nguyen huu hanh 's cv jan 2016
TRANSCRIPT
CURRICULUM VITAE – Nguyen Huu Hanh
Date: 01/2016 Page 1 of 6
Name NGUYEN HUU HANH
Job Positions Schlumberger_Completions Field Service
Engineer
(All Core Completions Tools &
Down-hole Gauges/ Sensors)
Weatherford_MPD Field Technical Assistant
(Managed Pressure Drilling Technology)
VGCE_Head Marketing
(Anti Corrosion Technology and Solutions)
Years in
Oilfield
20-Jul-2010 to Apr-2011 (Weatherford MPD
Drilling)
26-Jun-2011 to Mar-2015 (Schlumberger
Completions)
Sep 2015 to Present
(Vietnam GloCoating Engineering_VGCE)
Nationality Vietnamese
Date of Birth 03-Aug-1988
Languages Vietnamese, English
NRIC /
Passport
261094003/ B5144482
Date of Issue /
Expiry
21-Mar-2011 / 21-Mar-2021
Contact No. /
012 940 945 38/ [email protected]
Address 207 Le Hong Phong Str, Ward 8, Vung tau City
I. EDUCATION / QUALIFICATIONS
Ho Chi Minh City University of Technology, Ho Chi Minh City, Viet Nam.
Faculty of Geology and Petroleum Technology
Bachelor of Drilling and Production Engineering - April 2011, GPA: 8.1/10.
II. EMPLOYMENT HISTORY-EXPERIENCE
i. Marketing & Sales
Head Marketing, Vietnam GloCoating Engineering JSC.
(VGCE, Anti Corrosion Technology & Solutions)
CURRICULUM VITAE – Nguyen Huu Hanh
Date: 01/2016 Page 2 of 6
ii. Software Utilization
Completions Production
Artificial Lift
(Gas lift &
ESP)
Well Builder (Schematic
Design and
Builder)
Pipesim
DesignPro (Gas
lift & ESP
Designer)
TDAS (Tubular
Design &
Analysis)
FracCADE (Hydraulic
Fracturing
Design &
Evaluation)
Pipesim
Well Tracker (Tracking Well
Information for
Installation,
Workover)
T&D (Torque &
Drag Simulator)
iii. Field Job Experience
ITEM DATE DESCRIPTIONS CLIENT
1 Sep-Mar 2015
(SCHLUMBERGER
VIETNAM)
Coordination of Workshop Job
Preparations and Field Installations
Supervise Installation of Complex
Completions Multi Zones, Single
String with Core Completions Tools
such as Expansion Joint, Gas lift
mandrels …etc with Series of
Production/ Isolation Packers and
Sliding Sleeve Door c/w Electric
Down-hole Gauge Installation
Supervise Work-over POOH
Complex Completions and Re-Run
Completions installation
Trouble shooting Electrical Down-
hole Gauges and Acquisition Unit
PVEP-POC Dai Hung
Field Dai Hung 2
Vietnam
2 Jul-Sep 2014 Job Preparations and Supervision
Work-over Campaign Upper
Completions
Cuu long JOC,
Su Tu Vang, CPP
Vietnam.
CURRICULUM VITAE – Nguyen Huu Hanh
Date: 01/2016 Page 3 of 6
Supervise Installation of Hybrid
Artificial Lift Completions ESP &
Gas Lift with Upper Core
Completions Tools Well #SV-6P and
SV-1P
3 May-June 2014 Supervise Installation of Subsea
Standard Completions Single String
c/w Electric Down-hole Gauge
(NHQG High-Tier Quartz Gauge,
EDMC-Welded Connector and
Splices)
Premier Oil,
Dua Subsea Project,
Vietnam.
4 Apr 2014 Trouble shooting Electric Down-hole
Gauges
Maintenance Surface Acquisition
Unit ASUX on WH Platform S, N
and E.
JVPC,
Rang Dong Project,
Vietnam
5 Feb 2014 Trouble shooting Down-hole Gauges
Multi-dropped mode
Maintenance of SHCS_Surface
Hydraulic Control System with
RTAC Software_Realtime
Acquisition and Control for Down-
hole Flow Control Valves (Intelligent
Completions Tools) Producer and
Injector wells
Premier Oil,
Chim Sao Project,
Vietnam.
6 Sep 2013-Jan 2014
(SCHLUMBERGER
VIETNAM)
Completions Preparations and
Supervision
Completions Preparations and
Supervision
Supervise Safety valve installation
Premier Oil,
Dua Subsea Project,
Vietnam.
Dai Hung POC,
Dai Hung Project,
Vietnam.
Cuu long JOC,
Su Tu Vang-NE
Project, Vietnam.
7 Aug 2013-Sep 2013
(SCHLUMBERGER
IRAQ)
Supervise Permanent Down-hole
Monitoring Commission onshore
Support ESP Completions
Preparations
Petronas, Garraf
Field, Iraq.
