Mohammad Saleh Sanoussi Hussain
Consultant EngineerPersonal Profile:
Nationality: Saudi Arabia Martial Status: Married Date of Birth: 13-02-1956 Place of Birth: Madinah Al-Munawara. (K.S.A)
Contact:
Saudi Arabia – Jeddah Mobile: +966 50 568 4815 E-mail: [email protected]
Education:
Bachelor of Civil Engineering -King Fahad University of Petroleum & Minerals.Dhahran, K.S.A- 1979
Membership of Professional Organizational / Society:
Consultant Engineer Office accredited by the Saudi Council Of Engineers. Triangle of Success Registered Consultant Office. Associate Value Engineering Specialist –Board of SAVE International Certificate no.
20060111- 24/Jan/2006. Certificate of Registration as Consultant Engineer (CE. Sce) Membership no. 10757 Saudi
Council of Engineers-27/Jan/2009. International WHO's WHO's of Professionals Organization and Historical Society-/2001
Seminar, Conference & Trainings:
Please see the attachments page no's (6 to 8).
Career Summary:
More than 30 years experience in private and public sector as Project Manager, and Technical Committee Chairman, for various projects in the private sector and for the Saline Water Conversion Corporation (SWCC) and Ministry of Water & Electricity projects, including desalination and power plant associated marine works, oil un-loading jetty seawater intake and discharge channels. Pump houses, pipeline construction, housing compounds, schools, concrete re-habilitation works, SWCC clinic, Sewage treatment plant etc. with broad range of managerial responsibilities Consultancy and supervision, monitoring and project controls as well as design review, review of shop drawings and process their recommendations and approval etc.
Participation and co-ordination with the international consultants like, Durtchhanom ,Khatib Alamy, ILF, Fitchner, Ewbank Precee Power & Water Ltd, from preliminary study stage and review of technical specification for Desalination & Power Plants and Water Transmission system , Housing Projects, and Sanitary Sewage Network Pipes in Jeddah City.
Page # 01 of 08
.
Professional Experience:
From Jan 2012 up to date Triangle of Success Consulting Office.
Duties / Responsibilities:
Study, Design and Management of Public and Private local Projects with International Consultants
Supervising Project within Agreed Schedule.
Forecast Budgeting and Scheduling for Projects.
Study New Projects Feasibility and give Recommendation BOQ and Pricing0
Applied Value Engineering Concepts in all Projects done under our Consulting Office.
From February 2009 Up to Dec 2011 Al Fowzani Contracting.
Position: Technical & Management Consultant for Western Province Projects.
Projects:
a) Construction of 50 ( three story) Housing Buildings for Saline Water Conv. Corporation Plants (Western Region.)
b) Construction of 19 Office Buildings of Border Guard (Jeddah City).
c) Construction of 8 towers in King Abdallah Medical City (Makkah Al-Mukarramah) Under Awarding.
Project Cost: 700 Million Saudi Riyals.
Duties / Responsibilities:
Management of all Branch Projects Technically and Financially
Meeting Project Deadline Efficiently and within Agreed Schedule
Attending Monthly and Quarterly Meetings with the Clients Representative
Forecast Budgeting and Scheduling for Projects.
Study New Projects Feasibility and give Recommendation BOQ and Pricing.
From August 2007 to March 2008- Al-Joudah Construction (Zahran Group).
Projects:
a) Construction of College Buildings in different Cities.
b) Al Baha Medical Tower Center
Project Cost: 800 Million Saudi Riyals
Position: Deputy General Manager
Page # 02 of 08
.
Duties / Responsibilities:
Developed the General Organization Structure of the Company
Prepared The Salary Scale
Initiated complete filing system with electronic data management
Projects Technical and Financial Management.
Implemented and Conducted Weekly/Monthly and quarterly meetings improving the overall communication in the Company
From June 2005 to July 2007 – Ministry of Water & Electricity.
Projects:
a). Jeddah City – Sewage Network Project (Main Lines):
Construction of 200 kilometer long sewage main lines of dia 400mm – 2500mm, including micro – tunneling / pipe jacking works.
b). Jeddah City – Sewage Network Project (Branch Lines).
Construction of 2100 kilometer branch sewage network covering entire Central and Northern districts of Jeddah City, pipeline dia varies from 200mm to 800mm.
(11) Eleven Contractor (12) Material suppliers are involved in these projects.
Project Cost: 250 Million Saudi Riyals.
