metrado de vidrios gral prado
TRANSCRIPT
-
7/22/2019 Metrado de Vidrios Gral Prado
1/20
01.10.01 VIDRIO DE CRISTAL TEMPLADO DE 8mm 450.79 p2
450.79 450.79
factor
V18 3.00 4.00 0.75 10.76 96.88
V19 3.00 4.00 0.75 10.76 96.88
V20 3.00 4.00 1.75 10.76 226.04
V21 2.00 2.50 0.36 10.76 19.38
V22 2.00 1.50 0.36 10.76 11.63
DESCRIPCION CANT. ANCHO ALTO
V18 3.00 4.00 0.75
V19 3.00 4.00 0.75
V20 3.00 4.00 1.75
V21 2.00 2.50 0.36
V22 2.00 1.50 0.36
13.00
Tipos de Ventanas ANCHO ALTO ALFEIZER
V-1 a 3.250 0.75 2.20
V-2 a 3.250 0.75 2.20
V-3 3.250 1.75 1.20
V-4 3.250 0.75 2.20
2.150 1.00 1.20
V-6 3.500 0.75 2.20V-7 2.000 0.75 2.20
V-14 1.625 0.75 2.20
V-15 1.475 0.75 2.20
V-16 2.950 0.75 2.20
V-17 2.025 0.75 2.20
-
7/22/2019 Metrado de Vidrios Gral Prado
2/20
01.10.01 VIDRIO DE CRISTAL TEMPLADO DE 8mm 4,516.06 p2
4,516.06 4,516.06
Pabelln N 01A factor
Primer Nivel 574.19
Eje 3A
V1a 2.00 3.25 0.75 10.76 52.47
V2a 2.00 3.25 0.75 10.76 52.47
Eje 1A
V3 4.00 3.25 1.75 10.76 244.88
Segundo Nivel
Eje 1A
V3 3.00 3.25 0.75 10.76 78.71
V14 1.00 1.63 0.75 10.76 13.12
V15 1.00 1.48 0.75 10.76 11.91
Eje 3A
V4 2.00 2.15 1.00 10.76 46.28
V3 1.00 3.25 1.75 10.76 61.22
V14 1.00 1.63 0.75 10.76 13.12
Cuarto Nivel
V28a 1.00 1.25 1.50 10.76 20.18
Pabelln N 01B
Primer Nivel
Eje 3A
V-1 a 3.00 3.25 0.75 10.76 78.71
V-2 a 1.00 3.25 0.75 10.76 26.24
V7 1.00 2.00 0.75 10.76 16.15
Eje 1A
V3 4.00 3.25 1.75 10.76 244.88
V6 1.00 3.50 0.75 10.76 28.26
Pabelln N 02Primer Nivel
Eje S
V1 2.00 3.25 0.75 10.76 52.47
V2 2.00 3.25 0.75 10.76 52.47
Eje Q
V3 4.00 3.25 1.75 10.76 244.88
Eje R
V16 1.00 2.95 0.75 10.76 23.82
Eje 3B
V17 1.00 2.03 0.75 10.76 16.35
Segundo Nivel
Eje S
V1 2.00 3.25 0.75 10.76 52.47
V2 2.00 3.25 0.75 10.76 52.47
Eje Q
V3 4.00 3.25 1.75 10.76 244.88
Eje R
V16 1.00 2.95 0.75 10.76 23.82
Eje 3B
V17 1.00 2.03 0.75 10.76 16.35
Pabelln N 03
-
7/22/2019 Metrado de Vidrios Gral Prado
3/20
Primer Nivel
Eje X
V1 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
Eje Z
V3 6.00 3.25 1.75 10.76 367.32
Segundo Nivel
Eje XV1 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
Eje Z
V3 6.00 3.25 1.75 10.76 367.32
Pabelln N 04-A
Primer Nivel
Eje H'
V1 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
Eje J'
V3 4.00 3.25 1.75 10.76 244.88
Segundo Nivel
Eje H'
V1 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
