perpetual ambitions - haji hassan group · haji hassan’s success story began with many struggles...

53
Haji Hassan Group perpetual ambitions

Upload: others

Post on 30-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

H a j i H a s s a n G r o u p

perpetual ambitions

Page 2: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

دنا جسورا ربطت بقوتها أنحاء شتى، أظهرت من خاللها الريادة في شيارتقينا المتواصلين. والنمو الخبرات في والقوة والتشييد، البناء صناعة أمام مستحيل فال الغايات، خارطة إلى لنصل الالمتناهي بطموحنا غاية إلى طمحت ما فـ)إذا النجاحات. تحقيق في صعب وال اإلمكانيات هر الد أبد يعش الجبال يحب صعود ومن ال الحذر، ونسيت المنى ركبت

بين الحفر(.

.. مجموعة الحاج حسن امتلكنا الحافز فسعينا وعملنا واجتهدنا نحن دربا لنا ورسم طموحنا عزز بإمكانياتنا وقناعتنا بذاتنا إيماننا فوصلنا. مشيناه؛ وكنا على خطى صاحب اإلرادة القوية الفقيد الحاج حسن العالي، القمة إلى ليصل طريقه اعترضت التي الصعاب على استند من وهو

بطموحه الالمحدود.

The bridges we have built forged many links and spanned great distances, and showcased our pioneering spirit, expertise and perpetual ascent in the construction industry. By remaining steadfast, we have achieved our goals. Through our capabilities and an insatiable drive to succeed, we have defied obstacles. As “when one sets aim to an end, one must constantly endeavor and abandon caution .. and one who detests climbing the heights, will forever live among the pits”. At Haji Hassan Group (HHG), we are extremely driven and motivated to work hard. Our solid resolution and unwavering belief in ourselves enforced our ambitions and guided our march in the path drawn by the late Haji Hassan Al A’ali. In his long journey towards greatness, he transformed every obstacle in his path into an enduring drive to reach for the heights.

FIRST EDITION 2015

© COPYRIGHT Text and Photography copyright

Haji Hassan GroupP.O. Box 530, Tel: +973 17551111, +973 17875287 Fax: +973 17919111, [email protected]

ALL RIGHTS RESERVED No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of the copyright holder.

Page 3: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Haji Hassan Al A’alithe founder

“My loyalty is to my country and its people, first and foremost. The profit I make is a profit generated to the country and the people”.

“والئي لوطني وشعبه أوال وأخيرا. والربح هو ربح

للوطن وأبنائه”.

Page 4: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

“If you have to flourish, you have to leave home and see the world.”Haji Hassan Al A’ali - 1952Founder

“Step by step is my philosophy to achieve

success”

With these words of wisdom by the founder, and

the competence of his successors, Haji Hassan

Group is managed by his descendants, who are

armed with the same sense and commitment,

innovation, community and responsibility as his.

Haji Hassan’s success story began with many struggles and hardships, but he

overcame them all. He succeeded in the construction industry and became the

first to establish a chain of factories. Amidst a competitive commercial market,

Haji Hassan embarked on a challenging journey towards success, from his

humble roots in the village of A’ali to the hub

of business in the Kingdom’s capital, Manama.

The group had been in existence since

the emergence of the construction and

infrastructure industries during the fifties

and sixties. During this period, Haji Hassan

had the vast potential and opportunities;

and so he ventured in the business armed

with his success philosophy and founded the

first Asphalt Factory in Bahrain in the 60s,

which was the starting point for Haji Hassan

who became one of the biggest successful

entrepreneurs in the country. During that

time, he introduced to the country the use

of specialized machineries for reclamation

and excavation. In the 70s, he expanded his

business by founding a large-scale Readymix

and another Precast factories, followed by

the establishment of a block-manufacturing

factory and more.

Today it is a diversified conglomeration of complementary businesses, which

has been serving the construction and industrial services sector in Bahrain.

It became the foundation of Haji Hassan’s growing empire, which soon

transformed him into an iconic symbol in the industry, as the largest provider of

excellent standard construction services to both the public and private sectors

in the Kingdom. Haji Hassan Al A’ali pursued his goals diligently one at a time,

aided by his methodical, perceptive and insightful qualities. Over a period of

time, he established the Haji Hassan Group and eventually ventured into the

construction and infrastructure industries, commencing in the ‘Noora’ Trade.

» خطوة بخطوة هي فلسفتي نحو تحقيق النجاح «

بهذه الكلمات الحكيمة من قبل المؤسس الراحل، وبفضل كفاءة أبنائه ممن تقلدوا إدارة مجموعة الحاج حسن من بعده وتسلحوا باإلرادة والعزيمة وتحمل المسؤولية، بدأت حيث البحرين، مملكة في والتشييد اإلنشاءات مجال في جديدة آفاق تفتحت قصة نجاح الحاج حسن بالكثير من الصعوبات والظروف القاسية التي عمل جاهدا على مواجهتها وتخطيها، فنجح في صناعة قطاع البناء واإلنشاءات، وكان أول من أسس النجاح نحو بالتحديات مليئة رحلة في وانطلق البحرين، في المصانع من سلسلة وسط سوق تجاري تنافسي، متخذا من مسقط رأسه )قرية عالي( مركز انطالقة نحو

عاصمة مركز األعمال، المنامة.

الحركة نشوء مع حسن الحاج مجموعة بدأت فترة في المملكة في واإلنشائية العمرانية الماضي، العقد من والستينيات الخمسينيات تجارته تعزيز نحو حسن الحاج دفع ما ذلك و ميدان دخوله في األولى الخطوة فتجسدت البحرين في لألسفلت مصنع أول وبناء اإلعمار التي النوعية القفزة فكانت 1960م، العام خالل المنافسين كبار ضمن عالية مكانة لنيل أهلته حيث من البحرين في األولى المجموعة لتصبح عمليات في والمعدات اآلالت واستخدام استيراد كانت هنا من الحقبة. لتلك والرصف االستصالح لتأسيس األفكار االنطالقة، فتوالت بعدها وتيرة مصنع للخرسانة الجاهزة وآخر للخرسانة مسبقة الجهود تكللت ثم السبعينيات، خالل الصب

بتأسيس مصنع للطابوق.

سلسلة اليوم حسن الحاج مجموعة أضحت والخدمات والتشييد البناء قطاع تخدم التي التكميلية الشركات من متنوعة من جعلت كما رائدة، تجارية امبراطورية إلنشاء وأسست البحرين، في الصناعية الحاج حسن العالي رمزا بارزا في الوسط التجاري، جعلته في الريادة في السوق المحلي

وأسواق الدول المجاورة ممن يقدمون خدمات لمختلف الجهات.

كان كما أو - بخطوة خطوة مسيرته، من األولى المراحل حسن الحاج بدأ هكذا يسميها "عتبة عتبة" - نحو تأسيس امبراطورية من الشركات العمالقة والتي يعود الواضحة نحو بناء مجموعة شركات الفذ ورؤيته الفضل فيها لعقله المدبر وفكره النورة" من كبرى تعرف اليوم باسم "مجموعة الحاج حسن" بدءا من تجارة "صناعة

مسقط رأسه.. قرية عالي.

19212003

“ إذا أردت النجاح، فعليك مغادرة المنزل ورؤية العالم”الحاج حسن العالي - 1952م

Page 5: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

برز الحاج حسن بفضل عقله الفذ وقدرته على مواكبة ليرسم والسريع المتغير االقتصادي المشهد وتيرة على ملموسة طفرة ويدخل النجاح خطوات بذلك ينتمي التي عالي قرية فعلت كما البحرين اقتصاد إليها، والتي اشتهرت بصناعة الفخار منذ آالف السنين، فاستمد قوته من تلك الحرفة حيث عمل منذ صغره في صناعة "النورة"، وهي مادة محلية الصنع تتمثل في حتى بالماء تبريده ثم ومن الجيري الحجر تحميض يصبح مسحوقا أبيضا يستخدم كمادة لدهن الجدران. وتعتبر صناعة النورة والفخار إحدى بصمات التاريخ التي ما زالت ماثلة أمامنا على الرغم مما اعتراها من تغيير وتطوير منذ نشأتها قبل آالف السنين، والتي تحمل في

طياتها هوية حضارية لسكان تلك القرية.

Haji Hassan was able to rise above his situation

in A’ali village, through his gift of intellect,

drive and the flexibility to keep up with a fast

changing economic landscape. As a young

man in a village famous for pottery making,

he utilized his special skills and determination

in order to excel and earn a living. Later on, he

was part of venturing the 'Noora' Trade, an

industry that catalyzed the development and

acquired a reputation for A’ali village, since

it began in the area a thousand years ago.

‘Noora’ is a substance derived from roasting

limestone, and cooled with water until it

becomes a white powder that serves as an

ingredient in wall paints.

It was a significant phase in the life of Haji

Hassan, the time when he fulfilled his greatest

goal as pioneer and founder of Haji Hassan

Group.

“ارتبطت بصداقة وثيقة مع الحاج حسن ... كان عصاميا

واستطاع أن يبني نفسه بنفسه”.

الشيخ عبداهلل بن خالد آل خليفة

“I had a close friendship

with Haji Hassan...He was

self-made man who built

up himself”.

Sheikh Abdullah bin Khalid Al Khalifa

Page 6: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

VisionOur vision is to maintain our leadership status in the region and serve

as a premier partner in the infrastructure industry; to be known as the

originator of exceptional developments and as a manufacturer and

provider of building materials and products.

MissionThe Haji Hassan Group is committed to the continuous development

of industrial and infrastructural businesses in the region by providing

products and services of high quality to meet the satisfaction of its

clients from both the public and private sectors. The team will continue

to maintain clients’ satisfaction through social responsibility to their

companies, excellence in all aspects, international standards of product

quality, innovative technology, fulfilment of clients’ expectations,

honesty and integrity.

رؤيتنا

البنى صناعات أعمال في انخرط من كأول اإلقليمية ريادتنا على الحفاظ التحتية وأيضا كشركاء في إنشاء المشاريع العمالقة والمميزة، وكمصنعين

ومزودين رئيسيين لمواد البناء وتوابعها.

مهمتنا

خالل من المنطقة في التحتية والبنية الصناعية األعمال بتنمية نلتزم أن من كل في عمالئنا رضا تلبي عالية جودة ذات وخدمات منتجات توفير عبر للشركات االجتماعية المسؤولية خالل من والخاص العام القطاعين المنتجات، لجودة الدولية بالمعايير نلتزم بحيث الجوانب، جميع في التميز باإلضافة العمالء تطلعات وتحقيق االبتكار، على القائمة والتكنولوجية

للصدق والنزاهة.

طرق شيدت وجسور مدت، ساهمت فيها أياد خفية. هم أولئك الذين سخروا وقتهم وجهدهم من أجل العمل على إنتاج ما يسهم في اقتصاد البلد. وال شك بأن كل هذه الجهود ساعدت على رفع اسم مجموعة الحاج حسن العالي عاليا، فاحتلت الصدارة وكانت دائما في المقدمة لجهودها المثمرة وسواعدها البناءة.

