MINING PLAN Chirkunda Balu Ghat Over Brakar River, Dhanbad AREA - 48.10 ACRE (19.473 Hectares) MINERAL Sand VILLAGE Chirkunda, Anchal- Nirsa DISTT-Dhanbad,STATE JHARKHAND APPLICANT Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary, Village:- Panchmahli Bardangal, P.O. + P.S.- Kumardhubi, Dist:- Dhanbad (Jharkhand) PREPARED BY CHINMOY DEY Tiril (Kokar) P.O. -R.M.C.H , Ranchi- 834009 REG. NO. RQP/ RNC/122/2006/A VALID UPTO- 26.10.2016

Upload: others

Post on 14-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

MINING PLAN

Chirkunda Balu Ghat Over Brakar River,Dhanbad

AREA - 48.10 ACRE (19.473 Hectares)

MINERAL – SandVILLAGE – Chirkunda, Anchal- Nirsa

DISTT-Dhanbad,STATE – JHARKHAND

APPLICANT

Shri Jagdish TiwaryShri Jagdish Tiwary,

S/o Late Ram Chabila Tiwary,Village:- Panchmahli Bardangal, P.O. + P.S.- Kumardhubi,

Dist:- Dhanbad (Jharkhand)

PREPARED BY

CHINMOY DEYTiril (Kokar)

P.O. -R.M.C.H , Ranchi- 834009REG. NO. RQP/ RNC/122/2006/A

VALID UPTO- 26.10.2016

Page 2: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

CONSENT LETTER FROM APPLICANT

The Mining Plan for sand in respect of the applied M L area of M/S Shri

Jagdish Tiwary, in Chirkunda Balu Ghat Over Brakar River, Dhanbad

district of Jharkhand, over 19.473 hect or 48.10 acres has been

prepared by Chinmoy Dey, Consulting Geologist, Regn. No. RQP/

RNC/122/2006/A. I request the Director of Mines, Directorate of Mines,

to make further correspondence regarding modification of the

mining plan with the said recognised person on his following address.

Tiril (Kokar),P.O. – R.M.C.H (Bariatu) Ranchi-834009.

I hereby undertake that the mining plan prepared by the said

recognised person shall be deemed to have been made with my

knowledge and consent and acceptable and binding on me in all

respect.

For M/S Shri Jagdish Tiwary.

Date:Place: (APPLICANT)

i

Page 3: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

C E R T I F I C A T E - I

I, Chinmoy Dey, Geologist, duly recognised to prepare “Mining Plans” under

Rule 22(c) of Mineral Concession Rules, 1960, my Registration No. being

RQP/RNC/159/2013/A, have prepared the mining plan of the applied M L

area of M/S Shri Jagdish Tiwary, in Chirkunda Balu Ghat Over Brakar River,

Dhanbad district of Jharkhand, over 19.473 hect or 48.10 acres. I do hereby

certify that the provisions of Mines Act, rules and regulations made

hereunder, have been observed in the aforesaid mining plan & where

specific permission will be required the applicant will approach the

authorities of Directorate general of mines safety, Dhanbad. I also certify

that the information furnished in the above Mining Plan is true and correct to

the best of my knowledge.

Place : Chinmoy DeyDate : RQP/ RNC/122/2006/A

ii

Page 4: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

C E R T I F I C A T E - II

This is to certify that the provisions of MCDR, 1988 have been

observed in the Mining Plan of the applied M L area of M/S Shri

Jagdish Tiwary, in Chirkunda Balu Ghat Over Brakar River, Dhanbad

district of Jharkhand, over 19.473 hect or 48.10 acres and wherever

specific permissions are required, the applicant will approach the

concerned authorities of Jharkhand state mines and geology

department and directorate of mines, Jharkhand for granting the

permission.

Place : Chinmoy DeyDate : RQP/ RNC/122/2006/A

Iii

Page 5: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

CONTENTS

C H A P T E R DESCRIPTION P A G E

0. INTRODUCTION 1

1. GENERAL 3

2. LOCATION & ACCESSIBILITY 6

3. GEOLOGY AND EXPLORATION 8

4. MINING 11

5. BLASTING 13

6. MINE DRAINAGE 14

7. STACKING OF MINERAL REJECTS ANDDISPOSAL OF WASTE

15

8. USE OF MINERAL 16

9. OTHER 17

10. MINERAL PROCESSING 19

11. ENVIRONMENTAL MANAGEMENT PLAN 20

12. PROGRESSIVE CLOSURE PLAN 24

ANNEXURE

Annexure-I CONSENT ORDER

VILLAGE MAP

ID PROFF

iv

Page 6: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

LIST OF PLATES

Plate No Description Scale (R F)

I Key Plan 1 : 2,50,000

II Area Plan 16" = 1 mile

III Surface Plan 1 : 2,000

IV Geological Plan 1 : 2,000

V Working Plan 1 : 2,000

VI Environment Plan 1 : 5,000

VII Environmental Management Plan 1 : 2,000

VIII Conceptual Plan 1 : 2,000

v

Page 7: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 1REGN NO. – RQP/RNC/122/2006/A

INTRODUCTION

M/S Jagdish Tiwari has obtained sand mining lease at Mouza- Kapasara, Thana –

Chirkunda, Dist - Dhanbad over an area of 48.10 Acres (19.47 ha.) from the Govt. of

Jharkhand in the year 2015 As a matter of fact, the applicant was granted mining lease

for Three (3) years and has carried out mining operation.

The material to be mined is usually termed as sand which finds ready market in

construction activities like building construction, road, and other activity.

