29
PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE PADA BASEMENT GEDUNG KANTOR PELAYANAN PUBLIK PEMERINTAH KOTA CIMAHI The Calculation and Method Construction of Secant Pile at Basement Cimahi Government Public Service Office Building TUGAS AKHIR Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan pendidikan Diploma Tiga Program Studi Teknik Konstruksi Gedung di Jurusan Teknik Sipil Oleh: DEBI CHINTYA DEWI RESY PUSPITA DEWI NIM. 171111037 171111059 POLITEKNIK NEGERI BANDUNG 2020

Upload: others

Post on 16-Oct-2021

34 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

PERHITUNGAN DAN METODE PELAKSANAAN SECANT

PILE PADA BASEMENT GEDUNG KANTOR PELAYANAN

PUBLIK PEMERINTAH KOTA CIMAHI

The Calculation and Method Construction of Secant Pile at

Basement Cimahi Government Public Service Office Building

TUGAS AKHIR

Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan pendidikan

Diploma Tiga Program Studi Teknik Konstruksi Gedung di Jurusan Teknik Sipil

Oleh:

DEBI CHINTYA DEWI RESY PUSPITA DEWI

NIM. 171111037 171111059

POLITEKNIK NEGERI BANDUNG

2020

Page 2: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

i

ABSTRAK

Pada pembangunan Gedung Kantor Pelayanan Publik Pemerintah Kota

Cimahi terdapat beberapa perbedaan ketinggian lahan. Perbedaan tersebut

berdampak pada metode pelaksanaan basement. Metode yang digunakan pada

proyek tersebut yaitu metode galian. Metode tersebut dirasa kurang efektif dan

kurang baik dikarenakan level muka air yang tinggi. Berdasarkan hasil pengujian

di lapangan pada kedalaman tanah 0 - 6 m didapatkan nilai N-SPT <10, dengan

nilai SPT tersebut maka pembuatan basement tidak disarankan metode penggalian

langsung. Apabila dilakukan penggalian langsung maka dikhawatirkan akan terjadi

kelongsoran pada tanah tersebut.

Metode pelaksanaan yang akan digunakan dalam mengatasi permasalahan

yang disebutkan pada paragraf sebelumnya yaitu perubahan metode galian

langsung menjadi metode secant pile. Dalam melakukan analisis metode secant pile

dilakukan dengan menggunakan bantuan software Plaxis V.8.2. Setelah didapatkan

hasil analisis tersebut didapatkan faktor keamanan pada galian dan gaya – gaya

dalam pada secant pile. Gaya – gaya dalam tersebut selanjutnya akan di analisis

untuk mendapatkan perencanaan penulangan secant pile dan capping beam.

Hasil yang diperoleh setelah dilakukan analisis didapatkan nilai deformasi

19,87 mm dan safety factor galian sebesar 2,175. Selain hal tersebut didapatkan

penulangan utama secant pile 9D25 mm, tulangan sengkang D16-200 mm.

Tulangan utama capping beam 6D25, tulangan sengkang D16-200.

Kata Kunci : N-SPT, Metode Galian, Secant Pile, Deformasi, Safety Factor

Page 3: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

ii

ABSTRACT

In the construction of the Cimahi City Government Public Service Office

Building, there are several differences in land height. These differences have an

impact on the method of basement implementation. The method used in the project

is the excavation method. This method is deemed ineffective and inadequate due to

the high water level. Based on the results of field testing at a soil depth of 0 - 6 m,

the N-SPT value is <10, with this SPT value, making a basement method is not

recommended. If direct excavation is carried out, it is feared that landslides will

occur on the land.

The implementation method that will be used in overcoming the problems

mentioned in the previous paragraph is a change in the direct excavation method

to the secant pile method. In analyzing the secant pile method, it was carried out

using the help of Plaxis V.8.2 software. After obtaining the results of the analysis,

the safety factor in the excavation and internal forces on the secant pile is obtained.

The internal forces will then be analyzed to obtain a plan for the reinforcement of

the secant pile and capping beam.

The results obtained after analyzing the deformation value were 19.87 mm

and the excavation safety factor was 2.175. In addition to this, the main

reinforcement obtained is secant pile 9D25 mm, stirrup reinforcement D22-200

mm. Capping beam main reinforcement 6D25, stirrup reinforcement D22-200.

