BRE398: Building Information Modeling

BIM Project Case Study

Stephen AU

Oct. 17, 2013

Lecture Class BRE398: Building Information Modeling

BRE398: Building Information Modeling

Cases Study

MTECH Confidential– 2011 Page

Beijing 2008

Olympic

Stadium

Swire

Properties

One Inland East

Nan Fung

廣州国际贸易展示中心

Sa Po North

Residential

Estate

BRE398: Building Information Modeling

Cases Study

MTECH Confidential– 2011 Page

Beijing 2008

Olympic

Stadium

Swire

Properties

One Inland East

Nan Fung

廣州国际贸易展示中心

Sa Po North

Residential

Estate

BRE398: Building Information Modeling

2008 Beijing Olympic Stadium4

Architect: Herzog & de

Meuron

Engineering Consultant:

ARUP UK

Main Contractor:中国建筑设计研究院

BIM Consultant: MTECH &

Gehry Technologies

2003

BRE398: Building Information Modeling

BIMBridging the gap between concept and reality

5

Modeling concept, design and development Details

6

BIM Model Application

BRE398: Building Information Modeling

Structural Beam Design

BRE398: Building Information Modeling 8

Stair Design

BRE398: Building Information Modeling

3D Navigation

BRE398: Building Information Modeling

Cases Study

MTECH Confidential– 2011 Page

Beijing 2008

Olympic

Stadium

Swire

Properties

One Inland East

Nan Fung

廣州国际贸易展示中心

Sa Po North

Residential

Estate

BRE398: Building Information Modeling

One Inland East11

Owner: SWIRE PROPERTIES

The total site area is 109,900 square feet comprising about 54,800 square feet from the sites of the industrial buildings and 55,100 square feet of adjoining land. The approved gross floor area of 1.5 million sq.ft (141,000 sq.m) represents a plot ratio of approximately 14.0 on the total site area. The approved plans are for a building of 70 storeys (59 office floors) to be erected on the sites of the industrial buildings with a height of approximately 280 metres. The estimated construction cost is approximately HK$3 billion.

Completion: 2004 to 2008

Consultants

Architect: Wong OUYANG

Structural: ARUP

MEP: MEINHARDT

QS: LEVETT & BAILY

Main Contractor

Gammon Construction

2005

BRE398: Building Information Modeling

Project Mission

Achieve the defined high building quality

Grade A and the highest commercial building in the East of

Hong Kong Inland

Early to start up the off-shore procurement

Reduce the construction time

70 stories building in 18 months

BRE398: Building Information Modeling

BIM Data Structuring

Architect

B. S.

Engineer

Structural

Engineer

BRE398: Building Information ManagementMTECH Confidential– 2005 Page14

机电系统同步設計 & 干涉检查

MEP Design - Design Collaboration

Integrated BIM Model

BRE398: Building Information Modeling

Collision Checking

MTECH Confidential– 2005 Page 16

BRE398: Building Information Modeling

Virtual Construction Feasibility Study

MTECH Confidential– 2005 Page 17

Prof Heng Li, Tim Huang, Stephen Kong, Neo Chan, Samuel Guo, Jack Chung, Greg Chan

BRE398: Building Information Modeling

4-Day cycle in Typical Floor18

Reveal works coordination and resources utilization across indifferent bays.

MTECH Confidential– 2005 Page

BRE398: Building Information Modeling

4-Days Cycle

(Reality vs VP) Day 1

MTECH Confidential– 2005 Page 19

BRE398: Building Information Modeling

4-Days Cycle

(Reality vs VP) Day 4

MTECH Confidential– 2005 Page 20

BRE398: Building Information Modeling

Cases Study

MTECH Confidential– 2011 Page

Beijing 2008

Olympic

Stadium

Swire

Properties

One Inland East

Nan Fung

廣州国际贸易展示中心

Sa Po North

Residential

Estate

BRE398: Building Information Modeling

Nanfung China 琶洲南丰汇

Developer: Nanfung China

International Trading Exhibition Center with 17

floors:

1-4th floors – Exhibition hall

5th floor Dining area

6-17th floors Showroom offices

Under ground 1-3th floor – Car park and shopping

area

Location: Guangzhou, China

Ground Area : 24,862 sq. m.

