new prek-8 gilmartin school...morganti was concerned that run‐off from the site would contaminate...

26
New PreK-8 Gilmartin School Elementary School #3 Waterbury, Connecticut T T h h e e M Mo or r g g a a n n t t i i G Gr r o o u u p p , , I I n n c c . . AGC/CT 2012 Build Connecticut Award Application Construction Manager / General Contractor: New Large Construction 100 Mill Plain Road Danbury, CT 06810 Phone: (203) 7432675 Fax: (203) 8304478 Website: www.morganti.com

Upload: others

Post on 02-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  •  

    NNeeww PPrreeKK--88 GGiillmmaarrttiinn SScchhooooll EElleemmeennttaarryy SScchhooooll ##33

    WWaatteerrbbuurryy,, CCoonnnneeccttiiccuutt

    TThhee MMoorrggaannttii GGrroouupp,, IInncc.. AAGGCC//CCTT 22001122 BBuuiilldd CCoonnnneeccttiiccuutt AAwwaarrdd AApppplliiccaattiioonn

    CCoonnssttrruuccttiioonn MMaannaaggeerr // GGeenneerraall CCoonnttrraaccttoorr:: NNeeww LLaarrggee CCoonnssttrruuccttiioonn

    100 Mill Plain Road Danbury, CT 06810 

    Phone: (203) 743‐2675 Fax: (203) 830‐4478  

    Website: www.morganti.com 

  • Construction Management / General Contractor: New Large Construction The Morganti Group, Inc. – New PreK-8 Gilmartin School

    TABLE OF CONTENTS

          

    1. AGC/CT Build Connecticut Award Application  

    2. Summary  

    3. Judging Criteria Narrative  

    4. Project Photographs  

    5. Press Clippings   

                Application Fee Check – Separate Sealed Envelope   

  • Construction Management / General Contractor: New Large Construction The Morganti Group, Inc. – New PreK-8 Gilmartin School

    2 | SUMMARY

    Why does the New PreK‐8 Gilmartin School merit a Build Connecticut Award?  

    The New PreK‐8 Gilmartin School merits an Associated General Contractors Build Connecticut Award 

    for three simple reasons.  The first being Morganti’s leadership which lead to returning ninety‐five 

    percent of the construction contingency fund to the Owner.  Secondly, the sheer complexity of the 

    building layout resulted in precise coordination.  And lastly, we had success of using a relatively new 

    product manufactured over‐seas, glass‐fiber reinforced concrete (GFRC) panels. 

     During the pre‐construction phase of the project, Morganti’s thorough review of the documents and 

    attention to detail when writing our subcontractor scopes of work significantly minimized the use of 

    construction contingency funds.  In turn, the Owner was able to use those monies for various 

    enhancements toward the latter stages of the project.  Three of the higher‐dollar improvements 

    included providing sod in lieu of seed at the play field, installing a multi colored rubberized play surface 

    at the playground in lieu of mulch and new boys’ and girls’ toilet rooms built after project completion. 

     The Architect, The S/L/A/M Collaborative, envisioned a child lying on the ground with their arms 

    spread looking up into the future as the inspiration of the building layout.  That inspiration lead to 

    significant layout and coordination challenges.  Just a few of the complex building features included 

    numerous radii walls, both interior and exterior.  The focal exterior wall at the main entrance of the 

    school was not only on a radius, but also leaning out seven degrees.  There were also multiple exterior 

    facades; face and glazed brick, composite wall panels, metal wall tiles, GFRC panels and EIFS. 

     At the end of the day, the installation of the GFRC panel façade was the project’s showcase.  

    Swisspearl®, the manufacturer of the panels based in Switzerland, featured Gilmartin School in their 

    international edition of architectural high profile buildings issued earlier this year.  In addition, because 

    of the success on this project, The S/L/A/M Collaborative brought a high profile client, ESPN, to the site 

    in order to visualize how the GFRC panels would look installed on their proposed building. 

  • Construction Management / General Contractor: New Large Construction The Morganti Group, Inc. – New PreK-8 Gilmartin School

    3 | JUDGING CRITERIA NARRATIVE

    State of‐the‐art advancement  

    The New PreK‐8 Gilmartin School included a state‐of‐the art photovoltaic (PV) system to supplement 

    the buildings’ energy system.  During building construction, Morganti installed the entire infrastructure 

    necessary to support the new photovoltaic system.  Although the panel installation was not in our 

    contract, nor were they installed until a year after substantial completion, we returned to the project 

    to coordinate the installation of the panels with the City of Waterbury’s contractor.  This system allows 

    the Owner to use the energy from the PV system when there is a need and also returns energy to the 

    utility in times of low building demand. 