Position: Director General Project Execution in Ministry of Water and Electricity – Jeddah.
Consultants: ILF-Austria and Khatib & Alami-Lebanon
Duties / Responsibilities:
Overall responsible for project monitoring, project controls, re-design and construction management, quality assurance & quality control and approval of interim & final payment applications (invoices) for the completed contracts.
Conducting progress review meetings, co-ordination meetings with Consultants, Contractors and other Government Departments Managers.
Involved in the following projects from preliminary design stage review till execution, commissioning and final taking over.
From June 1980 to 2005 – SWCC (Saline Water Conversion Corporation):
Shoiba Infrastructural Projects from 2002 to 2005:
Projects:
2.1 Sewage treatment plant of 1750m3 /day capacity.
2.2 Shoiba beach development works.
2.3 Shoiba Medical Clinic.
2.4 Shoiba fire and safety brigade station.
Page # 03 of 08
.
Projects cost: 21 million Saudi riyals.
Position: Technical Committee Chairman.
Consultants: These projects have been executed directly under the supervision of SWCC Technical Committee Chairman with engineering staff, (No supervision consultants).
Duties / Responsibilities:
Includes complete site inspection and supervision of all construction activities, Monitoring Programs and Progress of works. Management of supervision team including reviews of all layout drawings, shop drawings, material submittals / approvals, program and progress, monthly payment certificates, Variation Orders, conducting meeting and taking appropriate technical decisions and reporting the projects status to Head office in Riyadh.
Shoiba Housing Projects from 2002 to 2004:
Project: Shaoiba Housing compound Part A & B comprising (3) three story apartment building 30 no's with 3 big schools building with all infrastructure facilities
Project Cost: 210 million Saudi Riyals.
Position: Technical Committee Chairman.
Consultants: This project has been executed directly under the supervision of SWCC Technical Committee Chairman with engineering staff, (No supervision consultants).
Duties / Responsibilities:
Site inspection and supervision of all construction activities, Monitoring Programs and Progress of works. Management of supervision team including reviews of all layout drawings, shop drawings, material submittals / approvals, program and progress, monthly payment certificates, Variation Orders, conducting meeting and taking appropriate technical decisions and reporting the projects status to Head office in Riyadh, including supervision of infrastructure works i.e. roads, water supply and sewage network etc.
Concrete Rehabilitation Project from 2000 to 2002:
Project: Power transmission over-head line concrete foundation re-habilitation project. Shoiba to Makkah 80 kilometers long.
Project Cost: 10 million Saudi Riyals.
Position: Technical Committee Chairman.
Consultants: Saudi Cowi Consult -Denmark.
Duties / Responsibilities:
Monitoring and inspection of works supervised by consultants, conducting progress review meetings with consultant & contractor.
Review and approval of work procedures / method statements and material submittals.
Note: This project has been executed on energized (live)110kv power transmission line.
Shoiba – Jeddah Water Transmission system from 1995 to 2000:.
Project: 162 kilometer long, Shoiba – Jeddah water transmission system: 60" dia carbon steel pipeline with 2-valve stations and up-grading of existing pump station from Shoaiba to Makkah, including construction of main Pump station at Shoaiba.
Page # 04 of 08
.
Project Cost: 1.00 billion USD.
Position: Construction Manager.
Consultants: This project has been executed directly under the supervision of SWCC Technical Committee Chairman with engineering staff, (No supervision consultants).
Duties / Responsibilities:
To assist chairman in all pipeline project construction activities, monitoring programs and progress of works, management of site supervision team of engineers.
Review and approval of pumping stations layout, construction drawings, material submittals, payment certificates and variation order.
Conducting progress & technical meetings and taking appropriate technical decision.
Shoiba Desalination and power plant, Phase-II from 1992 to 1995:
Project: 100 MGD / 500 MW Desalination and power plant, including fuel oil un-loading jetty and other associated heavy marine engineering works.
Project Cost: 3.4 Billion Saudi Riyals.
Position: Head of Civil Engineering Department.
Consultants: EWBANK Price Water & Power Ltd.- U.K.
Duties / Responsibilities:
Involved in all inspection & construction management activities, supervision of all civil works of Desalination & Power Plant and its associated buildings, structures and marine works. i.e construction of 150 meter high chimneys, massive concreting of turbine foundations, boiler foundations, sea water intake structures. 6x144,000 cubic meter water storage tanks, multi storied control room building and all infrastructure works of power & Desalination Plants including oil un-loading jetty of 100,000 DWT.