Developed Area: 132,519.5sq.m

Local Architect: Guangzhou Architect Design Insitute

Main Contractor: Shanghai Construction

2008

BRE398: Building Information Modeling

CATIA BIM Models

BRE398: Building Information Modeling

Project Mission

Improved building quality, reduced construction costs and, time including:

Improved visibility by project leadership into information developed by the extended building team

Improved coordination of building systems to identify and address potential conflicts

Security of construction cost and time to project completion

Integration between design documentation and fabrication or construction activities

Reduced project transaction costs (paper printing, rework, etc.)

Correction of major design fault before construction

Early use of building design asset

Multiple Views of BIM Model

BRE398: Building Information Modeling

Architecture/Structure/MEP View

BRE398: Building Information Management27

BRE398: Building Information Modeling

Architect and Structure Design Conflicts

The struture beam is above the slab

BRE398: Building Information Modeling

Fall Ceiling Height Issue

L04 After Install the MEP Services, the Fall Ceiling Height cannot match 3100mm

BRE398: Building Information Modeling

Fall Ceiling Height Issue

Original Fall Ceiling Height is 6600mm, the outcome is 5500mm

5m

3m

5.8m

6m

5.5m

2.4m

2.4m

6.8m

2.8m

5.8m

Head Room Clearance Checking

BRE398: Building Information Modeling

Design for Safety by BIM

BRE398: Building Information Modeling

Virtual vs Real

BRE398: Building Information Modeling

Virtual vs Real34

BRE398: Building Information Modeling

3D Navigation

MTECH Confidential– 2005 Page 35

BRE398: Building Information Modeling

Cases Study

MTECH Confidential– 2011 Page

Beijing 2008

Olympic

Stadium

Swire

Properties

One Inland East

Nan Fung

廣州国际贸易展示中心

Sa Po North

Residential

Estate

BRE398: Building Information Modeling

Sa Po North Residential Estate

Owner : Bright Strong Limited

Location : DD107, Sha Po North, Kam Tin, Yuen Long, N.T., Hong Kong

Project Manager: Sun Hung Kai Real Estate Agency Limited

Arch : Ronald Lu & Partners (Hong Kong) Limited

C&S : Sun Hung Kai Architects and Engineers Ltd.

M&E : Sun Hung Kai Architects and Engineers Ltd.

Site Area : 175,977 m2

GFA:

36,000 m2 (Domestic)

10,000 m2 (Non‐deomestic)

2,000 m2 (Club House)

Use : Residential 2012

BRE398: Building Information Modeling

Project Mission

Improved visibility by project leadership into information developed by the extended building team

Early use of building design asset

Improved coordination of building systems to identify and address potential conflicts

Security of construction cost and time to project completion

Integration between design documentation and fabrication or construction activities

Reduced project transaction costs (paper printing, rework, etc.)

Correction of major design fault before construction

BRE398: Building Information Modeling

Testing the work sequence in 4D before

the work begins

BRE398: Building Information Modeling

Excavation ELS Design Review

Deliverable - Podium

BRE398: Building Information Modeling

Optimization of Pipe works Layout

Optimize the headroom before pipeworks installed

Easy re-routing of various services to validate alternative routings

Easily checking pipeworks arrangement on façade wall

Optimize the wall opening to façade wall

Optimize the pipeworks layout in order to avoid the obstruction to the scene view from inside

MEP Services in Podium

BRE398: Building Information Modeling

Pipeworks Position OptimizationAfter BIM verification

BRE398: Building Information Modeling

Re-fine Slab Level

Making work ready by coordinating detailed 3D designs

Section A

Section B

Pipeworks installation in the bath room by the sunken slab

Rendering for Mock-up Flats

BRE398: Building Information Modeling

Life-Like Experience for Interior Design

Better Collaboration from Shared Vision of Needs,

Values and Purposes in the Design phase:

BRE398: Building Information Management

[email protected]

Questions & Answers

BRE398: Building Information Modeling

Summary

Why What Who When How

Business

Initiatives –

Time, Cost,

Quality,

Customer

satisfaction

BIM –

3D,4D,5D,….

Design,

Construction ,

O&M, Safety,

Green

Developers

Consultants

Contractors

Customers

Project

Lifecycle -

Design – Bid –

Build – O&M

BIM Execution

Plan

Business

Challenges –

limitation of

2D and

collaboration

Lean

Construction /

VDC/ Asset

Lifecycle

Management

BIM consultant