ENI, Iraq
8 Nov 2012-Aug 2013
(SCHLUMBERGER
VIETNAM)
Supervise Permanent Down-hole
Gauge Installation
Supervise Work-over
Supervise Down-hole Gauge
Monitoring System Commissioning
(Uniconn WellWatcher, FIC-II cards,
Comm Card, Modbus Protocol
Cuu long JOC,
Su Tu Den Project,
Vietnam.
ThangLong JOC,
Hai Su Trang &
Hai Su Den Projects,
Vietnam.
CURRICULUM VITAE – Nguyen Huu Hanh
Date: 01/2016 Page 4 of 6
(RS232/RS485), Gauges NMQG-
AA.
Lower and Upper Completions
Preparation, Installation and
Maintenance: Electric Down-hole
Gauge, Safety Valve (TRMAXX-
5E), Gas Lift Mandrel, Chemical
Injection Mandrel (DCIN-II), MRP
packer, Seal-bore Packer (Quantum),
Swell packer, Sand Screens.
ThangLong JOC,
Hai Su Trang &
Hai Su Den Projects,
Vietnam.
9 Jul 2012-Oct 2012
(SCHLUMBERGER
MALAYSIA)
Subsea Completions Installation:
Deep Set safety valve (TRC-II),
Multiport packer (XMP-CL), Tubing
Isolation Valve (TIVF-C), Formation
Isolation Valve (FIV), Chemical
injection mandrel (DCIN-II),
Permanent Down-hole Gauge
(NPQG-AA).
SPAR Completions Installation:
Mudline packer (XMP-CL), Tubing
Isolation Valve (TIVF-C), Formation
Isolation Valve (FIV), Chemical
injection mandrel (DCIN-II),
Permanent Down-hole Gauge
(NPQG-AA).
Murphy Oil
Corporation,
Kikeh Project,
Malaysia.
Murphy Oil
Corporation,
Kikeh Project,
Malaysia.
10 Jun 2011-Jul 2012
(SCHLUMBERGER
VIETNAM)
NPQG-AA installation (Net
Permanent Quartz Gauge-Welded)
Standard Completion: TRMAXX-5E
Safety Valve, Gas Lift Mandrel,
SSD, Nipple, PBR,
Quantum/MRP/XMP Packer (Multi
Ports Packer), Hydro Trip Sub.
Intelligent completions installation:
Multi-drop Dual gauges (W, T
connections) and Flow Control
Valves (TRFC-HD, ODIN), also
multiple down-hole lines.
Cuulong JOC,
Su Tu Den Project,
Vietnam.
Dai Hung POC,
Dai Hung Project,
Vietnam.
Premier Oil Vietnam
Offshore,
Chim Sao Project,
Vietnam.
11
Feb 2011-Apr 2011
(WEATHERFORD
VIETNAM)
Preparation & Maintenance of
Equipment for MPD Jobs (Managed
Pressure Drilling) - Combination
Application (Constant Bottom-hole
Pressure & Pressurized Mud-cap
Drilling Applications).
Petronas Carigali
Vietnam Limited,
Topaz Project,
Vietnam.
CURRICULUM VITAE – Nguyen Huu Hanh
Date: 01/2016 Page 5 of 6
Preparation & Maintenance of
Equipment for Completions Jobs.
Cuu Long JOC,
Su Tu Den Project,
Vietnam.
12 Jul 2010-Dec 2010
(WEATHERFORD
VIETNAM)
Preparation & Maintenance of
Equipment for MPD Jobs (Managed
Pressure Drilling) - CBHP
Application (Constant Bottom-hole
Pressure).
Preparation & Maintenance of
Equipment for Completions Jobs.
Hoang Long JOC,
Te Giac Den Project,
Vietnam.
Cuu Long JOC,
Su Tu Den Project,
Vietnam.
III. TECHNICAL TRAINING HISTORY
Date Course Location Comments
10th Nov - 12th Dec,
2013 RMC FE Intermediate Course
MLC,
Abu Dhabi
Schlumberger
Completions
Intermediate
09th Oct - 15th Dec,
2011 CPS FE Basic Course
MLC,
Abu Dhabi
Schlumberger
Completions
Basic
IV. SCHLUMBERGER QHSE TRAINING
Date Course Location
27th - 28th
May 2013 CTC Commentary Task Coach
Schlumberger Vung Tau
Base
12th - 14th
Mar 2013 QHSE-2 for Supervisors
Palace Hotel, Vung Tau
Jul 2014 BOSIET (Sea Survival – HUET – Basic First Aid
– Basic Fire Awareness)
PVMTC, Vung Tau,
Vietnam
Jun 2011 Oil Field Services-1 Kuala Lumpur, Malaysia
CURRICULUM VITAE – Nguyen Huu Hanh
Date: 01/2016 Page 6 of 6
V. PERSONAL SKILLS
Excellence in Team-Work and Individual Work
Fluency in English Communications both Oral and Written
Recordable Ability of Problem Solving Skill
Capability of Working Under High Pressure Situations
Well adaptable to deal with many Clients and Parties
High Passion in Works
Self-Motivated.