mohammed ali' cv_12-2015

12
Page 1 of 12 Mohammed Ali Ahmed Abdul Baky Objective Seeking a creative position what I have acquired through previous work experience, qualifications, as well as my educational background. Work experience September, 2002 Till March, 2014. Firm: AAW Consultant Engineers Co. From Nov-2015 to Now QS Section Head, Deputy Contracts Department Manager in Headquarter. Job Responsibilities: 1. To participate with head od design division in adopting the development plans for the department based on their acquired expertise through the follow up of projects due to their direct communication with the design personnal and projects management team. 2. Implement design sector policies and procedures, and attains goals, 3. Performs a managerial role for the section. 4. Assign team leader to new projects, in coordination with the department manager. 5. Provide technical advice to the QS section member if needed. 6. Review & approval the QS section work in coordination with the contract section head and vice versa. 7. Coordinate with team leaders the assignment of their members to ongoing projects, based on the work load and due dates. 8. Ensure and coordinate with the section team leaders that all deadline are met. 9. Decide on the sections need for resource (human, software, furniture,..etc). 10. Notify the department manager about the hours available for each project. 11. Determine the training needs for the employees in their section and enhance their qualifications. 12. Enhance and develop employees qualification in the section through training. 13. Follow the application of the Qualty Management System in the section (QMS). 14. Makes an annual evaluation of employees in their section. From Julay-2015 to Nov-2015 QS Team Leader in Headquarter. Job Responsibilities: 1. Implement design sector policies and procedures, and attains goals, 2. Assign the employees for new projects, in coordination with the Section head. 3. Provide technical advice to the QS section member if needed. 4. Review & approval the QS section work. 5. Coordinate with section head the assignment of the members to ongoing projects, based on the work load and due dates. 6. Ensure and coordinate with the section head that all deadline are met. 7. Follow the application of the Quality Management System in the section (QMS). 18 7art Raef, from Atiah Street, ElSa7el, Shoubra, Cairo, Egypt. Mobile : + 20 1122695021 Email:[email protected]

Upload: mohammed-ali

Post on 21-Jan-2017

172 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: Mohammed Ali' CV_12-2015

Page 1 of 12

Mohammed Ali Ahmed Abdul Baky

Objective Seeking a creative position what I have acquired through previous work experience,

qualifications, as well as my educational background.

Work

experience

September, 2002 Till March, 2014.

Firm: AAW Consultant Engineers Co.

From Nov-2015 to Now

QS Section Head, Deputy Contracts Department Manager in Headquarter. Job Responsibilities:

1. To participate with head od design division in adopting the development plans for the

department based on their acquired expertise through the follow up of projects due to their

direct communication with the design personnal and projects management team.

2. Implement design sector policies and procedures, and attains goals,

3. Performs a managerial role for the section.

4. Assign team leader to new projects, in coordination with the department manager.

5. Provide technical advice to the QS section member if needed.

6. Review & approval the QS section work in coordination with the contract section head and

vice versa.

7. Coordinate with team leaders the assignment of their members to ongoing projects, based

on the work load and due dates.

8. Ensure and coordinate with the section team leaders that all deadline are met.

9. Decide on the section’s need for resource (human, software, furniture,…..etc).

10. Notify the department manager about the hours available for each project.

11. Determine the training needs for the employees in their section and enhance their

qualifications.

12. Enhance and develop employees qualification in the section through training.

13. Follow the application of the Qualty Management System in the section (QMS).

14. Makes an annual evaluation of employees in their section.

From Julay-2015 to Nov-2015

QS Team Leader in Headquarter. Job Responsibilities:

1. Implement design sector policies and procedures, and attains goals,

2. Assign the employees for new projects, in coordination with the Section head.

3. Provide technical advice to the QS section member if needed.

4. Review & approval the QS section work.

5. Coordinate with section head the assignment of the members to ongoing projects, based on

the work load and due dates.

6. Ensure and coordinate with the section head that all deadline are met.

7. Follow the application of the Quality Management System in the section (QMS).

18 7art Raef, from Atiah

Street, ElSa7el, Shoubra,

Cairo, Egypt.

Mobile : + 20 1122695021

Email:[email protected]

Page 2: Mohammed Ali' CV_12-2015

Page 2 of 12

From December-2014 to Julay-2015

Senior QS Engineer in Headquarter. Job Responsibilities:

1. Preparation of contracts, including details regarding quantities of required materials in

accordance with final design drawing.

