of working platform
- Appointed Registered professional inspect and sign for the workability of working platform of height above 1.8m.
3 3 9 (Yellow)
Specific Training
6 Fall of person at height - 200mm high toe-board and fence at
450mm and 900mm to be installed. - Prohibit to move the working platform if
any worker on it.
2 4 8 (Yellow)
Specific Training & Safety Harness required
7 Falling objects from the working platform
- Working platform should be closely planked with 200mm toe-board equipped.
- No other works shall be carried out under the activities that are working above.
- Chain block shall be used to the materials that are heavy in weight and large in size.
- Fence off the working area with barrier and notice / warning sign should be provided.
4 2 8 (Yellow)
Specific Training & Safety Harness required