Keywords: N-SPT, Excavation Method, Secant Pile, Deformation, Safety Factor

Page 4: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

iii

KATA PENGANTAR

Puji dan syukur kami panjatkan kepada Allah Swt. karena atas limpahan

rahmat dan karunianya kami dapat menyelesaikan penyusunan laporan tugas akhir

dengan judul “Perhitungan Dan Metode Pelaksanaan Secant Pile Pada

Basement Gedung Kantor Pelayanan Publik Pemerintah Kota Cimahi”.

Dalam penyusunan laporan ini tentunya tidak lepas dari bantuan, bimbingan

serta dukungan dari semua pihak hingga selesai. Oleh karena itu pada kesempatan

ini penulis mengucapkan banyak terima kasih kepada :

1. Allah SWT yang senantiasa memberikan kemudahan dan kelancaran, kepada

peulis, terutama dalam penyusunan laporan tugas akhir

2. Orang tua penulis yang senantiasa memberi kasih sayang, motivasi, do’a,

arahan, dan bimbingan serta telah memberikan pendidikan yang terbaik bagi

penulis.

3. Bapak Hendry, Dipl.Ing.HTL.,MT selaku Ketua Jurusan Teknik Sipil,

Politeknik Negeri Bandung.

4. Fisca Igustiany, SST, MT selaku Ketua Program Studi Teknik Konstruksi

Gedung.

5. Bapak Udi Raharjo, Drs MM. selaku Pembimbing I yang selalu memberikan

bimbingan dan arahan dalam menyelesaikan penyusunan tugas akhir ini.

6. Bapak Andri Krisnandi Somantri, SST., M.Eng selaku Pembimbing II yang

selalu memberikan bimbingan dan arahan dalam menyelesaikan penyusunan

tugas akhir ini.

7. Bapak Geni Firuliadhim, Ir, MT selaku Ketua Penguji atas segala kritik dan

saran yang dapat membangun dalam laporan tugas akhir ini.

8. Bapak Agus Suyono, ST, MT. selaku Penguji I atas segala kritik dan saran yang

dapat membangun dalam laporan tugas akhir ini.

9. Bapak Krish Madyono H, Dipl. Ing, HTL, MT. selaku Ketua Pelaksana Tugas

Akhir Teknik Sipil Tahun 2020.

Page 5: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

iv

10. Bapak Bagyo Yulianto selaku Pengawas Strktur Proyek Pembangunan Gedung

Kantor Pelayanan Publik Pemerintah Kota Cimahi yang selalu memberikan

motivasi, bimbingan dan arahan kepada penulis.

11. Rekan-rekan kelas 3B Teknik Konstruksi Gedung angkatan 2017 yang telah

memberikan masukan, semangat, dukungan dan doa sehingga memperteguh

motivasi dalam penyusunan laporan tugas akhir ini.

12. Diki Mahmudin yang telah memberikan semangat,dukungan,masukkan serta

do’a sehingga bisa memotivasi untuk teguh dalam penyusunan tugas akhir ini.

13. Pihak-pihak lain yang telah membantu, yang tidak dapat penulis sebutkan satu

per satu, atas segala kebaikan dan bantuannya selama ini. Semoga amal baik

yang telah diberikan senantiasa mendapat balasan dari Allah SWT.

Penulis menyadari bahwa dalam pembuatan laporan tugas akhir ini masih

terdapat banyak kekurangan dan masih jauh dari kesempurnaan karena keterbatasan

pengetahuan dan kemampuan penulis. Oleh karena itu bimbingan serta saran yang

membangun sangat penulis harapkan. Semoga laporan tugas akhir ini dapat berguna

bagi penulis sendiri maupun pihak lain yang membutuhkan. Atas segala

perhatiannya, penulis mengucapkan terima kasih.