Eje J'
V3 4.00 3.25 1.75 10.76 244.88
Pabelln N 04-A
Primer Nivel
Eje H'
V1 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje J'
V3 4.00 3.25 1.75 10.76 244.88
V6 1.00 3.50 0.75 10.76 28.26
Segundo Nivel
Eje H'
V1 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje J'
V3 4.00 3.25 1.75 10.76 244.88
V6 1.00 3.50 0.75 10.76 28.26
DESCRIPCION CANT. ANCHO ALTO
V-1 a 5.00 3.25 0.75
V-1 22.00 3.25 0.75
V-2 a 3.00 3.25 0.75
V-2 22.00 3.25 0.75
V-3 48.00 3.25 1.75
2.00 2.15 1.00
V-6 3.00 3.50 0.75
-
7/22/2019 Metrado de Vidrios Gral Prado
4/20
V-7 2.00 2.00 0.75
V-14 2.00 1.63 0.75
V-15 1.00 1.48 0.75
V-16 2.00 2.95 0.75
V-17 2.00 2.03 0.75
V-28a 2.00 3.25 0.75
116.00
16,061.64
Tipos de Ventanas ANCHO ALTO ALFEIZER
V-1 a 3.250 0.75 2.20
V-2 a 3.250 0.75 2.20
V-3 3.250 1.75 1.20
V-4 3.250 0.75 2.20
2.150 1.00 1.20
V-6 3.500 0.75 2.20
V-7 2.000 0.75 2.20
V-14 1.625 0.75 2.20
V-15 1.475 0.75 2.20
V-16 2.950 0.75 2.20
V-17 2.025 0.75 2.20
-
7/22/2019 Metrado de Vidrios Gral Prado
5/20
01.10.01 VIDRIO DE CRISTAL TEMPLADO DE 8mm 11,094.78 p2
11,094.78 11,094.78
Pabelln N 01A factor
Primer Nivel 321.60
Eje D
V1 2.00 3.25 0.75 10.76 52.47
V2 1.00 3.25 0.75 10.76 26.24
Segundo Nivel
Eje D
V1a 1.00 3.25 0.75 10.76 26.24
V3 1.00 3.25 1.75 10.76 61.22
V4 1.00 2.15 1.10 10.76 25.46
V5 1.00 1.55 0.75 10.76 12.51
Eje A
V2 1.00 3.25 0.75 10.76 26.24
Tercer Nivel
Eje D
V1a 1.00 3.25 0.75 10.76 26.24
V1 1.00 3.25 0.75 10.76 26.24
V2 1.00 3.25 0.75 10.76 26.24
V5 1.00 1.55 0.75 10.76 12.51
Pabelln N 01B factor 157.42
Segundo Nivel
Eje D
V1a 2.00 3.25 0.75 10.76 52.47
V1b 1.00 3.25 0.75 10.76 26.24
Tercer Nivel
Eje A
V1a 2.00 3.25 0.75 10.76 52.47
V1b 1.00 3.25 0.75 10.76 26.24Pabelln N 02 1,207.71
Primer Nivel
Eje 3D
V1a 2.00 3.25 0.75 10.76 52.47
V2a 2.00 3.25 0.75 10.76 52.47
V7 1.00 2.00 0.75 10.76 16.15
Eje 1D
V3 4.00 3.25 1.75 10.76 244.88
V6 1.00 3.50 0.75 10.76 28.26
Segundo Nivel
Eje 3D
V1a 2.00 3.25 0.75 10.76 52.47
V2a 2.00 3.25 0.75 10.76 52.47
V7 1.00 2.00 0.75 10.76 16.15
Eje 1D
V3 4.00 3.25 1.75 10.76 244.88
V6 1.00 3.50 0.75 10.76 28.26
Tercer Nivel
Eje 3D
V1a 2.00 3.25 0.75 10.76 52.47
V2a 2.00 3.25 0.75 10.76 52.47
-
7/22/2019 Metrado de Vidrios Gral Prado
6/20
V7 1.00 2.00 0.75 10.76 16.15
Eje 1D
V3 4.00 3.25 1.75 10.76 244.88
