parametros de perforacion e indicios de pega - final

Upload: filipe-af

Post on 25-Feb-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL

    1/6

    Sch

    lumbergerPrivate

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    IPMIPMIPMIPM ---- PrevenciPrevenciPrevenciPrevencinnnn de Pega de Tuberade Pega de Tuberade Pega de Tuberade Pega de Tubera

    5555---- ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin yyyy

    SealesSealesSealesSeales dededede PegaPegaPegaPega dededede TuberaTuberaTuberaTubera

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    2

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin

    ((((PresinPresinPresinPresin dededede circulacincirculacincirculacincirculacin))))PresinPresin dede CirculacinCirculacin

    IncrementaIncrementaIncrementaIncrementa CuandoCuandoCuandoCuando::::

    El gastode flujo se incrementa

    Restriccinanular

    Restriccininterna

    Limpiezade agujero inadecuada

    Peso de lodoms pesado o propiedadesde lodo pobres

    Barrenatapadao parcialmentetapada

    DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::

    El gastode flujo se reduce

    Peso de lodoms ligero o mejorespropiedadesde lodo

    Influjo en el agujero

    Washout

    Aireen el lodo

    Falla en la bomba

    VariacinVariacinVariacinVariacin en laen laen laen la PresinPresinPresinPresin dededede BombeoBombeoBombeoBombeo CuandoCuandoCuandoCuando::::

    Problemasde limpiezade agujero

    Stuck PipeIPMIPMIPMIPM

    Schlumbe

    rgerPrivate

    3

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin

    (Torque en(Torque en(Torque en(Torque en SuperficieSuperficieSuperficieSuperficie))))Torque enTorque en SuperficieSuperficie IncrementaIncrementaIncrementaIncrementa cuandocuandocuandocuando::::

    Limpieza de agujeroinadecuado

    Cambio de nguloen el agujero

    Cambio de Formacin

    Incrementode peso sobrela barrena

    Propiedadesde lodopobres

    Washout en la tubera de perforacin. DisminuyeDisminuyeDisminuyeDisminuye cuandocuandocuandocuando::::

    Mejorala limpiezadel agujero

    Angulodel pozo

    Cambio de Formacion

    Cambio de velocidadde rotacin

    Disminuyeel peso sobrela barrena

    Mejorespropiedades de lodo

    Desgaste de la Barrena (PDC)

    Adicin de lubricantes

    VaranVaranVaranVaran cuandocuandocuandocuando::::

    Receso de Perforacin (cambio deformacin, secuencias arena/lutita

    Repasando con estabilizadores.

    Embolamiento

    Formacionesde arena.

    Chatarra en el agujero.

    Washout en la tubera deperforacin.

    Peso excesivo sobrela barrena.

    RPM

    Perforacinseca.

  • 7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL

    2/6

    Sch

    lumbergerPrivate

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    4

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin ((((SobretensinSobretensinSobretensinSobretensin))))SobretensinSobretensin

    IncrementaIncrementaIncrementaIncrementaCuandoCuandoCuandoCuando::::

    Limpieza de agujero inadecuada

    Camas de recortes

    La geometra del agujero est cambiandoCambio de formacin

    Propiedadesde lodo pobres

    Puntos apretados (agujero bajo cal ibre ,estabilidadd e formacin, enjarre mas grueso)

    DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::

    Mejora en limpieza de agujero

    Cambio de formacin

    Mejores propiedadesde lodo

    Adicin de lubricantes

    Agujeroen unaseccinvertical

    Seccionesde agujero fuera de calibre

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    5

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin

    ((((PresinPresinPresinPresin DiferencialDiferencialDiferencialDiferencial PDM)PDM)PDM)PDM)PresinPresin diferencialdiferencial en motor deen motor de fondofondo

    IncrementaIncrementaIncrementaIncrementa CuandoCuandoCuandoCuando:

    Incrementael gasto de flujo.

    Cortadores estn gastados al punto de que lacara de la barrena est en contacto directo conel fondo del pozo.

    Peso sobre barrenaexcesivo.

    Cortadores demasiados grandes Formacinmas suave de lo esperado.

    Limpieza del agujero.

    DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::

    Disminuyeel gastode flujo.

    Washout en la tubera de perforacin.

    Erosin extrema en la barrena(raro).Reduccindel peso sobrebarrena.

    Stuck PipeIPMIPMIPMIPM

    Schlumbe

    rgerPrivate

    6

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin((((TasaTasaTasaTasa dededede PenetracinPenetracinPenetracinPenetracin))))

    TasaTasa dede PenetracinPenetracin::

    IncrementaIncrementaIncrementaIncrementa CuandoCuandoCuandoCuando::::

    La formacin cambia

    Se perfora cercanoal balance

    DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::

    La barrenaest gastadaPeso, velocidad de rotacin o hidralica ya no son ptimas

    Cambio de formacin

    Washout en la tubera de perforacin.

    Peso de lodo demasiado alto

    Propiedadesdel lodo demasiadopobres

    VaranVaranVaranVaran CuandoCuandoCuandoCuando::::

    Formacinen capas(intercalaciones)

    Barrenagastada

    Barrenaembolada

    Washout en la tubera de perforacin.

    Inconsistente aplicacinde peso sobre barrena

  • 7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL

    3/6

    Sch

    lumbergerPrivate

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    7

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin((((EmboladasEmboladasEmboladasEmboladas))))EmboladasEmboladas

    IncrementanIncrementanIncrementanIncrementan CuandoCuandoCuandoCuando::::

    Cuando lasemboladas son ajustadas a un

    mismovalor,

    Lodoms ligero o mejorespropiedadesGas y un influjo en el agujero

    Washout en la tubera de perforacin.

    Aire en el lodo

    Fallaen las bombas

    DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::

    Cuando lasemboladas son ajustadas a un

    mismovalor,

    Restriccin anular

    Restriccin interna

    Limpieza del agujero inadecuada

    Lodomas pesado o con propiedades pobres

    Barrena tapada o parcialmentetapada

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    8

    DEE: Densidad Esttica Equivalente (Bombas Apagadas)

    DEC: Densidad EquivalenteCirculante(BombasEncendidas)

    DEE=Presin

    gTVDDEEDEC= +

    APL

    gTVD

    DefinicinDefinicinDefinicinDefinicin de DEE & DECde DEE & DECde DEE & DECde DEE & DEC paraparaparapara APWDAPWDAPWDAPWD

    Stuck PipeIPMIPMIPMIPM

    Schlumbe

    rgerPrivate

    9

    DECDECDECDEC medidomedidomedidomedido porporporpor APWDAPWDAPWDAPWDEve nt/procedure ECD change Other in dica tions Commen ts

    M ud ge la ti on , S ud de n, s ho rt - li v ed S im il ar p re ss ur e su rg e i n A v oi d su rg e b y sl ow

    p um p s ta rt up p re ss ur e s ur ge po ss ib le p um p p re ss ur e p um ps an d b re ak ro ta ti on

    C ut t in gs p i ck - up Inc re as e th en l ev el a s C ut t in gs a ts u rfac e In cr ea se m ay b e m or e

    steady-state reached noticeable with rotation

    P lu gg in g a nn ul us Inte rm it ten t s ur ge S tan dp ip e p re ss ur e

    increases Surge increase ?

    Torque/RPM fluctuations

    High overpulls

    Gradual increase Tota l cuttings expected If near p lugging , may get

    not seen at surface pressure surge sp ikes

    Increased torque

    ROPdecreases

    S ud de n i nc re as e a s H ig h o ve rp ul ls M on it or bo th st an dp ip e

    p ac ko ff p a ss es s e ns or ' Ste ad y' i n cr ea s e in p re ss ur e a nd E C D

