BAB II PERANCANGAN POLA DAN SISTEM SALURAN TUANG Pengumpulan dan Pengolahan Data Pengumpulan Data Tabel perhitungan sistem saluran tuang, sebagai berikut: Tabel 2.1 Tabel Perhitungan Sistem Saluran Tuang No Notasi dan Rumus Input Output 1 Berat Produk, Wo (kg) 0.12 - 2 Density Alumunium, ρ (kg/cm 3 ) 0.0027 - 3 Yield Rasio, y (%) 70 - 4 Pouring Weight, W (kg) - 0.17 Pouring Volume, V (cm 3 ) - 63.49 5 Wall Thickness, p (cm) - 1.79 6 Casting Height, c (cm) 7.955 - 7 Sprue Height, h (cm) 10 - 8 Jenis Gating System Parting Line - 9 Tipe Sprue Terompet - 10 Jumlah Ingate 1 - 11 Jumlah Runner 1 - 12 Effective Sprue Height, (ESH) (cm) - 9.80 13 Pouring Rate, (R) for Al (kg/sec) - 0.29 14 Pouring Time, tp (sec) - 0.59 15 Calculate Sprue Area, As (cm 2 ) - 0.87 a). Jari-Jari, r (cm) - 0.53 b). Diameter Bawah Sprue, Ab (cm) - 1.05 c). Tinggi Pouring Basin, b (cm) 2 (asumsi) - d). Diameter Atas Sprue (cm) - 1.65 16 Gating Ratio yang Digunakan Sprue Runner Gate [1 : 0,9 : 0,8 ] Gating Ratio at Sprue 0.87 - - LAPORAN PRAKTIKUM PERANCANGAN POLA DAN SISTEM SALURAN TUANG vii

Upload: ahmad-brian

Post on 13-Jul-2016

216 views

Category:

Documents


3 download

DESCRIPTION

Contoh data yang diperlukan dalam pembuatan gating system

TRANSCRIPT

Page 1: PengeCoran data

BAB II PERANCANGAN POLA DAN SISTEM SALURAN TUANG

Pengumpulan dan Pengolahan Data

Pengumpulan Data

Tabel perhitungan sistem saluran tuang, sebagai berikut: Tabel 2.1 Tabel Perhitungan Sistem Saluran Tuang

No Notasi dan Rumus Input Output1 Berat Produk, Wo (kg) 0.12 -

2 Density Alumunium, ρ (kg/cm3) 0.0027 -3 Yield Rasio, y (%) 70 -

4Pouring Weight, W (kg) - 0.17

Pouring Volume, V (cm3) - 63.495 Wall Thickness, p (cm) - 1.796 Casting Height, c (cm) 7.955 -7 Sprue Height, h (cm) 10 -8 Jenis Gating System Parting Line -9 Tipe Sprue Terompet -10 Jumlah Ingate 1 -11 Jumlah Runner 1 -12 Effective Sprue Height, (ESH) (cm) - 9.8013 Pouring Rate, (R) for Al (kg/sec) - 0.2914 Pouring Time, tp (sec) - 0.59

15

Calculate Sprue Area, As (cm2) - 0.87a). Jari-Jari, r (cm) - 0.53b). Diameter Bawah Sprue, Ab (cm) - 1.05c). Tinggi Pouring Basin, b (cm) 2 (asumsi) -d). Diameter Atas Sprue (cm) - 1.65

16

Gating Ratio yang Digunakan Sprue Runner Gate [1 : 0,9 : 0,8 ]

Gating Ratio at Sprue 0.87 - -Gating Ratio at Runner - 0.78 -Gating Ratio at Gate - - 0.70

17 Jumlah Runner - 1 -

18

Calculate Runner Area (Ar)a). Ar - 0.78 -b). Kedalaman Tinggi Runner - 1.5 -c). Lebar Runner - 0.52 -

19

Calculate Well Dimensiona). Jari-Jari - 0.53 -b). Diameter Bawah Sprue - 1.05 -c). Well Area - 5.26 -d). L Well - 0.87 -e). Jari-Jari Well - 1.29 -

LAPORAN PRAKTIKUM PERANCANGAN POLA DAN SISTEM SALURAN TUANG vii

Page 2: PengeCoran data

BAB II PERANCANGAN POLA DAN SISTEM SALURAN TUANG

f). Diameter (D) - 2.59 -g). Well Depth - 6 -

20

Calculate Ingatea). Jumlah Ingate 1 - -b). Luas Area Ingate - 0.70 -c). Asumsi Kedalaman Ingate - 0.75 -e). Lebar Ingate, l - 0.93 -f). Flowing Volume, Q - 107.04 -

21

Velocity (cm/sec)Velocity at Sprue 123.20 - -Velocity at Runner - 136.89 -Velocity at Gate - - 154.00

22

Reynold Number (cm2/kg)Reynold Number at Sprue 448.48 - -Reynold Number at Runner - 498.31 -Reynold Number at Gate - - 560.60

LAPORAN PRAKTIKUM PERANCANGAN POLA DAN SISTEM SALURAN TUANG vii