Bandung, 2020

Penulis

Page 6: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

v

DARTAR ISI

ABSTRAK ............................................................................................................... i

ABSTRACT .............................................................................................................. ii

KATA PENGANTAR ........................................................................................... iii

DAFTAR LAMPIRAN ........................................................................................ viii

DAFTAR GAMBAR ............................................................................................. ix

DAFTAR TABEL .................................................................................................. xi

DAFTAR ISTILAH ............................................................................................. xiii

DAFTAR SINGKATAN DAN LAMBANG.................................................... xviii

BAB I PENDAHULUAN ...................................................................................... 1

I.1 Latar Belakang ................................................................................................... 1

1.2 Rumusan Masalah ............................................................................................. 3

1.3 Tujuan ............................................................................................................... 3

1.4 Ruang Lingkup ................................................................................................. 4

1.5 Sistematika Penulisan ....................................................................................... 4

BAB II TINJAUAN PUSTAKA ............................................................................. 5

II.1 Karya Ilmiah Sejenis Sebelumnya.................................................................... 5

II.2 Dinding Penahan Tanah ................................................................................... 5

II.2.1 Jenis Dinding Penahan Tanah ....................................................................... 6

II.2.2 Manfaat dan Fungsi Dinding Penahan Tanah ............................................... 9

II.3 Data Penyelidikan Tanah Lapangan ................................................................. 9

II.4 Penentuan Parameter Tanah ........................................................................... 13

II.4.1 Korelasi Berdasarkan Nilai N-SPT ............................................................. 14

II.4.2 Korelasi Berdasarkan Jenis Tanah............................................................... 17

II.5 Pembebanan .................................................................................................... 20

Page 7: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

vi

II.6 Tekanan Tanah Lateral ................................................................................... 20

II.6.1 Tekanan Tanah Aktif ................................................................................... 20

II.6.2 Tekanan Tanah Pasif ................................................................................... 22

II.6.3 Gaya – Gaya Lateral Pada Dinding Turap .................................................. 23

II.6.4 Gaya Lateral Akibat Tekanan Tanah ........................................................... 24

II.6.5 Gaya Lateral Akibat Tekanan Air ............................................................... 25

II.7 Perancangan Dinding Turap ........................................................................... 25

II.7.1 Prinsip Umum Perancangan Turap Kantilever ............................................ 25

II.7.2 Analisis Tulangan Untuk Perencanaan Secant Pile.................................... 30

II.8 Secant Pile ...................................................................................................... 32

II. 9 Metode Konstruksi ........................................................................................ 33

II.9.1 Metode Pelaksanaan secant pile .................................................................. 33

II.9.2 Metode Pelaksanaan Capping Beam ........................................................... 36

II.10 Alat – Alat Berat ........................................................................................... 36

II.10.1 Exavator .................................................................................................... 38

II.10.3 Wheel Loader............................................................................................. 41

II.10.4 Bor Machine .............................................................................................. 43

II.10.5 Crauwler Crane ......................................................................................... 44

II.11 Metode Analisis Menggunakan Software ................................................... 45

BAB III METODOLOGI ...................................................................................... 47

III.1 Identifikasi Masalah ...................................................................................... 49

III.2 Identifikasi Data ............................................................................................ 49

III.3 Studi Literatur dan Pengumpulan Data ......................................................... 49

III.4 Pengolahan Data............................................................................................ 49

III.5 Tahapan Analisis Perencanaan Secant Pile dengan software ....................... 49

III.5.1 Plaxis V.8.2 ................................................................................................ 49

Page 8: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

vii

III.5.2 spColomn ................................................................................................... 55

III.6 Metode Pelaksanaan ...................................................................................... 58

BAB IV ................................................................................................................. 60

HASIL DAN PEMBAHASAN ............................................................................. 60

IV.1 Data Tugas Akhir .......................................................................................... 60

IV.1.1 Analisa Data Tanah .................................................................................... 60

............................................................................................................................... 61

IV.1.2 Data Laboratorium ..................................................................................... 62

IV.1.3 Data Pembebanan....................................................................................... 65

IV.2 Perencanaan Secant Pile ............................................................................... 65

IV.2.1 Input Data................................................................................................... 66

............................................................................................................................... 68

IV.2.2 Analisis Galian Bassement ......................................................................... 68

IV.2.3 Hasil Analisis ............................................................................................. 69

IV.3 Perhitungan Penulangan Secant Pile ............................................................ 73

IV.4 Metode Pelaksanaan...................................................................................... 81

IV.4.1 Pekerjaan Persiapan ................................................................................... 82

4.4.2 Pembuatan Secant Pile ................................................................................. 93

IV.4.3 Pembuatan Capping Beam ....................................................................... 101

BAB V ................................................................................................................. 108

PENUTUP ........................................................................................................... 108

V.1 Kesimpulan .................................................................................................. 108

V.2 Saran ............................................................................................................. 110