2. Assisting in establishing a client's requirements and undertaking feasibility studies.

3. Preparing and analysing costings for tenders.

4. Providing advice on contractual claims

5. Analysing outcomes and writing detailed progress reports

6. Valuing completed work and arranging payments;

From March-2014 to December -2014

Senior Quantity Surveyor Engineer

Title: Westown Infrastructure Trunk Package.

Country : 6th october, Giza, Egypt. Owner: SODIC.

Contractor : Hassan Allam for Construction

Brief Description of the Contract:

Construction of all external roads and infrastructure networks and utility services within

roads rights of way in the Westown project covering an area of 123 ha.

The infrastructure works include completion of all related structural and mechanical

works of road works, water supply and fire-fighting system, Irrigation system, sewerage

collection system, storm water drainage system, electrical distribution system, street

lighting and, telecommunications system.

Contract Amount: L.E. 60 million.

Title: Uptown Cairo – Package 17A.

Country : Al Mokattam, Cairo, Egypt. Owner: Emaar Misr.

Project Management: Turner Internaional.

Contractor : Rowad Modern Engineer.

Brief Description of the Contract:

The package of 17A is an infrastructure services in uptown cairo project which include

excution, completion, maintinance and handing over of all related structural and

mechanical works which is divided in tow parts as follow:

1. Ground Water Resevoir 10,000 Cum.

2. HDPE water line 780 ML.

Contract Amount: L.E. 55 million.

Responsibilities include:

- Prepare the accumulative progress as a guide to project management either in

connection with any contract or sub-contract.

- Prepare monthly payment application to be submitted to Employer according to

accumulative progress.

- Valuation the project progress and advice from time to time on cost management, or

value management.

- To carry out such other duties as may properly be those of a Quantity Surveyor.

- Evaluate and review submitted contractual claims;

- Maintaining awareness of the different building contracts in current use;

- Preparing the final payment application

Page 3: Mohammed Ali' CV_12-2015

Page 3 of 12

September, 2002 Till March, 2014.

Firm: Societe Egyptienne D’Entreprises – SEDE,

From July-2013 to Now

Senior Estimator for the following Tenders in Kingdom of Saudi Arabia Title: P&C of Potable Water Pump Station and Storage Tanks.

Contract No. 108-C01.

Estimated Tender Value: SR 199’546’408.99

Owner: Royal Commission for Jubail and Yanbu, Royal Commission in Jubail

Engineer : Suadi Consulting Services

Brief Description of the Contract:

The works to be included in the current construction contract are the following:

• 4 numbers 42,500 m³ each, 80 m dia Potable and Process Water Storage Tanks. • Pump Station Building for 205,000 m³/day capacity with the equipment for Phase 1. • Chlorination Room for ultimate capacity with equipment for Phase 1. • Supporting Facilities for ultimate requirement • Electrical Substation and prime rated generating system • All Associated Mechanical Pipe work • Three points Potable Water Truck Filling Station • Guard House and control gates for facility and tank filling station. • Site work including roads, natural grading & storm drainage, potable water, sanitary and security fence • Area lighting and power distribution • Telecommunication system • Additional site preparation work for future expansion phases.

- From Dec-2012 to May-2013

Senior Estimator for the following Tenders in Sultantae of Oman Title: Water Transmission Pipeline from the Water Treatment of Wadi Dayqah Dam at

Mazari in Willayat Qurayyat to Deem Reservior in Muscat Governorate.

Contract No. 135/2012.

Estimated Tender Value: Omani Rial 32’222’746.655

Estimated Alternative Tender Value: Omani Rial 31’765’095.67

Owner: Public Authority for Electricity & Water, Sultanate of Oman.

