north sea activities week 20 - foga.dk oversigtskort 2015/week 20 2015 eng.pdf · foga north sea...
TRANSCRIPT
Telefonkabel TAT 14 as laid 2000
Må ikke kopieres uden tilladelse fra FOGA ApS
Week 20
EU
RO
PIP
E2
Atlanticcrossing
1(N
) telephonecable
system
Kortet må ikke anvendes til navigation
ODIN telephone cable, segment 3
OD
INte
lefo
nka
be
l, se
gm
en
t 2
May 12, 2015
Mast
Cecilie-2 feltet
Horns Rev 1Wind FarmHorns Rev 1Wind Farm
7
Reproduced from Admiralty Chart 2182B by permission of theController of Her Majesty’s Stationery Office andHydrographic Offices of Denmark and United Kingdom.
Reproduced from Admiralty Chart 2182B by permission of theController of Her Majesty’s Stationery Office andHydrographic Offices of Denmark and United Kingdom.
Tyra SE Field
Trafo
3
Signatures:
NO
RN
ED
cable
laid
and tre
nch
ed
HORNS REV 2Wind farmHORNS REV 2Wind farm
FINO 3500 metersafety zone
FINO 3500 metersafety zone
FARSUND
Cable
rout
e Valh
all to
Far
sund
Cable
rout
e Valh
all to
Far
sund
Danice
komm
unikationskabel
Danice
komm
unikationskabel
pipeline, no protective zoneexisting pipeline, 200 meter protective zonecommunication cable, established 1995-2008survey line/ pipeline inspection/planned cable routeexisting installationsubsea constructiondiving activityconstruction- or research vesselnavigational warning
1 Drilling rig NOBLE SAM TURNER is in pos. at XANA.2 Acc.p/f ATLANTIC ESBJERG on Stand off positin at
DAN-B, will be moved to final position at first givenweather window.
3 Drilling rig ENSCO 72 in pos at TYRA SE-A.4 Acc. rig COSL RIGMAR to be moved from SYD ARNE WHP N.
to Kristianssand at first given weather window.5 Acc.p/f ATLANTIC LABRADOR is in pos at the TYRA E Field.
To be moved internally at Tyra, mid-summer.6 Drilling rig ENSCO 71 in position at HCE.7 Drilling rig ENERGY ENHANCER in post at SVEND.8 Drilling rig MÆRSK RESOLVE in pos at the Hejre Field.9 Drilling rig MÆRSK RESOLUTE South Arne field10 SEAFOX 5 in pos. at VALDEMAR BA.11 Acc.rig ATLANTIC AMSTERDAM in pos at DAN FA
Vessels/activities:The vessel EDDA FLORA expected to conduct ROV inspections at DONGinstallations/piplines + DUC Fields/SOURTH ARNE, 30/4.The vessel M/V BIBBY POLARIS working at the TYRA Field from wk 15.The vessel M/V ANETTE CHRISTINA conducting gaurdduties at TYRA E.To be relieved by VENUS II at 13/05.The ATLANTIS DWELLER is expected to finish the job at the DUCfield during this week.ESVAGT KAPPA conducting guard duties at the HEJRE Platform site.PACIFIC OSPREY has finished the job and left the GNSC B11 Gas platform,German Sector. The buoys on station to be recovered ASAP.The vessel STADISLAN YUDIN expected at the VALDEMAR WNW fieldfor installing a new platform. Approx. 10. - 24/5.
4 DSV Constructor
Kranfartøj BALDER
Installationsarbejdepå Syd Arne Feltetfra ultimo august
5
NorpipeEuropipe
1
Europipe 2
Afviserfartøj NINI Øst feltetSALLING
MÆRSKASSISTER
Afviserfartøj GORM-TYRA EVEGA II
CONSTRUCTOR
GECO TRITON
Afviserfartøj BOJE 2 feltetMALLEMUKKEN
RENÉ DESCARTESUdlægning af fiberkabelved VALDEMAR felter
fra ca. 23/7
CECILIEguard vessel atTYRA VALDEMAR
1
m/v EDT PTOTEADAN A
HAVILA CRUSADER
Forsyningsfartøjved Syd Arne feltetca. 30/8 - 12/9
DANTYSKWindfarm500 msafetyzone
DANTYSKWindfarm500 msafetyzone
SEVEN FALCONSIRI Field
SEVEN FALCONSIRI FIELD
Akademik Shatskiyconducting D2 surveyAkademik Shatskiyconducting D2 survey
VEGA IIguard vessel atTYRA VALDEMARuntil 21/7
OLYMPIC COMMANDERDUC fields
M/V CECILIE
9
TRYM field
SubseacontructionSubseacontruction
11
NEXANS SKAGERRAKCable works
ELEKTRONCable works
NORTH SEA ACTIVITIESOverview chart based on offshore-operator‹sinformation of ongoing and planned activities.Please notice descriptions at the back with updates this week.
