network developement capstone project 2009 sping quarter
Embed Size (px)
DESCRIPTION
This project was a culmination of two years of study at ITT-Technical Institutes\'s Bessemer, AL campus for an Associates degree in ITCNS (Information Technology Computer Network Systems). It was a team project of 7 members with the goal of designing a network solution for a fictional medical practice consolidation of 5 doctors in a company named Radiant Medical Services.TRANSCRIPT
- 1. Radiant Medical Services, LLC Proposed Network Solution By: Greenbox Network Solutions
2. Project Consultants
- Bridgette Ellis Project Leader
- Brenda Jefferson Network Solutions Consultant
- Richard Rumley Network Design Specialist
- Tyler Foster - Network Solutions Consultant
- Andrew Shepherd Risk Assessment Specialist
- Eugene Walker Network Solutions Consultant
- Patrick Bolling Network & Web Design Specialist
3. Purpose
- Resolve five doctors issues
- Provide better service to patients
- Zero impact to normal business operations
4. Project Context
- The doctors at Radiant Medical Services desire network access to all office locations.
- Another requirement is an upgraded system allowing seemless access to patient medical records.
- The doctors office hours are 7am-9pm daily depending on when the doctors in.
- With this new upgraded system they shall need to increase their staff to allow for projected growth.
- Physical security must be provided in addition to complying with current HIPPA laws. They also need a backup plan for disaster recovery on the central site.
5. Project Deliverables
- Each office will need a LAN design that will be incorporated into the WAN design. These designs will:
-
- Provide the ability to provide information on each patient as well as communications abilities between all locations.
-
- Meet all necessary security and disaster planning in regards to all relevant HIPPA requirements at a reasonable cost.
- Timeline
-
- Detailed timeline outlining all phases and works to be completed.
6. Primary Business Objectives
- Our primary business objectives are defined within two categories:
-
- 1 provision of a high-quality, fully functioning network solution for the doctors and patients of Radiant Medical Services, LLC that will meet all their requirements successfully.
-
- 2 To design, plan, implement, and test this network solution successfully in such a way as to be a financial asset to both Radiant Medical Services, LLC and Greenbox Network Solutions.
7. Secondary Business Objectives
- All of our secondary business objectives are designed to assist in the successful completion of the primary ones, as previously listed, such as:
-
-
- Successful achievement of the network design plans and pre-testing using network simulation software.
-
-
-
- Complete the purchase of all equipment and supplies necessary to complete the project within all budget and timeline parameters.
-
-
-
- Successful setup and initialization of all network equipment and connections including all software packages.
-
-
-
- Successful testing and initialization of all business software including vital updates.
-
-
-
- A successful training program for all appropriate employees and the doctors on the new computer systems and software programs.
-
8. Goals & Objectives
- 1 stObjective:
-
-
- A comprehensive network design that will incorporate all submitted requirements and allow for projected growth.
-
- 2 ndObjective:
-
-
- Comprehensive and full detail plans for all network connections including all configuration, network, and other necessary settings.
-
- 3 rdObjective:
-
-
- Construction of a complete plan of action to allow each doctor to conduct business as normal without disruption to the staff or patients.
-
- 4 thObjective:
-
-
- The construction of a realistic and detailed timeline that will be goal oriented and geared toward a successful completion of the proposed network solution.
-
9.
- 5 thObjective:
-
-
- Detailed plans for the purchase, storage, & transportation/delivery of all necessary equipment and supplies to the appropriate locations within all specified cost parameters as contained within the proposed budget.
-
- 6 thObjective:
-
-
- The actual implementation of all the above plans including all the proper documentation by the onsite personnel during this phase of the project.
-
- 7 thObjective:
-
-
- Final testing of all installed hardware, software, and network connectivity.
-
- Final Objective:
-
-
- Initialization of the entire network and any last minute configuration adjustments to have the network up and operating within all specified ranges.
-
10. Scope Specifications
- Key Highlighted Specifications:
-
- High-level plans for the proposed network design to be constructed in the provision of a network infrastructure to connected all 5 office locations.
-
- Provision of all necessary configuration settings for all computer systems and network devices.
-
- A comprehensive action plan for the installation process that will allow all five office locations to conduct their normal daily business operations.
-
- The creation of a highly detailed timeline for the successful completion of the proposed upgrades and network.
11.
-
- Purchasing, procurement, storage, and delivery of all equipment and supplies that will be involved in the upgrading and installation process.
-
- Provision of all necessary personnel for the successful completion of the project.
-
- Provision of full diagnostic testing of all equipment, network connections, and software packages.
-
- The replacement of all dot-matrix and low-end printers at all five office locations with network enabled printers.
-
- All computer systems (hardware & software) will be upgraded (replaced) with newer equipment and up-to-date versions of necessary software as per submitted requirements.
12.
-
- Specifically addressed requirement scope specifications per remote & central office locations will include:
-
-
- Additional servers, workstations, and other necessary hardware & software
-
-
-
- The LAN at the central office location will be upgraded as specified
-
-
- Software to be installed per workstation:
-
-
- Microsoft Office
-
-
-
- Email client software
-
-
-
- Web browser
-
-
- Network connectivity to centralized patient information, billing, & insurance claim applications, and the Internet.