Engineer : Yas Consulting Engineers LLC

Brief Description of the Contract:

The proposed project components are summarized as follows

Construction of potable water transmission pipeline of 1200 mm bore mild steel from the TWT to a pumping station (PS2), approximate length 14.5 km. - Construction of 400 mm bore DI, potable water pipeline from the Hayl-al-Ghaf branch point to the terminations at the Hayl-al-Ghaf falaj and water reservoir approximate length 4.8 km. - Construction of 700 mm bore DI, potable water pipeline from the Daghmar branch point to the bifurcation at Qarib, approximate length 4.4 km. - Construction of 600 mm bore DI, potable water pipeline from the Qarib branch point to the Quriyat reservoir , approximate length 3.7 km. - Construction of 600 mm bore DI, potable water pipeline from the Qarib branch point to the Daghmar irrigation break head tank, approximate length 2.7 km. - Construction of 2,000 m³ Daghmar irrigation (break head) RCC tank to feed the distribution system. - Construction of the irrigation distribution pipelines in 600/400/300 mm bore ductile iron

Page 4: Mohammed Ali' CV_12-2015

Page 4 of 12

to supply potable water to the Daghmar area for irrigation purposes, approximate lengths 4.5km of 600mm, 2.9km of 400mm and 6.6 km of 300 mm. - Construction of irrigation distribution and interconnecting pipes from the distribution pipelines to provide a replacement supply to individual irrigated landholdings in the Daghmar area, total length some 37.1 km. - Design and construction of a pumping station 2 (PS2) on the main transmission line, including the supply and installation of all pumping plant and provision for future expansion (PS2b). - Design and construction of building services provisions to buildings designed by the Engineer. - Construction of potable water transmission pipeline of 1600 mm bore mild steel to the existing delivery main at deem reservoir, with flow measurement and control of transfer, approximate length 32.6 km. - Design and construction of all control, instrumentation and SCADA for the entire Scheme (i.e. PS2, ,DIT, Quriat Reservoir and Hail Al Ghaf reservoir and Falaj, and Deem) including communications cabling, and data acquisition. System shall be designed and constructed for interfacing with control centre at Baushar, Muscat as well as selected information to be transferred to WTW facility. - Testing, commissioning of the Works.

From June -2012 to Dec -2012

Senior Project Engineer for the Following Project in United Arab Emarites. Title: Water Supply System for Fulairah Distribution Network Lot A

EPC Contract No. N-7396/A Owner: Abu Dhabi Transmission & Despatch Company (TRANSCO)

Engineer : ILF Consulting Engineers LLC

Brief Description of the Contract:

EPC works for Water Supply System for Fujairah Distribution Network – New Qidfa Pump Station QPS-2 (1) Construction of the new pump station QPS-2, including survey and soil investigation and all necessary civil, electrical, mechanical and ICT works. (2) Hydraulic design for the complete Water Distribution Network. (3) Overall System responsibility for design, functionality and operability. This includes but is not limited to the hydraulic calculations for the entire proposed Fujairah Distribution Network (Lot A, Lot B and Lot C), the overall system operation and control philosophy and the necessary coordination works between the Lot A contractor and the Lot B/C contractors. (4) Interface coordination with other Contractors, with TRANSCO, FEWA, Fujairah Municipality, other Authorities and Owners and all existing facilities (especially with the QPS-1 facilities and the new tanks from SWRO Plant) (5) Control and communication system for the complete system, including full integration and functional responsibility (6) Supply of fibre optic cable for Lot B and Lot C. (7) Any other works as defined in detail in the specification. Amount: AED 223,783,168.18

Page 5: Mohammed Ali' CV_12-2015

Page 5 of 12

From Oct-2010 to June-2012

Senior Estimator for the following Tenders in Sultantae of Oman Title: Construction of Water Distribution Networks for Bisiya, Al Ma’amur, Al Habbi and

Ten Surrounding Villages in Dakhiliyyah Region

Contract No. 342/2011.

Estimated Tender Value: Omani Rial 140.240,139,14

Owner: Public Authority for Electricity & Water, Sultanate of Oman.

Engineer : Energoprojekt – Entel (EPE)

Brief Description of the Contract:

The proposed project components are summarized as follows

A. Procurement, construction and commissioning of water distribution networks with

pertaining structures, equipment, etc.

* Water distribution networks for the above areas are divided into the three zones as

follows:

1. Zone 1: This zone includes Wadi Quriyat, Saloot and Al Dhaby Villages. Approximate

length of DI pipeline dia from DN 400 up to DN 200 is 41 km & HDPE 140 km from

dia DN 315 up to DN 125.Ductile iron (K9) pipeline with class 16 bar fittings

2. Zone 2: This zone includes Bisiya, Al Haisha, Ghushaibah and Al Fal Villages.

Approximate length of DI pipeline dia DN 400 is 14.2 km & HDPE 110 km from dia

DN 250 up to DN 125.