DAFTAR PUSTAKA ........................................................................................... xx

LAMPIRAN ........................................................................................................ xxii

Page 9: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

viii

DAFTAR LAMPIRAN

Lampiran I Data Administrasi

I-1 Formulir Bimbingan Tugas Akhir

Lampiran II Data Teknis

II-1 Hasil Uji SPT di lapangan

II.-2 Hasi Uji Laboratorium sample Tanah

II-3 Grafik Gideon

II-4 Statigrafi

II-5 Gambar Hasil Perancangan

Page 10: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

ix

DAFTAR GAMBAR

Gambar II. 1 Penerapan Dinding Penahan Tanah ................................................. 6

Gambar II. 2 Dinding Penahan Tanah Type Gravity............................................. 7

Gambar II. 3 Dinding Penahan Tanah Type Kantilever ........................................ 7

Gambar II. 4 Dinding Penahan Tanah Type Counterfort ...................................... 8

Gambar II. 5 Dinding Penahan Tanah Type Butress ............................................. 9

Gambar II. 6 Lokasi Penelitian Tanah ................................................................ 10

Gambar II. 7 8 Alat Uji Penetrasi N-SPT ........................................................... 14

Gambar II. 9 Grafik Korelasi NSPT dengan Nilai Kohesi.................................. 14

Gambar II. 10 Exavator ...................................................................................... 38

Gambar II. 11 Dump Truck ................................................................................. 39

Gambar II. 12 Wheel Loader ............................................................................... 41

Gambar II. 13 Bor Machine ................................................................................ 43

Gambar II. 14 Crawler Crane ............................................................................. 44

Gambar III. 1 Flowchart Metodologi ................................................................. 48

Gambar III. 2 Geometri Input Pada Program Plaxis V.8.2 ................................. 51

Gambar III. 3 Generate Mesh ............................................................................. 52

Gambar III. 4 Initial Conditions ......................................................................... 52

Gambar III. 5 Generate Water Pressure ............................................................. 53

Gambar III. 6 Initial Stress Generate ................................................................. 53

Gambar III. 7 Tahap Kalkulasi ........................................................................... 54

Gambar III. 8 General Information (spColomn) ................................................ 55

Gambar III. 9 General Information (spColomn) ................................................ 56

Gambar III. 10 Circular Section (spColomn) ..................................................... 56

Gambar III. 11 All Sides Equal (spColomn) ....................................................... 57

Gambar III. 12 Design Criteria .......................................................................... 57

Gambar III. 13 Factored Loads .......................................................................... 58

Gambar IV. 1 Lokasi Proyek ............................................................................... 60

Gambar IV. 2 Analisis Galian ............................................................................. 69

Gambar IV. 3 Bidang Gelincir Output Plaxis ..................................................... 70

Gambar IV. 4 Hasil Safety Factor ....................................................................... 70

Page 11: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

x

Gambar IV. 5 Bending Moment .......................................................................... 71

Gambar IV. 6 Horizontal Displacement ............................................................. 71

Gambar IV. 7 Axial Force ................................................................................... 72

Gambar IV. 8 Shear Force .................................................................................. 72

Gambar IV. 9 Perencanaan Tulangan Secant Pile .............................................. 77

Gambar IV. 10 Perencanaan Tulangan Capping Beam ....................................... 80

Gambar IV. 11 Tahapan Pekerjaan Secant Pile .................................................. 81

Gambar IV. 12 Layout Site Plan ......................................................................... 84

Gambar IV. 13 Pembuatan Guide Wall ............................................................... 94

Gambar IV. 14 Pengeboran Tiang Secant Pile ................................................... 94

Gambar IV. 15 . Tiang Primary Pile ................................................................... 95

Gambar IV. 16 Fabrikasi Tulangan ..................................................................... 96

Gambar IV. 17 18 Pengecoran Beton untuk Secondary Pile .............................. 96

Gambar IV. 19 . Secant Pile yang Telah dicor .................................................... 97

Gambar IV. 20 Penggalian Capping Beam ....................................................... 101

Gambar IV. 21 Penulangan Capping Beam ...................................................... 102

Gambar IV. 22 . Pemberian bekisting Capping Beam ...................................... 102

Gambar IV. 23 Pengecoran Capping Beam ...................................................... 102

Gambar IV. 24 . Pembongkaran Bekisting........................................................ 103

