parametros de perforacion e indicios de pega - final
TRANSCRIPT
-
7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL
1/6
Sch
lumbergerPrivate
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
IPMIPMIPMIPM ---- PrevenciPrevenciPrevenciPrevencinnnn de Pega de Tuberade Pega de Tuberade Pega de Tuberade Pega de Tubera
5555---- ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin yyyy
SealesSealesSealesSeales dededede PegaPegaPegaPega dededede TuberaTuberaTuberaTubera
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
2
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin
((((PresinPresinPresinPresin dededede circulacincirculacincirculacincirculacin))))PresinPresin dede CirculacinCirculacin
IncrementaIncrementaIncrementaIncrementa CuandoCuandoCuandoCuando::::
El gastode flujo se incrementa
Restriccinanular
Restriccininterna
Limpiezade agujero inadecuada
Peso de lodoms pesado o propiedadesde lodo pobres
Barrenatapadao parcialmentetapada
DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::
El gastode flujo se reduce
Peso de lodoms ligero o mejorespropiedadesde lodo
Influjo en el agujero
Washout
Aireen el lodo
Falla en la bomba
VariacinVariacinVariacinVariacin en laen laen laen la PresinPresinPresinPresin dededede BombeoBombeoBombeoBombeo CuandoCuandoCuandoCuando::::
Problemasde limpiezade agujero
Stuck PipeIPMIPMIPMIPM
Schlumbe
rgerPrivate
3
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin
(Torque en(Torque en(Torque en(Torque en SuperficieSuperficieSuperficieSuperficie))))Torque enTorque en SuperficieSuperficie IncrementaIncrementaIncrementaIncrementa cuandocuandocuandocuando::::
Limpieza de agujeroinadecuado
Cambio de nguloen el agujero
Cambio de Formacin
Incrementode peso sobrela barrena
Propiedadesde lodopobres
Washout en la tubera de perforacin. DisminuyeDisminuyeDisminuyeDisminuye cuandocuandocuandocuando::::
Mejorala limpiezadel agujero
Angulodel pozo
Cambio de Formacion
Cambio de velocidadde rotacin
Disminuyeel peso sobrela barrena
Mejorespropiedades de lodo
Desgaste de la Barrena (PDC)
Adicin de lubricantes
VaranVaranVaranVaran cuandocuandocuandocuando::::
Receso de Perforacin (cambio deformacin, secuencias arena/lutita
Repasando con estabilizadores.
Embolamiento
Formacionesde arena.
Chatarra en el agujero.
Washout en la tubera deperforacin.
Peso excesivo sobrela barrena.
RPM
Perforacinseca.
-
7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL
2/6
Sch
lumbergerPrivate
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
4
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin ((((SobretensinSobretensinSobretensinSobretensin))))SobretensinSobretensin
IncrementaIncrementaIncrementaIncrementaCuandoCuandoCuandoCuando::::
Limpieza de agujero inadecuada
Camas de recortes
La geometra del agujero est cambiandoCambio de formacin
Propiedadesde lodo pobres
Puntos apretados (agujero bajo cal ibre ,estabilidadd e formacin, enjarre mas grueso)
DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::
Mejora en limpieza de agujero
Cambio de formacin
Mejores propiedadesde lodo
Adicin de lubricantes
Agujeroen unaseccinvertical
Seccionesde agujero fuera de calibre
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
5
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin
((((PresinPresinPresinPresin DiferencialDiferencialDiferencialDiferencial PDM)PDM)PDM)PDM)PresinPresin diferencialdiferencial en motor deen motor de fondofondo
IncrementaIncrementaIncrementaIncrementa CuandoCuandoCuandoCuando:
Incrementael gasto de flujo.
Cortadores estn gastados al punto de que lacara de la barrena est en contacto directo conel fondo del pozo.
Peso sobre barrenaexcesivo.
Cortadores demasiados grandes Formacinmas suave de lo esperado.
Limpieza del agujero.
DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::
Disminuyeel gastode flujo.