V6 1.00 3.50 0.75 10.76 28.26
Cuarto Nivel
Interior
V28b 1.00 1.55 1.50 10.76 25.03
Pabelln N 03 1,070.87Primer Nivel
Eje 21D
V2 3.00 3.25 0.75 10.76 78.71
V1' 1.00 3.25 0.75 10.76 26.24
V7 1.00 2.00 0.75 10.76 16.15
V8 1.00 2.25 0.75 10.76 18.16
Eje 23D
V3 1.00 3.25 1.75 10.76 61.22
V4 3.00 2.15 1.00 10.76 69.43
V5 1.00 1.55 0.75 10.76 12.51
Segundo Nivel
Eje 21D
V1'a 2.00 3.25 0.75 10.76 52.47
V2a 2.00 3.25 0.75 10.76 52.47
V7 1.00 2.00 0.75 10.76 16.15
Eje 23D
V3 4.00 3.25 1.75 10.76 244.88
V6 1.00 3.50 0.75 10.76 28.26
Tercer Nivel
Eje 21D
V1'a 2.00 3.25 0.75 10.76 52.47
V2a 2.00 3.25 0.75 10.76 52.47
V7 1.00 2.00 0.75 10.76 16.15
Eje 23D
V3 4.00 3.25 1.75 10.76 244.88
V6 1.00 3.50 0.75 10.76 28.26
Pabelln N 04 1,707.42
Primer Nivel
Eje Q
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje S
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26Segundo Nivel
Eje Q
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje S
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Tercer Nivel
-
7/22/2019 Metrado de Vidrios Gral Prado
7/20
Eje Q
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje S
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Pabelln N 05 1,786.81Primer Nivel
Eje Q
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V12 1.00 2.75 1.00 10.76 29.60
V13 1.00 3.50 1.75 10.76 65.93
Eje S
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Segundo Nivel
Eje Q
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje S
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Tercer Nivel
Eje Q
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje S
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Pabelln N 06 1,707.42
Primer Nivel
Eje U
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje W
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Segundo NivelEje U
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje W
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Tercer Nivel
Eje U
-
7/22/2019 Metrado de Vidrios Gral Prado
8/20
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje W
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Pabelln N 07 1,707.42
Primer NivelEje U
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje W
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Segundo Nivel
Eje U