Gambar V. 1 Grafik Gaya – Gaya Dalam Secant Pile ...................................... 109

Page 12: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xi

DAFTAR TABEL

Tabel II. 1 Resume Hasil Pengujian Bor Mesin .................................................. 11

Tabel II. 2 Resume Hasil Sondir .......................................................................... 12

Tabel II. 3 Korelasi Berat Jenis Tanah untuk Tanah Kohesif dan Non Kohesif.. 15

Tabel II. 4 Korelasi Tanah Jenuh untuk Tanah Non Kohesif .............................. 16

Tabel II. 5 Nilai Tipikal Berat Volume Tanah ..................................................... 16

Tabel II. 6 Hubungan antara Nilai SPT dengan Sudut Gesr Dalam .................... 17

Tabel II. 7 Hubungan Antara Jenis Tanah dan Poisson Ratio ............................. 18

Tabel II. 8 Hubungan Antara Sudut Geser Dalam dengan Jenis Tanah .............. 18

Tabel II. 9 Hubungan Antara Sudut Geser Dalam, Tingkat Plastisitas dan Jenis

Tanah ..................................................................................................................... 19

Tabel II. 10 Hubungan Antara Kohesi, NSPT, Sudut Geser dengan Tanah

Lempung ............................................................................................................... 19

Tabel II. 11 Beban Lalu Lintas untuk Analisis Stabilitas (DPU 2001) dan Beban

Diluar Jalan ........................................................................................................... 20

Tabel II. 12 (a) Dinding Turap dengan Landasan yang Didukung tiang-tiang (b)

Bendun gan elak secular........................................................................................ 24

Tabel II. 13 (a) Penggambaran Jaring Arus (b) Diagram Tekanan Air Neto Di

Belakang Turap ..................................................................................................... 25

Tabel II. 14 (a)Turap secara keseluruhan pada tanah lempung (b) Turap pada tanah

lempung diurug tanah granular (c) Gaya – gaya diatas titik dengan gaya lintang nol

untuk kasus ............................................................................................................ 28

Tabel II. 15 Secant Pile ........................................................................................ 32

Tabel II. 16 Tahapan Pekerjaan Secant Pile ........................................................ 34

Tabel II. 17 Tahapan Pekerjaan Secant Pile Mencapai Muka Air Tanah ............ 35

Tabel II. 18 Tahapan Pekerjaan Secant Pile Melebihi Muka Air Tanah ............. 36

Tabel IV. 1 Hasil Penyelidikan Tanah N-SPT ..................................................... 61

Tabel IV. 2 Kesimpulan N-SPT Rata – rata ......................................................... 62

Tabel IV. 3 Hasil Pengujian Lab Pengujian Tanah UDS I .................................. 63

Tabel IV. 4 Hasil Pengujian Lab Pengujian Tanah UDS II ................................. 64

Page 13: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xii

Tabel IV. 5 Hasil Pengujian Lab Pengujian Tanah DS ........................................ 65

Tabel IV. 6 Input Parameter Lapisan Tanah ........................................................ 67

Tabel IV. 7 Input Parameter Secant Pile .............................................................. 68

Tabel IV. 8 Alat – alat K3 .................................................................................... 82

Tabel IV. 9 Material untuk Pembuatan Site Plan ................................................. 85

Tabel IV. 10 Alat – alat untuk pembuatan Site Plan ........................................... 87

Tabel IV. 11 Alat – alat pembuatan Shop Drawing ............................................. 88

Tabel IV. 12 Pengadaan material konstruksi DPT ............................................... 89

Tabel IV. 13 Alat Berat yang diperlukan untuk pekerjaan konstruksi ................. 91

Tabel IV. 14 Alat untuk pembersihan lahan ........................................................ 93

Tabel IV. 15 Material pembuatan Secant Pile ..................................................... 97

Tabel IV. 16 Alat untuk pembuatan Secant Pile .................................................. 99

Tabel IV. 17. Material pembuatan Capping Beam............................................. 104

Tabel IV. 18 Alat untuk pembuatan Capping Beam .......................................... 106

Tabel V. 1 Hasil Analisis dengan software Plaxis 8.2 ....................................... 108

Tabel V. 2 Dimensi dan Penulangan Secant Pile ............................................... 110

Page 14: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xiii

DAFTAR ISTILAH

A

Alat Berat : mesin berukuran besar yang didesain untuk

melaksanakan fungsi konstruksi seperti pengerjaan

tanah (earthworking) dan memindahkan bahan

bangunan

B

Basemen : sebuah tingkat atau beberapa tingkat dari bangunan

keseluruhan atau sebagian yang terletak di bawah

tanah.

