moodle at san clemente - carste studio p t y l t d · 2009. 4. 2. · chalkboard & wall...

1
Drawing No.: Title: Drawn: Scale: Date: Status: Plot Date: Drawing: Amendments: Rev: Date: Legend: Detail: Bar Scale: Client: Project No: Project: North Point: 08:16 Project Name: Alterations Stage 2: San Clemente Catholic High School SRB/LE CC 2/04/09 carste STUDIO PTY LTD All information, concepts and ideas contained herein are the property of Carste Studio Pty Ltd and may not be distributed and/ or reproduced without express permission from Carste Studio Pty Ltd. It is the responsibility of the builder to check and verify all dimensions on-site prior to the commencement of work and to notify Carste Studio Pty Ltd of any errors and omissions. Do not scale drawing. Do not use drawing for consrtuction purposes unless issued by Carste Studio Pty Ltd for construction. ABN 16122394450 trading as ACN 122394450 p: (02) 4951 2578 m: 0427 432 720 f: (02) 4950 0591 e: [email protected] a: PO Box 149 Wallsend 2287 stephen booker architect Architects and Heritage Consultants 30.08.08 CATHOLIC SCHOOLS OFFICE Diocese of Maitland - Newcastle Ground Floor Demolition Plan 78 Havelock Street Mayfield 1:100 08:16-CC A-01 N 017 950 2,100 018 1,000 2,100 015 2,070 950 W05 1,029 2,486 004 1,540 2,400 001 2,990 980 012 1,000 2,400 W01 2,988 980 005 2,100 950 010 2,040 950 014 3,180 1,020 19A 3,190 890 019 2,400 900 023 885 2,085 020 900 2,100 022 900 2,100 13A 855 2,050 W04 Sill 1,100 900 600 016 2,050 950 024 1,000 2,100 24A 2,100 1,000 009 2,100 950 1,200 3,580 REMOVE EXISTING PANELS TO WALL AND REINSTATE OPENING REMOVE DAIS AND STEPS REPLACE EXISTING WINDOW WITH DOOR. RETAIN WINDOW REMOVE EXISTING WALL REMOVE EXISTING DAIS REMOVE EXISTING DOOR INFILL AND MAKE GOOD REMOVE INTERNAL PARTITIONS, WALLS, FITTINGS AND FIXTURES AND MAKE GOOD. REPLACE ENTRY DOOR WITH NEW UNIT COMPLIANT WITH AS AND BCA. REMOVE EXISTING WALL AND DOOR AND MAKE GOOD REMOVE EXISTING STAIR AND MAKE GOOD INFILL TIMBER FRAME TO FLOOR LINE OF OVERHEAD BRIDGE CONNECTION OVER - FFL RL 22.20m NEW OPENING IN EXISTING WALL SEAL UP NEW DOOR REPLACE UPPER PANELS OF GLASS WITH FROSTED GLASS WIDEN DOOR TO 950mm ENLARGE OPENING REMOVE DOOR REMOVE EXISTING WALL AND DOOR, MAKE GOOD. PREPARE SURFACES FOR RETILING FLOOR AND WALLS EXISTING CONCRETE COLUMN AND STEEL POSTS REMOVE EXISTING PINBOARDS REMOVE DAIS REMOVE DAIS, CHALKBOARD & WALL FITTINGS FORM NEW DOOR WAY NEW DOOR REMOVE DAIS, CHALKBOARD & WALL FITTINGS BREAK OPEN FOR NEW VISION PANEL REGLAZE WITH CLEAR GLASS