     Excellence in project management  

    Beginning in pre‐construction Morganti’s ability to manage the entire building process led to many 

    advantages throughout the project.  Our thorough review of the contract documents and attention to 

    detail when writing the subcontractor scopes of work minimized the use of construction contingency 

    on the project.  The Owner was able to add many enhancements to the project because of this.  These 

    improvements, again, included additional boys’ and girls’ lavatories, installing sod on the play field in 

    lieu of seed, which allowed for immediate use during the first school year and installing a rubberized 

    play‐scape surface at the playground in lieu of mulch.   

       Through Morganti’s proactive approach to project management, the team was continually monitoring 

    and updating the project schedule and how subcontractor deliveries were affecting the production in 

    the field.  This allows us to identify when a contractor is falling behind and take the necessary steps to 

    keep the project on schedule.  A good example of this is when the structural steel subcontractor began 

    to fall behind on their shop drawings.  A red flag was raised and the issues were addressed and 

    corrected.  The project schedule was updated; the steel deliveries re‐sequenced all while maintaining 

    the overall project schedule.  

  • Construction Management / General Contractor: New Large Construction The Morganti Group, Inc. – New PreK-8 Gilmartin School

    3 | JUDGING CRITERIA NARRATIVE

    Project team effectiveness  

    Late in construction there was a change to the location of an array of photovoltaic (PV) panels on the 

    building.  The project team came together to analyze the impact and come up with a plan which would 

    not delay the completion of the project.  Because of all the team members’ attention to this matter, 

    the additional work which was required in nearly completed areas was performed with minimal impact 

    to the previously installed finishes and again did not impact the overall project schedule.   

     Another example to the project team coming together to resolve an issue was the discovery of 

    unsuitable materials below one corner of the proposed building.  Within two days the material was 

    deemed unsuitable by the geotechnical engineer and the design team, a meeting was held to 

    determine the best way to quantify and track the material removal and fill installation and the 

    appropriate change order directives were issued.  Because of the team’s swift action the site 

    contractor and concrete contractor incurred no delays in completing their respective work.   

     Innovation in construction techniques, materials or design  

    One of the first construction materials that immediately stood out in the early stages of design was the 

    glass‐fiber‐reinforced concrete (GFRC) panels located on the south face of the classroom wing.  The 

    locations and specific patterns of the four different colored panels, the two radii walls they were to be 

    installed on (one being tilted) and the window layout with the panel joints all presented unique 

    coordination challenges. 

     The manufacturer of the GFRC panels, Swisspearl®, featured the Gilmartin School in their international 

    edition of architectural high profile buildings issued earlier this year.  In addition, because of the 

    success and the end product, The S/L/A/M Collaborative brought a high profile client, ESPN, to the site 

    to in order to visualize how the GFRC panels would look installed on their building. 

  • Construction Management / General Contractor: New Large Construction The Morganti Group, Inc. – New PreK-8 Gilmartin School

    3 | JUDGING CRITERIA NARRATIVE

    Excellence in client services  

    Initially when this project went out to bid in July of 2008, a phasing plan was in place to use the 

    existing school and portables.  The respective bids pushed the project over budget.  During the review 

    of the bids and the subsequent value engineering sessions which followed, it was determined that by 

    eliminating the phasing on the project the necessary monies could be saved.  The solution was to 

    move the entire school off site to a nearby vacant parochial school.  This allowed for efficiency in 

    construction of the new building and a reduction of construction time on the overall schedule of nearly 

    seven months.  Morganti’s attention to detail during pre‐construction and subsequent construction, 

    and notification to the owner that funds were available, allowed the Owner to repurpose the saved 

    contingency for beneficial use on the project. 

     Contribution to the community  

    Morganti had the opportunity to contribute to the community in a number of ways.  During the course 

    of the project Morganti personal participated in mentoring programs and job fairs in the City of 

    Waterbury.  Of particular note was the ACE 2007/2008 Mentoring Program.  This program brought 

    together various professionals who went out to schools in the city and spoke about career 

    opportunities in their fields.  In Morganti’s case, our Director of Pre‐Construction visited with students 

    at one of the local high schools and discussed topics related to the construction field.   The students 

    were very engaged and asked numerous questions regarding the construction industry.   

