Moblan Lithium
Presentation of the Project
Mistissini/Oujé-Bougoumou
October, 2018
MOBLAN LITHIUM
29 août 2016 1
Moblan Lake Lithium Deposit
MOBLAN LITHIUM
Octobre 2018 2
HISTORY OF THE MOBLAN LAKE SITE
Exploration by Muscocho
Exp.
1961
1963
Discovery of spodumene
SelcoMining Co.
1972-1975
1992+
Abitibi Lithium
Co
PFS study
Soquem
2001
2005+
GlobestarMining
43-101
Perilya
43-101
Presentationto the Band
Council
2010+
2017
Guo AO Lithium
+
Soquem
MOBLAN LITHIUM
Octobre 2018 3
PROMOTOR
Lithium Guo AO Ltd:
• President & CEO: Mrs. Jin Gao
• Canadian subsidiary in Town of Mount Royal (Qu.) of
Shenzhen Guo Ao Mining Investment Partnership (LP)
(Shenzhen, China)
• Role : Develop and exploit lithium mine in Canada
• Sister company of Neotec Lithium Ltd, a lithium
carbonate producer in Taixing, China
Taixing
Shenzhen
MOBLAN LITHIUMLOCATION– MOBLAN LAKE
Octobre 20184
In the Eeyou Istchee Region:
• 170 km (by road) from Cree Nation
of Mistissini
• 135 km (by road) from
Chibougamau
• 140 km (by road) from the Cree
Nation of Oujé-Bougoumou
• 180 km (by road) from Chapais
Moblan Lithium
Wabushi Mine
MOBLAN LITHIUMOVERVIEW – LAKE MOBLAN SITE
Octobre 20185
Ore: 1.5% Li2O
Production of spodumene:
• 200,000 to 213,000 t/y
• 5.8-6.2% Li2O
Open-pit mine: 23 ha.
Operation: +/- 12 years, 7d/7, 24 h/d, 350 d/y
Power requirements: 9 MW
Work camp: 7 days rotation
Open-pit mine:
10 Mt ore
Plant:
2,600 t/d
Tailings
Pile
Waste rock dump:
27 Mt
Overburden
dump: 3 Mt
Low grade ore
dump
MOBLAN LITHIUMOVERVIEW – SHIPPING OF SPODUMENE
Octobre 20186
Shipping of spodumene:
Route du Nord: 115 km
Road 167 South: 20 km
Transhipment at Chibougamau’s railway port
Transport by train to Montreal: +/- 500 km
Transport to China (port of Taixing): > 20,000 km
MOBLAN LITHIUM
Octobre 2018 7
PROJECT MILESTONES REACHED: ENVIRONMENTAL BASELINE
Study Area Inventories and Surveys
MOBLAN LITHIUMSENSITIVE COMPONENTS: FISH HABITAT AND WATER COURSES
Octobre 20188
Anoxic ponds
Inventoried fishspecies:
Allegheny pearl dace
Northern pike
Brook trout
Lac Coulombe
Lac Moblan
Fish habitat
Fish
habitat
Spawning
potential
Spawning
potential
Otters
MOBLAN LITHIUMFAUNA AND FLORA
Octobre 20189
Rock vole
protection
No other species of conservation interestfound:
Amphibians
Grass-snakes
Salamanders
Forest birds
Fish
Mammals
Bald eagle
protection
Bears
Lynx
Beavers
Mooses
MOBLAN LITHIUM
Octobre 2018 10
WORK TO BE COMPLETED: ENVIRONMENTAL BASELINE
> Environmental characterization of soils
> Flow and environmental characterization of groundwater
> Hydrography, hydrology and flow of surface water
> Road traffic
> Traditional use and cultural heritage
> Archaeological heritage
> Socio-economic profile
> Spawning potential
Additional studies in progress
MOBLAN LITHIUM
Octobre 2018 11
WORK IN PROGRESS :
STAKEHOLDER CONSULTATION Open House Presentation
October 2018
Review and comments on ESIA Report
sections
Open House on Impact
AssesmentResults
December2018
Workingcommittes on critical issues
Discussion meetings on
specificconcerns Website:
www.neoteclithium.com
MOBLAN LITHIUM
Octobre 2018 12
TO BE COMPLETED : ANALYSIS OF ALTERNATIVES
Power supply
> Diesel generators
> Natural gas generators
> Hydroelectricity
Lithium carbonate plant
> Plant in Taixing, China
> Extraction plant in Chibougamau
> Extraction by other producers in Quebec
Transport logistics
> Trucking to Chibougamau
> Transportation by train to port
> Expedition from port in Montreal or Becancour
Tailings management
> Mud pond
> Filtered « cake » pile
> Submerged mud pond
MOBLAN LITHIUM
Octobre 2018 13
Present work sourced from
local businesses:
- EnviroCree for biological surveys,
hydrogeology and geotechnics
- Drilling Chibougamau: for geotechnical
investigation
More than 300 jobs during construction (1-2 years)
Approximately 150 direct jobs for the operation of the mine and concentrator
PROJECT BENEFITS
> Source of employment for Mistissini/
Chibougamau/Oujé-Bougoumou/Chapais region
> IBA to be negotiated with the Cree Nation of
Mistissini
> Source of private investment in the James Bay –
Eeyou Istchee region
> Worldwide contribution to the electrification of
transport, including China
MOBLAN LITHIUM
Octobre 2018 14
NEXT STEPS
April to
August
2018
October to
December
2018
Autumn
2018
Winter
2019
Spring
20192020
Biological
Surveys
Consultations
Impact
analysis
Public presentations
of the EIA results
Acceptability
analysis
Answers to
COMEX questions
Environmental
analysis
Start of production
MOBLAN LITHIUM
Octobre 2018 15
CONCLUSION
> Open-pit mine, smaller than Nemaska-Li
> Smaller plant than North American
Lithium project
> Meets the growing needs of the
sustainable transport market
> Project developed with respect for the
local ecosystem
> Planning in close collaboration with
stakeholders and communities
Copyright © Hatch 2016. All
Rights Reserved.
Merci
Thank you 謝謝