Review and approval soil investigation reports, soil improvements methods & its approval.
Note: After completion of major civil works promoted as construction manager for Shoiba-Jeddah Water Transmission system project.
Madina - Yanbu Desalination and power plants - Phase-II from 1991 to 1992:
Project: 60 million gallon per day / 164 MW desalination and power plant Madina-Yanbu Phase-II.
Project Cost: 700 Million US$.
Position: Head of Civil Engineering Department.
Consultants: The Kuljian Consulting Engineers – U.S.A.
Duties / Responsibilities:
Involved in all inspection & construction management activities, supervision of all civil works of Desalination & Power Plant and its associated buildings, structures and marine works. i.e construction of 150 meter high chimneys, massive concreting of turbine foundations, boiler foundations, sea water intake structures. water storage tanks, multi storied control room building and all infrastructure works of power & Desalination Plants. Review and approval of soil investigation reports, soil improvements procedures etc.
Page # 05 of 08
.
Shoiba Desalination and power plants - Phase-I from 1985 to 1991:
Project: 40 million gallon per day / 325 MW desalination and power plant Shaoiba Phase-I.
Project Cost: 2.5 Billion Saudi Riyals.
Position: Head of Civil Engineering Department.
Consultants: Fitchner Consulting Engineers - Germany.
Duties / Responsibilities:
Involved in all inspection & construction management activities, supervision of all civil works of Desalination & Power Plant and its associated buildings, structures and marine works. i.e construction of 150 meter high chimneys, massive concreting of turbine foundations, boiler foundations, sea water intake structures. 3x144,000 cubic meter water storage tanks, multi storied control room building and all infrastructure works of power & Desalination Plants including oil un-loading jetty of 20,000 DWT.
Review and approval of soil investigation reports, soil improvements procedures etc.
Jubail – Riyadh water transmission system from 1980 to 1985:
Project: Construction of 60" dia (carbon steel pipe), two parallel lines of 466 kilometer each and Riyadh City feeding lines, dia 2000mm of total length 132km to transfer 980,000m3 of water per day.
Project cost: 1.60 billion USD.
Position: Project Engineer.
Consultants: ILF Consulting Engineers – Austria.
Duties / Responsibilities:
Involved in all site construction, supervision, inspection activities of pipe line project and its appurtenance including construction of Riyadh city feeding lines.
Review of material submittals, method statements, shop drawings and QA/QC plans.
Attending progress review meetings with consultants & contractors.
Personal References:1- Dr. Abdullah Al-Shaikh
Deputy of Governor for Training & DevelopmentSaline Water Conversion Corpn.Riyadh, Saudi Arabia.
Tel: + 966505408186
2- Dr. Mohammed K. BasalamahProject Manager.ILF Consulting Engineers.Jeddah- Saudi Arabia.Tel: + 966505603575
3- Eng. Saleh Al-Najdy Director General in SWCC Riyadh – K.S.A. Tel: + 966554365065
Page # 06 of 08
.
List of Conference / Seminars / Training Courses Attended.
S.No Title Country Sponsored by Date
1 Project Management Professional (PMP)للمشاريع اإلحترافية اإلدارة K.S.A SAC For Training 8th March 2008
16th March 2008
2 Associate Value Engineering Specialistقيمية هندسة مشارك أخصائي K.S.A SAVE International 24th Jan 2006
3 Engineering Arbitration Seminarالهندسي التحكيم ندوة K.S.A G.C.C Commercial
Arbitration Centre02nd May–200503rd May-2005
4
Value Engineering Study Workshop for Ras-Al Zoor Riyadh (SWCC)
رأس لمشروع قيمية هندسة دراسة ورشة بالتحلية الزور
K.S.A Al-Yousuf: Value Engineering
01st Jan – 200520th Jan - 2005
5Value Engineering Study Workshop.
لتطبيق قيمية هندسة دراسة ورشة بالتحلية القيمية الهندسة
K.S.A Al-Yousuf: Value Engineering
11th Oct – 200420th Oct – 2004
6Advanced Value Engineering Seminar
(MOD.II)2 موديل-عمل( )ورشة القيمية الهندسة
K.S.A Al-Yousuf: Value Engineering
10th May-200412th May-2004
7
Value Engineering Training Workshop Mod-I
عن عمل ورشة تأسيسة تدريبية حلقة القيمية الهندسة
K.S.A Al-Yousuf Value Engineering
20th Dec-200324th Dec-2003
8Training Program on Project
Documentation writing.العقود صياغة حول التدريبي البرنامج
OMAN
Chamber of Commerce &
Industry – Salalh Branch.