Ebrahim Ali Al A’ali‘SUCCESS CONTRIBUTOR TO HHG’

Ahmed Ali Al A’ali‘SUCCESS CONTRIBUTOR TO HHG’

Adel Hassan Al A’aliDirector

Hana Hassan Al A’aliDirector

Jalal Hassan Al A’aliDirector

Maitham Ahmed Al A’aliDirector

Moh'd Waheed Hassan Al A’aliDirector

Hani Hassan Al A’aliDirector

The minds behind the success...board of directors

Page 7: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

1990 -20101980

1972

Moved asphalt plant to Sitra

1972

Opened phase 1 of Jalal Garden housing compound

1975

Opened Faisal Garden housing compound

1976

Implemented all pavement works at Mina Salman development; including paved area for container handling facilities

Purchased calcium silicate plant produced the first lightweight blocks in the Gulf region

1977

Major upgrade of the brick and block plant producing 20,000 high-quality 8 inch blocks per shift

1978Purchased second asphalt plant which included a larger storage capacity & automatic batching producing 120 tons/hr

Established the Haji Hassan Readymix

Established Bahrain Precast Concrete Co. (joint venture)Upgraded the crushing plant in Hafeera which became the largest in the Island with one primary and two secondary crushers producing 300 tons/hr

1979Established Haji Hassan Mechanical Engineering Workshop

1980Established Haji Hassan Crane Division provided the largest capacity crane in Bahrain at 400 tonsOpened Delmon Shopping Centre

1981Acquired Haji Hassan Reinforcement Co.

1982

Opened Hani Garden housing compound

1983Partnered with Bahrain Bulk Trade

1984Opened Maitham Garden housing compound

Established Arabian Parts CompanyMoved blocks factory to Abu Zwaid (ALBA Area)

Opened Haji Hassan Tower building in Sanabis

1985Established the Arabian Chemical Industries (ISOLA)

1993Established the first polythene tank factory in the GCC

Established United Precast Concrete (UPC) in Dubai

Invested in Bahrain Rubber Co.

1996Opened the Al A’ali Shopping Complex in Seef Area

Opened Bahrain Asphalt Branch in Doha to do the sub-base and asphalt work for the Dukhan Highway project, as a subcontractor

Established Bahrain Pipes Co.

2000Establishment of UPC Oman

2002Established UPC Abu Dhabi

Established UPC Qatar

2006HSBC Partnership through an Investment in the BPC Group2007

Major upgrade of Haji Hassan Mechanical Engineering Workshop

2011Established KRAH Bahrain (joint venture)

2015Upgraded the Mobile Crane capacity to 500 ton

1960

Moved all plants to Salmabad site

1963

Secured a three-year crusher contract with Bahrain Petroleum Company (BAPCO)

1964

Upgraded crushing plant producing 150 tons/hr

1965Purchased the first asphalt plant on the Island

Established Bahrain Asphalt as the first national asphalt contractor in Bahrain

Implemented the first airport runway1965

Upgraded blocks factory production increased to 12,000 blocks per day with capabilities of producing kerbs and interlocking paving bricks

1966

First-time upgrade of the asphalt plant production increased to 115 tons/hr

1969

Second-time upgrade of the asphalt plant

1952

Small manual crushing plant near Burhama Area

1954Purchase of the first manual block machine producing one block at a time

Upgrade of crushing plant through purchase of new crushing machines- with a capacity to produce 115 tons/hr 1955

Location moved to Nuaem

1956First upgrade for the blocks factory through purchase of the first electric block machine which produced two 8 inch blocks at a time. Opened the first group office in Lulu Road

Opened a small manual tile plant for the production of floor tiles

1957Block Factory moved to Salhiya Area

Establishment of the construction department

Implemented the 1st reclamation project in Mina Salman for the Public Works DepartmentConstructed a number of projects for the Public Works Department such as small Health clinic in Tubli, Mariam Al Omran School in Muharraq and Hospitals in Hidd

1958

Purchased 2nd crusher resulting in a total capacity of 30 tons/hr

1959

Second upgrade of the blocks factory producing three 8 inch blocks at a time resulting in a capacity of 4,000 blocks per day

1950 1960 1970

TIMELINE

1952 - present

Page 8: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

A foundation towards infrastructurehistory the beginning

“لقد ضربت بالعمود حجرا فانفلقت، فخرجت منها دودة عمياء وفي فمها شيء أخضر تحمله،

فقلت في نفسي: ))ما دام اهلل يرزق الدودة في جوف هذه الصخرة،فإني وثقت باهلل وثوقا منقطع النظير((".

Page 9: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

“Haji Hassan was one of the greatest men who had a major impact in the renaissance of the country.”H.E. Ali Saleh Al SalehMinister of Commerce

The marvelous success attained by Haji Hassan Group started in 1952. Today, it

had grown with more than 13 divisions engaged in the manufacture of various

construction materials for the Kingdom’s infrastructure projects. One of the

most important achievements of the Group is founding the Asphalt Factory,

to provide street interlocking paving bricks services in the sixties in partnership

with ‘Barbar Green’ Plant. It was such a huge leap that it immediately propelled

the Group to the pinnacle of the construction industry. After prevailing against

foreign competition, the Asphalt Factory became the first of its kind Bahraini

factory founded using Bahraini capital; as such, it was named Bahrain Asphalt.

Alongside an ever-expanding scope of work, the group also entered into joint

ventures with foreign companies such as ‘Wimpy’, in undertaking projects on

the expansion of Bahrain International Airport as well as many other street

interlocking paving bricks projects that became a great part of the architectural

revolution and hastened the growth of the Kingdom.

The Group eventually established Haji Hassan Readymix and Bahrain Precast

Concrete companies after its eventual success.

These factors heavily contributed to the

projects of the Ministry of Works, among

others. Haji Hassan Group aims to induce a

commercial boom in the Kingdom by building

shopping malls such as Delmon Center and Al

A’ali Shopping Complex.

Today, Haji Hassan Group is considered a

pioneer in the Readymix concrete industry in

the Kingdom as well as a leading supplier of

blocks.

جذريا ونما 1952م العام انطالقة مع المسبوق غير حسن الحاج مجموعة نجاح بدأ بشتى البناء مواد تصنيع على عملها أساس يقوم شركة 13 من أكثر ليشمل هو المجموعة نجاحات أهم ومن التحتية. البنية مجاالت في تدخل والتي أنواعها، تأسيس مصنع لألسفلت لغرض حفر ورصف الشوارع في فترة الستينيات، وذلك عن طريق شراكة استراتيجية مع مصنع )باربر غرين(. و قد أهلت تلك الشراكة ألن يتبوأ التغلب على إياه من القطاع ممكنا مصنع األسفلت هذا مرتبة مميزة في مثل هذا المنافسة األجنبية آنذاك ليصبح أول شركة محلية ذات رأسمال بحريني أطلق عليه اسم )شركة أسفلت البحرين(. بعدها؛ اتسع نطاق العمل فتمكنت المجموعة من التعاون مع شركات أجنبية مثل )ويمبي( من أجل توسعة مطار البحرين الدولي ورصف أغلب شوارع مناطق البحرين وغيرها من المشاريع التي أحدثت نهضة عمرانية هائلة

وساهمت في عمليات التنمية.

مصنع إنشاء وأيضا المخلوطة للخرسانة مصنع إنشاء فكرة تبلورت بعدها؛ للخرسانة مسبقة الصب بعد النجاح الباهر الذي حققه مصنع األسفلت. وكان لمصنع

مشروعات في متعددة إسهامات الخرسانة ذلك؛ تال عدة. أخرى ومشاريع اإلسكان وزارة السوق في طفرة إحداث إلى المجموعة توجه التجاري من خالل االستثمار في إنشاء المجمعات التجارية كمجمع دلمون الواقع في قلب المنامة

ومجمع العالي الواقع في ضاحية السيف.

الشركات من حسن الحاج مجموعة تعد اليوم، الرائدة في إنتاج الخرسانة المخلوطة في مملكة

البحرين وأول المزودين للطابوق في المنطقة.

“كان أحد الرجال العظام الذين تركوا آثارا كبيرة في مسيرة

النهضة في البالد.”معالي السيد علي صالح الصالح،

رئيس مجلس الشورى ووزير التجارة السابق

Page 10: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

HAJI HASSAN WORKSHOP

BAHRAIN TANKS

KRAH BAHRAIN

BAHRAIN RUBBERCOMPANY

HAJI HASSAN CRANESDIVISION

ARABIAN PARTS COMPANY

BAHRAIN PIPES

BAHRAIN BLOCKS

AL A'ALISHOPPINGCOMPLEX

ARABIAN CHEMICAL INDUSTRIES

HAJI HASSAN READYMIX

BAHRAIN ASPHALT

HAJI HASSAN REINFORCEMENT

BAHRAIN PRECAST GROUP

GROUP DIVISIONS

Page 11: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

CIVIL ENGINEERING & CONTRACTING

Foun

ded

in1965

Bahrain Asphalt (BA), was established in the 1960s as the first

asphalt contractor in Bahrain. Today, it is considered a leader in the

implementation of prestigious projects in the public and private sectors.

BA operates to the highest international standards and enjoys ratification

by Bureau Veritas since 2005 for its dedication in maintaining quality

and safety in all its operations. The company is a pioneer in the fields

of production, research and development and is fully equipped with

modern laboratories and test equipments under the supervision of

qualified engineers and technicians. It is the first company in Bahrain

to produce Polymer Modified Bitumen (PMB). The company has worked

on a range of major projects like Bahrain International Airport, Bahrain

International Circuit, third crossing of Sheikh Khalifa bin Salman Bridge,

new runway and associated facilities in Sakhir Airbase, North Manama

Causeway, and many more.

في نوعها من األولى وهي 1960م عام البحرين أسفلت شركة تأسست القطاعين لكال خاص طابع ذات مرموقة مشاريع وتنفذ البحرين، مملكة تم المعتمدة. الدولية المعايير ألعلى وفقا وذلك والخاص، الحكومي التصديق على الشركة من قبل مكتب "فيريتاس” منذ عام 2005م لتفانيها في الحفاظ على أعلى معايير الجودة والسالمة في جميع عملياتها. تتميز الشركة وتوابعه، ومشتقاته األسفلت وإنتاج والتطوير البحث مجاالت في الريادة في وذلك في مختبرات مجهزة بالكامل ومعدات اختبار حديثة تدار بإشراف فنيين المعدل البوليمر مستحلب تنتج شركة أول وهي مؤهلين، ومهندسين الكبرى المشاريع الشركة على مجموعة من البحرين. وقد عملت والقار في والمميزة مثل مطار البحرين الدولي، حلبة البحرين الدولية، بناء المعبر الثالث والمرافق للطائرات جديد مدرج بناء سلمان، بن خليفة الشيخ جسر في من وغيرها المنامة شمال جسر ومشروع الصخير بقاعدة المرتبطة

المشاريع.

bahrainasphalt.com

BAHRAIN ASPHALT

Page 12: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Facts you must know

One of the biggest asphalt producers in Bahrain.

One of the largest producers of asphalt in Qatar.

4,000 Tonnes daily average asphalt production in Qatar, with maximum output of 7,000 tonnes achieved.

Construction of the largest infrastructure Project issued by the Ministry of Works, in Joint Venture with Six Construct.

One of the few local companies given the accreditation to handle the F1 race track construction.

First company to produce Polymer Modified Bitumen (PMB) in Bahrain.

Haji Hassan realized his potentials and foresaw the

overwhelming opportunities to expand his business and to reflect his philosophy leading to his success in founding the first asphalt factory in Bahrain in the 60’s.