    - none if pack-offstays standpipe pressurebelow sensor

    Gas migration Increase ifwell shut- in Shut- in surface pressure take care ifestimating gas

    increase linearly (approx.) migration rate

    R un ni ng in ho le I nc re as e - ma gn it ud e M on it or t ri p t an k E ff ec t en ha nc ed if n oz zl es

    dependent on gap, speed, plugged

    rheology,etc

    P ul li ng o ut ofh o le D ec re as e - m ag ni tud e M on ito r tr i p tan k E f fe cte n ha nc ed i fn oz zl es

    dependent on gap, speed, plugged

    rheology,etc

    Making a connection Decrease to static mud Pumpson/off indicator Watch for significant

    density Pump flow rate lag changes in ESD

    B ar i te s ag D ec re as e in s tat i c mu d H i gh tor qu e an d ov er pu ll s W hi le s li di ng p er io di ca ll y o r

    density, or unexplained rotating wiper trip to stir-up

    density fluctuations deposited beds, correct

    mud rheology

    G as i n fl ux D ec re as e s in ty pi ca l ho le In cr ea se s i n pi t l ev el a nd In it i al i n cr ea se i n pi t g ai n

    sizes differential pressure may be masked

    Liqu id in flux Decreases if l ighterthan Look for flow atmudline if Plan response ifsha llow

    drilling fuid relevant water flow is expected

    Increases if influxis

    accompanied bysolids

    Packoff may 'blow-through'

    before formation breakdown

    Cuttingsbed formation

    Plugging below sensor

  • 7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL

    4/6

    Sch

    lumbergerPrivate

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    10

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin ((((PasonPasonPasonPason))))

    QueQueQueQuepasapasapasapasa enenenen esteesteesteeste

    PozoPozoPozoPozo????

    IncidenteIncidenteIncidenteIncidente de Controlde Controlde Controlde Control

    dededede pozopozopozopozo

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    11

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin ((((PasonPasonPasonPason))))

    QueQueQueQuepasapasapasapasa enenenen esteesteesteeste

    PozoPozoPozoPozo????

    IncidenteIncidenteIncidenteIncidente dededede PegaPegaPegaPega dededede

    TuberaTuberaTuberaTubera

    Stuck PipeIPMIPMIPMIPM

    Schlumbe

    rgerPrivate

    12

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacinRotaryRPM

    1850

    1950

    2050

    2150

    2250

    2350

    2450

    2550

    2650

    2750

    2850

    2950

    3050

    3150

    3250

    3350

    0 50 100 150 200

    RPM

    D

    epth

    [m

    ]

    Rotary RPM

    QueQueQueQuepasapasapasapasa enenenen esteesteesteestePozoPozoPozoPozo ????

    WeightonBit

    1850

    1950

    2050

    2150

    2250

    2350

    2450

    2550

    2650

    2750

    2850

    2950

    3050

    3150

    3250

    3350

    0 5 10 15

    WOB[klbf]

    D

    epth

    [

    m

    ]

    Weight onBit

    FallaFallaFallaFalla dededede PowerDrivePowerDrivePowerDrivePowerDrive

  • 7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL

    5/6

    Sch

    lumbergerPrivate

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    13

    ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin

    QueQueQueQuepasapasapasapasa enenenen esteesteesteestePozoPozoPozoPozo????

    TuboTuboTuboTuboLavadoLavadoLavadoLavado yyyy PegaPegaPegaPega dededede TuberaTuberaTuberaTubera

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    14

    IndicadoresIndicadoresIndicadoresIndicadores dededede AgujeroAgujeroAgujeroAgujero ApretadoApretadoApretadoApretado

    ViajandoViajandoViajandoViajando AfueraAfueraAfueraAfuera

    Limpieza de

    Agujero

    Inadecuada

    Formaciones

    Reactivas

    Formaciones no

    consolidadas

    Formaciones

    Geopresuriza

    das

    Formacione

    sMviles

    Geometra

    del Agujero

    Inadecuada

    (Perfil del

    pozo y

    escalonamie

    nto)

    Alto

    Sobrebalance

    yArenas

    Permeables

    Fracturas Y

    F al la s C ha ta rr a

    Ojode

    Llave

    Bloques

    de

    Cemento

    Revestimient

    o Colapsado

    Arrastre yResistencia

    Incrementoen arrastre

    Incrementorepentino con

    posibleresistencia

    Incremento enarrastre

    Incrementoen arrastre

    Incrementorepentino en

    arrastre conposible

    resistencia

    Resistenciaerrtica y

    repentina

    Incrementael arrastre en

    conexiones

    Resistenciarepentina

    errtica

    Resistenciarepentina y

    errtica

    Posiblemente

    Indicacincclica

    Resistencia

    repentinay errtica

    Resistenciarepentina

    Efecto de

    Circulacin

    Puedelevantar los

    recortes

    Sin efecto Puede levantarel puente.