3. Zone 3: This zone includes Al Ma’amur, Al Habbi, Al Suwayh, Al Qabidiyah, Al

Muameer and Al Hafeer Villages. Approximate length of DI pipeline dia DN 400 and

DN 300 is 9 km & HDPE 140 km from dia DN 250 up to DN 125.

B. Procurement, construction and commissioning of service water reservoirs with

pertaining structures, equipment, etc. at the following locations: 1. Zone 1 Wadi Quriyat Reservoir capacity of 1,500 m3.

2. Zone 2 Bisiya Reservoir capacity of 4,000 m3.

3. Zone 3 Al Ma’amur Reservoir capacity of 5,000 m3.

C. Procurement, construction and commissioning of two Tanker Filling Stations with

pertaining structures, equipment, etc.

D. Procurement, construction and commissioning of administration compound with

pertaining structures, equipment, etc.

E. Procurement, installation and commissioning of SCADA system

Title: Water Supply Scheme for AI Ajaiz, Abu Madabi and Hayma in AI Wusta Region

Contract No. 325/11.

Estimated Tender Value: Omani Rial 33,531,335.049 (Regret)

Owner: Public Authority for Electricity & Water, Sultanate of Oman.

Engineer : Mott MacDonald & Company LLC

Brief Description of the Contract:

The proposed project components are summarized as follows

Transmission Main:

Ductile iron (K9) pipeline with class 25 bar fittings

- DN 400mm DI main from Duqum Zone 2 reservoir to Al Ajaiz (63 km).

- DN 300mm DI main from Al Ajaiz to Abu Madabi (62 km).

- DN 300mm DI main from Abu Madabi to Haymaa (52 km).

Ductile iron (K9) pipeline with class 16 bar fittings

- DN 200mm DI main from Hayma to MOD camp (12 km).

- DN 200mm DI main from Hayma to SSF camp (24 km).

Distribution Network:

- Distribution network for Al Ajaiz (8 km).

- Distribution network for Hayma (58 km).

Page 6: Mohammed Ali' CV_12-2015

Page 6 of 12

Works in Existing Duqum Zone 2 Reservoir compound: - Pumping station accommodating pumps of Hayma water supply schemes and related pipe

work.

- Generator building.

- 1,000 KVA, 11/0.433 KV Transformer with necessary protection.

- 1,000 KVA Generator to cater for Duqum and Hayma Water supply scheme.

Al Ajaiz Reservoir Compound:

- 1,000 cum capacity reservoir.

- 200 cum capacity elevated tank with 22m staging height.

- Pumping station and related pipe work within the reservoir compound.

- Guard house.

- Chlorination building.

- Generator building.

- 1,000kVA, 11/0.433 Transformer with necessary protection.

- 1,000 kVA Generator.

- Compound works and other site infrastructure works.

Works in Existing Abu Madabi Elevated Tank compound: - 1,000 cum capacity reservoir.

- Pumping station and related pipe work within the reservoir compound.

- Chlorination building.

- Generator building.

- 500 kVA Generator. - Other site infrastructure works.

- Note: Construction of 200 cum capacity elevated tank, transformer works, guard house,

compound and fencing works, road works and compound lighting are included in the Abu

Madabi Distribution Project which is under construction.

Hayma Reservoir compound:

- 5,000 cum capacity reservoir. - 600 cum capacity elevated tank with 20m staging height.

- Pumping station and related pipe work within the reservoir compound.

- Guard house.

- Chlorination building.

- Generator building.

- 500 kVA Generator.

- 500 kVA 11/0.433 Transfonner with necessary protection.

- Compound works and other site infrastructure works.

Mechanical works:

- Pump installation as per Data sheet and pump room pipe work as per relevant drawings.

- Surge analysis and surge protection equipment.

Electrical and Instrumentation works: - Electrical works as per specification and relevant drawings.

- Instrumentation, control and SCADA system as per specification and relevant

Title: Water Distribution Networks for Wilayats Al Qabil and Ibra - Phase I

Contract No. 223/11.

Estimated Tender Value: Omani Rial 23011,0.1,9.3,

Owner: Public Authority for Electricity & Water, Sultanate of Oman.

Engineer : Mott MacDonald & Company LLC

Brief Description of the Contract:

1.1 The proposed project components under Phase I package for the Wilayat Al Qabil are

summarised as follows:

- Existing Al Qabil Reservoir compound: Replace existing Mudhayrib pumps with new pumps

and necessary pipe works as per relevant drawings and specification.

