permohonan pembayaran toko&suplier tci
DESCRIPTION
suplierTRANSCRIPT
CIWARINGIN, 17 SEPTEMBER 2015
KEPADA YTH. :
BAPAK HENDRAWAN DAN BAPAK FENDY, JAKARTA.
DENGAN HORMAT,
PERMINTAAN UANG UNTUK KEPERLUAN TGL 17 SEPTEMBER 2015
UNTUK PEMBAYARAN TANAH CIJURAI
DITRANSFER LANGSUNG KE REKENING SUKARTA B. CASMITA
BANK BRI UNIT PASAR MINGGU NO. AC 4144 01 000 169 537
TCI
NOTGL
KETERANGAN KODE JMH SATUANHARGA
TOTALNOTA SATUAN
1 1-Sep-15 K 6,799 KG Rp 110 Rp 747,890
TOTAL Rp 747,890
#tujuh ratus empatpuluh tujuh ribu delapan ratus sembilan puluh rupiah#
DEMIKIAN AGAR MENJADI TAHU ADANYA. TERIMA KASIH.
MENGETAHUI, DIBUAT OLEH ;
FENDY YUDHA CHANDRA
FACTORY MANAGER
TANAH CIJURAI
CIWARINGIN, 17 SEPTEMBER 2015
KEPADA YTH. :
BAPAK HENDRAWAN DAN BAPAK FENDY, JAKARTA.
DENGAN HORMAT,
PERMINTAAN UANG UNTUK KEPERLUAN TGL 17 SEPTEMBER 2015
UNTUK PEMBAYARAN TB. FAJAR
DITRANSFER LANGSUNG KE REKENING BANK MANDIRI
Bank Mandiri A / C . 134.000.773.9161A/N. NURASA IMAN
TCI
NOTGL
KETERANGAN KODE JMH SATUANHARGA
TOTALNOTA SATUAN
1 29-Jul-15 Pasir u proyek pagar barat M 1 rit Rp 750,000 2 30-Jul-15 Pasir u proyek pagar barat M 1 rit Rp 750,000 3 1-Aug-15 5 dus paku 4 cm M 5 Rp 360,000 Rp 1,800,000 4 5-Aug-15 Thinner ND Borobudur M Rp 408,000
Kran 0,5 inch ONDA M Rp 40,000
5 8-Aug-15 Ember Aduk M Rp 70,000
TOTAL Rp 3,818,000
# tiga juta delapan ratus delapanbelas ribu rupiah #
DEMIKIAN AGAR MENJADI TAHU ADANYA. TERIMA KASIH.
MENGETAHUI, DIBUAT OLEH ;
FENDY YUDHA CHANDRA
FACTORY MANAGER
KEPADA YTH. :
BAPAK HENDRAWAN DAN BAPAK FENDY, JAKARTA.
DENGAN HORMAT,
PERMINTAAN UANG UNTUK KEPERLUAN TGL 17 SEPTEMBER 2015
UNTUK PEMBAYARAN CV. CAHAYA MULIA
DITRANSFER LANGSUNG KE REKENING Bank BCA
BCA A / C . 299.002.8888A/N. WAHYUDY SUSILO
TCI
NOTGL
KETERANGAN KODE JMHHARGA
TOTALNOTA SATUAN
1 27-Jul-15 1 rol NYHY 3x2,5 Makita M Rp 850,000
Isolasi Nitto 20 pcs M 20 Rp 7,000 Rp 140,000
Lampu Rotari LTE-1161 M Rp 150,000
Lampu LED SW Visicom M 5 Rp 28,000 Rp 140,000
6 set soket 3 x16A K 6 Rp 50,000 Rp 300,000
2 pcs fiting GPL M 2 Rp 35,000 Rp 70,000
2 pcs Limit switch WL-CA2 M 2 Rp 85,000 Rp 170,000
SUB TOTAL Rp 1,820,000
2 5-Aug-15 1 rol NYHY 4x2,5 M Rp 1,050,000
6 pcs Selector M 6 30,000 Rp 180,000
SUB TOTAL Rp 1,230,000
3 8-Aug-15 12 pcs stop kontak M 12 8,000 Rp 96,000
12 pcs steker arde biru M 12 9,000 Rp 108,000
Rp 204,000
4 10-Aug-15 6 pcs GA 30 K 6 60,000 Rp 360,000
Retur 6 pcs Selector 6 30,000 Rp 180,000
SUB TOTAL Rp 180,000
TOTAL Rp 3,434,000
# tiga juta empat ratus tigapuluh empat ribu rupiah #
DEMIKIAN AGAR MENJADI TAHU ADANYA. TERIMA KASIH.