The Govt. of Jharkhand has made it mandatory to prepare and submit “Mining Plan”

highlighting mining methodologies of extracting mineral (in this case sand) as well as

outline the “Environment Management Plan” before application for granting of mining

lease and environment clearances can be taken up for consideration . A mining plan

apart from being a document for pursuing scientific mining suggest measures to contain

any likely adverse impact on environment and ecology.

While preparing the mining plan, due considerations have been made to ensure that the

relevant provisions under MMDR Act 1957, MMR 1961 and Mines Act 1952 as well as

mines rules 1955 are adhered to.

The relevant provisions of rules and regulations as well as guidelines framed by the

Govt. of Jharkhand for mining of minor minerals have been kept in mind while preparing

the ‘Mining Plan’.

The ‘Mining plan’ preparation is broadly based on

Maps and data provided by the applicant

Discussion with the applicant

Help of standard publication , book , maps etc wherever thought necessary

Prevailing technical norms.

Though effort has been made to collect as much information / data as possible,

appropriate assumptions has been made wherever it has been considered necessary.

Required numbers of competent and qualified persons as per Mines Act, Rules and

Page 8: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 2REGN NO. – RQP/RNC/122/2006/A

Regulations as well as for properly carrying out safe and technically correct mining

operation have been recommended in the ‘Mining Plan’ report.

Page 9: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 3REGN NO. – RQP/RNC/122/2006/A

CHAPTER - I01 .GENERAL

01.01. Name and Address of the of Applicant:

Name : M/s JagdishTiwari

Village : Kapasara

P.O. : Chirkunda

P.S. : Chirkunda

State : Jharkhand

Phone : +918967000019

01.02 Status of applicant

The applicantsare the owner of their firm and financially sound, they have their own

other business also.

01.03 Mineral(s) which are occurring in the area and which the applicantintends to mine. - Sand

01.04 Name of the RQP preparing the Mining plan

Name : Chinmoy Dey

Address : Tiril (Kokar),

P.O. – R.M.C.H (Bariatu)

Ranchi-834009

Phone : 9199452487

Registration no. : RQP/ RNC/122/2006/A

Valid up to : 26-10-2016

01.05 Period for which the applied applied area granted:Three years from 2015-2016 to 2017-2018

01.06 Name of the Prospective Agency - Sri JagdishTiwari

Page 10: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 4REGN NO. – RQP/RNC/122/2006/A

01.06 Details of the area

(i) Details

District & State :Dhanbad, Jharkhand

Village : Kapasara

Plot Nos. : 555/P

Khata Nos :

Thana no : 255

(ii) Total lease area – 48.10 Acres (19.47 Ha)

(iii) Land Status : Gair Marzua Land

01.07 Infrastructure:

Location and Approach:

The applied area is located at Village - Kapasara, Anchal - Nirsa, Post & Thana- Chirkunda,

Dist - Dhanbad, Jharkhand. The proposed project activity will be carried out in the bed of the

River Barakar. Theproposed mining lease area falls in Survey of India Toposheet No. 73

I/13. The vicinity map is given below:

Between Latitude N23°43'29.37" To N23°43'46.47"

Between Longitude E86°47'88.68" To E86°48'12.56"

Connectivity:Nearest Railway StationNearest railway station is Barakar Railway Station which is about 4km N from the mine

site.

Nearest AirportNearest Airport is Birsa Munda Airport, Ranchi which is about 159 km SW from the mine

site.

Nearest HighwayNearest highway is NH- 2, 1.09 Km W from the applied area.

Nearest Town/City

Page 11: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 5REGN NO. – RQP/RNC/122/2006/A

Nearest Town: Asansol, West Bengal (Located at an approximate aerial distance of 18km on East side of the proposed site)

Nearest City: Dhanbad(Located at an approximate aerial distanceof 38.5 km on Westdirection of the proposed site)

Nearest District Headquarter: Dhanbad(Located at an approximate aerial distance of 63

km on West direction)

Page 12: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 6REGN NO. – RQP/RNC/122/2006/A

CHAPTER - II02. LOCATION & ACCESSIBILITY

02.01 L0CATION

The deposit is located in Dhanbad district of Jharkhand. The name of the village where

the deposit occurs is Kapasara. The nearest police station is Chirkunda.

The deposit is located in Dhanbad district of Jharkhand. The name of the village where

the deposit occurs is Kapasara. Nearest Airport is Birsa Munda Airport, Ranchi which is

about 159 km SW from the mine site.

The applied lease area covers plot no. 555/P

The Thana numbers are 255

The latitude and longitudinal details are as under

Between Latitude N23°43'29.37" To N23°43'46.47"

Between Longitude E86°47'88.68" To E86°48'12.56"

Reference toposheet no is 73 I /13.

02.02. ACCESSIBILITY:-

The deposit in Dhanbad district is approachable from Kapasara proper.

Nearest highway – Nearest highway is NH- 2, 1.09 Km West from the applied area.

Nearest railway station – The nearest railway station is Barakar railway station which is

about 4km North from the mine site.

Nearest Air links – The air links is available from the state capital Ranchi at a distance

of 159 km from the leasehold area.

02.03 Location Map

The locational details of the deposit along with nearby features have been shown in

drawing no- 01.

Page 13: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 7REGN NO. – RQP/RNC/122/2006/A

02.04 Key plan

The area has been marked on a survey of India toposheet 73 I/13. The features coming

within 5 km and 1 km radius from the centre of the deposit have been circled in the key

plan and shown in drawing no -02.

02.05Surface Plan

The topography and existing status of the area has been shown in drg no- 03, titled as

‘surface plan’.