Page 7: Mohammed Ali' CV_12-2015

Page 7 of 12

- Proposed Mudhayrib High Level Reservoir Compound: A reservoir of 8000 cum capacity

and space for two additional reservoirs of same capacity in the compound.

- Existing Mutarid Reservoir Compound: A reservoir of 410 cum capacity including necessary

pipe work, A pump house including installation of pumps and pipe works as per relevant

drawings and specification.

- Proposed As Sarm Reservoir Compound: A Reservoir of 4000 cum capacity and space for

two additional reservoirs of same capacity in the compound.

Transmission Main:

- Ductile Iron (K9) Pipeline with Class 16 bar fittings: Extend DN 400mm DI (Approx. 500m)

main from the down hill of Mudhayrib reservoir to the proposed Mudhayrib High Level

Reservoir.

- Ductile Iron (K9) Pipeline with Class 25 bar fittings: 300mm DI (Approx. 7500m)

transmission main from Mutarid pump station to the proposed As Sarm reservoir.

Distribution Network:

- Distribution network (Approx. 193,000m) for Mudhayrib zone supply from Mudhayrib High

and Existing reservoirs.

- Distribution network (Approx. 109,000m) for Mutarid zone - supply from Mutarid and As

Sarm reservoirs.

Mechanical Works:

- Pump installation and pump room pipe work as per relevant drawings and specification.

Electrical and Instrumentation Works:

- Electrical works as per specification and relevant drawings, Instrumentation, control and

SCADA system as per specification and relevant drawings.

1.2 The proposed project components under Phase I package for the Wilayat Ibra are

summarise as follows:

- Existing Al Qabil Reservoir Compound: A reservoir of 2,750 cum capacity including

necessary pipe work, Upgrade the existing two pumps of 132 cum/hr at 160m to 155cum/hr

at 203 m by changing impeller diameter. Pump Type: 104P 7E SN1320 4, Make: ITT

Industries.

- Existing Ibra Reservoir Compound: 6,000 cum capacity reservoir including necessary pipe

work

- Proposed Al Haymah Reservoir Compound: A reservoir of 4,000cum capacity and space for

two additional reservoirs of same capacityin the compound.

- Proposed Ibra Hospital Area Water Tower Compound: An Ibra Hospital Area Water Tower

of 1500 cum capacity

Transmission Main:

- Ductile iron (K9) pipeline with class 25 bar fittings

- Branch main from connection point to Al Haymah Low Level Reservoir: DN 600mm DI 750

m length (approx.) and DN 400 mm – 400m length (approx.).

- Tapping of branch main from Al Qabil – Ibra transmission main to Ibra Hospital area Water.

Tower: DN 400mm DI - 500m length (approx.)

Distribution Network :

- Distribution network for Ibra South Core area – supply from Ibra Reservoir (approx.

195,000m length)

- Distribution network for Ibra North core area – supply from Al Haymah zone

(approx.102,000m length)

Mechanical Works:

- Pump installation and pump room pipe work as per relevant drawings and specification

Electrical and Instrumentation Works:

- Electrical works as per specification and relevant drawings

- Instrumentation, control and SCADA system as per specification and relevant drawings.

Page 8: Mohammed Ali' CV_12-2015

Page 8 of 12

Title: Construction of Extension to The Water Distribution Networks in Nizwa in Dakhliya

Region.

Contract No. 194/2011.

Estimated Tender Value: Omani Rial 32,019,783.163 (Regret)

Owner: Public Authority for Electricity & Water, Sultanate of Oman.

Engineer : Energoprojekt – Entel (EPE)

Brief Description of the Contract:

The proposed project components are summarized as follows

A) Procurement, construction and commissioning of water distribution networks with

pertaining structures, equipment, for the following project areas:

1. Zone 1 & 2 Niabat Birkat Al Mooz 1 & 2 and Tawi Al Nusf areas. Approximate length of DI

pipeline dia 300 mm is 3 km & HDPE 51 km dia from 125 up to 250 mm.

2. Zone 3 Nizwa University and Karsha Industrial Area. Approximate length of DI pipeline dia

from 300 up to 600 mm is 9 km & HDPE 31 km dia from 125 up to 315 mm.