Bar Bender : alat pembengkok tulangan

Bar Cutter : alat pemotong tulangan

Bentonite material yang digunakan pada pekerjaan secondary

pile

Bronjong : anyaman kawat baja yang dilapisi dengan seng atau

galvanis

Bucket : mata bor berbentuk tabung yang berfungsi untuk

mengambil tanah basah

C

Casing : pipa selubung baja yang berfungsi agar lubang bor

tidak longsor

Concrete Bucket : tempat pengangkutan beton dari truck

mixer concrete sampai ke tempat pengecoran

Capping Beam : balok penutup pada kontruksi bangunan bawah

(turap, dinding penahan)

Crawler Crane : salah satu jenis dari crane, dimana alat ini merupakan

pengangkat yang biasa digunakan didalam proyek

konstruksi

D

Deformasi : perubahan bentuk atau ukuran dari sebuah objek

Page 15: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xiv

Dinding Turap : dinding vertikal (relatif tipis) yang berfungsi untuk

menahan masuknya air kedalam lubang galian

Dump truck : alat berat yang berfungsi untuk mengangkut atau

memindahkan material pada jarak menengah sampai

jarak jauh (>500m)

Direct Shear Test : pengujian tanah untuk menentukan kekuatan geser

tanah setelah konsoloidasi setelah diberikan beban

Displacement : perubahan atau pergeseran

E

Elevasi : ketinggian suatu bangunan

Excavator : alat berat yang terdiri dari lengan (arm), boom (bahu)

serta bucket (alat keruk) dan digerakkan oleh tenaga

hidrolis yang dimotori dengan mesin diesel dan

berada di atas roda rantai (trackshoe)

F

fc’ : kekuatan tekan minimum yang mengacu pada SNI

dengan satuan Mpa

Flowchart : suatu bagan dengan simbol-simbol tertentu yang

menggambarkan urutan proses secara mendetail dan

hubungan antara suatu proses (instruksi) dengan

proses lainnya dalam suatu program.

G

H

Hammer test : suatu alat yang digunakan untuk pemeriksaan mutu

beton tanpa merusak beton

I

J

K

Page 16: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xv

K3 : kesehatan dan keselamatan kerja.

Kawat Bendrat : kawat yang dipakai untuk pemasangan tulangan

Kohesi : gaya tarik menarik antar molekul yang sama

Kohesif : tanah yang mempunyai sifat lekatan antara butir –

butirnya seperti tanah lempung

Konstruksi : suatu kegiatan membangun sarana maupun prasarana,

dikenal juga sebagai bangunan atau satuan

infrastruktur pada sebuah area atau pada beberapa

area.