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje W
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Tercer Nivel
Eje U
V1' 3.00 3.25 0.75 10.76 78.71
V2 3.00 3.25 0.75 10.76 78.71
V7 1.00 2.00 0.75 10.76 16.15
Eje W
V3 6.00 3.25 1.75 10.76 367.32
V6 1.00 3.50 0.75 10.76 28.26
Pabelln N 08 1,428.10
Primer Nivel
Eje B'
V1a 2.00 3.25 0.75 10.76 52.47
V2a 3.00 3.25 0.75 10.76 78.71
V5 1.00 1.55 0.75 10.76 12.51
Eje D'
V2 1.00 3.25 0.75 10.76 26.24
V3 5.00 3.25 1.75 10.76 306.10
Segundo Nivel
Eje B'
V1a 2.00 3.25 0.75 10.76 52.47V2a 3.00 3.25 0.75 10.76 78.71
V5 1.00 1.55 0.75 10.76 12.51
Eje D'
V2 1.00 3.25 0.75 10.76 26.24
V3 5.00 3.25 1.75 10.76 306.10
Tercer Nivel
Eje B'
V1a 2.00 3.25 0.75 10.76 52.47
V2a 3.00 3.25 0.75 10.76 78.71
-
7/22/2019 Metrado de Vidrios Gral Prado
9/20
V5 1.00 1.55 0.75 10.76 12.51
Eje D'
V2 1.00 3.25 0.75 10.76 26.24
V3 5.00 3.25 1.75 10.76 306.10
01.10.02 MURO CORTINA E=10 4,438.79 p2
Pabelln N 01A 4,438.79
Parte posterior 1.00 17.30 6.70 10.76 1,247.64
Parte frontal 1.00 17.30 6.45 10.76 1,201.09
2.00 2.25 2.95 10.76 142.89
Pabelln N 01B
Parte posterior 1.00 13.05 6.70 10.76 941.14
Parte frontal 1.00 13.05 6.45 10.76 906.02
285.00
DESCRIPCION CANT. ANCHO ALTO
V1 3.00 3.25 0.75
V1' 37.00 3.25 0.75
V1a 18.00 3.25 0.75
V1'a 4.00 3.25 0.75
V1b 2.00 3.25 0.75
V2 45.00 3.25 0.75
V2a 19.00 3.25 0.75
V3 109.00 3.25 1.75
V4 4.00 2.15 1.10
V5 6.00 1.55 0.75
V6 17.00 3.50 0.75
V7 17.00 2.00 0.75
V8 1.00 2.25 0.75V12 1.00 2.75 1.00
V13 1.00 3.50 1.75
V28b 1.00 1.55 1.5
285.00
-
7/22/2019 Metrado de Vidrios Gral Prado
10/20
01.10.01 VIDRIO DE CRISTAL TEMPLADO DE 8mm 2,313.54 p2
2,313.54 2,313.54
factor
V-51 1.00 2.65 1.50 10.76 42.79 4,743.49
V-32 1.00 3.55 0.75 10.76 28.66
V-35 1.00 2.65 0.75 10.76 21.39
V-38 1.00 2.45 0.75 10.76 19.78
V-39 1.00 1.85 0.75 10.76 14.93
V-40 1.00 3.40 0.75 10.76 27.45
Zona de Losa deportiva y Cafetn
V-32 2.00 3.55 0.75 10.76 57.32
V-33 1.00 2.45 1.75 10.76 46.15
V-34 1.00 1.15 0.75 10.76 9.28
V-35 1.00 2.65 0.75 10.76 21.39
V-36 2.00 1.20 0.75 10.76 19.38
V-37 1.00 2.05 0.75 10.76 16.55
V-41 1.00 1.60 1.75 10.76 30.14
V-43 11.00 3.40 0.80 10.76 322.06
V-44' 1.00 4.45 0.75 10.76 35.92
V-46' 1.00 2.00 0.75 10.76 16.15
V-47' 2.00 4.85 0.75 10.76 78.31
V-48 1.00 2.70 0.75 10.76 21.80
V-49 1.00 3.55 0.75 10.76 28.66