     With regards to construction, again because of our extensive pre‐construction review and scoping, we 

    were able to return ninety‐five percent of the contingency funds to the Owner who in turn used those 

    funds for various enhancements.  One of the larger improvements contributing to the community was 

    placing sod at the new play field and walking track in lieu of planting seed.  This allowed us to make the 

    area available to the public a year earlier than originally planned.  Because the school is located in a 

  • Construction Management / General Contractor: New Large Construction The Morganti Group, Inc. – New PreK-8 Gilmartin School

    3 | JUDGING CRITERIA NARRATIVE

    residential neighborhood, neighbors are frequently on school grounds taking advantage of what the 

    school has to offer. 

     Also, as part of our contract we were required to comply with the Waterbury Good Jobs! Ordinance 

    with the intention of putting Waterbury residents, apprentices and minorities to work.  We were able 

    to meet and/or exceed all categories of this ordinance providing employment opportunities to the 

    local residents of Waterbury. 

      Meeting the challenge of a difficult job  

    There is no question that layout alone of this building was a challenge, the configuration of the 

    classroom wing itself with walls being on radii and being tilted out from a vertical plane presented 

    many challenges.  These challenges we not only confined to the foundation and structural steel, but 

    also included the interior wall and ceiling layouts.  The exterior walls, especially the one section that 

    leans out, was particularly complex.  Allowances had to be made not only for the curve of the building, 

    but also the growth of the horizontal dimensions as the construction moved up vertically from grade.  

    One particular piece of the construction was the coordination of the punched window openings and 

    the GFRC panel layout.  Meticulous care had to be taken to ensure that the window not only matched 

    the vertical panel seams but also the horizontal seams.  Allowances also had to be made for panel 

    dimension reductions due to the lean of the building.  This lean shortened the vertical distance each 

    panel covered and thus the window layout had to adjust for this reduction.   

     

    Sensitivity to the environment and the surroundings  

    Early on in preconstruction it was identified that the erosion controls called out in the documents may 

    not be adequate for the site which lies above a stream channel that empties into the Naugatuck River.  

  • Construction Management / General Contractor: New Large Construction The Morganti Group, Inc. – New PreK-8 Gilmartin School

    3 | JUDGING CRITERIA NARRATIVE

    Morganti was concerned that run‐off from the site would contaminate the waterway and additional 

    erosion control measures were incorporated into the documents.  We are glad to report there was not 

    one incident of run‐off contaminating the adjacent waterways.   

     Another example of the projects sensitivity to the environment was the saving of a large established 

    oak tree which bordered the project.  There was to be a retaining wall installed in close proximity to 

    the oak.  The arborist and landscape architect were called, a meeting was set up and the conclusion to 

    move the retaining wall to save the tree was made.  There were also numerous instances where the 

    arborist made determinations with the landscape architect to save trees scheduled for removal and to 

    trim back and clean out the tree canopy to enhance not only the site but also the health of the 

    surrounding trees. 

  • Construction Management / General Contractor: New Large Construction The Morganti Group, Inc. – New PreK-8 Gilmartin School

    5 | PRESS CLIPPINGS

     The Morganti Group would like to highlight the following articles featuring the New PreK‐8 Gilmartin School;   “School’s ‘modern’ now ‘quaint’ featured in the Republican‐American newspaper – March 2009  “Gilmartin School Groundbreaking Ceremony” featured in High Profile magazine – May 2009  “Waterbury students make a fresh start… a new school year in a brand new school…” featured in the Republican‐American newspaper – September 2010  “Waterbury Public Schools – Action Plan” featured in Education Executive magazine – Fall 2011   The articles listed above follows this page respectively.  

  • 1 - COVER-22 - TOC3 - APPLICATION4 - SUMMARY5 - JUDGING CRITERIA NARRATIVE5 - PRESS CLIPPINGS6 - PHOTO 16 - PHOTO 26 - PHOTO 36 - PHOTO 46 - PHOTO 56 - PHOTO 66 - PHOTO 87 - PRESS CLIPPINGS8 -ARTICLES 18 -ARTICLES 28 -ARTICLES 3