Page 14: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 8REGN NO. – RQP/RNC/122/2006/A

CHAPTER - III0.3GEOLOGY AND EXPLORATION

3.1 Physiography:The mining lease area falls under Survey of India Toposheet No. 73 I/13. The Latitude &

Longitude is given below:

Between Latitude N23°43'29.37" To N23°43'46.47"

Between Longitude E86°47'88.68" To E86°48'12.56"

The Barakar River flows from the North West to South East. The flow rate of the river

varies with the quantity of precipitation in the catchment area. A major portion of the

precipitation occurs during the monsoon season i.e., from mid of June to mid of

September every year.

3.2 Geology:The deposit is river borne. The sands get carried out from upper reaches of River

Barakar during the monsoon to be deposited all along the river bed once the water

current subsides. As such, the deposit of sand is cyclic & replenish able in nature.

3.3 DETAILS OF EXPLORATION :The deposit in the river bed is up to a shallow depth. The exploration is carried out on the

basis of physical verification of the river bed all along the river bed coming within the

lease area. Now, the sand mining is going on in the area and it is found potential for

mining.

Future Exploration Programme:The river bed material will be replenished during the monsoon season every year. So, it

is not necessary to carry out further exploration.

Method of estimation of reserves:The entire deposit is in river bed. The estimation of the reserves has been drawn on the

basis of actual measurement of length and breadth of river bed falling within the proposed

lease hold area and multiplied by the thickness of sand bed which in this case is taken as

1mtr. The details are given below with reference of Geological plan at 100 mgrid interval.

Page 15: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 9REGN NO. – RQP/RNC/122/2006/A

Length in m Avg. width inm

Avg. Thickness in m Volume in Cum

474 390 3 554580

Geological Reserves and grade:

The total reserves as estimated within the leasehold are at present approximately 554580

cum and Quantity of extracted river sand will be replenished every year after monsoon.The

extractable reserves will be realized after leaving out 1/5th of the width of the river in order to

protect the river banks. Therefore the total extractable reserves will be 80% of the total

reserves i.e. 0.8X554580= 443664 cum.

However, the total production capacity from the existing area is only 443664 Cum/A. Hence

this will be the mineable reserve. The mining will be done only upto a depth of 3meter.

Anticipated life of the mine:

The reserve estimated above will replenish every year. So, the life of the mine will be for the

entire lease period.

Feasibility study based on the geographical conditions and operating conditions:

Infrastructure: Road is near to the working site. Manpower is cheaply available.

Geology: Geologically the area is potential and the deposit is sufficient for fulfillment of the

requirement.

Legal matters: Leasehold area is valid as per the rule of M.C.R. 1960. There will be no

displacement. Land is GM land.

Operating: The applicant has all the mining equipment’s used for the scientific mining. The

mine is eco-friendly.

Page 16: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 10REGN NO. – RQP/RNC/122/2006/A

Reserves and Resources Estimated For River Sand

Classification Code Quantityin Cum

Total Mineral Resources (A+B) 554580

A. Mineral Reserve

(1) Proved Mineral Reserve 111 554580(2) Probable Mineral Reserve 122 …………

B. Remaining Resources

(1) Feasibility Mineral Resource 211 …………

(2) Pre-feasibility Mineral Resource 221 …………

Pre-feasibility Mineral Resource 222 …………

(3) Measured Mineral Resource 331 …………

(4) Indicated Mineral Resource 332 …………

(5) Inferred Mineral Resource 333 …………

(6) Reconnaissance Mineral Resource 334 …………

Page 17: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 11REGN NO. – RQP/RNC/122/2006/A

CHAPTER – IV0.4MINING

4.1 Year wise development:

No development work is required as the mining is for river bed sand. Extraction of river sand

will be done manually and transportation by tippers. It has been proposed to collect

approximately 476482 cum/year. The river bed material will be replenished during the

monsoon season every year.

4.2 Year wise production:

Sand will be lifted from the river bed for all the eight months except the monsoon period

from June to September @ 59560 cum per month. Proposed production for next three years

is as follows:

Fig. in cum

Year Opening Balanceof Deposit in cum

Productionin 11 cum

BalanceDeposit in11 cum

Replenishmentin 11 cum

ClosingDepositin cum

1st 443664 443664 0 443664 4436642nd 443664 443664 0 443664 4436643rd 443664 443664 0 443664 443664

4.3 Proposed rate of production when the mine is fully development.

Proposed rate of production will be 443664cum at the stage of fully development of mine.

4.4 Mineable Reserves and anticipated life of the mine.

443664cum is the quantity of reserves estimated as Geological Reserves and about

443664cum will be replenished every year after monsoon. As such the life of the mine will

continue till the period of lease and subsequent lease renewals.

4.5 Proposed Method of Mining.

4.5.1 Opencast Working

Method for developing and working the deposits

Page 18: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 12REGN NO. – RQP/RNC/122/2006/A

The sand deposited as river bed material will be collected in its existing form mechanized.

Method of mining

The mining is confined to collection of sand from the river bed. The operation will be

mechanizedwith the help of excavator, shovel in which the river bed material will be

collected in its existing form. Sand Mining will be carried out only up to a depth of 3m at river

bank and in water it could not be measured. Hand tools like shovel, pan, sieve etc. will be

used. Mining will be carried out only during the day time

4.5.2 Underground Working

Not Applicable.

4.6 Extent of Mechanization.

Mechanization will be done.

Production Planning:

Assumptions1 Daily Production Approx. 1849 cum (avg)2 Total excavation monthly 55458 cum3 Total manpower required per day 15

No. Type Nos. Capacity Mode 0fOperation

1 Excavator/JCB 03 0.9m3 Diesel2 Tippers & Tractor tailor 14 & 7 10 & 5 tones Diesel3 Water Sprinkler 01 Diesel

Transportation details:

The sand transportation will be done by ensuring the following:

1) All bigger trucks/dumpers having capacity 9.375Cu.m

2) Trucks/dumpers will be properly covered.