V-50 1.00 3.45 0.75 10.76 27.85
V-52 1.00 2.30 0.75 10.76 18.57
V-53 1.00 2.75 0.75 10.76 22.20
V-54 3.00 0.80 1.00 10.76 25.83
Mmparas 2.00 3.40 2.95 10.76 215.92
1.00 3.67 2.95 10.76 116.54
1.00 2.52 2.95 10.76 80.021.00 3.70 2.95 10.76 117.49
2.00 2.00 2.20 10.76 94.72
1.00 2.40 2.20 10.76 56.83
V32 2.00 3.55 0.75 10.76 57.32
V42 11.00 3.70 0.80 10.76 350.47
V44 2.00 4.45 0.75 10.76 71.85
V45 1.00 1.57 0.75 10.76 12.67
V46 1.00 2.00 0.75 10.76 16.15
V47 2.00 4.85 0.75 10.76 78.31
V52 1.00 2.30 0.75 10.76 18.57
V53 1.00 2.75 0.75 10.76 22.20
Mmparas 2.00 2.00 2.20 10.76 94.72
01.10.02 MURO CORTINA E=10
2.00 17.50 6.45 10.76 2,429.95
71.00
-
7/22/2019 Metrado de Vidrios Gral Prado
11/20
DESCRIPCION CANT. ANCHO ALTO
V32 2.00 3.55 0.75
V-32 3.00 3.55 0.75
V-33 1.00 2.45 1.75
V-34 1.00 1.15 0.75
V-35 2.00 2.65 0.75
V-36 2.00 1.20 0.75
V-37 1.00 2.05 0.75V-38 1.00 2.45 0.75
V-39 1.00 1.85 0.75
V-40 1.00 3.40 0.75
V-41 1.00 1.60 1.75
V42 11.00 3.70 0.80
V-43 11.00 3.40 0.80
V44 2.00 4.45 0.75
V-44' 1.00 4.45 0.75
V45 1.00 1.57 0.75
V46 1.00 2.00 0.75
V-46' 1.00 2.00 0.75
V47 2.00 4.85 0.75
V-47' 2.00 4.85 0.75
V-48 1.00 2.70 0.75
V-49 1.00 3.55 0.75
V-50 1.00 3.45 0.75
V-51 1.00 2.65 1.50
V52 2.00 2.30 0.75
V53 2.00 2.75 0.75
V-54 3.00 0.80 1.00
-
7/22/2019 Metrado de Vidrios Gral Prado
12/20
01.10.01 VIDRIO DE CRISTAL TEMPLADO DE 8mm 312.89 p2
312.89 312.89
factor
V23 1.00 4.11 0.33 10.76 14.60 298.29
V24 1.00 0.90 0.33 10.76 3.20
V25 1.00 1.00 1.33 10.76 14.32
V26 1.00 2.00 1.33 10.76 28.63
V27 1.00 3.21 1.00 10.76 34.55
V2 1.00 3.25 0.75 10.76 26.24
V30 1.00 3.25 1.75 10.76 61.22
V31 1.00 0.83 0.75 10.76 6.70
V32 1.00 2.17 0.75 10.76 17.52
V33 1.00 0.93 0.75 10.76 7.51
V29 1.00 3.55 0.75 10.76 28.66
V3 3.00 2.88 0.75 10.76 69.75
14.00
DESCRIPCION CANT. ANCHO ALTO
V23 1.00 4.11 0.33
V24 1.00 0.90 0.33
V25 1.00 1.00 1.33
V26 1.00 2.00 1.33
V27 1.00 3.21 1.00
V2 1.00 3.25 0.75
V30 1.00 3.25 1.75
V31 1.00 0.83 0.75V32 1.00 2.17 0.75
V33 1.00 0.93 0.75
V29 1.00 3.55 0.75
V3 3.00 2.88 0.75
-
7/22/2019 Metrado de Vidrios Gral Prado
13/20
01.10.01 VIDRIO DE CRISTAL TEMPLADO DE 8mm 0.00 p2
0.00 0.00
factor
0.00
-
7/22/2019 Metrado de Vidrios Gral Prado
14/20
-
7/22/2019 Metrado de Vidrios Gral Prado
15/20
-
7/22/2019 Metrado de Vidrios Gral Prado
16/20
-