PRODUCTS RANGEVARIOUS ASPHALT MIXES

SUB-BASE PRODUCTS

ROAD-BASE PRODUCTS

LIMESTONE AGGREGATES

EMULSION PRODUCTS

MODIFIED BITUMEN

Key Projects North Manama Causeway, Bahrain International Airport, Sakhir Airbase, Sheikh Isa Bin Salman Causeway, Sheikh Khalifa Bin Salman Causeway, Bahrain International Circuit, Dukhan Highway (Qatar), Sanad Junction, Salmabad Junction, Diplomatic area junction, and many more.

BA is one of the leading

crushing plant

in Bahrain

Leading local company which undertakes the construction of roads, airport runways, taxiways, aircraft aprons, carparks etc.

Page 13: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Bahrain Asphalt established their first stone crushing plant in 1968 in Sanabis area, before relocating to Asker in 1977. The modern facilities allow Bahrain Asphalt to produce a wide range of aggregate products which include:

General Type B fill, Type A Road-base, Modified Type A Road-base,

and a full range of single size aggregates for use in drainage

and sewer construction. As well as Limestone dust for tile grout

production.

Bahrain Asphalt's Wet Mix Plants meets the demands of contract specific material specifications as equipped with a fully automatic control panel, produce homogeneous blended aggregates with the controlled addition of sand, cement, aggregates and water to produce a range of specialized aggregates and cement bound sub-base materials, with an output up to 240 tons per hour per plant.

STONE CRUSHER PLANTS

“Civil and Asphalt works term contract within Refinery borders and Jabal (Oil Wells Locations)”(Award for best contractor in 2005 from Bapco)

WET MIX PLANTS

Page 14: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1978

Bahrain Precast Concrete (BPC) was founded in 1978. BPC holds a quality

management system Certification ISO 9001-2008 certified by DNV. The

company designs, produces and erects precast components inclusive

of pre-stressed Hollowcore slabs, cladding panels, external/internal

sandwich and solid load bearing panels, shear walls, columns, beams,

boundary walls and staircases. Finishing of the precast element can be

achieved by using pigmented concrete and colorful aggregates with either

sandblasting, retarding and acidwashing.

وهي 1978م، العام في الصب مسبقة للخرسانة البحرين شركة تأسست قبل من المصدقة ISO 9001-2008 الجودة إدارة نظام شهادة على حاصلة الجاهزة المكونات وتركيب وإنتاج بتصميم الشركة وتقوم .DNV شركة وخارجية داخلية دمج ولوائح الكسوة وألواح الجوفية األلواح من الشاملة الخرسانة االنتهاء من عنصر واألعمدة والجسور واألسوار والساللم. ويمكن مع ملونة وحصى مصطبغة خرسانة استخدام خالل من الصب مسبقة

الغسل الحامضي أو السفع الرملي.

BAHRAIN PRECAST CONCRETE

bpcgroup.biz

Page 15: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Al A’ali Shopping Mall colored façade panels with sandblasted/retarding finishes, hollowcore slabs and GRC elements.

HOLLOWCORE SLABS

COLUMNS

BEAMS

SHEARWALLS (G/C)

LOADBEARING

DECORATIVE FAÇADE ELEMENTS (G/C)

BOUNDARY WALLS (G/C)

QUAY WALLS

STAIRCASES

GARDEN / EXTERNAL

DECORATIVE ELEMENTS

PRODUCTS RANGE

Majority of the monuments in the Kingdom.First ever footbridge (near Marina Club).Majority of bus stop shelters.

THE BIG PROJECTS IN BAHRAIN GOSI Shopping Mall

colored façade panels with sandblasted finishes and hollowcore slabs.

Ritz Carlton Hotel (formerly Le Meridien Hotel)

façade panels in white color with sandblasted finishes and boundary walls.

Citi Bank HQ

colored façade panels with acidwashed finishes.

BNI HQ

colored façade panels with sandblasted finishes.

Four Seasons Hotel

colored façade elements with acidwashed, light and deep sandblasted finishes.

Accommodation

administration building, mess hall, mosque and boundary wall for National Guard HQ 2 - full precast building system.

13-storey hotel

full precast building system.

11-storey, 18-storey, 24-storey twin towers and 35-storey apartment building

structural building system.

Page 16: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Established in 2000

United Precast Concrete Oman LLC (UPC) – started business in Oman around year 2000 under Dubai License and currently UPC has a representative office in Oman.

Although UPC does not own a production facility in Oman but widely provides design manufacture, transportation and assistance with erection, executing the full range of products and projects in Oman.

Major projects are, Rameez Shopping Mall, Muscat City Centre, Staff Accommodation in addition to 150 Villas at Duqum.

OMAN

Established in 2002

The company has been in Qatar since 2002 and started production in July 2003 from a brand new factory in the developing area of Mesaieed Industrial City outside Doha.

With the expertise of highly skilled engineers, UPCQ was able to provide design solutions and precast products offering high value for money by saving both cost and time for its valued clients.

In order to accommodate the present development in Qatar with a high rising population and all the related challenges, UPCQ is among others offering fully precast systems for Labour Accommodation,Villa Compounds, Sub-stations and other building systems. These systems have been designed by UPCQ and have a significantly faster construction time compared to the traditional systems, ensuring a significantly shorter payback of the investment.

Our product ranges from... Prestressed hollowcore slabs of 150, 200, 265, 320, 400 and 500 mm, Fully Precast Building systems, Façade elements, Solid Panels (Pigmented and Grey), Boundary walls, Beams & Columns, Stair cases.

QATARDUBAI

Established in 1993

United Precast Concrete Dubai L.L.C. (UPC) – an associated company of Haji Hassan Group - Bahrain, located in Al Quoz Industrial Area in Dubai which is approximately 20 Kms away from Dubai City Centre.

UPC Dubai, a Company established in July 1993, is specialized in design, production and erection of precast concrete elements for building projects. The company has more than 25 years of experience from Bahrain.

Our range of products is based on the latest know-how, both as regards the properties of concrete design as well as product and production development.

Our product ranges from... Prestressed hollowcore slabs of 150, 200, 265, 320, 400 and 500 mm, Facade elements, Solid panels (pigmented and grey), Prestressed tt slabs from 400- 950 mm, Boundary walls, Beams and columns, Standard stair cases, Building systems.

United Precast Concrete Abu Dhabi L.L.C. (UPC) – an associated company of Haji Hassan Group - Bahrain, located in Mussafah Area in Abu Dhabi which is approximately 30 Kms. away from Abu Dhabi City. We have the privilege of being sponsored by Mr. Abdullah Saleem Al Khazma Al Katheeri, Chairman to Road Department, Abu Dhabi Municipality.

UPC Abu Dhabi, a Company established in July 2002, is specialized in design, production and erection of precast concrete elements for building projects. The company has more than 25 years of experience from Bahrain.

Our range of products is based on the latest know-how, both as agreed the properties of concrete design as well as product and production development.

Our product ranges from... Prestressed hollowcore slabs of 150, 200 and 265 mm, Facade elements, Solid panels (pigmented and grey), Prestressed tt slabs from 400 - 950 mm, Boundary walls, Beams and columns, Standard stair cases, Building systems.

Established in 2002

ABU DHABI

Page 17: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1977

Founded in 1977, Haji Hassan Readymix (HHR) is Bahrain’s pioneer supplier

of factory-produced concrete. It is the only Readymix concrete supplier

in Bahrain to have been continuously approved by the government

authorities since the introduction of their accreditation scheme.

HHR’s quality certification guarantees compliance with ISO 9000:2008,

British, European & American Standards, building a reputation for

quality and service. Wherever quality and reliability are critical, HHR is

the preferred choice. Whether it’s a super-flat surface for the Drag Strip

at Bahrain International Circuit or a heavyweight concrete for X-Ray

shielding, HHR boasts of an unequalled portfolio of projects. Other

recent examples include North Manama Causeway (145,000 m3), Bahrain

International Airport Runways & Aprons (500,000 m3), Sitra Causeway

(250,000 m3), Four Seasons Hotel (96,000 m3) and Bahrain City Centre &

Access Bridge (220,000 m3).

حيث المجال، هذا في الرائدة الجاهزة للخرسانة حسن الحاج شركة تعتبر تواصلت التي الوحيدة الخرسانة شركة وهي 1977م العام في تأسست البحرين منذ تطبيق نظام االعتماد الموافقة عليها من قبل وزارات مملكة خالل من مرموقة متميزة سمعة الشركة اكتسبت لهذا و بهم، الخاص االمتثال للمعايير البريطانية واألوروبية واألمريكية والمتعلقة بشاهدة الجودة

.ISO 9000:2008

في ذلك كان سواء المنتجات تتنوع وقد األهمية، بالغا أمران والثقة الجودة خرسانة أو الدولية البحرين حلبة في والتعقيد الملمس فائق سطح اختيار أو في مشروعات ذات طابع الوقائية، الثقيل ألغراض مباني األشعة الوزن من 145٫000 متر كعب، مشروع مدرجات خاص مثل مشروع جسر شمال المنامة مطار البحرين الدولي 500٫000 متر كعب، مشروع جسر سترة 250٫000 متر مكعب، فندق فور سيزونس 96٫000 متر مكعب، أو مجمع البحرين سيتي سنتر وجسر

الوصول 220٫000 متر مكعب.

HAJI HASSAN READYMIX

hajihassanreadymix.com

Page 18: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

1. Structural concrete grades from C2 to C80.

2. Specialist designs for

a. Heavyweight Concrete for X-Ray and nuclear shielding

b. Lightweight concrete for insulation and rehabilitation

c. Self Compacting Concrete

d. Pavement Quality concrete for roads, Airports & racing tracks

e. Underwater Concrete

f. High Durability Concrete

g. Dry Lean Mixes for road bases

h. Secant & Segmental Piling and Diaphragm Wall Concrete

i. Slipform Concrete

j. PFA & Silica Fume Concrete

k. Mortars and screeds

l. Gunite & Shotcrete Mixes

3. Precast concrete kerbs & flags

4. High quality Washed Marine Sand

5. Double Screened Aggregates

6. High durability spacers for steel reinforcement (25 mm - 75 mm)

PRODUCTS RANGE

Fontana Towers60,000 m3 of up to C55 concrete placed at 45 storey heights for three towers using hi-power static pumps and 28 meter radius placing booms.

BIC Drag Strip Specially designed Pavement Quality concrete placed by paving machine to achieve high tolerance surface flatness for drag racing.

Major Projects

Causeways - North Manama Causeway, Sheikh Hamad Causeway, Sheikh Khalif Causeway, Sitra Causeway

Flyovers - Zallaq Flyover, Hamad town flyover, Abraj Al Lulu Flyover, Seef Flyover, Budaiya Road Flyover

Hotels - Four Seasons Hotel , Ritz Carlton Hotel, Gulf Hotel, Holiday Inn

Malls - Bahrain City Centre, Seef Mall Phase I, II and III, Bahrain City Centre Interchange

Others -

- National Assembly Building

- National Theatre

- Sheikh Isa Library

- Grand Mosque

- Riffa International School

- Villamar

- US Navy Base Development

- Sh. Isa Airbase (Hanga Defences)

- Bahrain International Airport (every Runway, all emergency exits and the remote aprons)

- Bahrain International Circuit

- Durrat Al Bahrain (more than 20,000 m3 of sprayed gunite concrete just for swimming pools)

- Bahrain Bay

- Al Dur Integrated Water Production and Power Plant

- GIIC II Pelletising Plant, sea water intake and jetty

Page 19: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1996

Bahrain Pipes (BP), established in 1996, has an outstanding reputation

in the local and region market, produces the highest quality plastic

pipes and fittings using the latest technology machinery and the most

advanced materials. It gradually expanded business throughout the GCC

region, Middle East and East African countries. Bahrain Pipes products

accommodate for a wide range of applications such as drainage,

sewage, drinking water, irrigation, cable ducting…etc. These products

are produced using an extensive range of materials and are produced

in conformance to German, British, American, European and Australian

standards. In order to keep abreast of the latest technology, Bahrain

Pipes is an active member of the Plastics Pipe Institute, USA. Bahrain

Pipes is considered the pioneer in the manufacture of Polybutene-1 hot

and cold plumbing and heating systems in the Middle East. It produces

an approximate output of 16,000 tons per year, with a substantial share

of its production being exported mainly to the GCC, Middle East and

North Africa.