Konsultan : perusahaan yang telah ditunjuk oleh pengguna jasa

untuk melakukan perancangan proyek

Kontraktor : perusahaan yang telah ditunjuk oleh pengguna jasa

untuk melaksanakan pekerjaan sesuai dengan rencana

Kurva S : tabel dan kurva penjadwalan serta pendanaan proyek

L

M

Modulus Elastisitas : angka yang digunakan untuk mengukur objek atau

ketahanan bahan untuk mengalami deformasi

elastisitas ketika gaya diterapkan pada benda itu

N

Non – Kohesif : tanah yang tidak mempunyai atau sedikit sekali

lekatan antara butir – butirnya atau hamper tidak

mengandung lempung misalnya pasir

O

P

Plaxis : software

Poisson Ratio : perbandingan antara kontraksi lateral terhadap

regangan longitudinal, jika suatu bahan ditarik secara

linear

Pondasi : bagian dari konstruksi bagian bawah

Preliminary Design : tahap perencanaan

Page 17: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xvi

Primary Pile : tiang yang berfungsi sebagai penutup galiandan

pengendap

Q

R

Ready Mix : campuran pasta beton siap jadi yang dibuat di tempat

pembuatan beton sebelum dikirim ke lokasi proyek

S

Secant Pile : jenis dinding penahan tanah yang jarak antar pile –

nyaberdempetan dan saling bersinggungansatu sama

lain untuk menahan gaya lateral

Secondary Pile : tiang seperti bore pile yang dibuat tanpa adanya

tulangan

Sengkang : tulangan yang digunakan untuk menahan tegangan

geser dan torsi dalam konstruksi struktur

Sheet Pile : salah satu jenis dinding penahan tanah yang dibuat

untuk menahan gaya lateral

Site Plan : gambar yang menunjukkan detail dari rencana yang

akan dilakukan

Shop Drawing : gambar teknis lapangan yang digunakan sebagai

acuan pelaksanaan pekerjaan

Soil Nailing : teknik perkuatan tanah in – situ untuk menjaga

kestabilan galian tanah dengan cara memasukkan

perkuatan dengan ukuran relative kecil (biasanya besi

beton)

Sondir : uji tanah dengan melakukan penetrasi konus kedalam

tanah

T

Topografi : bentuk permukaan bumi

Page 18: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xvii

Truck Mixer : alat yang digunakan untuk mengangkut dan

mengaduk beton dari tempat pembuatan beton ke

lokasi pengecoran

Page 19: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xviii

DAFTAR SINGKATAN DAN LAMBANG

DPT : dinding penahan tanah

Ka : koefisien aktif

Kp : koefisien pasif

SF : safety factor

SPT : Standard Penetration Test

Mu : momen ultimate (ton.m)

Ag : luas alas secant pile (mm2)

f’c : mutu beton (MPa)

fy : mutu baja (MPa)

r : jari – jari (mm)

D : diameter lingkaran (mm)

sb : selimut beton

H : tinggi

b : lebar

c : kohesi

v’ : poisson ratio

𝐷𝑠 : diameter secant pile

Qw : beban kerja tiang Pondasi

qu : kuat tekan bebas

Q : sudut geser tanah

𝛿 : kemiringan tanah

𝜎ℎ : gaya horizontal

Page 20: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xix

𝜎𝑣 : gaya Vertikal

𝛾 : berat volume tanah

𝜑 : sudut geser

Qall : kapasitas izin

Qult : daya dukung batas tiang (ton)

Nb : nilai Nspt pada elevasi dasar tiang

Ap : luas penampang tiang (m2)

N : nilai rata-rata sepanjang tiang

Page 21: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …
Page 22: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …
Page 23: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …
Page 24: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …
Page 25: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …
Page 26: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

SURAT PERNYATAAN

PERSETUJUAN PUBLIKASI KARYA TULIS ILMIAH

UNTUK KEPENTINGAN AKADEMIS

Nama Penulis 1 : Debi Chintya Dewi

NIM Penulis 1 : 171111037

Nama Penulis 2 : Resy Puspita Dewi

NIM Penulis 2 : 17111109

Jurusan / Program Studi : Teknik Sipil / D3 Teknik Konstruksi Gedung

Demi pengembangan ilmu pengetahuan, menyetujui untuk memberikan kepada Politeknik Negeri Bandung,

Hak Bebas Royalti Non-Eksklusif (Non-Exclusive Royalty-Free Right) atas tugas akhir/skripsi/tesis

saya yang berjudul (dalam Bahasa Indonesia saja kecuali Jurusan Bahasa Inggris):

“Perhitungan dan Metode Pelaksanaan Secant Pile Pada Basement Gedung Kantor Pelayanan Publik

Pemerintah Kota Cimahi”

beserta perangkat yang ada (bila diperlukan). Dengan Hak Bebas Royalti Non Eksklusif ini Politeknik

Negeri Bandung berhak menyimpan, mengalih media/memformat, mengelola dalam bentuk pangkalan

data (database), mendistribusikan, dan menampilkan/mempublikasikan tugas akhir saya di internet/media

lain untuk kepentingan akademis tanpa perlu meminta ijin dari saya selama tetap mencantumkan nama saya

sebagai penulis/pencipta dan sebagai pemilik Hak Cipta.

Saya bersedia untuk menanggung secara pribadi tanpa melibatkan pihak Politeknik Negeri Bandung,

segala bentuk tuntutan hukum yang diambil atas pelanggaran hak dalam karya ilmiah saya ini.

Demikian Surat Pernyataan ini saya buat dengan sebenarnya.