3) Vehicles will be provided with all safety measures like reverse alarm, back-mirror, etc

4) Vehicles will have pollution-test certificates

5) Regular checks will be done by the management to ensure the health of the trucks.

6) Regular water spraying at fixed interval of time.

7) Maintenance of roads to fill all pot-holes to avoid spillage.

8) Regular cleaning of road to avoid any accumulation of sand.

Page 19: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 13REGN NO. – RQP/RNC/122/2006/A

CHAPTER – VBLASTING

No blasting is required for river bed sand mining.

Page 20: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 14REGN NO. – RQP/RNC/122/2006/A

CHAPTER – VI

MINE DRAINAGE

No drainage system/Nallah is meeting the river bed. Hence no precaution is required to

protect.

Page 21: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 15REGN NO. – RQP/RNC/122/2006/A

CHAPTER – VII

STACKING OF MINERAL REJECTS& DISPOSAL OF WASTES

Since there is no waste or mineral rejects generation in the mine hence no proposal for the

stacking is discussed under this chapter. The entire mineral produced is useable.

Page 22: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 16REGN NO. – RQP/RNC/122/2006/A

CHAPTER – VIII

USE OF MINERALS

Sand is said to have more impact on the strength of the construction. Various grading of

sand the size of the particles or granules of sand ranges from 1/16mm to 2mm. Based on

the size of the particles, the sand can be classified as fine, medium and coarse. The

particles of fine sand are much smaller when compared to the other types. However, each

of them has their own purpose in construction. The coarse sand is used for constructing

pillars and underground tanks, while the medium sand is used for the first layer of plastering

and other works. The final finish of plastering includes the use of fine sand. Pit coarse sand

obtained from quarries is used in the construction of houses in urban areas. It is filtered

when required for specific uses in construction such as plastering. Features of good quality

sand like any other material, there are certain features that determine the quality of sand.

Good quality sand should not possess more than 4% of silt content. It should have natural

and crushed stone sand.

Page 23: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 17REGN NO. – RQP/RNC/122/2006/A

CHAPTER – IX

OTHERSThe entire operation will be on contract and the supervision will be done by the applicant. It

is providing employment to the local people who are engaged for the sand mining

operations. It also enhances commercial activities by engagement of local truck owners,

maintenance activities and other related activities. The entire operations as discussed

above are stepping up the socio-economic condition of the nearby areas.

Site is provided with mobile shelter, restroom with all facilities like drinking water, bathroom,

etc.

Applicant will also carry out various CSR activities in the nearby villages. The details are

mentioned here:

Infrastructure Development

1) Construction/ extension/ cleaning/ repairing of Sewage drains.

2) Desiltation/ deepening/ renovation of ponds.

Health & Hygiene1) To Improve Health Seeking Behavior of the Community through outreach

mobile health Clinic.

2) To establish Referral Centre for Specialized Services in Disability

Management.

3) To contribute in reducing cataract burden.

Sustainable Livelihood1)To Form, equip and strengthen Women Self Help Groups to combat poverty,

inequality and injustice.

2)To Nurture Sporting Talents amongst Local Youths.

3)To improve efficiency in Agriculture Practice and ensure increase in income

4)To Ensure and strengthen Irrigation Facilities.

Empowerment1) Capacity Building/SHG Activities

2) Youth Development - Training at various centers and Computer training

Agricultural Extension1) Irrigation benefits

Page 24: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 18REGN NO. – RQP/RNC/122/2006/A

2) Fencing of agricultural fields

Social Education1) Pre Matric Coaching/ English Spoken Class

2) Adult Literacy Programme

Page 25: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 19REGN NO. – RQP/RNC/122/2006/A

CHAPTER -X

MINERAL PROCESSING

Mineral processing is not applicable for river bed sand mining.

Page 26: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 20REGN NO. – RQP/RNC/122/2006/A

CHAPTER – XI

ENVIRONMENT MANAGEMENT PLAN

11.0 A Key Plan as per Rule 28(5)(a) on a scale of 1:50000 has been prepared

incorporating boundary of the mining lease and adjoining area lying within five kilometers

there of contours, natural drainage system, roadways, forests, village boundary,

predominant wind direction (Plate 1).

An Environment Plan of the area of mining lease inclusive of the adjoining area within five

hundred meters of the boundary of the lease area on 1:5000 scale incorporating the

boundary of the mining lease, contour lines, roadways, forests, predominant wind direction,

air and water sampling point has been prepared under Rule 28(5)(b) – Plate No. 06.

11.1 Existing Land Use Pattern :Land Use Pattern:

Summary Area (in Ha)

Government Land 19.47

The land use of the mine lease area is the river bed of River Barakar and there will be no

change in land use after operation. The sand will be replenished every year during the

monsoon season. The ultimate land use of the mine lease area will not be change.

Water Regime:The Barakar River flows from the north-western to south-eastern. The flow rate of the river

varies with the quantity of precipitation in the catchment area. A major portion of the

precipitation occurs during the monsoon season i.e., from June 15 to September 15 every

year. There will be no change in the water course of the river as well as any pumping/

withdrawal of water from the river. In the proposed project there is no need of water to carry

out operations but drinking water will be required for the working people. It will be provided

by the management.

Human Settlement and Demographic Profile:There is no village settlement within 500 m of the lease area. The living conditions of the

people residing beyond 500 m of the lease area is expected to improve by way of socio-

economic development of the region through direct & indirect employment, community

Page 27: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 21REGN NO. – RQP/RNC/122/2006/A

developmental programmes etc. However, this will in any way not have any negative effect

on the welfare of people.

Public Building etc:There is no Public building within 300 meter of the proposed leasehold area.