NORTH SEA ACTIVITIESOverview chart based on offshore-operator‹sinformation of ongoing and planned activities.Please notice descriptions at the back with updates this week.
Chart not to be used for navigation
FOGA ApSFishermens Informationof Oil- andGas ActivitiesTlf. +45 75 451144
VENUS II
guard vessel atTYRA VALDEMAR
VEGA IIguard vessel atSkagerrak 4 cable
ENERGY ENHANCERDAN FE
NEXANS SKAGERRAK& ELEKTRON conductingcable works from 20/7Guard vessel: ANETTE DAHL
SEVEN OSPREYSIRI Field
ENSCO 72TYRA EAST B
4
SEVEN OSPREY
MÆRSK RESOLVESOLSORT-2
TOISA INVINCIBLETYRA SE Project
AUDACIATYRA SE Project
ENERGY SWANTYRA SE Project
HIGHLAND ROVERTYRA SE Project
UP JASPERTYRA SE Project
SAIPEM 7000
Installationworkat GORM E
VENUS II
guard vessel atTYRA VALDEMAR
CECILIEguard vessel at
TYRA VALDEMAR
ANETTE DAHLguard vessel atSkagerrak 4 cable
SKANDI OLYMPIAto the DUC fields
ENSCO 71HALFAN A
ENERGY ENHANCERGORM A
THOR CHASER
M/V REMUSsupport vsl forATLANTIC EXPLORER
Guard vessel forATLANTIC EXPLORER
VEGA IIguard vessel atTYRA VALDEMAR
JOHN SHAWPort of EsbjergDTD: 2/4-2014
1
2
NORDSØEN MOB vesselat CECILIE
m/v SKANDI NOVASurvey EKOFISK Fieldm/v SKANDI NOVASurvey EKOFISK Field
ATLANTIC ESBJERGGORM
Gas pipeline Syd Arne-Harald-Nybro
Gas pipeline Syd Arne-Harald-Nybro
Oil pipeline Gorm - Nybro
Gas pipeline Tyra - Nybro 0,49"0,12"
1,24
"
DANY-1X
SIAH-1XSIAH-1X
DANY-1X
SKANDI CARLASurvey atHejre Export Pipeline
ATLANTIC AMSTERDAMDAN FA
8
ISLAND VALIANTTil DUC felterne
CASTORO SEIGORM HEJRE PIPELINE
MAERSK TRANSPORTERCASTORO SEITug for
MAERSKCASTORO SEITug for
MAERSK TRACERCASTORO SEITug for
FAR SUPERIORSupplying pipes forCASTORO SEI
SBS CIRRUSSupplying pipes forCASTORO SEI
HIGHLAND STARSupplying pipes forCASTORO SEI
LORELAYPIPELINETYRA - VBA
VENUS IIgaurd vessel atTYRA East (13/05)
VENUS IIgaurd vessel atTYRA East (13/05)
F/V PERNILLE KIMGuard vessel forCASTORO SEI
SKANDI CARLASupport for CASTORO SEI
F/V KRISTINAguard vessel forHEJRE Project
OLEG STRASHNOVTYRA W & E
WELL SERVICERROAR & GORM
UNION SOVEREIGNSupport for HERMOD CARLO MAGNO
Support for HERMOD
KOLGASupport for HERMOD
ANETTE CHRISTINAguard vessel forHEJRE Project
JANGA BORKguard vessel forHEJRE projektet
ESVAGT KAPPAguard vessel for
Platform siteHEJRE
ESVAGT KAPPAguard vessel for
Platform siteHEJRE
FUGRO SALTIREHEJRE Project
SEAFOX 5VALDEMAR BASEAFOX 5VALDEMAR BA
1
ENSCO 72TYRA SE-AENSCO 72TYRA SE-A
3
DEEP HELDERInspection ofDONG assets
M/V ANETTE CHRISTINAgaurd vessel forTYRA-VALDEMARPipeline
SEAHORSETo TYRA EB &TYRA SE
MÆRSK RESOLVEHEJRE JacketMÆRSK RESOLVEHEJRE Jacket
NOBLE SAM TURNERXANA 02/12NOBLE SAM TURNERXANA 02/12
Lille John 2
XANAESVAGT KAPPA
ENERGY ENHANCERIn position at SVENDENERGY ENHANCERIn position at SVEND
Stine SCB 2
Stine SCB 1
4
Acc. Rig COSL RIGMAR fromSYD ARNE WHP N to KristianssandAcc. Rig COSL RIGMAR fromSYD ARNE WHP N to Kristianssand
NINI E
Nini-A
6
M/V ATLANTIS DWELLERInspection of pipelinesat the DUC fields
M/V ATLANTIS DWELLERInspection of pipelinesat the DUC fields
ATLANTIS DWELLER
M/V CECILIEMOB preparednessat the CECILIE Field
BIBBY POLARIS
M/V BIBBY POLARISTo the TYRA FieldM/V BIBBY POLARISTo the TYRA Field
7