تأسست شركة مواسير البحرين في العام 1996م وحققت نجاحات وسمعة جميع الى لتصل تدريجيا منتجاتها وتوسعت المحلية، السوق في متميزة الخليج وبلدان الشرق األوسط وشمال أفريقيا وتعد من رواد المصنعين دول الضغط وأنابيب والري الشرب ومياه الصحي الصرف مياه وأنابيب لمواسير من واسعة مجموعة وباستخدام اآلالت أحدث مستخدمين وتوابعها، المواد المتوافقة مع اشتراطات السوق األلماني، البريطاني، األمريكي، األوروبي واالسترالي. وكخطوة تهدف لمواكبة آخر التطورات التقنية، أصبحت الشركة األمريكية. المتحدة بالواليات البالستيكية المواسير معهد في فعاال عضوا وتعتبر الشركة هي الرائدة في منطقة الشرق األوسط في مجال تصنيع أنابيب إنتاجها ويزيد حجم والباردة، الساخنة للسباكة األنابيب إيثلين ونظام البولي 16٫000 طن سنويا وبكميات متفاوتة يتم تصديرها بشكل مباشر الى دول عن

الخليج والشرق األوسط وشمال افريقيا.

BAHRAIN PIPES

bahrainpipes.com

Page 20: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

PROJECTS / AREA UAE - HDPE Pipes for Potable Water System in Abu Dhabi’s ‘Yas Marina Circuit- F1’

KSA - HDPE & UPVC Pipes to ‘King Abdulaziz Health City’ project‘

QATAR - HDPE Cable Duct pipes to ‘Kahrama – Ministry of Electricity‘

Various Pipes & fittings to ‘Qatar Int’l Airport’ project

Our Products

Our products reflect the eminence of life through the standards that we pursue in being the largest manufacturer of plastic pipes in the Middle East. We ensure to deliver quality, value and durability for our customers through focused communication.

BAHRAIN - Bahrain Int’l Airport, Bahrain Int’l Circuit, Khalifa Port Infrastructure at Hidd, Amwaj Island, Durrat Al Bahrain, Riffa Views, Reef Island, Bahrain Financial Harbor, Sheikh Khalifa Bridge, T.S.E Transmission Line & Farm Connections, Alba Expansion 5, Bahrain Bay, Dilmunia, Ministry of Housing Projects and many more.

PRODUCTS RANGE

Bahrain pipes factory has a passion for continuous development, and accurable research as an integral part of its operation.

Facts The only manufacturers in Bahrain who has the certifications of NSF, SKZ Germany, SASO, WRAS.

The only and first manufacturers of PolyButelene-1 pipes in the Middle East.

The One and only factory in Bahrain which has the most variety of product range.

UPVC DRAIN, WASTE & VENTILATION PIPES & FITTINGS

UPVC UNDERGROUND SEWERAGE PIPES & FITTINGS

UPVC TELEPHONE & ELECTRICAL DUCT & CONDUITS

UPVC & HDPE PRESSURE PIPES & FITTINGS FOR POTABLE WATER & IRRIGATION

LDPE & MDPE PIPES FOR POTABEL WATER & IRRIGATION

CPVC & PB-1 PIPES & FITTINGS FOR HOT & COLD WATER APPLICATION

Page 21: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1981

In line with the pioneering vision of its founding father, the late Haji

Hassan Al A’ali, Bahrain Blocks (BB) was founded in 1981 as the first blocks

factory in Bahrain. Haji Hassan started manufacturing the first wave of

concrete blocks in the Kingdom of Bahrain since 1950s. BB manufactures

and supplies all types of masonry concrete blocks and interlocking paving

bricks that adhere to national and international standards, such as the

Hollow Single Wall of 20cm and 19cm concrete block, Solid Single Wall

of 20cm and 19cm concrete block, and the Insulated Thermo Double

Wall block with 17 mm polystyrene inserts. Bahrain Blocks has achieved

a daily production capacity of 25,000, meeting the dramatic increase in

demand for concrete blocks that prompted Bahrain Blocks to purchase

new machineries throughout its lifespan with a major expansion of its

factory in 1985.

المؤسس رؤية مع تماشيا 1981م عام في البحرين طابوق شركة تأسست الراحل الحاج حسن ولتكون مكمال إلحدى اعماله التي امتهنها منذ خمسينيات القرن الماضي، وكان أول مصنع للطابوق في البحرين يعمل على تصنيع جميع الى البناء باإلضافة منتجات طابوق الكتل الخرسانية المستخدمة في أعمال وتنتج والدولية، الوطنية بالمعايير ملتزمة المتشابك، الرصف طوب إنتاج الشركة أيضا منتوجات مثل طابوق أحادي الخرسانة بجدار أجوف ذا سمك 20 و 19 سم، وحوائط أحادية صلبة ذات سمك 20 و 19 سم، وكتل خرسانية بجدار مزدوج عازل للحرارة "بوليسترين مدرج" بسمك 17 ملم. تمكنت الشركة من تحصيل طاقة إنتاجية يومية قدرها 25٫000 قطعة مما دفع للزيادة الهائلة في الطلب على كتل الطابوق الخرسانية وبالتدريج تحديث معدات وآالت الشركة

لغرض التوسعة الدائمة.

BAHRAIN BLOCKS

bahrainblocks.com

Page 22: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

THE PRODUCT To further boost its production capacity and enhance its quality standards to meet the demands in the Kingdom, Bahrain Blocks installed a fully automated block and interlocking paving bricks manufacturing machinery in 1995 with a capacity to produce 45,000 concrete blocks and 3,500 m2 interlocking paving bricks per day.

Bahrain Blocks is currently producing all type of masonry concrete block as well as four colors (Grey, Red, Charcoal and Yellow) of Interlock & Unilock paving bricks. It continues to be devoted in meeting customers’ expectations with competitive pricing, timely delivery & continual improvement.

Major Fact

One of the biggest Hollow Block producers in Bahrain having capacity of 45,000 concrete blocks and 3,500 m2 of interlocking paving bricks per day.

Highlight: “Bahrain City Centre has consumed 1,181,600 blocks, making it the second largest single order for the company. Our blocks have also been certified by the Ministry of Works for its quality.“

The first Hollow Blocks

producer in Bahrain since

1950

Certifications Ministry of Works- Insulation Block Certificate, MCR 1093/2015, Material Engineering Directorate- Ministry of Housing - Compliance Certificate, Block Fire Rated Certificate from m/s Al Hoty Analytical Services.

Expansion A New Plant with latest technology having maximum capacity of about 70,000 concrete blocks and 4,500 m2 of interlocking paving bricks per day.

PRODUCTS RANGE

MAJOR PROJECTS

- BAHRAIN INTERNATIONAL CIRCUIT

- CITY CENTRE

- CITI BANK BAHRAIN

- AL A’ALI SHOPPING COMPLEX

- DURRAT AL BAHRAIN

- BAHRAIN INTERNATIONAL

AIRPORT

- ZAMIL TOWER

- SEEF MALL

Masonry Hollow Blocks

Insulation Blocks

Solid Blocks

U Blocks

Rectangular Pavers

Uni lock Pavers

Square Pavers

Page 23: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1981

Haji Hassan Reinforcements (HHRF), founded in 1981, is the major

supplier of cut and bend reinforcements and welded mesh products in

the Kingdom of Bahrain. The company is equipped with the latest and

the most sophisticated modern technology machineries for automatic

bending, which are all imported from USA, Germany and UK. We are

capable of manufacturing an entire line of reinforcement steel products

according to BS and ASTM standards.

HHRF is equipped with the latest machinery to produce high quality

products as per BS and ASTM specifications. One of the most important

operations in the construction of reinforced concrete products involve

cutting and bending of rebar into the correct shapes and sizes as specified

in structural drawings. New modern machinery of advanced technology

for cutting and bending of steel, high capacity and automation result in

shorter delivery times and higher accuracy in dimensions. Highly qualified

and experienced engineers prepare bar bending schedules and shop

drawings as per BS 8666 and BS 4466 using ARMOUR SOFTWARE.

مورد كأكبر 1981م العام في المسلح للحديد حسن الحاج شركة تأسست أحدث باستخدام الشركة وتقوم التسليح، لحديد والثني للقطع رئيسي والمستوردة التلقائي االنحناء حيث من تطورا اآلالت وأكثر التكنولوجيا كامل خط تصنيع ويمكنها كما المتحدة. والمملكة وألمانيا أمريكا من BS البريطانية المواصفات هيئة لمعايير وفقا التسليح حديد منتجات من

.ASTM والجمعية األمريكية الختبار المواد

و لدى الشركة شبكة سلكية ملحومة مجهزة بأحدث التقنيات إلنتاج منتجات المتقدمة التكنولوجيا باستخدام الحديثة اآلالت عن فضال عالية، جودة ذات لتقطيع وثني الصلب، وبقدرتها العالية ونتائج التشغيل اآللي في موعد تسليم أقصر ودقة عالية في األبعاد. كما تتميز الشركة بوجود مهندسين مؤهلين ذوي خبرة عالية يجهزون شريط جداول االنحناء والمخططات التنفيذية وفقا الواقعية المعدنية الصفائح درع تقنية باستخدام BS 4466 و BS 8666 لـ

.(ARMOUR SOFTWARE)

HAJI HASSAN REINFORCEMENTS

hhreinforcement.com

Page 24: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

PRODUCTS RANGEEstimating and detailing of rebar

Cutting and bending of rebar

Steel stock bar trading

Welded wire mesh products

All kinds of rebar fixing and installation at site

Epoxy coated rebar

Highlights Supplying high tensile reinforcement bars of 12 meters long of all sizes ranging from 8 mm - 40 mm, CARES approved to the specs. BS4449/ASTM A615 GR60.

Supply of welded

wire mesh products to

BS4443

HHRFFACTS

Have been associated with many prestigious projects and structures such as North Manama Causeway, US base project, Shopping malls, High rise towers and so on.

Sophisticated and advanced fabricating facilities, latest software technology in rebar detailing and delivery resources to undertake the most challenging projects.

Holds Ministry of Works and Ministry of Housing certification.

Biggest stock of high yield reinforcing bars.

Recognized as one of the leading reinforcement steel cut and bend producers in the island.

To supply BS4449/ ASTM A615 GR60 steel rebar, sourced from Qatar, UAE, Turkey, Unirol Bahrain, rebar detailing and designing services, rebar cut and bend services supported by professional steel fixing teams to achieve an average of 2000 tons/month.

