NJUNS Update For OJUA Presented by Tami KatzmarekApril 23, 2008

NJUNS Update For OJUA Presented by Tami KatzmarekApril 23, 2008

Page 2: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

by Tami KatzmarekApril 23, 2008What’s New

Page 3: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

New Look on the Web!

Page 4: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Additional Features Added• Road name and house number fields in ticket

header

• Pole Coordinate fields in header and job steps

• More searchable fields

• Company defined fields – customizable

• Pole Transfer ticket grouping into projects

• Dynamic Mapping

• Work management system integration enabling batch ticket creation

• Auto-complete fields to eliminate data entry errors

Page 5: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

New Fields on Tickets

Page 6: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Company Defined Fields

Up to 20 separate companydefinable fields for work management system integrationand specialized informationnot currently listed on the ticket.

Page 7: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Action Item Grouping

All ticket action items are groupedin one commonarea.

Page 8: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Reporting Capabilities• NJUNS currently delivers report information

several different formats (XML, CSV, TIFF, PDF, Web Archive, Excel).

• The data is easily imported into Excel or Access for user customizable reports and charts.

• Additional reporting functions are continually being evaluated for deployment.

Page 9: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008
Page 10: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000Nu

mbe

r of T

rans

fers

# Completed 305 587 410 779 656 545 364 365 261 253 488 366 221

Over 30 Days 2401 2099 1524 1512 1483 1146 1083 823 854 966 855 764 787

Total 4845 4413 3804 3862 3435 3004 2823 2535 2693 2964 2754 2651 2717

DEC 02 JAN 03 FEB 03 MAR 03 APR 03 MAY 03 JUN 03 JUL 03 AUG 03 SEP 03 OCT 03 NOV 03 DEC 03

Page 11: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

•Since its inception, NJUNS has maintained nearly 600,000 tickets without any data loss.

•NJUNS is averaging 4000-4500 e-mail transmissions daily. New email delivery failure notice on ticket view.

• NJUNS servers are located in a co-location facility in Carrollton, GA on diverse fiber optic rings with redundant internet service providers. 100% backup power provided by generator at the building.

Reliability

Page 12: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

• Offsite data backup storage utilizing nightly backups via LiveVault by Iron Mountain, Inc. A seven day running library of backed up data is available in the event of a database issue.

• Weekly database backup to a separate local hard drive.

• Program backup stored in a safety deposit box at a local bank.

Reliability

Page 13: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

The Future of NJUNS

Because our membershipdetermines our course of action, based on the needs of the utility community, we control our own future.

The Sky’s The Limit!

Page 14: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Planned Enhancements• Additional features and reporting

capabilities are being continually reviewed by the Technology Committee.

• Work Management System Integration utilizing Web Services to enable two-way updates between NJUNS and your work management system.

Page 15: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Other Programs Available to OJUA

Page 16: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Joint Trench• Designed to solicit partners and to coordinate

multiple occupant trench projects.

• Ticket creation is similar to Pole transfer.

• It can track all aspects of the project from Initial Contact to Final Billing.

Page 17: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008
Page 18: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Project Notification• Project Notification is a broadcast notification to

registered facility owners, both aerial and buried, by county for the entire state.

• Notification receipt determined by individual utility whether to accept notices for aerial, buried or both types of projects.

• Allows interaction between utility companies interested in participating in large or sensitive projects.

• Provides reminder to members for a no response condition half-way to the information due date.

Page 19: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Example of Project Notification Ticket

Page 20: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Oversize Load Move• Designed to follow regulations enacted in GA

covering all moves greater in size than standard AASHTO guidelines for non-permitted vehicles, but is customizable to work with other state’s guidelines.

• Like Project Notification, it is a broadcast notification to all affected aerial facility owners along the predetermined route.

• Allows interaction between utilities and permitting agencies prior to a scheduled move.

• To date, it has handled over 1500 house moves.

Page 21: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Example of Oversize Load Ticket

Page 22: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

Efficient Utility Communication

Page 23: NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008 NJUNS Update For OJUA Presented by Tami Katzmarek April 23, 2008

For More Information Contact:

Roy [email protected]

Chris [email protected]

Efficient Utility Communication