REMOVE DOOR FRAME REMOVE SINK & STOP OFF SERVICES REMOVE WINDOW DEMOLISH FLOOR OVER RENEW DOOR REMOVE BENCH STRIP OUT WC AREA FOR REFURB EXCAVATE FOR FOOTINGS FOR NEW RAMP NEW DOOR OPENING REVERSE HAND DOOR, OPEN OUT AND MAKE GOOD SCABBLE EXISTING CONCRETE SURFACE IN PREPARATION FOR RAMPED CONCRETE TOPPING REMOVE WALL REMOVE DOOR AND FRAME REMOVE DOOR AND FRAME RAISE TROUGH HEIGHT TO SUIT NEW PAVEMENT LEVELS STOP OFF SERVICES REMOVE DIAS & BENCH REHANG DOOR TO OPEN OUT REMOVE PAVERS IN PREPARATION FOR RAMP CONSTRUCTION LIFT PAVERS FOR RELAYING AT HIGHER LEVEL AS SHOWN DWG A 02. RELOCATE SEAT REMOVE EXISTING CEILING TILES REMOVE EXISTING CEILING TILES REMOVE SINK, BENCHES & SPLASHBACK REMOVE HONOUR BOARDS FOR RELOCATION IN RECEPTION AS REQUESTED PREPARE FOR NEW RAMP CONSTRUCTION LIBRARIAN OFFICE/ WORKROOM CPT 35.70m 2 DP AV STORE CPT 9.00m 2 ENTRY SV 10.60m 2 BOOK HIRE CPT 28.55m 2 WINDOW WINDOW DOORS DOOR GROUND FLOOR WA CBR RL 19.00m OPENING Y DOOR WINDOW DP Catalogues Compactus G19 (E): CURRENT BOOK HIRE ROOM - TO REMAIN EXISTING WALKWAY CBR EXISTING STAIRS GARDEN BED R.L. + 19.500 R.L. + 19.650 G27 WC EXISTING R.L. 18.50 EXISTING R.L. 18.47 EXISTING SEAT EXISTING R.L. 18.49 EXISTING R.L. 17.33 EXISTING R.L. 18.50 EXISTING R.L. 18.60 EXISTING PAVERS RAISED PAVERS R.L. 18.65 PAVERS EXISTING SEAT REMOVE EXISTING SEAT Bin Bin Bin Bin Bin Bin Bin Notice Board D.P. EXISTING GARDEN BED R.L. 18.60 POWER DISTRIBUTION BOARD POWER DISTRIBUTION BOARD STRIP OUT INTERNAL FIXTURES FOR RENEWAL. RENEW CARPET STOP OFF SERVICES, REMOVE BENCHES & FITTINGS COMPLETE. STOP OFF SERVICES, REMOVE BENCHES & FITTINGS COMPLETE. REMOVE EXISTING SEAT RAISE LEVEL OF EXISTING SEAT REMOVE FLOOR G17 (A5): PERFORMING ARTS CPT G23 (B3): FOOD TECHNOLOGY SV G20 (A8): GENERAL PURPOSE LEARNING AREA CPT G15 WC: WOMEN CT G16 EXISTING STAIR (REMOVED) EXISTING LIGHTWELL G24 (B3): PANTRY SV EXISTING SCIENCE CANTEEN G26 STAFF ROOM (SEPARABLE PORTION) CPT GENERAL PURPOSE LEARNING AREA CURRENT GENERAL PURPOSE LEARNING AREA CURRENT MUSIC ROOM CPT CURRENT DESIGN & TECHNOLOGY ROOM CPT G18 - CURRENT GYM / ASSEMBLY ROOM CURRENT CAREERS OFFICE CURRENT SPECIAL LEARNING UNIT EXISTING GPLA CURRENT MUSIC ROOM G1 INTERVIEW REMOVE WINDOW AND BREAK OUT SILL EXISTING R.L. 18.64 EXISTING CONSTRUCTION ACOUSTIC WALL - PBD EQUIV TO BORAL T1616F 230 BRICK. SEE SCHEDULE OF FINISHES FOR SURFACE FINISH 270 BRICK SEE SCHEDULE OF FINISHES FOR SURFACE FINISH = BRICK BK = STUD (TIMBER OR STEEL) ST 0 1 2 3 4 5 REMOVE PAVERS IN PREPARATION FOR RELAYING AT NEW LEVELS