ANETTE CHRISTINA/VENUS II
2
10
ANETTE CHRISTINAguard vessel atTYRA East
ANETTE CHRISTINAguard vessel atTYRA East
ESVAGT CARPATHIA
EDDA FLORAROV inspections at DONG,DUC & SYD ARNE
EDDA FLORAROV inspections at DONG,DUC & SYD ARNE
EDDA FLORA
VALDEMAR
OIL FIELD WNW
VALDEMAR
OIL FIELD WNW
STADISLAN YUDINVALDEMAR WNWSTADISLAN YUDINVALDEMAR WNW
NORTH SEAACTIVITIES
FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES
Trafikhavnskaj 19DK‐6700 EsbjergTel.: +45 75 45 11 44
e‐mail: [email protected] page: www.foga.dk
Update of informationWeek 20May 12 ‐ 18, 2015Next FOGA‐info is distributedMay 19, 2015
FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:
MAERSK OIL
Vessels:
The vessel BIBBY POLARIS conducting diving operations at the DUCfields from end of week 15 entering the safety zones at VALDEMAR BA, ROAR & TYRA EAST.
The vessel ANETTE CHRISTINA conducting guard duties at the TYRA East field. VENUS II is expected to relieve ANETTE CHRISTINA in the evening 13/05.
The the ROV inspections carried out by the vessel ATLANTIS DWELLER at the DUC fields are expected to be finished within this week.
Rigmoves:
The acc. rig ATLANTIC ESBJERG is on a stand off position at DAN‐B
Survey at the DAN Field:
During the next couple of years Maersk Oil and the University of Aarhus are conducting a survey regarding the influence of noise from the oil platforms on the harbour porpoises. In connection with the project a number of yellow buoys have been deployed south and east of the DAN Field.
6 Dan800E 55° 28.423'N 005° 07.228'E
The safety zones are 500 meters from the positions.
Illustration of hose when idle.
DONG Energy Installations
56o 28.96' N 04o 54.67' E56o 24.13' N 04o 45.58' E56o 38.45' N 05o 19.27' E56o 40.49' N 05o 24.74' E
56o 30.96' N 05o 02.46' E56o 30.95' N 05o 03.56' E
SIRI‐field:CECILIE‐A field:NINI A‐field:NINI B‐field:STINE fields ‐ Subsea installations:STINE SCB‐1:STINE SCB‐2:
DONG Energy
The acc. rig ATLANTIC ESBJERG is on a stand off position at DAN‐Band will be finally positioned at first given weather window.
The rig ENERGY ENHANCER is in position at the SVEND Field.
The rig ENSCO 72 is in position at the TYRA SE‐A Field.
SEAFOX 5 is on position at VALDEMAR BA.
Rigs:
Drilling rig MÆRSK RESOLVE is in position at the HEJRE Jacket. Position: 56°14'51 N ‐ 003° 57'37 E.
Vessels:
The vessel EDDA FLORA is expected to carry out ROV inspections at the DONG assets as well as TYRA E, HARARLD,GORM and
SIRI Tanker Loading Facility
6 Dan800E 55° 28.423'N 005° 07.228'E
7 Dan800S 55° 28.158'N 005° 06.411'E
8 Dan1600E 55° 29.168'N 005° 07.637'E
9 Dan1600S 55° 27.733'N 005° 06.282'E
10 Dan3200E 55° 29.751'N 005° 08.758'E
11 Dan3200S 55° 26.893'N 005° 05.892E
12 Dan6400E 55° 28.473'N 005° 12.591'E
13 Dan6400S 55° 25.823'N 005° 10.165'E
14 Dan9600E 55° 28.422'N 005° 15.626'E
15 Dan12800S 55° 23.097'N 005° 13.705'E
FINO 3 ‐ Research Platform
The research platform FINO 3was established in 2007/2008 approx. 45 nautical miles west of the island Sylt at the position 55° 11,7' N 007° 09,5' E.A 500 meter safety zone has been established around the platform, which in the future will be situated inside of the DAN TYSK wind farmarea.
