NIROPS 2013 Closeout The Phoenix IR System Engineering Team Woody Smith (Ring Leader) Charles Kazimir (Kaz) Bill Forsyth (Hawaiian Bill) Dave Chamberlain (Super Dave) Phoenix System 10th Anniversary FY'13 The Phoenix IR System Flight Technicians Woody Smith (The Old Guy) Charles Kazimir (Kaz) Rob Navarro (Big Rob) John “Woody” Kessler (WoodyK)

Upload: others

Post on 29-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

NIROPS 2013 Closeout

• The Phoenix IR System • Engineering Team

• Woody Smith (Ring Leader) • Charles Kazimir (Kaz)

• Bill Forsyth (Hawaiian Bill) • Dave Chamberlain (Super Dave)

Phoenix System 10th Anniversary FY'13

• The Phoenix IR System • Flight Technicians

• Woody Smith (The Old Guy) • Charles Kazimir (Kaz) • Rob Navarro (Big Rob)

• John “Woody” Kessler (WoodyK)

Page 2: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

2013 Technician Statistics

• Total Technician Hours were 967.89 (about 80 hours less than 2012) hours

• Total Technician Days were 270 (same as 2012)

Days

• Total Technician Missions were 1237 (200 less than 2012)

• Almost 2x more hours/missions than 2007 to 2011.

Phoenix System 10th Anniversary FY'13

Page 3: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

Milestones

• Stabilized and cleaned up signals – More gain = better sensitivity, clearer image – Image “stretch” improved for all conditions – Improved digital image signal filtering

• New fire detection and “desmoke” – More reliable sub-pixel heat detection – Able to “see under” gaseous heat cloud which

improves actual “on-the-ground” heat perimeter interpretation

Phoenix System 10th Anniversary FY'13

Page 4: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

Phoenix System 10th Anniversary FY'13

Gaseous Extreme Heat Cloud

Page 5: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

Implement “Desmoke”

Phoenix System 10th Anniversary FY'13

Page 6: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

Desmoke Effect

• Better heat perimeter location

Phoenix System 10th Anniversary FY'13

Page 7: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

Phoenix System 10th Anniversary FY'13

Heat “Halo” Effect

Page 8: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

Phoenix System 10th Anniversary FY'13

Color ortho used to “eliminate” halo effect

Page 9: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

AMS System

• Received AMS system from NASA in March 2013 • Installed in N144Z in March 2013. • Next week we will work w/NASA engineers to

start transforming the operator interface from a scientific research instrument to an operational user interface.

• The AMS will provide additional capabilities important to forest health discoveries and ….. (we are still learning what we can do with it)

Phoenix System 10th Anniversary FY'13

Page 10: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

Continuous Improvement Program

• Optics • Detectors • Analog signal chain • Digital data processing • Products development • Delivery • Quality assurance

Phoenix System 10th Anniversary FY'13

Page 11: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

IR information sharing

• Facebook Group – Infrared • FreeArc link - We are using version 0.666

http://freearc.org/Download.aspx download the Windows installer and the Add-on: FreeArc PowerPack (standard set of

external compressors) FreeArc documentation http://freearc.sourceforge.net/index.htm

Phoenix System 10th Anniversary FY'13

Page 12: NIROPS 2013 Closeout · 2013. 11. 18. · 2013 Technician Statistics • Total Technician Hours were 967.89 (about 80 hours less than 2012) hours • Total Technician Days were 270

Fire Detection “Saved The Day – Elk and Pony”

Phoenix System 10th Anniversary FY'13

SUN

VALLEY & KETCHU

M AREA