Upload: others

Post on 19-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Moodle at San Clemente - carste STUDIO P T Y L T D · 2009. 4. 2. · chalkboard & wall fittings break open for new vision panel reglaze with clear glass remove door frame remove

D r a w i n g N o . :

T i t l e :

D r a w n :

S c a l e :

D a t e :

S t a t u s :

P l o t D a t e :

D r a w i n g :

A m e n d m e n t s :R e v : D a t e :

L e g e n d :

D e t a i l :

B a r S c a l e :

C l i e n t :

P r o j e c t N o :

P r o j e c t :

N o r t h P o i n t :

08:16

P r o j e c t N a m e :

Alterations Stage 2:San Clemente Catholic High School

SRB/LE

CC

2 / 0 4 / 0 9

c a r s t e S T U D I O P T Y L T D

Al l i n fo rma t ion , concep ts and i deas con ta ined he re in a rethe p rope r t y o f Ca rs te S tud io P ty L td and may no t bed is t r i bu ted and / o r rep roduced w i thou t exp ress pe rm iss ionf rom Cars te S tud io P ty L td . I t i s t he respons ib i l i t y o f t hebu i l de r t o check and ve r i f y a l l d imens ions on -s i t e p r i o r t othe commencemen t o f wo rk and to no t i f y Cars te S tud ioP ty L td o f any e r ro rs and omiss ions . Do no t sca led raw ing . Do no t use d raw ing fo r cons r tuc t i on pu rposesun less i ssued by Cars te S tud io P ty L td fo r cons t ruc t i on .

A B N 1 6 1 2 2 3 9 4 4 5 0 t r a d i n g a s A C N 1 2 2 3 9 4 4 5 0

p : ( 0 2 ) 4 9 5 1 2 5 7 8 m : 0 4 2 7 4 3 2 7 2 0 f : ( 0 2 ) 4 9 5 0 0 5 9 1e : b o o k e r a r c h @ t p g . c o m . a u a : P O B o x 1 4 9 W a l l s e n d 2 2 8 7

s t e p h e n b o o k e r a r c h i t e c tA r c h i t e c t s a n d H e r i t a g e C o n s u l t a n t s

30.08.08

CATHOLICSCHOOLSOFFICEDiocese ofMaitland - Newcastle

Ground Floor Demolition Plan

78 Havelock Street Mayfield

1:100

08:16-CC A-01

N

017

9502,100

018

1,0002,100

015

2,070950

W05

1,0292,486

004

1,5402,400

001

2,990980

0121,0002,400

W01 2,988

980

005

2,100950

010

2,040950

014

3,18

01,

020

19A

3,190890

019

2,400900

023

885

2,08

5

020

900

2,10

0

022

900

2,10

0

13A

8552,050

W04

Sill 1,100900

600

016

2,050950

024

1,00

02,

100

24A

2,10

01,

000

009

2,100950

1,20

0

3,580

REMOVE EXISTING PANELSTO WALL AND REINSTATEOPENINGREMOVE DAIS

AND STEPS

REPLACE EXISTINGWINDOW WITH DOOR.RETAIN WINDOW

REMOVE EXISTINGWALL

REMOVE EXISTINGDAIS

REMOVE EXISTING DOORINFILL AND MAKE GOOD

REMOVE INTERNAL PARTITIONS,WALLS, FITTINGS AND FIXTURESAND MAKE GOOD. REPLACE ENTRYDOOR WITH NEW UNIT COMPLIANTWITH AS AND BCA.

REMOVE EXISTING WALL ANDDOOR AND MAKE GOOD

REMOVE EXISTING STAIRAND MAKE GOODINFILL TIMBER FRAMETO FLOOR

LINE OF OVERHEADBRIDGE CONNECTIONOVER - FFL RL 22.20m

NEW OPENING INEXISTING WALL

SEAL UP NEW DOORREPLACE UPPER PANELSOF GLASS WITH FROSTEDGLASS

WIDEN DOOR TO 950mm

ENLARGE OPENINGREMOVE DOOR

REMOVE EXISTING WALLAND DOOR, MAKE GOOD.PREPARE SURFACES FORRETILING FLOOR AND WALLS

EXISTINGCONCRETE COLUMNAND STEEL POSTS

REMOVE EXISTINGPINBOARDS

REMOVE DAIS

REMOVE DAIS,CHALKBOARD& WALL FITTINGS

FORM NEWDOOR WAY

NEW DOOR

REMOVE DAIS,CHALKBOARD& WALL FITTINGS

BREAK OPENFOR NEWVISION PANEL

REGLAZE WITHCLEAR GLASS

REMOVEDOOR FRAME

REMOVE SINK& STOP OFF

SERVICES

REMOVEWINDOW

DEMOLISHFLOOR OVER

RENEWDOOR

REMOVEBENCH

STRIP OUT WCAREA FOR REFURB

EXCAVATE FORFOOTINGSFOR NEW RAMP

NEW DOOROPENING

REVERSE HAND DOOR,OPEN OUT AND MAKE GOOD

SCABBLE EXISTING CONCRETESURFACE IN PREPARATION FORRAMPED CONCRETE TOPPING

REMOVE WALL

REMOVE DOORAND FRAME

REMOVE DOORAND FRAME

RAISE TROUGHHEIGHT TO SUIT NEWPAVEMENT LEVELS

STOP OFF SERVICESREMOVE DIAS & BENCH

REHANG DOORTO OPEN OUT

REMOVE PAVERS INPREPARATION FORRAMP CONSTRUCTION

LIFT PAVERS FORRELAYING ATHIGHER LEVEL ASSHOWN DWG A 02.