3. Zone 5 Hail Firq, Hai Al Turath South and Hai Al Turath North. Approximate length of DI

pipeline dia 300 and 400 mm is 6 km & HDPE 66 km dia from 125 up to 250 mm.

4. Zone 7 Nizwa Industrial Area, Ridat Al Busaid and Khumailah 2. Approximate length of DI

pipeline dia 300 and 400 mm is 7 km & HDPE 44 km dia from 125 up to 315 mm.

5. Zone 9 Jahfan West Plan Extension, Alain Extension and Ghaf Al Shaik. Approximate length

of DI pipeline dia from 300 up to 500 mm is 7 km & HDPE 28 km dia from 125 up to 200 mm.

6. Zone 10 Wadi Samit Extension and Qumah. Approximate length of DI pipeline is 2 km dia

200 and 300 mm & HDPE 24 km dia from 125 up to 315 mm.

7. Zone 11 Tanuf Village and Al Sad Plan. Approximate length of DI pipeline dia 300 up to 500

mm is 5 km & HDPE 47 km dia from 125 up to 250 mm. Construction of water distribution

network for new planned area within this zone might be canceled during construction stage.

Approximate length of DI pipeline dia 300 mm is 2.5 km & HDPE 9.5 km dia from 125 up to

250 km.

B) Procurement, construction and commissioning of service water reservoirs with

pertaining structures, equipment, at the following locations:

1. Zone 1 & 2 Birkat Al Mouz 1, Volume of 3,000 m3;

2. Zone 7 Al Taymsa, Volume of 5,000 m3;

3. Zone 9 Sypa, Volume of 3,000 m3;

4. Zone 10 Wadi Samit, Volume of 2,000 m3;

C) Procurement, construction and commissioning of booster pump station at Birkat Al

Mouz 1 with pertaining structures, equipment, etc., as specified in the Volume 2, Volume 3 and Volume

4 of the Tender Documents. Pump station consists of 1 working + 1 stand by pump capacity of 25 l/s and

head of 60 m. D) Rehabilitation of the existing sampling points;

E) Procurement, installation and commissioning of SCADA system as specified.

Junior Estimator for the following Tenders in Sultantae of Oman

Title: Construction of Transmission Pipelines, Tanks and Booster Stations For Salalah,

Tender No. 234/2009

Estimated Tender Value (Main Offer): Omani Rial 49,999,000.00

Estimated Tender Value (Alternative Offer): Omani Rial 47,550,000.00

Owner: Minister of State and Governor of Dhofar, Directorate General of Water,

Sultanate of Oman.

Engineer: DR. Ahmed Abdel Warth & Partners LLC (Consulting Engineers)

Brief Description of the Contract:

- Pumping station at Salalah Desalination Plant site, total capacity 30 MGD

- Strategic ground reservoir at SDP site, capacity 20 MG

Page 9: Mohammed Ali' CV_12-2015

Page 9 of 12

- Saadah strategic ground reservoir at Salalah, capacity 20 MG

- Salalah strategic ground reservoir at Garzeez, capacity 20 MG

- Raysut ground reservoir, capacity 2 MG

- Taqah ground reservoir, capacity 2 MG

- Connection to the existing ground reservoir at Mirbat, capacity 2 MG

- Water pumping station at Salalah strategic ground reservoir site (at Garzeez), capacity 7

MGD

- Supply and installation of Transmission pipelines 105km DI, from 600mm up to 1200mm,

with all associated reinforced concrete structures such as Line-in valve chambers along the

route, Air valve chambers, Wash - out chambers, wadi protections, laying of Fibre Optic

Cable , Thrust Boring under Roads (Tunnels) & Connection with Local Electric Overhead

Grids

Title: Construction additional Tanker Filling Stations in Ash Sharqiyah Region, Tender

No. 105/2010

Estimated Tender Value (Main Offer): Omani Rial 20,950,000.00

Estimated Tender Value (Alternative Offer): Omani Rial 20,700,000.00

Owner: Public Authority for Electricity & Water, Sultanate of Oman.

Engineer : Energoprojekt – Entel (EPE)

Brief Description of the Contract:

- Supply and installation of main pipeline Ductile iron 156km with 600 mm, 200mm &

150mm diameter with all associated reinforced concrete structures such as valve chambers,

thrust blocks, culverts, ducts, Wadi Protections & NDRC, etc.

