Pinehurst Country ClubGreen Committee Meeting
January 10, 2013
![Page 2: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/2.jpg)
Agenda
Chairperson Report – Erich Tiepel Approval of minutes
General Manager’s Report – Loren Pippin Grounds Report – Steve Sarro
Driving Range Status Report on Safety Nets Discussion on Integrated Plan
Course Preview Tree Care
Winter Care for Trees Update on DuPont Imprelis
Tee boxes Winter/Spring Schedule
Sand replacement in bunkers Winter/Spring Schedule
Water Update Harriman Construction Water Supply Acquisition Status – Paul Motzkus Outlook on 2013
Water Spring/Summer schedule for turf maintenance Update on Native Area Plans
New Business
![Page 3: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/3.jpg)
Tanner Consulting
Hired to create ball trajectory study and recommend options for improving the safety and overall health of the driving range.
Improvements take into account variables such as elevation, club speed, temperature, etc.
Developed four options for improvements. Combinations of options can be implemented as well.
![Page 4: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/4.jpg)
![Page 5: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/5.jpg)
![Page 6: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/6.jpg)
Tree Care
Pruning will begin in JanuarySeeking arborist hazardous opinion on
cottonwood fate on #7 green.Removing dead trees on 2, 14, 15Imprelis Update
![Page 7: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/7.jpg)
Tee Boxes
Fall of 2012: forward tees on Pfluger #2 & #6. Increased tee space, due to open in spring of 2013.
![Page 8: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/8.jpg)
Maxwell 5 middle tee
![Page 9: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/9.jpg)
Maxwell 8 middle tee
![Page 10: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/10.jpg)
Maxwell 15 back tee
![Page 11: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/11.jpg)
Maxwell 17 middle and forward tee
![Page 12: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/12.jpg)
18 Fairway Bunker Management
Goal: Perform the model bunker for Pinehurst CC and future bunker renovations.
Removed contaminated sandReplace drain linesRe-sod edgesInstall irrigationApply liner to prevent future
contaminationInstall sand
![Page 13: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/13.jpg)
Harriman Construction
Completed outlet structure was poured incorrectly the first time and is the reason for delays.
The dam inspector was pleased with the dam overall this week.
Denver Water hopes to begin filling by February.
![Page 14: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/14.jpg)
Harriman Construction
These gauges manage flow for the Johnson Lateral and eventually the Ft. Logan Ditch.
![Page 15: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/15.jpg)
Harriman Construction
Bear Creek is currently running near 10 cfs.
Since November 1st, Bowles Reservoir and Soda Lakes have been filling.
Once Harriman is ready to fill, it has first priority to fill.
![Page 16: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/16.jpg)
2013 Turf Maintenance
1. Identify more areas of the course that can sustain lower maintenance inputs
2. Aesthetically pleasing areas out of play
3. Less water, mowing, fertilizer
4. Over seed with native or drought tolerant turfgrass species
![Page 17: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/17.jpg)
Pfluger
![Page 18: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/18.jpg)
Maxwell
![Page 19: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/19.jpg)
Other Spring Projects
3 Dam Repairs and pavingJohnson Lateral CleaningIrrigation upgradesFlower Beds aroundbio bathroomsIncrease gardens
![Page 20: Pcc green comm_jan_10_13](https://reader034.vdocuments.pub/reader034/viewer/2022051413/55545eefb4c905a5798b4834/html5/thumbnails/20.jpg)
Future Dates
Green Committee Dates:Thursday, February 14th 2013 at 4pmThursday, March 14th 2013 at 4pm*