Dibuat di* : Bandung

Pada tanggal : September 2020

Yang menyatakan

Penulis 1 Penulis 2

Debi Chintya Dewi Resy Puspita Dewi

NIM. 171111037 NIM. 171111059

Catatan / Keterangan:

*Nama Kota

**Lingkari salah satu

CD Karya Tulis menjadi milik dan koleksi UPT Perpustakaan, tidak dipinjamkan ataupun

diperjualbelikan, apabila ada yang memerlukan, maka harus menghubungi penulis karya tulis yang

bersangkutan.

Sebagai sivitas akademika Politeknik Negeri Bandung, yang bertandatangan di bawah ini saya:

Page 27: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …
Page 28: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xx

DAFTAR PUSTAKA

Abidin, Maulana. 2013. “Perencanaan Secant Pile Sebagai Dinding Penahan Tanah

Basement Dengan Menggunakan Program Plaxis v8.2”. Jakarta: Universitas

Mercu Buana Jakarta

Alpin Kurniawan, Dzaky. 2017. “Perencanaan Dinding Penahan Tanah Pada

Basement Midtown Point And Ibis Syle Hotel Jakarta”. Surabaya: Institut

Teknologi Sepuluh November

Asiyanto. 2009 “Metode Konstruksi Pekerjaan Fondasi”

Darmawan, Muhammad Satria. Puji Wiranto, Wiratma Tri Nugraha. “Produktivitas

Mobile Crane Pada Pembangunan Gedung Apartement”, Bogor

Das, Braja M. 1994. “Mekanika tanah (Prinsip – Prinsip Rekayasa Geoteknis) JilID

I”. Jakarta Erlangga.

Das, Braja M. 1994. “Mekanika tanah (Prinsip – Prinsip Rekayasa Geoteknis) JilID

II”. Jakarta Erlangga.

Djuwadi, 2010, “Buku Bahan Ajar Rekayasa Pondasi 2”. Bandung: Politeknik

Negeri Bandung.

Hardiyatmo, Hary Chrishtady, 2011. “Analisis Dan Perancangan Fondasi II”.

Gadjah Mada University Press: Yogyakarta

Hardiyatmo, Hary Chrishtady, 2014. Analisa dan Perencanaan Fondasi I. Gadjah

Mada University, Yogyakarta.

Kusuma, Ir. Gideon H “ Grafik dan Tabel Perhitungan Beton Bertulang

Berdasarkan SKNNI T-15-1991-03.

Page 29: PERHITUNGAN DAN METODE PELAKSANAAN SECANT PILE …

xxi

Mahindra Aji, Nanda. 2018. “Perencanaan Turap Dengan Menggunakan Program

Plaxis Di Piyungan Yogyakarta”. Surakarta: Universitas Muhammadiyah

Surakarta.

Putra, M. Irvan Hari 2018, “Analisis Pemilihan Alat Berat Pada Pekerjaan Galian

Dan Timbunan Proyek Pembangunan Fakultas Hukum UII (Heavy Equipment

Choice Analysis On Cut And Fill Work Of UII Law Construction), Yogyakarta.

Raneysa Mitzi. 2017. “Analisis Proteksi Galian Tanah Lunak Menggunakan Secant

Pile Berangkur Di Surabaya”.

Ristiafaty Utami, Zanira. 2017. “Perencanaan Metode Pelaksaan Perbaikan

Dinding Penahan Tanah Pada Gedung Condotel Kyirad Boutique Village”.

Bandung: Politeknik Negeri Bandung.

Rochmanhadi 1992, Alat – alat berat dan Penggunaannya YBPPU, Semarang.

Rosiyanti, S. F. 2008 “Alat Berat uNtuk Proyek Konstruksi

Standar Nasional Indonesia. 2013. “SNI-2847-2013 Tentang Persyaraan Beton

Struktural untuk Bangunan Gedung “.Badan Standarisasi Nasional.

Standar Nasional Indonesia. 2013. “SNI-1727-2013 Tentang Beban Minimum

untuk Perancangan Bangunan Gedung dan Struktur Lainnya”. Badan

Standarisasi Nasional.

Standar Nasional Indonesia. 2017. “SNI-8460-2017” Tentang Persyaratan

Perancangan Geoteknik. Badan Standarisasi Nasional.

Steven, Ho, Erron Gunardi, Paravita Sri Wulandari, Benjamin Lumantarna, “Studi

Kasus Terhadap Pelaksaan Basement 5 Lantai Di Wilayah Surabaya Barat”

Surabaya.