Quality of air, ambient noise level and water:

During daytime noise is produced due to movement of vehicles and mining machineries. At

night only the twittering of the crickets from the nearby fields and jungles can be heard.

No monitoring data is available in this area. Therefore air quality data will be obtained by

deploying monitoring instruments considering the prevalent wind direction, area of

settlements and the transportation routes as per the National Ambient Air Quality

Standards’2009

Baseline information of water regime will be obtained by analyzing surface water- upstream

and downstream and ground water data from dug well and tube wells.

Flora:Common flora like mango, jamun, Jackfruit and some bushes could be seen in the nearby

area.

FaunaDomestic animals like cows, goats and pigs could be seen. Wild animals are not found

except jackal and fox can be seen. Common birds are jungle crow, cotton feed, myna etc.

Common reptiles are snake and lizard.

Climatic Condition:The rainfall in the area is mainly due to southwest monsoon and nearly 80 to 85% of the

annual rains occur between June and September.Remaining 15% to 20% rain is distributed

unevenly, sometimes rain also occurs between January and March.

The normal Annual rainfall of the district has been reported to be 1000 mm based on data

from 1901 to 1970. There is a large variation in rainfall in space and time.

The district is endowed with typical climate with extremes in summer as in winters. The

mercury shoots up to 450C or even more during peak summer and dips to less than 50C

during the month of January. Winter spans from mid of November to mid of February.

Summer months are April to middle of June which ends with onset of monsoon.

Page 28: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 22REGN NO. – RQP/RNC/122/2006/A

Whether the area comes under notified area under Water Act, 1974:In fact entire State of Jharkhand notified as the Pollution Control area under the Water Act,

1974. By virtue of its location the area falls under the notified area under the Water Act,

1974.

11.2 Environment Impact Assessment:The sand mining activity will have minimum adverse impact on the environment; rather it will

have beneficial impact. The removal of the sand from the river bed will be confined to the

dry portion of the bed. However, the following areas are affected due to sand mining:

i. Dust generation during handling and transportation.

ii. Noise pollution

iii. Impact on river water quality

iv. Impact on ground water

v. Impact on flora and fauna

Some of the beneficial effects from sand mining activity are:

i. Regular de-siltation of the river to avoid flooding

ii. Up-gradation of socio-economic level of the area

iii. Vital support to construction activity

The baseline study of the various environmental parameters is being studied for one season

except monsoon.

The study area also witnesses huge transportation activities of minerals, men, material, etc.

The data obtained from the ambient air quality analysis carried out by our EIA/EMP

consultant indicates that for a number of occasions the level of air quality was higher than

the permissible limits which is quite obvious since the area has been declared critically

polluted area.

The surface water quality data shows that all the parameters are within range except the

concentration of microbial organisms. Moreover the ground water analysis data was found

within permissible limits except the dissolved mineral concentration level.

As far as the noise level is concerned, it is only during the loading and transportation of the

mineral. Moreover, no populated area found within 500 meters from the edge of the river.

Page 29: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 23REGN NO. – RQP/RNC/122/2006/A

There is no rare species of flora or endangered fauna in the study area. There is no eco-

sensitive area, wildlife sanctuary and national parks in 10 kms radius of the proposed sand

lease.

11.3 MANAGEMENT PLAN:This project is required for collection of sand necessary for construction. The sand to be

collected /gathered from these leases along the river will be sent to the site of construction

of various kinds of infrastructures, building bridges, road etc.

The project involves collection of river bed material. This will also help to prevent widening

of the riverbeds and to prevent flooding off and damage to the adjoining areas. This can

only be achieved by maintaining the existing course of the river. This is ensured through the

following:

1. Restriction of mining operation upto3mt and above ground water level.

2. 1/5th of the width of the river will be left intact for maintaining the embankment.

3. Maintain 500 meters distance as safety zone from bridges, weirs, etc

4. No sand mining during rainy season

5. No damage to the river banks.

6. Prevention of River Bank erosion by lying of boulders & pebbles.

7. Water spraying along the haul roads & transportation routes to prevent air pollution.

8. Maintain the health of the transportation roads.

9. Transportation by covered trucks.

10. Maintenance of trucks to prevent spillage and noise minimization.

11. Use of proper PPE’s for the workforce is ensured.

12. No withdrawal/ pumping of water from sand lease areas

13. This project operation will provide livelihood to the poorest section of the society. It provides

employment to the people residing in vicinity directly or indirectly by the project.

Page 30: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 24REGN NO. – RQP/RNC/122/2006/A

CHAPTER – XII

PROGRESSIVE CLOSURE PLANUNDER RULE 23 B (2) OF M.C.D.R., 1988

12.1. Introduction:

The name of the applicant, the location and extent of lease area, the type of leasearea (forest, non-forest etc) the present land-use pattern, the method of mining &mineral processing operations:

Name of Applicant:

SRI JAGDISH TIWARI

Village - Kapasara, Post & Thana - Chirkunda, Dist.-Dhanbad, Jharkhand

Land Use Pattern:

Summary Area (in Ha)

GM Land 19.47

Existing Land use pattern:

The land use of the mine lease area is the river bed of River Barakar and there will be no

change in land use after operation. The sand will be replenished every year during the

monsoon season. The ultimate land use of the mine lease area will not be change.

Method of Mining :

Refer Chapter –IV.