- 11 Tanker Filling stations.

- 11 elevated storage Tank 80 m³.

- 2 pumping station (capacity 60 liters / sec and pressure 15 bar)

- 3 pumping stations sites list (capacity up to 20 liters / sec and pressure of 12 bar)

- 2 break pressure tank of 100 m³ & 350 m³ capacity.

- Works of the soil investigation and reporting.

- Rehabilitation of the existing Tanker Filling station.

- scada works.

- Electrical and mechanical works.

Title: Water Transmission Main for Expansion of Distribution Networks in AI Amerat

Wilayat, Tender No. 202/2010

Estimated Tender Value(Main Offer): Omani Rial 52,987,980.952

Estimated Tender Value (Alternative Offer): Omani Rial 50,481,487.387

Owner: Public Authority for Electricity & Water, Sultanate of Oman.

Engineer: Mott MacDonald, Sultanate of Oman Brief Description of the Contract:

- The scope of work includes inter olia civil and building works, procurement, construction

and testing; Mechanical and Electrical Plant and Services (M&E Plant) design, engineering,

manufacture, inspection and testing at the maker's works and at site, packing for export

shipment, insurance, delivery to site, unloading, complete erection, site testing, start up,

commissioning, pelionnance testing; putting into operation, training of PAEW staff (or

others) assigned to operate the Works, and maintenance support during the defects liability

period.

Page 10: Mohammed Ali' CV_12-2015

Page 10 of 12

Junior Estimator for the following Tenders in Kingdom of Saudi Arabia.

Title: YANBU – MADINA PHASE 3 (WATER TRANSMISSION SYSTEM - TENDER

NO. C-933 – B2)

Estimated Tender Value: Saudi Rial 628,922,669.800

Owner: Saline Water Conversion Corporation – Kingdom of Saudi Arabia

Engineer: ILF Consulting Engineers Brief Description of the Contract:

Project will provide the Engineering, Procurement & Construction (EPC) includes installation,

testing, commissioning, and initial maintenance of the Water Transmission Main for YANBU –

MADINA PHASE 3 as follows: - The scope of the Yanbu Madina Phase 3 Water Transmission System is to transport the

additional quantity of potable water, which will be produce at the Yanbu Desalination Plants

(Phase 1, 2 &3), to the Madina area, the Yanbu area, the Hanakiyah area, the Coastal area and

to the Mahd area. - Transport and Installation of Pipes for The Madina Hanakiyah Feeder Line (MHFL) with a

length of 47.9 km from HPS to STS with 24” steel pipes and with a length of 45.8 km

between STS and HTS with 28” steel pipes. - Transport and Installation of Pipes for The Madina Mahd Feeder Line (MMFL) with a length

of 29.2 km from the YMML-3 tap-off to MPS with 32” steel pipes and with a length of 202.3

km from MPS to MAT with 83.6 km 28” steel pipes and 118.7 km 24” steel pipes. - The tap-off stations at the MMFL for the supply of the various cities and areas, namely Al

Asheerah, Yotamah, Wadi Al Faraa, Al Akhal, Al Suwarqiyah, Al Oquilah. - The tap-off station at the MHFL for the supply of the various cities and areas, namely

Oweinah. - 7 No Tanker Filling station at end of each Tap-off (2 - 8 Filling Arms .(

- 7 No Steel Ground Tank at each Tanker Filling station capacity (1,000m³).

- 7No Electrical Buildings at each Tanker Filling station . - 4No Line valve chambers, 341 air chambers and 320 washout chambers on the main lines . - Major & Minor Wadi protection for 5 km on the pipeline

- Tunnels under the road 2 Km long. - Works of the soil investigation and reporting. - 12000 m³ of Concrete, 1,200 Tons of Steel Reinforcement. - Mechanical and Electrical Works. - SCADA works . - Electrical works.

Technical & Estimator Engineer for the following Projects in Sultantae of Oman.

From Dec-2009 to Oct-2010

Title: Water Supply Schemes to ADAM - AD Dakhliya Region

Contract No. 258/08. Owner: Public Authority for Electricity & Water, Sultanate of Oman.

Engineer : Energoprojekt – Entel (EPE)

Brief Description of the Contract:

- Supply, construction, testing and commissioning of 85 km of D.I water transmission

pipelines of diameters from 300 mm to 600mm .