7/22/2019 Metrado de Vidrios Gral Prado
17/20
01.10.02 MURO CORTINA E=10 0.00 p2
0.00
0.00
DESCRIPCION CANT. ANCHO ALTO
V-1 a 0.00 3.25 0.75
V-1 0.00 3.25 0.75
V-1' 0.00 3.25 0.75
V-2 a 0.00 3.25 0.75
V-2 0.00 3.25 0.75
V-3 0.00 3.25 1.75
V-4 3.25 0.75
0.00 2.15 1.00
V-5 0.00 1.55 0.75
V-6 0.00 3.50 0.75
V-7 0.00 2.00 0.75
V-8 0.00 1.63 0.75
V-12 0.00 1.48 0.75V-13 0.00 2.95 0.75
V-28b 0.00 3.25 0.75
0.00
Tipos de Ventanas ANCHO ALTO ALFEIZER
V-1 a 3.250 0.75 2.20
V-2 a 3.250 0.75 2.20
V-3 3.250 1.75 1.20
V-4 3.250 0.75 2.20
2.150 1.00 1.20
V-5 1.550 0.75 2.20
V-6 3.500 0.75 2.20
V-7 2.000 0.75 2.20
V-14 1.625 0.75 2.20
V-15 1.475 0.75 2.20
V-16 2.950 0.75 2.20
V-17 2.025 0.75 2.20
-
7/22/2019 Metrado de Vidrios Gral Prado
18/20
V32 2
V33 1V34 1
V35 1
V36 2
V37 1
V41 1
V43 11
V44' 1
V46' 1
V47' 2
V48 1
V49 1
V50 1
V52 1
V53 1
V54 3
Mampara 3.4 2.95 2
3.67 2.95 1
2.52 2.95 1
3.7 2.95 1
2 2.2 2
2.4 2.2 1
V32 2
V42 11
V44 2
V45 1
V46 1
V47 2
V52 1
V53 1
Mampara PM-1 2x2.20 2
-
7/22/2019 Metrado de Vidrios Gral Prado
19/20
DESCRIPCION CANT. ANCHO ALTO
V1 25.00 3.25 0.75
V1' 37.00 3.25 0.75
V1a 23.00 3.25 0.75
V1'a 4.00 3.25 0.75V1b 2.00 3.25 0.75
V2 78.00 3.25 0.75
V2a 22.00 3.25 0.75
V3 160.00 3.25 1.75
V4 4.00 2.15 1.10
V5 6.00 1.55 0.75
V6 20.00 3.50 0.75
V7 19.00 2.00 0.75
V8 1.00 2.25 0.75
V12 1.00 2.75 1.00
V13 1.00 3.50 1.75
V14 2.00 1.63 0.75
V15 1.00 1.48 0.75
V16 2.00 2.95 0.75
V17 2.00 2.03 0.75
V18 3.00 4.00 0.75
V19 3.00 4.00 0.75
V20 3.00 4.00 1.75
V21 2.00 2.50 0.36
V22 2.00 1.50 0.36
V23 1.00 4.11 0.33V24 1.00 0.90 0.33
V25 1.00 1.00 1.33
V26 1.00 2.00 1.33
V27 1.00 3.21 1.00
V28a 2.00 3.25 0.75
V28b 1.00 1.55 1.50
V29 1.00 3.55 0.75
V30 1.00 3.25 1.75
V31 1.00 0.83 0.75
V32 5.00 3.55 0.75
V32' 1.00 2.17 0.75
V33' 1.00 0.93 0.75
V33 1.00 2.45 1.75
V34 1.00 1.15 0.75
V35 2.00 2.65 0.75
V36 2.00 1.20 0.75
V37 1.00 2.05 0.75
V38 1.00 2.45 0.75
V39 1.00 1.85 0.75
-
7/22/2019 Metrado de Vidrios Gral Prado
20/20
V40 1.00 3.40 0.75
V41 1.00 1.60 1.75
V42 11.00 3.70 0.80
V43 11.00 3.40 0.80
V44 2.00 4.45 0.75
V44' 1.00 4.45 0.75
V45 1.00 1.57 0.75V46 1.00 2.00 0.75
V46' 1.00 2.00 0.75
V47 2.00 4.85 0.75
V47' 2.00 4.85 0.75
V48 1.00 2.70 0.75
V49 1.00 3.55 0.75
V50 1.00 3.45 0.75
V51 1.00 2.65 1.50
V52 2.00 2.30 0.75
V53 2.00 2.75 0.75
V54 3.00 0.80 1.00