THE BIG PROJECTS- North Manama Causeway

- US base projects-multi storey buildings

- Alba Pot line expansion 5

- Bahrain International Exhibition Center

- GOSI shopping complex

- Urea project-GPIC

- Hidd Power Station

- Salmaniya Medical Complex

- Ministry of Housing Projects

- National Bank of Bahrain

- Zamil tower

- Sheraton residence

- Shaikh Khalifa Bin Salman Causeway

Page 25: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1985

Arabian Chemical Industries (ACI), the construction chemical

manufacturing division of Haji Hassan Group was established in 1985

and provides products to the construction industry from groundbreaking

to finishing.

ACI manufactures a broad range of products under the brand name

‘ISOLA’ for well-defined market segments. It has proven to be extremely

popular, and holds major market shares in a large and growing segment

of the construction industry in Bahrain as well as other GCC states. Its

technology was acquired from leading and world renowned German

and American companies. Through the years, it has grown into a solid

and stable company, and has consistently delivered customer satisfaction

in compliance with ASTM, DIN, BS and ISO 9001:2008 standards. A

specialized and experienced staff enables us to keep the ISOLA range

relevant and up-to-date.

وتوفر 1985م، عام في الكيماويات لصناعة العربية الشركة تأسست مجموعة واسعة من المنتجات تحت العالمة التجارية "آيزوال" والتي تعتبر األبرز

بين مثيالتها.

الصناعي القطاع ومواد الكيماوية المواد صناعة مجال في رائدة الشركة األساس، حجر في المستخدمة المواد من بدء والتشييد البناء قطاع ومواد التجارية العالمة أثبتت وقد الصيانة، الى وصوال النهائية التشطيبات وحتى "آيزوال" جودتها وشعبيتها من خالل االستحواذ على الشريحة األكبر من أسواق البحرين ودول الخليج العربي، وذلك بفضل استخدام تقنيات متطورة وحديثة أثبتت فاعليتها على مدى والتي ألمانية وأمريكية، مبتكرة من قبل شركات المتبعة الدولية المعايير االعتبار بعين آخذين العمالء رضا وحققت الوقت ألنظمة ال ASTM، DIN، BS و ISO 9001:2008. وتتمتع الشركة بوجود طاقم ذي خبرة واسعة استطاع على مر الزمن المحافظة على اسم العالمة التجارية

"آيزوال" ووضعها في الصدارة.

ARABIAN CHEMICAL INDUSTRIES

arabianchemical.com

Page 26: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

CERTIFICATIONSThe Management system of Arabian Chemical Industries is certified by SGS system as per the requirements of ISO 9001:2008.

All ISOLA brand products meet the requirements of international standards such as ASTM, DIN, BS and ISO 9001:2008.

Honors & AwardsACI management won the 1st place - Gold Medal and Trophy (Men’s Sprint) of the Second, Third and Fourth Charity Chariot Chase organized by Rotary Club of Salmaniya, held at Awali in 1994, 1995 and 1996.

The Management System of Arabian Chemical Industries - ISOLA has been assessed and certified as meeting the requirements of ISO 9001: 2000 in December 2003 and ISO 9001:2008 in July, 2010. It was also awarded Best Division Memento from Haji Hassan Group, for outstanding performance in 2006.

First company to manufacture construction chemicals in

Bahrain

Major Products

Concrete and Mortar Admixtures Water reducing, plasticizing retarding admixtures, air entraining admixtures, plasticizer and workability enhancer, integral waterproofing liquid admixtures, foaming agents etc.

Surface Treatments Curing, sealing compound, concrete surface retarder, synthetic/water based concrete form release agents, universal mold oil, penetrating silicone sealer/water repeller, polyurethane shutter paint, cementitious wall putty, release agent etc.

Grouts Expansive grout additive, non-shrink, non-metallic grout, high strength, free flowing grout, thixotropic anchoring grout, low exotherm epoxy grout, water cleanable and sanded epoxy tile grout etc.

Concrete Repair High build patching mortar, polymer-modified repair mortar, non-shrink micro concrete, acrylic modified fairing coat mortar, high build epoxy repair mortar, LV/MV/Gel epoxy system, Epoxy putty, Epoxy resin crack injection system, corrosion protection primer, structural micro concrete, Zinc-rich epoxy primer etc.

Flooring Emery based concrete floor hardener, self levelling cementitious compound, heavy duty epoxy floor topping, heavy duty self levelling epoxy floor topping, quartz based concrete floor hardener, polyurethane coating, colored acrylic sealer, chemical abrasion resistant epoxy coating, moisture-intensitive epoxy coating, traffic deck coating system, chemical hardener and dust proofer.

Waterproofing/Dampproofing Liquid applied polyurethane waterproofing, trowel applied waterproof membrane, flexible cementitious waterproofing, bituminous protective paint, waterproofing mastic, fibre-reinforced bituminous paint, rubberized asphalt emulsion, acrylic based waterproofing membrane, asphalt primer.

Sealants Polyurethane/ Tar urethane/ Epoxy urethane joint sealants, Epoxy loop detector and lighting sealant etc.

Bonding agent/adhesives Acrylic/SBR Bonding admixtures, Mortar admixture, Epoxy bonding resin agent, Ceramic/Epoxy/Waterproof/Marble Tile adhesives and grouts. Wood adhesive, Road marker adhesive etc.

Page 27: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

HajiHassanWorkshop

∫ (π x r

2 )

Foun

ded

in1979

Haji Hassan Workshop (HHW) was established in 1979 as a mechanical

fabrication company capable of manufacturing a wide range of custom

built process equipment required by operations including oil and gas,

refineries, petrochemical, fertilizer, power and water and desalination

plants. HHW is committed to provide a variety of quality products and

services to its customers, shell and tube heat exchangers, pressure vessels

and storage tanks in different metallurgies and shell thicknesses, custom-

built process equipment like scrubbers, silencers, cyclones, exhaust

stacks, heavy steel structures and material handling systems as well as

heavy machining services and major plant equipment such as pumps and

valves, within the Kingdom of Bahrain and in GCC.

قادرة تصنيع كشركة 1979م عام للهندسة حسن الحاج ورشة تأسست على إنتاج مجموعة واسعة من المعدات المبنية خصيصا ألعمال النفط والغاز التحلية ومحطات والمياه والطاقة واألسمدة والبتروكيماويات والمصافي الجودة المنتجات عالية بتوفير مجموعة واسعة من الورشة تلتزم وغيرها. وصهاريج ضغط أوعية حرارية، مبادالت أنابيب مثل: لعمالئها، والخدمات تخزين مختلفة السمك، معدات عملية مبنية خصيصا مثل: أجهزة الغسيل، كواتم الصوت، إعصارات، عادم المداخن، هياكل الصلب الثقيلة وأنظمة تداول للمصانع الرئيسية للمعدات الثقيلة اآلالت تصنيع لخدمات باإلضافة المواد، ودول البحرين مملكة أسواق الورشة وتغطي والصمامات المضخات مثل

مجلس التعاون الخليجي.

HAJI HASSAN WORKSHOP

hhe.bh

Page 28: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in2011

KRAH Bahrain was founded in June 2011, it produces HDPE Storm

Water and Sewerage Systems for both gravity and pressure applications.

The company utilizes “Flexible” pipeline technology from KRAH AG in

Germany and manufactures pipes, fittings, manholes, above/below

ground tanks and outfall/ intake lines in sizes ranging from 300 -

4,000 mm in multiple stiffness and pressure classes. These products are

commonly used by Government Authorities.

أنظمة بإنتاج وتقوم 2011م. يونيو في (KRAH) بحرين كراه شركة تأسست أنابيب مياه األمطار وشبكات الصرف الصحي متعددة اإليثيلين عالية الكثافة للجاذبية وأنظمة الضغط. تعمل الشركة على استخدام تقنية خطوط أنابيب أنابيب وتركيب بتصنيع وتقوم ألمانيا في األم الشركة مع بالتعاون مرنة وفتحات أعلى و أسفل الخزانات األرضية وخطوط المخارج و المداخل بأحجام 4٫000 ملم بصالبة وضغط متعددين. وعادة مختلفة تتراوح من 300 ملم وحتى

تقوم الجهات الحكومية باستخدام هذا النوع من المنتجات.

KRAH BAHRAIN

krahbahrain.com

Page 29: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Krah Bahrain worked with the Main Contractor on the Ocean Outfall section of the project. It supplied the pipe requirements for the outfall line, which consists of 1,500mts of 1,600 mm ID solid wall HDPE pipe and a “Diffuser” system designed for the dispersal of the outflow from the Sewer Treatment Plant.

Krah Bahrain supplied the requirements for the sanitary sewer and drainage network of the Four Seasons Hotel located at Bahrain Bay. The project was originally designed to cater for reinforced concrete manholes and chambers. Krah supplied hundreds of units, in addition to installing the HDPE system.

Muharraq Sewer Treatment Plant“Ocean Outfall line”

Four Seasons Hotel Bahrain Bay

Page 30: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Tanks start from 200 liters to

8,000 liters

Foun

ded

in

Bahrain Tanks (BT) was founded in 1993. The company manufactures,

with high commitment to the ISO 9001 standard, polyethylene water

tanks, floats, buoys and the related accessories as well as products of road

barriers and 200 to 8,000 liter water tanks using the latest technology

in Rotational Molding. The products’ range is certified by the Ministry of

Housing.

على الشركة وتعمل 1993م عام في البحرين خزانات شركة تأسست وذلك لتر، 8٫000 وحتى لتر 200 من المياه خزانات وتصنيع الطريق حواجز توفير باستخدام أحدث تقنيات القولبة بالحقن والنفخ والذي يعكس التزامها بجودة وزارة قبل من معتمدة منتجاتها جميع أن على عالوة اآليزو، شهادة معايير

اإلسكان لمملكة البحرين.

BAHRAIN TANKS

1993

bahraintanks.com

Page 31: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1993

Bahrain Rubber Company (BRC), established in 1993 with a mission to

serve the regional oil, gas, and steel construction sectors. BRC is the first

rubber factory in the Kingdom that holds one of the leading continuous

Vulcanizing production lines in the GCC region. BRC is engaged in

the manufacture of industrial rubber and polyurethane products. BRC

is an ISO 9001:2008 compliant company adheres to the international

standards; BS, DIN & ASTM. It’s an approved vendor with the Ministry

of Works, Electricity and Water Authority, Alba, GPIC, GIIC GARMCO

& HPC, in addition to major oil companies like Saudi ARAMCO, SABIC,

BAPCO & Shlumberger.

BRC was honored with the prestigious Prime Minister’s Award for

Excellence in 1998, for its specialization in the supply of rubber products

to a host of manufacturing and industrial businesses throughout the

Middle East.

تأسست شركة البحرين للمطاط (BRC) عام 1993م كأول مصنع للمطاط في التي الخليج المطاط في دول البحرين، وتعد واحدة من أكبر شركات مملكة تقوم بتصليب المطاط بالكبريت )عملية الفلكنة(. تعمل الشركة على صناعة النفط قطاعات خدمة أجل من بوريثين البولي ومنتجات الصناعي المطاط للمطاط البحرين شركة تلتزم المنطقة. في الصلب البناء وصناعة والغاز .ISO 9001:2008 شهادة مع بتوافقها ASTMو BS ،DIN الدولية بالمعايير حيث تعتبر موردا معتمدا لوزارة األشغال، هيئة الماء والكهرباء، ألبا، جيبيك، جارمكو و شركة الحد للطاقة. باإلضافة إلى شركات النفط الكبرى مثل أرامكو

السعودية، وسابك، وشركة بابكو وشالمبرجر.