12.1.1 Reasons for Closure:

The reasons for closure of mining operations in relation to exhaustion of mineral lackof demand, uneconomic operations, natural calamity, directives from statutoryorganization or court etc:

Not Applicable

12.1.2 Statutory Obligations:

Page 31: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 25REGN NO. – RQP/RNC/122/2006/A

The legal obligations, if any which the applicant is bound to implement like specialconditions imposed while execution of lease deed, approval of mining plan,directives issued by the Indian Bureau of Mines, conditions imposed by the Ministryof Environment & Forests, State or Central Pollution Control Board or by any otherorganization describing the nature of conditions and compliance position there of :

The applicant will implement like special conditions imposed while execution of lease deed,

approval of mining plan, directives issued by the Central & State Government, conditions

imposed by the Ministry of Environment & Forests, State or Central Pollution Control Board

or by any other organization.

12.1.3 Closure Plan Preparation :The names and addresses of the applicant and recognized qualified person whoprepared the Mine Closure Plan and the name of the executing agency should befurnished. A copy of the resolution of the board of Directors or any other appropriateadministrative authority as the case may be on the decision of closure of mineshould be submitted.

Name of Applicant:

SRI JAGDISH TIWARI

Village - Kapasara, Post & Thana - Chirkunda, Dist.-Dhanbad, Jharkhand

Name of the RQP preparing Mining Plan:

Name : ChinmoyDey

Address : Tiril (Kokar),

P.O. – R.M.C.H (Bariatu)

Ranchi-834009

Phone : 9199452487

Registration no. : RQP/ RNC/122/2006/A

Valid up to : 26-10-2016

Page 32: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 26REGN NO. – RQP/RNC/122/2006/A

12.2 Mine Description :12.2.1 Geology :Briefly describe the topography and general geology indicating rock types available,the chemical constituents of the rocks / minerals including toxic elements if any, atthe mine site.

Physiography:

Refer Chapter – III.

General Geology:

Refer Chapter – III.

12.2.2 Reserves :Indicate the mineral reserves available category wise in the lease area estimated inthe last mining plan / mining scheme approved along with the balance mineral.

Length in m Avg. width inm

Avg. Thickness in m Volume in Cum

474 390 3 554580

The entire deposit is in river bed. The estimation of the reserves has been drawn on the

basis of actual measurement of length and breadth of river bed falling within the lease hold

area and multiplied by the thickness of sand bed which in this case is taken as 3.0 mtrs. The

details are given below with reference of Geological plan at100 m grid interval.

Geological Reserves and grade:

The total reserves as estimated within the leasehold are at present approximately

443664cum and will be replenished every year after monsoon by the quantity to be lifted

from the river bed.

Anticipated life of the mine:

The reserve estimated above will replenish every year. So, the life of the mine will be for the

entire lease period.

Page 33: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 27REGN NO. – RQP/RNC/122/2006/A

Feasibility study based on the geographical conditions and operating conditions:

Infrastructure: Road and is near to the working site. Manpower is cheaply available.

Geology: Geologically the area is potential and the deposit is sufficient for fulfillment of the

requirement.

Legal matters: Leasehold area is valid as per the rule of M.C.R. 1960. There will be no

displacement. Land is GM land.

Operating: The applicant has all the mining equipments used for the scientific mining. The

mine is eco-friendly.

Reserves and Resources Estimated For River Sand

Classification Code Quantityin MT

Total Mineral Resources (A+B) 554580

A. Mineral Reserve

(1) Proved Mineral Reserve 111 554580

(2) Probable Mineral Reserve 122 …………

B. Remaining Resources

(1) Feasibility Mineral Resource 211 …………

(2) Pre-feasibility Mineral Resource 221 …………

Pre-feasibility Mineral Resource 222 …………

(3) Measured Mineral Resource 331 …………

(4) Indicated Mineral Resource 332 …………

(5) Inferred Mineral Resource 333 …………

(6) Reconnaissance Mineral Resource 334 …………

12.2.3 Mining Method :

Page 34: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 28REGN NO. – RQP/RNC/122/2006/A

Describe in brief the mining method followed to win the mineral, extent ofmechanization, mining machinery deployed, production level etc.

Method of Mining:

Refer Chapter –IV.

12.2.4 Mineral Beneficiation :Describe in brief the mineral beneficiation practice if any indicating the processdescription in short. Indicate discharge details of any tailings / middling and theirdisposal / utilization practice followed.

Refer Chapter – X.

12.3 Review of Implementation of Mining Plan / Scheme of Mining Including fiveyears Progressive Closure Plan up to the final closure of Mine :Indicate in detail the various proposals committed with special emphasis on theproposals for protection of environment in the approved Mining Plan / Scheme ofMining including five years Progressive Closure Plan up to the closure of mine vis-à-vis their status of implementation. Highlight the areas, which might have beencontaminated by mining activities and type of contaminants that might be foundthere. The reasons for deviation from the proposals if any with corrective measurestaken should also be given.

The area is under mining operation and during the course of mining operation the applicant

will adopt the measures for protection of environment. Whatever data for protection of

environment will be, the applicant will provide the same time to time.

12.4 Closure Plan :12.4.1 Mined-Out Land :Describe the proposals to be implemented for reclamation and rehabilitation ofmined-out land including the manner in which the actual site of the pit will berestored for future use. The proposals should be supported with relevant plans andsections depicting the method of land restoration / reclamation/ rehabilitation.

The land use of the mine lease area is the river bed of River Barakar and there will be no

change in land use after operation. The sand will be replenished every year during the

monsoon season. The ultimate land use of the mine lease area will not be change.

Page 35: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 29REGN NO. – RQP/RNC/122/2006/A

12.4.2 Water Quality Management :Describe in detail the existing surface and ground water bodies available in the leaseareas and the measures to be taken for protection of the same including control oferosion, sedimentation, siltation, and water treatment, diversion of water treatment,diversion of water courses, if any, measures for protection of contamination ofground water from leaching etc. Quantity and quality of surface water bodies shouldalso be indicated and corrective measures proposed to meet the water qualityconforming the permissible limits should also be described. Report of hydrologicalstudy carried out in the area may also be submitted. The water balance chart shouldbe given. If there is potential of Acid Mine Drainage the treatment method should begiven:

Monitoring of water will be carried out involving outside agency. In this area no acid mine

drainage could be seen so no proposal is proposed for this purpose. However, the hydro-

geological study of the entire Jharia coal-field is given here.