Washout en la tubera de perforacin.
Erosin extrema en la barrena(raro).Reduccindel peso sobrebarrena.
Stuck PipeIPMIPMIPMIPM
Schlumbe
rgerPrivate
6
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin((((TasaTasaTasaTasa dededede PenetracinPenetracinPenetracinPenetracin))))
TasaTasa dede PenetracinPenetracin::
IncrementaIncrementaIncrementaIncrementa CuandoCuandoCuandoCuando::::
La formacin cambia
Se perfora cercanoal balance
DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::
La barrenaest gastadaPeso, velocidad de rotacin o hidralica ya no son ptimas
Cambio de formacin
Washout en la tubera de perforacin.
Peso de lodo demasiado alto
Propiedadesdel lodo demasiadopobres
VaranVaranVaranVaran CuandoCuandoCuandoCuando::::
Formacinen capas(intercalaciones)
Barrenagastada
Barrenaembolada
Washout en la tubera de perforacin.
Inconsistente aplicacinde peso sobre barrena
-
7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL
3/6
Sch
lumbergerPrivate
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
7
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin((((EmboladasEmboladasEmboladasEmboladas))))EmboladasEmboladas
IncrementanIncrementanIncrementanIncrementan CuandoCuandoCuandoCuando::::
Cuando lasemboladas son ajustadas a un
mismovalor,
Lodoms ligero o mejorespropiedadesGas y un influjo en el agujero
Washout en la tubera de perforacin.
Aire en el lodo
Fallaen las bombas
DisminuyeDisminuyeDisminuyeDisminuye CuandoCuandoCuandoCuando::::
Cuando lasemboladas son ajustadas a un
mismovalor,
Restriccin anular
Restriccin interna
Limpieza del agujero inadecuada
Lodomas pesado o con propiedades pobres
Barrena tapada o parcialmentetapada
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
8
DEE: Densidad Esttica Equivalente (Bombas Apagadas)
DEC: Densidad EquivalenteCirculante(BombasEncendidas)
DEE=Presin
gTVDDEEDEC= +
APL
gTVD
DefinicinDefinicinDefinicinDefinicin de DEE & DECde DEE & DECde DEE & DECde DEE & DEC paraparaparapara APWDAPWDAPWDAPWD
Stuck PipeIPMIPMIPMIPM
Schlumbe
rgerPrivate
9
DECDECDECDEC medidomedidomedidomedido porporporpor APWDAPWDAPWDAPWDEve nt/procedure ECD change Other in dica tions Commen ts
M ud ge la ti on , S ud de n, s ho rt - li v ed S im il ar p re ss ur e su rg e i n A v oi d su rg e b y sl ow
p um p s ta rt up p re ss ur e s ur ge po ss ib le p um p p re ss ur e p um ps an d b re ak ro ta ti on
C ut t in gs p i ck - up Inc re as e th en l ev el a s C ut t in gs a ts u rfac e In cr ea se m ay b e m or e
steady-state reached noticeable with rotation
P lu gg in g a nn ul us Inte rm it ten t s ur ge S tan dp ip e p re ss ur e
increases Surge increase ?