MENGETAHUI, DIBUAT OLEH ;
FENDY YUDHA CHANDRA
FACTORY MANAGER
KEPADA YTH. :
BAPAK HENDRAWAN DAN BAPAK FENDY, JAKARTA.
DENGAN HORMAT,
PERMINTAAN UANG UNTUK KEPERLUAN TGL 17 SEPTEMBER 2015
UNTUK PEMBAYARAN Tk. Besi&Kaca BahagiaDITRANSFER LANGSUNG KE REKENING A/N. YAP THIAN LEN
BANK BCA A/C. 299.004.2899
TCI
NOTGL
KETERANGAN KODE JMHHARGA
TOTALNOTA SATUAN
1 31-Jul-15 3 set Epoxy Milan R 3 Rp 95,000 Rp 285,000
B poles resibon 4 S 19 Rp 11,000 Rp 209,000
Carbon brush AEG M 10 Rp 25,000 Rp 250,000
Mata Gergaji Sandflex M 8 Rp 10,000 Rp 80,000
SUB TOTAL Rp 824,000
2 5-Aug-15 10 set Epoxy Milan S 10 95,000 Rp 950,000
24 m Seling baja 6m/m S 24 11,000 Rp 264,000
5 pcs saklar Gurinda MT90 M 5 15,000 Rp 75,000
SUB TOTAL Rp 1,289,000
3 14-Aug-15 2 regulator HP+amper M 2 80,000 Rp 160,000
SUB TOTAL Rp 160,000
TOTAL Rp 2,273,000
# dua juta dua ratus tujuhpuluh tiga ribu rupiah #
DEMIKIAN AGAR MENJADI TAHU ADANYA. TERIMA KASIH.
MENGETAHUI, DIBUAT OLEH ;
FENDY YUDHA CHANDRA
FACTORY MANAGER
KEPADA YTH. :
BAPAK HENDRAWAN DAN BAPAK FENDY, JAKARTA.
DENGAN HORMAT,
PERMINTAAN UANG UNTUK KEPERLUAN TGL 17 SEPTEMBER 2015
UNTUK PEMBAYARAN MEKANIKA
DITRANSFER LANGSUNG KE REKENING BCA Cab.ABC Bandung
BANK BCA PT.Mekanika Periangan , A/C. 243.3133.277
TCI
NOTGL
KETERANGAN KODE JMHHARGA
TOTALNOTA SATUAN
1 15-Sep-15 Mould Keramik K 2 Rp 2,500,000 Rp 5,000,000
TOTAL Rp 5,000,000
# lima juta rupiah #
DEMIKIAN AGAR MENJADI TAHU ADANYA. TERIMA KASIH.
MENGETAHUI, DIBUAT OLEH ;
FENDY YUDHA CHANDRA
FACTORY MANAGER
KEPADA YTH. :
BAPAK HENDRAWAN DAN BAPAK FENDY, JAKARTA.