Please see the web page from the "Forschungs‐ und Entwicklungs zentrum, Fachhochscule Kiel Gmbh" www.fino3.de for more information.
HESS DenmarkSouth Arnefield development
The drilling rig MÆRSK RESOLUTE is established at the South Arne field'sWHP
FINO 3
55°11,7' N
7°09,5' E
DAN TYSK wind farmAcc. to the Danish Notices to Mariners No. 1154 the wind farm DAN TYSK will be established andmarked by cardinal buoys, stated by the positions 1‐9). During the building phase a 500 meter wide safety zone will be established around the wind park. In the area will be prohibition of navigation,anchoring, fishery and trawl equipment at theseabed.The prohibition period will be in force from1. december 2012. The wind farm , when completed, implies80 wind mills, a powerplatform, an accomodationplatform and power‐ and communication cables.
The vessel EDDA FLORA is expected to carry out ROV inspections at the DONG assets as well as TYRA E, HARARLD, GORM and SYD ARNE starting at GORM approx. 30/4. For further information, please see www.foga.dk
Hejre Project:
In connection to the establishment of the HEJRE Platform a safety zone of 500 m has been established around the position: 56°14,809' N ‐003°57,534' E . The safety zone has been established according to the Energy Ministry Order No 657 of 30 December 1985. The guard vessel ESVAGT KAPPA are conducting guard duties at the HEJRE Platform site. Position: 56°14'51 N ‐ 003°57'37 E.
Syd ArneSAL system56 05,549 N04 15,368 E
o
o
Syd ArneWHPN platform56 05,744 N04 13,154 E
o
o
Cardinal buoys Degrees Minutes Degrees Minutes
N (Q) 1) 55o
15,763 N 7o
07,691 E
N (Q) 2) 55o 14,806 N 7o 14,406 E
W (Q(9)15s) 3) 55o 11,301 N 7o 07,828 E
W (Q(9)15s) 4) 55o 06,839 N 7o 07,963 E
E (Q(3)10s) 5) 55o 10,482 N 7o 15,421 E
E (Q(3)10s) 6) 55o 06,877 N 7o 16,432 E
S (Q(6)+Lfl.15s) 7) 55o
02,912 N 7o
17,044 E
S (Q(6)+Lfl.15s) 8) 55o 02,646 N 7o 12,769 E
S (Q(6)+Lfl.15s) 9) 55o 02,377 N 7o 08,098 E
SOUTH ARNE fieldThe storage tank and top site of SOUTH ARNE field is installed at position 56o 04,72' N 004o 13,82' E, connected with a new bridge and platform South Arne WHPE at position 56o 04,693' N 004o 13,85' E.Satellitplatform Syd Arne WHP N is installed at the position 56o 05,744' N 004o 13,154' E, where a safety zone of 500 meter is established acc. to DEA regulation No. 657.
SOUTH ARNE's tanker loading facility, where tankers are loaded at 8 ‐ 10 day intervals is located at WGS‐84 pos. 56o 05,55' N 004o 15,37' E.
RESOLUTE is established at the South Arne field's WHP E platform.
The standby vessel ESVAGT CARPATHIA is servicing at the North platform with MOB‐preparedness.
The accommodation rig COSL RIGMAR is espected moved from the South Arnefield's WHP N to Kristianssand .
,04 15,368 Eo
Syd ArneWHPE platform56 04,694 N04 13,852 E
o
o
Syd ArneGBS platform56 04,702 N04 13,731 E
o
o
During May 2015 the oil company Wintershall expect to etablish a new platform called RAVN at the VALDEMAR WNW oil field at the position:55°52,912'‐ N 004°14,078' E. The work is carried out from the vessel STADISLAN YUDIN.
A prohibited area with a radius of 500 m from the position will be established. Within the area unauthorized navigation, anchoring, diving and fishing is prohibited.
This newsletter and infochart has been prepared on request from the cooperation Oil Gas Denmark and is distributed vai E‐mail to all fishing vessels and interested parties around the North Sea. Please also visit FOGA's website www.foga.dk. E‐mail [email protected] to subscribe or unsubscribe. Please also notice that the size of the newsletter as a pdf file is approx. 1 mb.
AF GruppenPACIFIC OSPREY has finished the decommisioning of the GNSC B11 gas platform on app. 55°27.45 N 004°33.00 Eand the vessels have left the site. The cardinal buoys at the perimeter of the 500 m safety zone will be revocered as soon as possible weatherpermitting.
p p g , g, g gprohibited.