30th Aug-200303rd Sep-2003
9 Strategic Planning and Implementation.وتطبيقية االستراتجي التخطيط K.S.A
University of Michigan Business
School
03rd May-200305th May 2003
10 Value Engineering Workshop (MOD.I)1 موديل-عمل( )ورشة القيمية الهندسة K.S.A Humoud Al-Salmi.
CVS-Life
28th Dec-200201st Jan-2003
11
Latest Developments in International Construction Law & Practice.
الدولي القانون في التطورات أحدث اإلنشاءات في وتطبيقاته
Cambridge U.K HAWKSMERE 12th Aug- 2002
16th Aug-2002
12 Program of Contractual Arbitrationاإلدارية العقود منارات برنامج K.S.A Al-Taweel
Consulting Center.16th June 200120th June 2001
13Project Integration and Scope
Management.المشروع وتكامل اإلدارة نطاق
K.S.AProject Management
institute (P.M.I) Future Engineering.
26th Sep-200028th Sep-2000
14
Total Project Management in the 21st
Century.القرن في للمشاريع في الشاملة اإلدارة
والعشرون الحادي
CaliforniaU.S.A Projacs International 05th Aug-2000
19th Aug-2000
Page # 07 of 08
.
S.No Title Country Sponsored by Date
15
Seventh Arab Structural Engineering Conference.
للهندسة السابع العربي المؤتمر فعاليات الكويت دولت في المنعقد اإلنشائية
Kuwait Kuwait University 24th Nov-199726th Nov-1997
16Executive Project Management
Conferenceالتنفيذية المشاريع إدارة مؤتمر
LondonU.K
Project Management and Controls Co.
(PROJACS)
25th Jul-199306th Aug-1993
17
Advanced Project Management by Computer.
اآللي الحاسب باستخدام المشروعات إدارة متقدم( )مستوى
K.S.A Engineering Committee 11th Dec-199216th Dec-1992
18 Value Engineering Workshopعمل( )ورشة القيمية الهندسة K.S.A Dar Al-Taqniya. 09th May-1992
13th May-1992
19Deteriorating Concrete Structure and Repair
Strategiesاإلصالح وإستراتيجية الخرسانية المنشات تأكل
Bahrain The Bahrain Society of Engineers.
16th Feb-199218th Feb-1992
20Structural Analysis & Design Using STAAD
III/ISDS Rel 12.13 استاد باستخدام اإلنشائي والتصميم التحليل
K.S.A Eng. Office Marwan Ashour
07th Dec-199113th Dec-1991
21 The Development in Structural Engineering.اإلنشائية الهندسية في التطورات K.S.A King Saud University. 27th Nov 1991
28th Nov 1991
22 Basic Corrosionالتآكل مبادئ K.S.A
National Association of Corrosion engineers
(NACE)Nov- 1991
23Engineering & Research Centre Course in
Concrete Control & Inspectionوفحصها الخرسانة جودة ضبط وأبحاث هندسة
U.S.A Bureau of Reclamation 8th March 1991
24
Structural Analysis & Design by Computer Application.
التحليل في وتطبيقاته اآللي الحاسب استخدام والتصميم اإلنشائي
K.S.A Engineering Committee. 22nd May-199027th May-1990
25 Effective Project Management & Leadershipللمشاريع الفعالية واإلدارة القيادة K.S.A The George Washington
University.17th May-199021st May-1990
26 Structural Analysis and Designاإلنشائي والتصميم التحليل K.S.A
Eng. Office Marwan Ashour 12th May 1990
16th May 1990
27First Regional Conference in Civil
Engineering RCCE-98المدنية للهندسة األول اإلقليمي المؤتمر
Bahrain The University of Bahrain
11th Mar-198913th Mar-1989
28
Concrete Cracks & Deterioration reasons & Remedial Measures.
في والتأكل الشروخ، التشققات، أسباب عالجها وطرق الخرسانية المنشآت
K.S.A Engineering Committee 05th Dec-198808th Dec-1988
29 Project Engineering and Managementواإلدارة المشاريع هندسة U.S.A Catalytic - Kuljian 01st Aug-1983
29th Feb- 1984
30 Desalination Technologyالتحلية تقنية U.K University of Glasgow 28th Jun-1982
01st Sep-1982
Page # 08 of 08