RELOCATESEAT

REMOVE EXISTINGCEILING TILES

REMOVE EXISTINGCEILING TILES

REMOVE SINK,BENCHES &SPLASHBACK

REMOVE HONOUR BOARDSFOR RELOCATION INRECEPTION AS REQUESTED

PREPARE FOR NEWRAMP CONSTRUCTION

LIBRARIAN OFFICE/WORKROOM

CPT35.70m2

DP

AV STORECPT

9.00m2

ENTRYSV

10.60m2BOOK HIRE

CPT28.55m2

WINDOW WINDOWDOORS

DO

OR

GROUND FLOOR WALKWAYCBR

RL 19.00m

OP

EN

ING

GROUND FLOOR WALKWAYCBR

RL 18.50m

DO

OR

WIN

DO

W

DP

Catalogues

Com

pactus

G19 (E): CURRENTBOOK HIRE ROOM -

TO REMAIN

EXISTING WALKWAYCBR

EXISTINGSTAIRS

GARDEN BED

R.L. + 19.500

R.L. + 19.650

G27WC

EXISTINGR.L. 18.50

EXISTINGR.L. 18.47

EX

ISTI

NG

SE

AT

EXISTINGR.L. 18.49

EXISTINGR.L. 17.33

EXISTINGR.L. 18.50

EXISTINGR.L. 18.60

EXISTINGPAVERSRAISEDPAVERS

R.L. 18.65

PAVERS

EX

ISTI

NG

SE

AT

REMOVE EXISTING SEAT

Bin

Bin

Bin Bin Bin Bin

Bin

NoticeBoard

D.P.

EXISTINGGARDEN

BED

R.L. 18.60

POWERDISTRIBUTION

BOARD

POWERDISTRIBUTION

BOARD

STRIP OUT INTERNALFIXTURES FOR RENEWAL.

RENEW CARPET

STOP OFF SERVICES,REMOVE BENCHES &FITTINGS COMPLETE.

STOP OFF SERVICES,REMOVE BENCHES &FITTINGS COMPLETE.

REMOVE EXISTING SEATRAISE LEVEL OF EXISTING SEAT

REMOVE FLOOR

G17 (A5): PERFORMING ARTSCPT

G23 (B3): FOOD TECHNOLOGYSV

G20 (A8): GENERAL PURPOSELEARNING AREA

CPT

G15 WC: WOMENCT

G16 EXISTING STAIR (REMOVED)

EXISTING LIGHTWELL

G24 (B3): PANTRYSV

EXISTING SCIENCE

CANTEEN

G26 STAFF ROOM(SEPARABLE PORTION)

CPT

GENERAL PURPOSELEARNING AREA

CURRENTGENERAL PURPOSE

LEARNING AREA

CURRENT MUSIC ROOMCPT

CURRENT DESIGN &TECHNOLOGY ROOM

CPT

G18 - CURRENT GYM / ASSEMBLY ROOM

CURRENTCAREERS

OFFICE

CURRENT SPECIALLEARNING UNIT

EXISTING GPLA

CURRENT MUSIC ROOM

G1 INTERVIEW

REMOVE WINDOW ANDBREAK OUT SILL

EXISTINGR.L. 18.64

EXISTINGCONSTRUCTION

ACOUSTIC WALL - PBDEQUIV TO BORAL T1616F

230 BRICK.SEE SCHEDULE OF FINISHESFOR SURFACE FINISH

270 BRICKSEE SCHEDULE OF FINISHESFOR SURFACE FINISH

= BRICKBK

= STUD (TIMBER OR STEEL)ST

0 1 2 3 4 5

REMOVE PAVERSIN PREPARATIONFOR RELAYINGAT NEW LEVELS