- Supply, construction, testing and commissioning of 55 km of HDPE water distribution

network of diameters from 110 mm to 250mm.

- All associated reinforced structures along the pipeline such as Air Valve Chambers, Wash

Page 11: Mohammed Ali' CV_12-2015

Page 11 of 12

out Chambers, Line Valve Chambers, Connection Chember, Fire Hydrants , thrust blocks,

Protection of Pipeline in Wadis & NDRC, etc

- Construction of 2 Nos. of 1200 & 5500 m³ capacity ground reservoirs complete with piping

works and associated buildings.

- Construction of 2 Nos. Tanker Filling station having water tower 30 m³ capacity each

complete with piping works.

- Construction of 2 No. Chlorination Building complete with wiring, control system and

associated Chlorination System.

- Connection to the Existing Over-Head Grids for Power Supply

- Laying of Fibre Optic Cable

Amount: Omani Rials 14,300,000.00

From Sep-2006 to Oct-2009

Title: Construction of Transmission Pipelines, Pumping Stations, Transmission Reservoirs

& Associated Buildings

Contract No. 136/2005

Owner: Public Authority for Electricity & Water, Sultanate of Oman.

Engineer (Design): PARSONS International & Co. LLC.

Engineer (Supervisor): Energoprojekt – Entel (EPE)

Brief Description of the Contract:

- Supply, construction, testing and commissioning of 130 km of steel water transmission

pipelines of diameters from 650 mm to 900mm with all associated reinforced concrete

structures such as valve chambers, culverts, ducts & NDRC.

- Supply, construction, testing and commissioning of 270 km of D.I water transmission

pipelines of diameters from 150 mm to 700mm with all associated reinforced concrete

structures such as valve chambers, thrust blocks, culverts, ducts & NDRC, etc.

- Construction of 18 Nos. of 800 to 5000 m³ capacity ground reservoirs complete with piping

works and associated buildings.

- Construction of 8 Nos. water towers 80 to 900 m³ capacity each and 30 m height complete

with piping works.

- Construction of 10 Nos. pumping stations with different flow and head (Flow Rate 2500 :

4000m3/hr) and upgrading of 3 Nos. existing pumping stations complete with wiring, switch

gear, control system and associated buildings.

- Laying of 50Km Over-Head Cables

- Laying of 310Km Fibre Optic Cable.

Amount: Omani Rials 49,000,000.00

Job Responsibilities:

- Liaising with relevant Authorities, Sub-Contractor, Consultant.

- Contracts, Procurement (Inquiries, quotations comparison, etc….) and Material delivery

schedules

- Ordering of materials according to previously organized program.

- Fully responsible and aware for all suppliers & sub-contractors works.

- Review of the Specifications and submittal.

- Preparing all shop drawing for approval.

- Technical matters, reports and meetings.

- Quantity surveying, interim payments, variation orders and claims.

- Handing over of completed works.

Page 12: Mohammed Ali' CV_12-2015

Page 12 of 12

Technical Engineer for the following Project in Egypt.

From Sept-2002 to Sep-2006

Title: Baltiem - Kafr El-Sheikh Highway Owner: Executive Organization for Development of Middle and North Coast

Engineer: Mouhram Bakhum

Brief Description of the Contract:

Construction of 67 km length and 17m width connection between the international high way and

Kafr El-Sheikh city Including 11 bridges to do free intersections for the high way direction , In

addition to service roads and embankment to the two sides of the Connection + tunnel under the

seaboard at the intersection with the Highway.

Amount: LE 250,000,000.00

Job Responsibilities:

- Co-ordination with Client authorities, Sub-Contractor, Consultant.

- Quantity surveying, interim payments, cost estimation for all activity.

Education

1997-2002 B.Sc. Faculty of Engineering, Civil Section, Public Works department, Al Azhar

University

Final Year Grade: Very Good.

Project Grade: Very Good.

Skills

Language:

Arabic: Native language.

English: Fluent.

Computer Skills:

Perfect command of Windows, Microsoft Office, AutoCAD and Internet.

Personal

data

Date of birth: 05/08/1980

Nationality: Egyptian

Marital status: married.

Military Service: Exempted

Identity Card 0101637, issued on 11/2015

Passport A02987330, Egypt, issued on 08/01/2011.

Driver License 2978816 issue on 31/12/2013

Engineers Syndicate, Civil Branch, Membership No. 1854/25