Hydro-Geology of the Area

Ground Water ScenarioStudy of geochemical assessment of river water quality and its possible contamination

wascarried out with the objective of identifying the occurrence of various geochemical

processesand suitability of these water resources for irrigation, potability and other ancillary

uses bylocal inhabitants. Analytical findings were plotted in geochemical facies diagrams to

find out the variability in Barakar river water quality. The study revealed that calcium

andbicarbonates are the dominant ions in all the samples analyzed. The Piper trilinear

diagrams reveal that CaHCO3 is the dominant hydro-chemical facies in the Barakar river

water in thestudy area. The Wilcox diagram, which shows the plot of percent sodium with

the total ionicabundance, indicates that river water in the study area chiefly falls within

excellent-to-goodquality class. The source of the ions in the water was examined and

classified accordinglyusing Gibb’s diagram and the diagram shows that rock weathering

plays the key role incontrolling the hydro-geochemistry of the Barakar river. Water quality

parameters wascompared with the prevalent environmental standards indicates that, with

few exceptions, the Barakar river water in the study area is fit for drinking and irrigation use

and is free fromalkali and salinity hazards.

Depth to Water Level

Page 36: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 30REGN NO. – RQP/RNC/122/2006/A

During May 2006, the depth to water levels in HNS wells tapping shallow aquifer ranged

from 5.1 to 12.90 mbgl. Depth to ground water levels during the post monsoon

(November 2006) varied between 2.6 and 9.24 mbgl.

Aquifer ParametersA total of 6 exploratory wells and 3 observation wells have been constructed down to depth

of 200 m in hard rock formation to decipher the potential fracture zones with their yields.

The exploratory data reveals presence of potential fractures between 30 and 100mbgl. The

yield of the well in general as evident from the exploratory data has been found to vary

between 5 and 62 m3/hr. The piezometric level varies between 4 and 30 mbgl. Aquifers

lying between the depth ranges of 30-100 m have moderate prospects of ground water

development

Water quality assessmentData obtained by geochemical analyses of Barakar river water were evaluated in the terms

of its suitability for drinking, livestock and irrigation uses.

Ground Water QualityGeochemical observations, including major ion and trace element analysis, and isotopic

tracing have been carried out in the Barakar River system (northeastern India) during a

surface-water- and groundwater-monitoring program aimed at evaluating impacts of mining.

The most mineralized end-member represents anthropogenic inputs (agricultural practices

and ore processing). The third end-member, characterized by a high 87Sr/86Sr signature, is

believed to be controlled by natural geochemical processes, although affected by human

activities (e.g. drainage of mine waste). Potential flow paths, investigated north of the area,

reveal that all groundwater types seem to evolve more in pockets than along a flow path.

The limited extent of transfer and the predominance of natural phenomena help to explain

the moderate level of groundwater contamination and the characteristics of surface water

contamination by mining and the metallurgy industry.Suitability for drinking and livestock usesTo assess the suitability for drinking and public health purposes, the hydro-chemical

parameters of the river water of the study area were compared with the prescribed limit of

Geochemistry of the River Barakar

Page 37: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 31REGN NO. – RQP/RNC/122/2006/A

Air Quality Management :

Describe the existing air quality status. The corrective measures to be taken forprevention of pollution of air should be described:

Ambient air quality has been monitored by us and external agency. For baseline study, in

each season monitoring will be carried out on two days in a week with 24-hourly samples

being collected on each day in future as per the norms laid down by MoEF. Emission of dust

due to movement of vehicles and machineries will produce impact on air. As such there is

no need for prevention of pollution of Air quality except sprinkling of water on haul road etc.

in dry season.

12.4.3 Waste Management :Describe the type, quality and quantity of overburden, mineral reject etc. availableand their disposal practice. If no utilization of waste material is proposed, the mannerin which the waste material will be stabilized should be described. The protectivemeasures to be taken for prevention of siltation, erosion and dust generation fromthese waste materials should also be described. If toxic and hazardous elementspresent in the waste material the protective measures to be taken for prevention oftheir dispersal in the air environment, leaching in the surface and ground water etcshould be described:

There is no generation of waste during mining operation, therefore, no provision of stock

yard is proposed. The entire mineral produced is useable.

12.4.4 Topsoil Management :

There is no generation of topsoil.

12.4.5 Tailing Dam Management :The steps to be taken for protection and stability of tailing dam, stabilization of tailingmaterial and its utilization, periodic desalting measures to prevent water pollutionfrom tailings etc, arrangement for surplus water overflow along with detail design,structural stability studies, the embankment seepage loss into the receivingenvironment and ground water contaminant if any should be described :

Not Applicable.

Page 38: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 32REGN NO. – RQP/RNC/122/2006/A

12.4.6 Infrastructure :The existing infrastructural facilities available such as roads, aerial ropeways,conveyer belts, railways, power lines, buildings & structures, water treatment plant,transport, water supply sources in the area etc and their future utilization should beevaluated on case-to-case basis. If retained, the measures to be taken for theirphysical stability and maintenance should be described. If decommissioningproposed, dismantling and disposal of building structures, support facilities andother infrastructure like electric transmission line, water line, gas pipeline, waterworks, sewer line, telephone cables, underground tanks, transportation infrastructurelike roads, rail, bridges, culverts etc, electrical equipments and infrastructures likeelectrical cables, transformers to be described in connection with restoring land forfurther use :

The applicant will construct the mobile office cum attendance room and first aid center, work

shop as per the site selection. A rest shelter will be provided near working quarry. Provision

of potable water will be made available in the shelters.