حصلت شركة البحرين للمطاط على جائزة سمو رئيس الوزراء للتميز لعام الشركات من لمجموعة المطاط منتجات توريد مجال في لخبرتها 1998م

الصناعية، والصناعات التحويلية في جميع أنحاء الشرق األوسط.

PM Award of Excellence

1998

BAHRAIN RUBBER COMPANY

bahrainrubber.com

BAHRAIN RUBBER COMPANY W.L.L.E n g i n e e r i n g R u b b e r s f o r t h e F u t u r e . . . .

Page 32: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1983

Arabian Parts Company (APC) is a leading provider of automotive

products and spare parts in the Kingdom of Bahrain, founded in 1983.

Our business activities include import and distribution of original and

OEM quality automotive spares, oils and lubes, tires and batteries for

both light and heavy vehicles.

APC offers a wide range of internationally recognized brands and

products. Our products come from prominent manufacturers around the

world including Germany, Italy, Japan, Korea, India, Turkey and East Asia.

Our customers include fleet owners, spare part shops, garages, retailers,

and other business entities.

تأسست شركة الغيار العربية عام 1983م وتعتبر من أهم مزودي قطع غيار على التجارية أنشطتها وتشمل البحرين. مملكة في وملحقاتها السيارات التشحيم ومواد زيوت من وملحقاتها السيارات غيار قطع وتوزيع استيراد

واألنابيب واإلطارات والبطاريات للسيارات الخفيفة والثقيلة.

من السوق احتياجات من واسعا مدى العربية الغيار شركة خدمات تغطي المنتجات المعتمدة عالميا، حيث تستورد الشركة قطع الغيار من بلدان عدة مثل ألمانيا واليابان وكوريا وإيطاليا والهند وتركيا وشرق آسيا. وتقدم الشركة النقل وشركات والمصانع، المقاوالت شركات أصحاب لعمالئها خدماتها

ومحالت قطع الغيار وورش الصيانة وتجار التجزئة وغيرهم.

ARABIAN PARTS COMPANY

arabianparts.com

Page 33: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1975

Haji Hassan Cranes (HHC) was founded in 1975. The company provides

rental services for cranes of all types and sizes. HHC continues to invest

in the provision of cranes equipped with the latest technology to meet

customer needs. It rents out mobile telescopic cranes with capacity

ranging from 30 to 500 tons on daily, weekly and monthly basis. All

cranes are certified by Lloyd’s Register, and all crane operators are

certified by the Traffic Directorate and Bureau Veritas.

The Company caters to projects in construction, refinery, petrochemicals,

ship repair and APM Port throughout the GCC.

الشركة وتقوم 1975م عام في للرافعات حسن الحاج شركة تأسست بتوفير خدمات تأجير الرافعات بمختلف أنواعها وأحجامها، وتواصل استثمارها حيث العمالء. وحاجات لتتوافق التقنيات بأحدث مزودة رافعات بتقديم بشكل طن 500 وحتى طن 50 من تبدأ متنقلة رافعات بتأجير الشركة تقوم قبل من ومصدقة عليها مؤمن الرافعات جميع وشهري. أسبوعي يومي، شركة لويدز لضمان الجودة، وجميع مشغلي الرافعات معتمدين من شركة المصافي، شركات منها عدة لشركات رافعات الشركة وتؤجر فيريتاس. الرافعات تأجير خدمات أن كما والموانئ، السفن إصالح البتروكيماويات،

متوزعة في معظم دول مجلس التعاون.

Mobile telescopic cranes

30 to 500 tons

HAJI HASSAN CRANES

hhcranes.com

Page 34: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

THE BIG PROJECTS Durrat Al Bahrain Haji Hassan Cranes Division participated in lifting life heavy boats and heavy concrete davits weighing around 120 Tons to 150 Tons, on the starboard side of Durrat Al Bahrain – Jewel of the Gulf, one of the biggest projects in Bahrain, comprising of auspicious villas and commercial complexes on and around the sea.

Bapco Haji Hassan Cranes Division had been awarded for the installation and heavy lifting of many fuel tanks inside BAPCO, the largest fuel stations in MENA region, by one of the most powerful cranes in our fleet.

Bahrain Financial HarborHaji Hassan Cranes Division has participated in the erection of the heaviest footbridge across the link towers. The bridge, with a weight of over 300 Tons and a length of around 45 meters was placed and then moved onto their respective towers. Bahrain Financial Harbor, a world class financial city, situated in the heart of Bahrain, Manama, prime reclaimed waterfront land, hub of all monetary activities.

Bahrain bay Haji Hassan Cranes actively took part in installation of steel at Bahrain Bay, one of the major projects in the Kingdom of Bahrain, consisting of financial malls and major investment districts closed to the sea site.

Alba Haji Hassan Cranes Division successfully completed the heavy lifting works of Pot line 6, for the major maintenance turnaround of ALBA refinery. Powerful dead lifter for the largest Aluminum refinery and smelters in

the world (ALBA) producing 890,000 metric tons per annum.

Batelco Haji Hassan Cranes Division rewarded in heavy lifting contract for the biggest telecom giant in Bahrain - BATELCO which is a semi government

owned firm, and the largest in the MENA region.

The contractual scope consists of transport and lifting of generators and chillers. Unloading, transport, lifting and installation of heavy equipment.

Bahrain International Circuit Haji Hassan Cranes Division played a vital role in the heavy lifting project of Bahrain International Circuit, including lifting the heavy stands of 150 Tons and raw materials. BIC race track is located in Sakhir, Kingdom of Bahrain where the Grand Prix held over.

Amwaj Island Marking another landmark, Haji Hassan Cranes Division took contract - lifted heaviest generators and chillers and were installed on their foundations with our in-house developed system lift from Group’s toughest cranes. Amwaj Island - a waterside development squaring 30 million sq./ft. of Kingdom of Bahrain.

CORESERVICES

MarinePortHeavy industry and manufacturingDaily hire and long term hireInfrastructural ProjectsRigging & Equipment

Gulf Petrochemical IndustriesHaji Hassan Cranes Division was the first company which used fleet of mobile cranes for the heavy lifts of plant erection and shutdown and site moves for GPI. Gulf petrochemical industries, a world class petrochemical and fertilizing company produces million tons each year. This project marked the excellence of Haji Hassan Cranes Division.

We cover Bahrain market as well as Qatar and Dubai. We rent the latest and most technologically advanced cranes from Terex and Liebherr.

Page 35: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1995

As one of the premium shopping centers in the Kingdom of Bahrain,

Al A’ali Shopping Complex, was established as a high-end shopping

destination and was designed to present a modern yet traditional Arabic-

influenced architecture style. Work began in 1995 and was completed

in October 1996 in one of Bahrain’s prime districts, Seef. The Complex is

spread over 52,000 square meters, comprising 3 levels with 5 entrances,

a wide variety of shops and restaurants in addition to parking spaces

for 600 cars. The Complex epitomizes its unique architectural design

gracefully combining contemporary architecture and traditional Arabic

elements and styles while the “new extension” showcases the more

contemporary aspect of the Complex integrating the modern with the

traditional. It’s conveniently located in the center of the city in close

proximity to the airport and the Saudi Causeway.

البحرين. مملكة في المتميزة التسوق مراكز أهم أحد العالي مجمع يعد أكتوبر 1996م، االنتهاء منه في العام 1995م وتم المجمع في العمل في بدأ

العمرانية البنية لتبرز صممت راقية تسوق كوجهة إنشاؤه تم حيث وجهة تقع العصر. بحداثة الممزوج األصيل العربي التراث من نبعت التي طوابق 3 ويضم مربع، متر 52٫000 بـ تقدر مساحة على هذه الراقية التسوق الموضة محالت من واسعة تشكيلة إلى باإلضافة رئيسية، مداخل 5 و استيعاب بمقدورها التي السيارات ومواقف والمطاعم، والتجارية العالمية بين الفريد المعماري بتصميمه الراقي المكان هذا يجمع سيارة. 600 حوالي التوسعة تعرض حين في التقليدية، العربية والعناصر المعاصرة العمارة وما والتقاليد. الحداثة بين يجمع معاصرة أكثر جانبا للمجمع الجديدة السيف، ضاحية في يقع حيث المدينة وسط موقعه العالي مجمع يميز

على مقربة من مطار البحرين الدولي وجسر المملكة العربية السعودية.

AL A'ALI SHOPPING COMPLEX

alaalicomplex.com

Page 36: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

High-end Shopping destination Al A'ali Shopping Complex blazed the trail for other shopping malls by being the first to establish itself in the Seef District which was predominantly sea at the time. It gradually established itself as a high-end shopping destination with a unique mix of tenants.

The first shopping Mall in the Seef

Area.

The 52,000 square meter complex

took 18 months from start to

opening.

The Complex was inaugurated by

the Prime Minister, H.R.H. Prince

Khalifa bin Salman Al Khalifa.

It’s the first shopping center

in Bahrain comprising entirely of

precast walls.

The AAC has parking space for

approx. 600 cars

AL A'ALI COMPLEX

FACTS

The first shopping center in

Bahrain using integrated building

management systems.

The first shopping center in

Bahrain utilizing specific electricity

meters for each store.

The first shopping center in

Bahrain to have a restaurant

walkway.

CERTIFICATIONSMECSC - member of the Middle East Council of Shopping Centers

Operations - British Council of Shopping Centers most variety of product range

Page 37: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Foun

ded

in1960

A beautiful and comfortable home is more than a basic need. It has

become a statement of one’s lifestyle and social status. Today there is a

great demand for high quality living spaces as Bahrain’s living conditions

improve on the wings of its fast growing economy. Haji Hassan Property

Division (HHP) is committed to meet this demand with unique and quality

homes.

The establishment of the Property Division back in 1960 had shown

how Haji Hassan Group envisaged the current demand in the real estate

sector in Bahrain. With over half-century of experience, HHP, as one of

the prime real estate development companies with hundreds of units

in the Kingdom of Bahrain, offers a wide range of choice from studio

apartments to luxurious 5 bedroom homes to different tastes and needs.

HH Properties has the professional expertise to manage projects from

start to finish including appointment of architects/contractors, project

execution/monitoring and performing maintenance services.

أصبح فقد اليوم. أساسية حاجة من أكثر هو ومريح جميل منزل امتالك على يتزايد الطلب نجد واليوم، االجتماعية. ومكانته الشخص حياة أساس مساحات المعيشة عالية الجودة في البحرين بتطور وتحسن أجنحة االقتصاد المتنامي. قسم ممتلكات الحاج حسن يلتزم بتلبية هذا المطلب مع توفير

مساكن ذات جودة وتميز.

على الطلب نمو مع )1960م( الستينيات فترة خالل الممتلكات قسم أنشئ شيد إذ العقارات مجال في رئيسيا دورا القسم ويلعب السكنية، المساحات فرع يعتبر المملكة. أنحاء مختلف في فاخرة وتجارية سكنية مجمعات مملكة في العقاري التطوير فروع أهم من واحدا حسن الحاج ممتلكات الفرع مجموعة واسعة النصف قرن. يقدم هذا التي تزيد على البحرين بخبرته من الخيارات العقارية المتنوعة بين شقق األستوديو ومنازل ذات 5 غرف نوم

فاخرة لترضى مختلف األذواق واالحتياجات.

من المشاريع إلدارة المهنية بالخبرة للممتلكات حسن الحاج فرع يمتاز مرحلة اإلنشاءوحتى التشطيب بما في ذلك تعيين المهندسين المعماريين

والمقاولين، وتنفيذ ومراقبة المشاريع، إضافة إلى القيام بخدمات الصيانة.