DENGAN HORMAT,
PERMINTAAN UANG UNTUK KEPERLUAN TGL 17 SEPTEMBER 2015
UNTUK PEMBAYARAN NIRI RUBBER
DITRANSFER LANGSUNG KE REKENING : PT. SAMUDERA LUAS PARAMACITRA
BANK BCA CIREBON A/C. 134.330.5757
TCI
NOTGL
KETERANGAN KODE JMHHARGA
TOTALNOTA SATUAN
1 7-Jul-15 Rubber Membrane 1 1/4 inch S 2 Rp 375,000 Rp 750,000 Sales Tax Rp 75,000
Rubber Lining 4,5x28x100 cm S 35 Rp 950,000 Rp 33,250,000
Sales Tax Rp 3,325,000
TOTAL Rp 37,400,000
# tiga puluh tujuh juta empat ratus ribu rp #
DEMIKIAN AGAR MENJADI TAHU ADANYA. TERIMA KASIH.
MENGETAHUI, DIBUAT OLEH ;
FENDY YUDHA CHANDRA
FACTORY MANAGER
KEPADA YTH. :
BAPAK HENDRAWAN DAN BAPAK FENDY, JAKARTA.
DENGAN HORMAT,
PERMINTAAN UANG UNTUK KEPERLUAN TGL 17 SEPTEMBER 2015
UNTUK PEMBAYARAN MDS (Mitra Dinamika Selaras)
DITRANSFER LANGSUNG KE REKENING
BANK
TCI
NOTGL
KETERANGAN KODE JMHHARGA
TOTALNOTA SATUAN
1 11-Aug-15 Membran 2 " S 2 Rp 550,000 Rp 1,100,000
Rubber Membrane 3 " S 2 Rp 700,000 Rp 1,400,000
TOTAL Rp 2,500,000
#dua juta limaratus ribu rp #
DEMIKIAN AGAR MENJADI TAHU ADANYA. TERIMA KASIH.
MENGETAHUI, DIBUAT OLEH ;
FENDY YUDHA CHANDRA
FACTORY MANAGER
CIWARINGIN, 17 SEPTEMBER 2015
KEPADA YTH. :
BAPAK HENDRAWAN DAN BAPAK FENDY, JAKARTA.
DENGAN HORMAT,
PERMINTAAN UANG UNTUK KEPERLUAN TGL 17 SEPTEMBER 2015
DITRANSFER KE REKENING PT TERRA COTTA
BRI UNIT CIWARINGIN 4128-01-000343-50-5
Uang Makan Kary. TCI
NO. KETERANGAN KODE JUMLAH
1 K 432,000
2 M 2,300,000
3 R 276,000
4 S 562,000
5 K 1,075,000
6 M 2,852,000
7 R 355,000
8 S 380,000
9 BIAYA ADM BRI M 185,000
TOTAL 8,417,000
TOTAL DITRANSFER 8,417,000
TOTAL TRANSFER LEWAT BRI
UNTUK KAS BESAR
DEMIKIAN AGAR MENJADI TAHU ADANYA. TERIMA KASIH.
MENGETAHUI ; DIBUAT OLEH
FENDY YUDHA CHANDRA
FACTORY MANAGER
UANG MAKAN KAR. BULANAN DIV. KERAMIK TGL. 30/08 S/D 12/09 2015
UANG MAKAN KAR. BULANAN DIV. MIX TGL. 30/08 S/D 12/09 2015
UANG MAKAN KAR. BULANAN DIV. ROOSTER TGL. 30/08 S/D 12/09 2015
UANG MAKAN KAR. BULANAN DIV. SANITARY TGL. 30/08 S/D 12/09 2015
UANG MAKAN KAR. HARIAN DIV. KERAMIK TGL. 30/08 S/D 12/09 2015
UANG MAKAN KAR. HARIAN DIV. MIX TGL.30/08 S/D 12/09 2015
UANG MAKAN KAR. HARIAN DIV. ROOSTER TGL. 30/08 S/D 12/09 2015
UANG MAKAN KAR. HARIAN DIV. SANITARY TGL. 30/08 S/D 12/09 2015