12.4.7 Disposal of Mining Machinery :The decommissioning of mining machineries and their possible post miningutilization, if any, to be described:

Not Applicable

12.4.9 Safety & Security:

Explain the safety measures implemented to prevent access to surface openings;excavations etc and arrangements proposed during the mine abandonment plan andup to the site being opened for general public should be described:

D.G.M.S. approved Safety shoes and helmets are being provided to the all workmen.

During proposed plan period there is no proposal to close the mine.

Security guards are engaged for security.

12.4.10 Disaster Management and Risk Assessment :This should deal with action plan for high-risk accidents like landslides, subsidenceflood, inundation in underground mines, fire, seismic activities, tailing dam failureetc. and emergency plan proposed for quick evacuation, ameliorative measures to be

Page 39: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 33REGN NO. – RQP/RNC/122/2006/A

taken etc. The capability of applicant to meet such eventualities and the assistance tobe required from the local authority should also be described:

High risk factors such as landslide, subsidence flood, fire, tailing dam failure etc are not

encountered nor anticipated during proposed five years plan period. As such, emergency

plan for quick evacuation, protective measures are not proposed. Also, no local habitant

exists as the working area is far away from the locality.

12.4.11 Care and maintenance during temporary discontinuance :For every five yearly review (as given in the mining scheme), an emergency plan forthe situation of temporary discontinuance or incomplete programme due to courtorder or due to statutory requirements or any other unforeseen circumstances,should include a plan indicating measures of care, maintenances, and monitoring ofstatus of unplanned discontinued mining operations expected to re-open in nearfuture. This should detail item wise status monitoring and maintenance withperiodicity and objective.

Due to unforeseen reason the mine will be a closed temporarily then proper care of workers

and staffs will be taken. Temporary discontinuance notice in the prescribed form will be sent

to the concerned authority of D.G.M.S., concerned State Government and concerned

Labour Department within the stipulated time.

Security guards to take care of the infrastructure shall be kept under the roll of the

management in case of any temporary discontinuation.

12.5. Economic Repercussions of closure of mine and manpower retrenchments:Manpower retrenchment, compensation to be given, socio – economicrepercussionsand remedial measures consequent to the closure of mines should bedescribed, specifically stating the following.

At this stage there will be no manpower retrenchment etc. in the area, hence, no proposal

for these have been discussed.

12.5.1 Number of local residents employed in the mine, status of the continuationfamily occupation and scope of joining the occupation back.

This project operation will provide livelihood to the poorest section of the society. It provides

employment to the people residing in vicinity directly or indirectly by the project.

Page 40: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 34REGN NO. – RQP/RNC/122/2006/A

12.5.2 Compensation given or to be given to the employees connecting withsustenance of himself and their family members.

Not Applicable

12.5.3 Satellite occupations connected to the mining industry – number of personsengaged therein – continuance of such business after mine closes.

Not Applicable

12.5.4 Continued engagement of employees in the rehabilitated status of mininglease area and any other remnant activities.

The applicant will habilitate a large area and more people of the local residents are engaged

in cultivation. Moreover the company will organize community development programmes in

the near by villages and more people will be benefited by these programmes.

12.5.5 Envisaged repercussions on the expectation of the society around due toclosure of mine.

Not Applicable.

12.6 Time Scheduling for Abandonment:

The details of time schedule of all abandonment operations as proposed in Para – 4should be described here. The manpower and other resources required forcompletion of proposed job should be described. The schedule of such operationsshould also be supplemented by PERT (Programme Evaluation & Review Technique),bar chart etc.

N.A.

12.7Abandonment Cost:

Cost to be estimated based on the activities required for implementing the protectiveand rehabilitation measures including their maintenance and monitoring programme.

N.A.

12.7 Financial Assurance :The financial assurance can be submitted in different forms as stated in Rule 23(F) (2)of Mineral Conservation and Development (amendment) Rules, 2003. In the mine

Page 41: MINING PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_01_Aug_… · Shri Jagdish Tiwary Shri Jagdish Tiwary, S/o Late Ram Chabila Tiwary,

M/S CHIRKUNDA BALU GHAT OVER BARAKAR RIVERAREA: 48.10 ACRES (19.47 HECTARES) LESSEE:SRI JAGDISH TIWARI

CHINMOY DEY 35REGN NO. – RQP/RNC/122/2006/A

closure plan, the manner in which financial assurance has been submitted and itsparticulars have to be indicated. :

The land use of the mine lease area is the river bed of River Barakar and there will be no

change in land use after operation. The sand will be replenished every year during the

monsoon season. The ultimate land use of the mine lease area will not be change.

The financial assurance in the form of Bank Guarantee is not required as the sand will be

replenished every year during monsoon season.

12.9 Certificate:

The above-mentioned actions have been taken to be stated clearly in the mineclosure plan. A certificate duly signed by the applicant to the effect that said closureplan complies all statutory rules, regulations, orders made by the Central or StateGovernment, statutory organizations, court etc, have been taken into considerationand wherever any specific permission is required the applicant will approach theconcerned authorities. The applicant should also give an undertaking to the effectthat all the measures proposed in the closure plan will be implemented in a timebound manner as proposed.

The above certificates are enclosed at the beginning of the mining plan.

12.10 Plans, sections etc:

The chapters at 1, 2, 3 and 4 should be supported with Plans. The Closure Plan mayalso be submitted depicting photographs, satellite images on compact disc etc.wherever possible.

N.A.

*****************************