HAJI HASSAN PROPERTIES

hajihassan.com

Page 38: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

A PRIDE TO SHARE Our tradition of expert planning and always putting the consumer first has contributed a great deal to the success. Having evolved from its modest beginnings into a diversified real estate provider in the Kingdom, HH Properties has gained the confidence of all its tenants. HHG is very proud to share the fact that many of the residents have made HH Properties their home for over 25 years.

Facilities

Swimming pool, Tennis court/Squash court, Gymnasium, Children play ground, 24 Hours security service, Car Park, Barbeque Stations...

Having the privilege of being privately owned and managed, HH Properties’ professional team is able to attend to each tenant personally and adhere to their personal request immediately.

Prime real estate over 300 units

lIST OFPROPERTy

FLATSWest Al-EkerAL- FATEHAL-SHABAAL-QADESIYA

JuffairJUFFAIRABINGDON CHELTENHAM

ManamaNAIM BUILDING

VILLASA’ali JALAL GARDENMAITHAM GARDEN

JerdabFAISAL GARDEN BudaiyaHANI GARDEN SaarKHALIL GARDEN

Manama HAJI HASSAN TOWER

Page 39: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Reaching beyond the limitthe projects

Page 40: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Rizzani De Eccher و Six construct نفذت مجموعة الحاج حسن بالتعاون مع شركة بناء مشروع جسر شمال المنامة، والذي يتضمن تطوير شارع الملك فيصل وتقاطع

الفاتح إلى مستويين بتقاطع منفصل ببناء جسر علوي.

شمل العمل بناء جسر مزدوج بطول 1٫42 كم لكل عارض من الجسر، و8 امتدادات الطريق المسبق الصب، و2٫42 كيلومتر من الخرساني الجسر بطول 237 متر من المكون من ثالثة إلى أربعة مسارات وإعادة بناء 1٫6 كيلومتر من الطرق الحالية على

طول شارع الفاتح والتقاطعات مع شارع الملك فيصل.

ويعتبر المشروع أحد أكبر مشاريع البنية التحتية في البحرين، إذ يوفر مدخال مباشرا لخليج البحرين ومرفأ البحرين المالي.

HHG worked in joint venture with Six Construct and Rizzani De Eccher on the

construction of North Manama Causeway project, which included the upgrade

of King Faisal Highway / Al Fateh Junction into a 2-level grade separated

junction spanning 1.6 km, and constructed with an elevated flyover.

The work included the construction of a twin glued segmental viaduct,

measuring 1.42km each with single cell box girders, 8 span 237m long pre-

stressed concrete viaduct, 2.42 km three to four lane dual carriageway. It also

included the reconstruction of a 1.6km road along Al Fateh Highway and its

intersections with King Faisal Highway.

It is the highest valued Ministry of Works funded contracts to date, providing

access to Bahrain Bay and Bahrain Financial Harbor Harbor and link to the

proposed Northern Ring Road.

North Manama Causeway Sheikh Isa bin Salman Causeway

أعمال بنجاح Six Construct شركة مع بالتعاون حسن الحاج مجموعة نفذت مشروع جسر الشيخ خليفة بن سلمان قبل ثالثة أشهر من الموعد المحدد. حيث سريع طريق من والمكون كم 46 البالغ الطريق تصميم على المجموعة عملت ثالثيا مزدوجا 41 مترا مسارا البالغ الجسر المسارات. ويستوعب عرض مزدوج ثالثي وممرين للخدمة، وقد تم االنتهاء من أعمال الجسر في أواخر العام 2004م. ويعتبر إذ البحرين في االستراتيجية السريعة الطرق أحد سلمان بن خليفة الشيخ جسر الجديد بالميناء عيسى بن سلمان الشيخ جسر خالل من فهد الملك جسر يربط ونمو تطوير في كبير وبشكل الجسر ويساهم كما بالحد. الصناعية والمنطقة يربط جسر كثالث والخارجية الداخلية التجارة حركة وتسهيل البحريني، االقتصاد

المنامة مع جزيرة المحرق.

Haji Hassan Group, in a joint venture with Six Construct, successfully completed

work on the Sheikh Khalifa bin Salman Bridge three months ahead of schedule.

The roadwork element comprises of a 6.4 km dual three-lane highway and

service road. The bridge width was set at 41 meters to accommodate a dual

three-lane carriageway and two service corridors and was completed in late

2004. Sheikh Khalifa bin Salman Bridge is considered one of Bahrain’s strategic

highway links connecting the King Fahad Causeway through Sheikh Isa bin

Salman Highway to the new port and industrial area situated in Hidd. In

addition, it contributes significantly to the development and growth of the

Bahraini economy and facilitates the movement of internal and external trade

as the third bridge linking Manama with Muharraq Island.

250,000 m3 high grade concrete supplied for Sitra Causeway

ساهمت شركة الحاج حسن للخرسانة الجاهزة بحوالي 250٫000 متر مكعب من الجودة باستخدام منتجات تجميعية خاصة حيث يعتبر جسر الخرسانة عالية سترة أحد أهم المشاريع الحساسة التي تبنتها وزارة األشغال بمملكة البحرين البالد وتم تصميم هذا لتنمية الالزمة التحتية البنية باعتباره جزءا مهما من

المشروع بهياكل وبنى قوية تدوم حتى 100 عام.

Archirodon أركيرودون بالتعاون مع شركة البحرين أسفلت شركة ساهمت في تنفيذ جسر الشيخ عيسى بن سلمان كمشروع استراتيجي في البحرين. فاستطاع فريق العمل بناء ثالث مسارات بحرية مزدوجة بطول 260 متر وبناء 11 كم من الطريق السريع. يربط الجسر شمال جزيرة المحرق بالمنطقة الدبلوماسية في الجزء الشمالي من المنامة. تم اختيار تصميم الجسر بشكل

شراعين ليصورا ثقافة غوص اللؤلؤ التقليدية في البحرين.

Haji Hassan Readymix has supplied over 250,000 m3 of high-grade

concrete using special aggregate products. Sitra Bridge and the new

interchange categorized by the Bahrain Ministry of Works as a critical piece

of infrastructure required for the country’s development, and designed as

a 100-year life-of-structure project.

The Sheikh Isa Bin Salman causeway connects North Muharraq with the

Diplomatic Area in the Northern part of Manama. The design of the bridge

with two sail-like structures was chosen to depict Bahrain’s traditional

pearl diving culture.

In association with Archirodon, who were responsible for the construction

of the 260 meters long cable stay bridge and dredging works, Bahrain

Asphalt constructed the 2.5 km dual three lane highway.

Sitra Causeway Sheikh Khalifa bin Salman Causeway

2.42 km long lanes of dual carriageway

1.6 km road intersection with King Faisal Highway

2.5 km causeway stretch

DivisionsInvolved

DivisionsInvolved

DivisionsInvolved

4.5 km long stretch 120 km bowstring

CAUSEWAyS

HajiHassanWorkshop

∫ (π x r

2 )

CIVIL ENGINEERING & CONTRACTING CIVIL ENGINEERING & CONTRACTING

DivisionsInvolved

CIVIL ENGINEERING & CONTRACTING

Page 41: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

والذي الدولي البحرين بناء مدرج طائرات مطار البحرين في ساهمت شركة أسفلت أول مطار الدولي البحرين العام 2002م. ويعتبر مطار العام 1937م وجدد في أنشأ في دولي في منطقة الخليج وهو المطار الرئيسي الوحيد في المملكة. وخالل الفترة من مطار في كبرى مشاريع ثالثة تنفيذ على البحرين أسفلت شركة عملت 2011-2012م

البحرين الدولي:

- إعادة بناء طريق مدرج الطائرات )أغسطس 2002م - مارس2004م(.

- إعادة بناء المدرج الرئيسي للمطار)أبريل 2006م - ديسمبر 2007م(.

- بناء 10 ساحات جديدة للمواقف وممرات جديدة )أبريل 2008م -مارس 2011م(.

ساحات فقط، الطوارئ لحاالت مدرج جديدة، ممرات بناء المشاريع هذه وشملت HV & أنظمة المياه، إمدادات نظام الصحي، للصرف نظام محطات، بناء إسمنتية، LV وبناء محطات كهربائية فرعية وتطوير نظام اإلضاءة األرضية للمطار لمتطلبات

CAT II B بحسب منظمة الطيران المدني الدولي.

Bahrain Asphalt helped build the runway of Bahrain International Airport (BIA)

which was established in 1937 and renovated in 2002. BIA is the first international

airport in the Gulf region and the only major airport in the Kingdom. During the

period 2002-2011, Bahrain Asphalt had completed the following three major

projects at BIA:

1- Reconstruction of parallel taxiway (Aug 2002 – Mar 2004)

2- Resurfacing of live BIA main runway (Apr 2006 – Dec 2007)

3- Construction of 10 new apron stands and new taxiways

(Apr 2008 – Mar 2011)

These projects included the construction of new taxiways, emergency runway,

concrete aprons, drainage system, water supply system, HV & LV system,

electrical substations and upgrading of airfield ground lighting system to CAT II

B requirements as per ICAO.

Ever since Bahrain International Airport was established in the Kingdom of Bahrain, Haji Hassan had always been a partner in its construction and development projects. HH made a significant contribution in the construction of its first runway in 1937.

Bahrain International Airport

1937 First runway 2002 Runway renovation

Sakhir Airbase (Upgrade of Airstrip)

البحرين في جوية قاعدة أول في والطرق التحتية البنية أعمال جميع إسناد تم المشروع هذا انهاء في الشركة نجحت وقد 2010م. في البحرين أسفلت لشركة خالل 6 أشهر باعتباره إنجازا يستحق الثناء. وتضمن المشروع أعمال الحفر، وأعمال الكهربائية، واإلضاءة، وبناء ساحات األعمال الطرق والمداخل، بناء الصحي، الصرف

المطار، والممرات، إضاءة المطار وغيرها.

2010م يناير 23-21 من أقيم الذي للطيران، الدولي البحرين معرض استقطب وقد كبرى الشركات العالمية المتخصصة في مجال الطيران العسكري والمدني وخدمات

الدعم.

Bahrain Asphalt (BA) had been awarded the infrastructure and pavement

construction works for the First International Airshow held in Bahrain in

2010. BA completed this fast track project in a 6-month period which is a

commendable achievement. The project included earthworks, drainage works,

sewerage works, electrical works and lighting; as well as construction of access

roads, aprons, taxiways, airfield lighting, etc.

The first Bahrain International Airshow, held on January 21-23, 2010, attracted

major international companies specializing in military, civil aviation and support

services.

الحالي الطائرات لتطوير مهبط البحرين في 2006م عقدا منحت شركة أسفلت السالكين، مدارج بناء شملت والتي تشغيلية جوية قاعدة إلى بالصخير المدرجات، نظام الصرف الصحي، إضاءة المطار األرضية، اإلضاءة عالية الصاري، بناء برج المراقبة، محطة الكهرباء، أنظمة االتصاالت وغيرها. وشملت األعمال األسفلت من وممرات مدرجات من مربع متر و270٫000 مكعب متر 500،000 حفر وساحات المطار من الخرسانة والتي شيدت باستخدام أحدث التقنيات في هذا الكاملة الطرق أعمال شبكة أحيلت االنتهاء منها في 2008م وقد المجال. تم

في قاعدة الصخير الجوية إلى شركة أسفلت البحرين.