13.
-
- Configuration of all network connections to allow for high-speed communications at all 5 locations with proper security measures in place to secure all data.
-
- ISP recommendation
-
- A comprehensive system for data backup ensuring full disaster recovery.
-
- Connectivity redundancy
-
- Full detailed documentation furnished
-
- Guidance/advice on full-time IT department staff versus contracted IT management service
-
- Guidance/advice on use of wireless systems
-
- Guidance/advice as to VoIP technology
-
- Network use and new software training provided to all appropriate Radiant Medical Services, LLC personnel.
14. Out-of-Scope Specifications
- Key Highlighted Specifications:
-
- Provision of security personnel and other physical security measures that lie outside of our control
-
- Security of all data and backup media outside of our possession during implementation of solution prior to transfer of that data to the new system
-
- Work delays caused by unforeseen events such as natural disasters or states of national emergency that no specified contingency plan has been constructed for
-
- Construction, addition, or provision for any office furniture necessary to house or support new network hardware or cabling requirements outside those specified within the submitted documents.
15.
-
- Extra training of Radiant Medical Services, LLC staff on network administration, configuration, and installation issues or other such issues not specified within our proposal.
-
- Provision of IT management services other than those necessary for successful completion of the proposed network solution.
- *Special Notice Regarding both Scope Specifications & Out-of-Scope Specifications:
-
- For more detailed information please refer to provided scope document under those sections respectively.
16. Assumptions
- Fifty percent of projects total cost due prior to implementation phase of project.
-
- Remaining portion due upon completion under Net30 terms.
-
-
- Radiant Medical Services, LLC will have no more than 30 days that will include weekends and holidays to pay the remaining balance.
-
- Any overflow or additional costs (including labor costs) will be added to the Net30 terms and due as above.
-
- Any hardware or software delivered on-site requires a sign-off by authorized employee of Radiant Medical Services, LLC.
-
- Client then assumes all liability for the item's) delivered and sign off on.
17. Risk Analysis
- Regulatory Risk
-
- Deadline for project is non-negotiable
-
- Target company software needs are non-negotiable, but compatibility issues may arise when new software is implemented.
- Technological Risk
-
- Some employees of Radiant Medical Services, LLC might be resistant to the upgrading of their materials.
-
- Since new equipment will be more robust, chance of security compromise will be greater.
-
- Potential exists for hackers to compromise internal network and obtain confidential information if security guidelines are not followed.
18.
- Operational and Financial Risk
-
- Due to current economic situation, it is possible that needed materials will be harder to obtain.
-
- In the declining economy, materials purchased at the outset of project could potentially cost less at time of completion.
19. Stakeholder
-
- Radiant Medical Services LLC
-
- Patients of Radiant Medical Services LLC
-
- Greenbox Network Design
-
- Resent College Graduates &Undergraduates
-
- Share Holders
-
- Community-At-Large
20. Recommended Project Approach
- Scope documentation
- System overview (specification)
- Design
- Implementation
- Integration
- Maintenance
21. WAN Topology 22. www.GreenBoxNS.com
- Now we will take you to the website we have designed to give you a more visual and interactive feel for what our company will bring to your business.
23. Cost Matrix 325000 Total Project Cost 187713.73 Labor137286.27 Sub Total 297 5 Server RoomCable LadderCable Ladder230 5 Server RoomWall MountsCeiling Hanging Kit7500 5 Server RoomNT TransportCisco Pix-520 Firewall 369 100 Facility / Server Room NT TransportCate6 Plenum Cable Jacks8970 5 Server RoomWall Mounts24 Port Patch Panels117.5 50 Facility Wall Mounts8 Port Face Plates50 50 FacilityWall MountsSingle Faceplates21480 24 (5) Facility / Server Room NT TransportCate6 Plenum Cable3813 2 Server RoomServer Terminal Single Rack LCD Monitor and Keyboard 346.36 2 Server RoomNT Equipment MountKeyboard Sliding Shelf442.64 2 Server RoomNT Equipment MountRack20965 7 Server RoomNT Traffic Cisco 10/100 Router24645 7 Server RoomNT Traffic Cisco Catalyst Switch10800 3 Server RoomServer System Max Server454.93 7 Printer RoomNT PrintingLinksys Print Server1049.95 5 Server RoomWireless Connection Cisco Wireless Router38000 50 Office Workstations Office PCsOptiplex 740 Mini Tower11999.5 50 Office WorkstationsManagement Software Microsoft Office1599.92 2 Server RoomServer Software Windows Small Business Server Price QuantityLocation Function Description 24. Concluding Remarks
- We will gladly take any questions you may have at this time.
- Thank you for your attention and consideration of our proposal.
25. Supporting Documents
- LAN Logical Network Diagrams
- Floor Plans
- Cabling Diagrams
26. Radiant-Central LAN 27. Radiant-North LAN 28. Radiant-East LAN 29. Radiant-West LAN 30. Radiant-South LAN 31. Radiant-Central Floor Plan 32. Radiant-North, East, West, & South Floor Plan 33. Cabling Diagram (All Location) 34. Cabling Drops Diagram