    Puede sernecesario

    seguir

    bombeando

    Puedelevantar los

    derrumbes.Puede se

    necesrio

    continuarbombeando

    S in e f ec to S in e f ec to S in e f ec to S in e f ec to S in e f ec to S in ef ect oS in e fect o S in e fec to

    Efecto deBackrriming

    (si es

    posible)

    Levanta yremueve las

    camas derecortes

    BuenProgreso

    Levanta yremueve los

    derrumbes

    Levanta yremueve los

    puentes

    Buenprogreso,

    pero talvezsea

    necesariocontinuar

    rimando

    Progresolento

    Puedeagravarse

    debido a laremocin del

    enjarre

    Progresolento

    Puede o notener xito

    Puedequitar la

    pata deperro

    Buenprogreso

    Sin progreso,necesita

    herramientasespeciales

    MECANISMO DE AGUJERO APRETADO

    INDICADORD

    EA

    GUJEROA

    PRETADO

    *

    ****Se recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y el procedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismo

    Stuck PipeIPMIPMIPMIPM

    Schlumbe

    rgerPrivate

    15

    IndicadoresIndicadoresIndicadoresIndicadores dededede AgujeroAgujeroAgujeroAgujero ApretadoApretadoApretadoApretado

    ViajandoViajandoViajandoViajando AdentroAdentroAdentroAdentro

    Limpiezade

    Agujero

    Inadecuada

    Formacione

    sReactivas

    Formacione

    sno

    consolidada

    s

    Formaciones

    Geopresurizada

    s

    Formaciones

    Mviles

    del

    Agujero

    Inadecuad

    a(Perfil

    Sobrebala

    ncey

    Arenas

    Permeable

    AgujeroBajo

    calibre

    Fracturas

    Y F a ll as C ha ta rr a O j o de L l av e

    Revestimie

    nto

    Colapsado

    Bloquesde

    Cemento

    Arrastre y

    Resistencia

    Incrementoen arrastre

    Incrementorepentino dearrastre con

    posiblesresistencias

    Incrementael arrastre

    Puedeincrementar elarrastre debidoa la formacinde derrumbes

    Incrementorepentino dearrastre con

    posibleresistencia

    Resistencia

    repentinayerrtica

    Incremento de

    arrastreen

    conecciones

    Resistenciarepentina

    Resistencia

    repentinay errtica

    Resistenciarepentina y

    errtica

    Probablemente no sea

    unproblema

    Resistencia repentina

    Generalmente no hayindicios

    Efecto deCirculacin

    Puede

    levantar losrecortes. Tal

    vez seanecesariolavar hasta

    elfondo

    S in e fec to Puede

    levantar losrecortes. Tal

    vez seanecesario

    lavar hastael fondo

    Puede levantar

    los recortes. Talvez sea

    necesario lavarhasta elfondo

    Sin efecto Sin efecto Sin efecto Sin efecto Sin efecto Sin efecto Sin efecto Sin efecto Puede haber

    un fraguadorepentino del

    cemento

    Efecto deBackrriming

    (si es

    posible)

    Levanta yremueve las

    camas derecortes

    Buenprogreso

    Levanta yremueve los

    puentes

    Levanta yremueve los

    recortes

    Buenprogreso,

    pero talvezsea

    necesariocontinuar

    rimando

    Progresolento

    Puedemejorar la

    condicindel

    agujero

    Se consigueestar en

    calibre

    Progresolento

    Puede o notener xito

    Sinprogreso,

    requierede

    herramientas

    especiales

    MECANISMO DE AGUJERO APRETADO

    INDICADORD

    E

    AGUJEROA

    PRETAD

    O

    *

    ****Se recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y el procedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismo

  • 7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL

    6/6

    Sch

    lumbergerPrivate

    Stuck PipeIPMIPMIPMIPM

    SchlumbergerPrivate

    16

    PreguntasPreguntasPreguntasPreguntas //// ComentariosComentariosComentariosComentarios