Torque/RPM fluctuations
High overpulls
Gradual increase Tota l cuttings expected If near p lugging , may get
not seen at surface pressure surge sp ikes
Increased torque
ROPdecreases
S ud de n i nc re as e a s H ig h o ve rp ul ls M on it or bo th st an dp ip e
p ac ko ff p a ss es s e ns or ' Ste ad y' i n cr ea s e in p re ss ur e a nd E C D
- none if pack-offstays standpipe pressurebelow sensor
Gas migration Increase ifwell shut- in Shut- in surface pressure take care ifestimating gas
increase linearly (approx.) migration rate
R un ni ng in ho le I nc re as e - ma gn it ud e M on it or t ri p t an k E ff ec t en ha nc ed if n oz zl es
dependent on gap, speed, plugged
rheology,etc
P ul li ng o ut ofh o le D ec re as e - m ag ni tud e M on ito r tr i p tan k E f fe cte n ha nc ed i fn oz zl es
dependent on gap, speed, plugged
rheology,etc
Making a connection Decrease to static mud Pumpson/off indicator Watch for significant
density Pump flow rate lag changes in ESD
B ar i te s ag D ec re as e in s tat i c mu d H i gh tor qu e an d ov er pu ll s W hi le s li di ng p er io di ca ll y o r
density, or unexplained rotating wiper trip to stir-up
density fluctuations deposited beds, correct
mud rheology
G as i n fl ux D ec re as e s in ty pi ca l ho le In cr ea se s i n pi t l ev el a nd In it i al i n cr ea se i n pi t g ai n
sizes differential pressure may be masked
Liqu id in flux Decreases if l ighterthan Look for flow atmudline if Plan response ifsha llow
drilling fuid relevant water flow is expected
Increases if influxis
accompanied bysolids
Packoff may 'blow-through'
before formation breakdown
Cuttingsbed formation
Plugging below sensor
-
7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL
4/6
Sch
lumbergerPrivate
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
10
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin ((((PasonPasonPasonPason))))
QueQueQueQuepasapasapasapasa enenenen esteesteesteeste
PozoPozoPozoPozo????
IncidenteIncidenteIncidenteIncidente de Controlde Controlde Controlde Control
dededede pozopozopozopozo
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
11
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin ((((PasonPasonPasonPason))))
QueQueQueQuepasapasapasapasa enenenen esteesteesteeste
PozoPozoPozoPozo????
IncidenteIncidenteIncidenteIncidente dededede PegaPegaPegaPega dededede
TuberaTuberaTuberaTubera
Stuck PipeIPMIPMIPMIPM
Schlumbe
rgerPrivate
12
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacinRotaryRPM
1850
1950
2050
2150
2250
2350
2450
2550
2650
2750
2850
2950
3050
3150
3250
3350
0 50 100 150 200
RPM
D
epth
[m
]
Rotary RPM
QueQueQueQuepasapasapasapasa enenenen esteesteesteestePozoPozoPozoPozo ????
WeightonBit
1850
1950
2050
2150
2250
2350
2450
2550
2650
2750
2850
2950
3050
3150
3250
3350
0 5 10 15
WOB[klbf]
D
epth
[
m
]
Weight onBit
FallaFallaFallaFalla dededede PowerDrivePowerDrivePowerDrivePowerDrive
-
7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL
5/6
Sch
lumbergerPrivate
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
13
ParmetrosParmetrosParmetrosParmetros dededede PerforacinPerforacinPerforacinPerforacin
QueQueQueQuepasapasapasapasa enenenen esteesteesteestePozoPozoPozoPozo????
TuboTuboTuboTuboLavadoLavadoLavadoLavado yyyy PegaPegaPegaPega dededede TuberaTuberaTuberaTubera
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
14
IndicadoresIndicadoresIndicadoresIndicadores dededede AgujeroAgujeroAgujeroAgujero ApretadoApretadoApretadoApretado
ViajandoViajandoViajandoViajando AfueraAfueraAfueraAfuera
Limpieza de
Agujero
Inadecuada
Formaciones
Reactivas
Formaciones no
consolidadas
Formaciones
Geopresuriza
das
Formacione
sMviles
Geometra
del Agujero
Inadecuada
(Perfil del
pozo y
escalonamie
nto)
Alto
Sobrebalance
yArenas
Permeables
Fracturas Y
F al la s C ha ta rr a
Ojode
Llave
Bloques
de
Cemento
Revestimient
o Colapsado
Arrastre yResistencia
Incrementoen arrastre
Incrementorepentino con
posibleresistencia
Incremento enarrastre
Incrementoen arrastre
Incrementorepentino en
arrastre conposible
resistencia
Resistenciaerrtica y
repentina
Incrementael arrastre en
conexiones
Resistenciarepentina
errtica
Resistenciarepentina y
errtica
Posiblemente
Indicacincclica
Resistencia
repentinay errtica
Resistenciarepentina
Efecto de
Circulacin
Puedelevantar los
recortes
Sin efecto Puede levantarel puente.
Puede sernecesario
seguir
bombeando
Puedelevantar los
derrumbes.Puede se
necesrio
continuarbombeando
S in e f ec to S in e f ec to S in e f ec to S in e f ec to S in e f ec to S in ef ect oS in e fect o S in e fec to
Efecto deBackrriming
(si es
posible)
Levanta yremueve las
camas derecortes
BuenProgreso
Levanta yremueve los
derrumbes
Levanta yremueve los
puentes
Buenprogreso,
pero talvezsea
necesariocontinuar
rimando
Progresolento
Puedeagravarse
debido a laremocin del
enjarre
Progresolento
Puede o notener xito
Puedequitar la
pata deperro
Buenprogreso
Sin progreso,necesita
herramientasespeciales
MECANISMO DE AGUJERO APRETADO
INDICADORD
EA
GUJEROA
PRETADO
*
****Se recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y el procedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismo
Stuck PipeIPMIPMIPMIPM
Schlumbe
rgerPrivate
15
IndicadoresIndicadoresIndicadoresIndicadores dededede AgujeroAgujeroAgujeroAgujero ApretadoApretadoApretadoApretado
ViajandoViajandoViajandoViajando AdentroAdentroAdentroAdentro
Limpiezade
Agujero
Inadecuada
Formacione
sReactivas
Formacione
sno
consolidada
s
Formaciones
Geopresurizada
s
Formaciones
Mviles
del
Agujero
Inadecuad
a(Perfil
Sobrebala
ncey
Arenas
Permeable
AgujeroBajo
calibre
Fracturas
Y F a ll as C ha ta rr a O j o de L l av e
Revestimie
nto
Colapsado
Bloquesde
Cemento
Arrastre y
Resistencia
Incrementoen arrastre
Incrementorepentino dearrastre con
posiblesresistencias
Incrementael arrastre
Puedeincrementar elarrastre debidoa la formacinde derrumbes
Incrementorepentino dearrastre con
posibleresistencia
Resistencia
repentinayerrtica
Incremento de
arrastreen
conecciones
Resistenciarepentina
Resistencia
repentinay errtica
Resistenciarepentina y
errtica
Probablemente no sea
unproblema
Resistencia repentina
Generalmente no hayindicios
Efecto deCirculacin
Puede
levantar losrecortes. Tal
vez seanecesariolavar hasta
elfondo
S in e fec to Puede
levantar losrecortes. Tal
vez seanecesario
lavar hastael fondo
Puede levantar
los recortes. Talvez sea
necesario lavarhasta elfondo
Sin efecto Sin efecto Sin efecto Sin efecto Sin efecto Sin efecto Sin efecto Sin efecto Puede haber
un fraguadorepentino del
cemento
Efecto deBackrriming
(si es
posible)
Levanta yremueve las
camas derecortes
Buenprogreso
Levanta yremueve los
puentes
Levanta yremueve los
recortes
Buenprogreso,
pero talvezsea
necesariocontinuar
rimando
Progresolento
Puedemejorar la
condicindel
agujero
Se consigueestar en
calibre
Progresolento
Puede o notener xito
Sinprogreso,
requierede
herramientas
especiales
MECANISMO DE AGUJERO APRETADO
INDICADORD
E
AGUJEROA
PRETAD
O
*
****Se recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y elSe recomienda seguir el procedimiento de Agujero apretado y el procedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismoprocedimiento de backrriming si es necesario hacer el mismo
-
7/25/2019 Parametros de Perforacion e Indicios de Pega - FINAL
6/6
Sch
lumbergerPrivate
Stuck PipeIPMIPMIPMIPM
SchlumbergerPrivate
16
PreguntasPreguntasPreguntasPreguntas //// ComentariosComentariosComentariosComentarios