“Bahrain Asphalt (BA) had been awarded a contract in 2006 to upgrade

the existing Airstrip to an operational airbase, which included construction

of runways, taxiways, aprons, drainage system, airfield ground lighting,

high mast lighting, control tower, electrical substation, communication

systems, etc. The work included 500,000 m3 of earth work, 270,000 m2

of asphalt runways and taxiways as well as concrete aprons which were

carried out using the latest technologies in the field. Upon completion of

the project in 2008, the execution of the complete road network in Sakhir

Airbase was also awarded to BA”.

Bahrain Airshow

Built after the success of Bahrain Grand Prix for Formula 1

2010 Officially opened by HM King Hamad bin Isa Al Khalifa

HajiHassanWorkshop

∫ (π x r

2 )

AIRPORTS

CIVIL ENGINEERING & CONTRACTING

HajiHassanWorkshop

∫ (π x r

2 )

CIVIL ENGINEERING & CONTRACTING

DivisionsInvolved

DivisionsInvolved

CIVIL ENGINEERING & CONTRACTING

DivisionsInvolved

Page 42: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

1,500 m shortcuts 2,500 m test oval and pit lanes

6 months Completion of project ahead of schedule

5,500m stretch of the race track

ساهمت شركة أسفلت البحرين في بناء 5,500 متر من مضمار سباق حلبة البحرين الدولية و1،500 متر من طرق الخدمة، و2٫500 متر من االختبار البيضاوي وحفرة الممرات. كما السباق، مضمار توسعة أعمال في الشركة أيضا ساهمت 2004م، عام وفي 2010م، عام في (Drag Race) السباق مضمار بناء وإعادة لتصميم الشركة تعاقدت البناء والرصف خالل حيث تم إنجاز المشروع بفترة وجيزة وتم االنتهاء من عمليات

شهرين متواصلين باستخدام تقنيات خاصة.

ما وتركيب وإنتاج بتصميم الصب مسبقة للخرسانة البحرين شركة قامت وأيضا، يقارب 12٫000 متر مربع من ألواح الكسوة المصطبغة على المباني وحوالي 2٫100 متر مربع من مربع متر 31٫000 وحوالي للحلبة، األغراض المتعدد المبنى في الرمادية األلواح من األلواح من مربع متر 1٫150 و الرياضات، من النوع هذا عشاق يجلس حيث المدرجات و300 الشخصيات كبار لبرج الملون اإلسمنتي البالط من مربع متر و6٫490 الصلبة وحدة من الحواجز. وقد تم عمل فحوصات اختبار دقيقة جدا للتأكد من أن المدرجات بعض تركيب في اآلخر التحدي وتمثل الكبرى. الجائزة سباق خالل الحمل تستوعب العمودية مع دمج تجاويف الواجهة إلى والتي تميل حوالي سبع درجات الكسوة ألواح

النوافذ واأللواح السفلية.

حيث البحرين بمملكة الصخير بمنطقة يقع سيارات لسباق مضمار الحلبة وتعتبر تقام فيه جائزة البحرين الدولية للفورموال 1.

Bahrain Asphalt (BA) has contributed to Bahrain International Circuit’s development

in the pavement construction of 5,500 meters of Race Track, 1,500 meters of

Service Roads and 2,500 meters of Test Oval and Pit Lanes. In 2004, BA has

also contributed in the “Track Extension Works”. The company was contracted

to design and reconstruct the Drag Race Track in 2010 and was accomplished

as a fast track project in 2 months by continuous interlocking paving bricks using

Concrete Interlocking paving bricks Train.

In addition, Bahrain Precast Concrete has designed, produced, delivered and

erected approximately 12,000 m2 of pigmented wall cladding panels on the team

and pit buildings and 2,100 m2 of grey panels at the multi-purpose building,

around 31,000 m2 of bleachers (on which the spectator’s seating is mounted) at

the grandstand and multipurpose building, 1,150 m2 solid slabs for the VIP tower,

6,490 m2 of colored concrete tiles at the VIP tower and 300 units of barriers.

Rigorous load-testing was conducted to ensure that the bleachers can withstand

the loads that they will be subjected to during the Grand Prix. Another challenge

was the erection of some cladding panels which are inclined at seven degrees to

the vertical facade incorporating window recesses and soffit panels.

Bahrain International Circuit is the race track situated in Sakhir in the Kingdom of

Bahrain, where Bahrain’s international Formula 1 Grand Prix is held.

Bahrain International Circuitالمدنية العقود من وعدد العقد مدة إكمال على البحرين أسفلت شركة عملت الفردية وكذلك عقود األسفلت مع شركة نفط البحرين "بابكو". شمل نطاق األعمال

العمل على مواقع آبار النفط والطرق وأعمال إصالح وتوسيع الطرق.

Bahrain Asphalt completed both term contract and a number of individual

civil and asphalt contracts for Bapco, scope of works included site preparation

works for oil well sites, access roads, repair works and road widening.

Bapco Projects

بعقود اإلسفلتية، الطرق مشاريع بمختلف البحرين أسفلت شركة قامت ومشاريع لصيانة وتوسيع مرافق ألبا والطرق المحيطة بها.

Various asphalt road projects undertaken, both term contract and

individual projects for the upkeep and expansion of Alba’s facilities and

surrounding highways.

Alba Projects

SPECIAl PROJECTS

BA completed

both term and individual civil and asphalt

contract

CIVIL ENGINEERING & CONTRACTING

DivisionsInvolved

CIVIL ENGINEERING & CONTRACTING

DivisionsInvolved

HajiHassanWorkshop

∫ (π x r

2 )

CIVIL ENGINEERING & CONTRACTING

DivisionsInvolved

Page 43: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

42 km of surface roads

930,000 tons of sub-base

1.7 million tons of asphalt

west) عملت شركة أسفلت البحرين على تنفيذ أعمال الرصف لطريق الدخان السريعcontract) ويتألف من 42 كم من الطريق السريع الجديد الذي يبدأ من حوالي كيلومتر

واحد إلى الشرق من بلدة الشحانية وحتى منطقة الدخان الصناعية. وقد تضمن العمل بناء أربع تقاطعات وأربع مسارات مزدوجة مع تقاطعات ذات مستويين، و 35 كم من الطرق المعبدة و 32 كم للطرق غير المعبدة. وبدأ العمل على مشروع طريق الدخان

السريع في يناير من العام 2006م وتم االنتهاء منه في يوليو من العام 2009م.

القاعدة وبإرساء طن مليون 1٫7 يقارب لما والرصف اآلسفلت أعمال الشركة نفذت الطرق لمواصفات وفقا وذلك طن 930٫000 يقارب بما السريع الدخان لطريق الفرعية السريعة والـQNBS. ولتحقيق مخرجات الـ 2nr من قدرة إنتاج أجود أنواع األسفلت بحوالي الالزمة. وباستخدام الساعة والتي تم إعداد كل واحدة بكافة ملحقاتها 240 طن في واألسطوانات (Hamm PTR) (6nr Vogele pavers) و تقنية رصف األسفلت باستخدام الفوالذية حيث وصلت الطاقة اإلنتاجية القصوى في اليوم الواحد الى 4٫000 طن لتتناسب

والجدول الزمني للمشروع.

Bahrain Asphalt (BA) executed the pavement works for The Dukhan Highway

project (west contract) which consisted of approximately 42 km of new highway

from Shahaniya to the Dukhan industrial area. Work included the construction

of a dual four-lane carriageway with grade-separated interchanges, 35 km of

surfaced collector distributor roads and another 32 km of unsurfaced roads.

The work commenced in January 2006 and reached completion in July 2009. BA

laid 1.7 million tons of asphalt and 930,000 tons of sub-base for this project in

accordance to Highway and QNBS specifications. To achieve this above outputs

2nr Asphalt plants having a production capacity of 240 tons/hour, each were

set up with all the necessary ancillaries. Continuous asphalt laying technology

using 6nr Vogele pavers and Hamm PTR and steel drum rollers were utilized and

the average output per day reached up to 4,000 tons to meet project schedule.

Dukhan Highway / Salwa Road - Qatar

HIGHWAy & ROADS

Major Projects in Bahrain

- Resurfacing of Sh. Isa Bin Salman Highway

- Rehabilitation of Sh. Hamad Avenue & Hamad Town Roads

- Signalized junction upgrade, and reconstruction of Estiqlal Highway

- Resurfacing of Janabiya Highway

- Signalized junction upgrade of Bahrain Gas Junction,

A’Ali junction and Traffic Directorate Junction

- Improvement of Bahrain Gas, A’Ali, Traffic Directorate Junctions

- Construction of Truck Haul Road - Askar

- Asphalt Works for Highway link to Durrat Al Bahrain

- Improvements of Zallaq Highway

- Sanad Junction and associated road improvement

- Rehabilitation of Khalifa Al Kabeer Highway

CIVIL ENGINEERING & CONTRACTING

DivisionsInvolved

Page 44: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

BUIlDINGS BAHRAIN

البحرين، طابوق شركة نفذتها التي المشاريع أكبر من واحدة البحرين درة تعتبر المشروع هذا يقع الهيكلة. أجل من خرسانية كتلة بتوفير1٫792٫730 قامت حيث على الساحل الجنوبي، ويربطه بالمنامة طريق سريع جديد مكون من أربع مسارات درة صممت البحرين. أسفلت شركة شيدته مزدوج وطريق كيلومتر، 25 طوله البحرين كمشروع سكني وتجاري ومنتجع سياحي فخم وتبلغ مساحته 21 كيلومتر مربع، ويتألف من 13 جزيرة على شكل صفين دائريين مكونين من سبع جزر )مرجان(

وخمس جزر )فيروز(، و يضم أكثر من 1٫000 فيال سكنية فخمة.

Durrat Al Bahrain is one of the biggest projects of Bahrain Blocks as we have

supplied 1,792,730 concrete block pieces for its structuration. This project is

located on the southern coast, and is linked with Manama by a new 25 km

highway of four lanes; dual carriage way constructed by our division, Bahrain

Asphalt. This 21 km2 master place has been designed as a residential and

commercial project and as a luxurious touristic resort in the Kingdom, offering

over 1,000 beautiful villas and consisting of a cluster of 13 spectacular islands

(seven “Murjan” islands and five “Fairouz” islands).

"Picture Courtesy by Husam Qasem"

Durrat Al Bahrain Bahrain City Center

الصب على تصميم وتركيب وإنشاء ما البحرين للخرسانة مسبقة عملت شركة يقارب 7٫600 متر مربع من 230 ملم من األلواح الخارجية السميكة بخرسانة من اللون يناير في به العمل بدأ وقد السطحية. للتشطيبات الحمضي للغسيل الفاتح البني

2009م، وتم االنتهاء منه في أبريل 2010م.

وهو األعمال ورجال السياح احتياجات يلبي خاصا منتجعا البحرين سوفيتيل يعتبر بالقرب من حلبة الخليج، وهو يقع الذي يوفر خدمات عالجية بمياه األول من نوعه

البحرين الدولية.

Bahrain Precast Concrete (BPC) designed, produced and erected approximately

7,600 m2 of 230 mm thick insulated external cladding panels in beige color

concrete with acid washed surface finishes. Work began in January 2009 and

was completed in April 2010.

Sofitel Bahrain is an exclusive resort which meets the needs of tourists and

businessmen. It is also the first hotel in the Gulf to perform treatment of sea

water.

26,620 m2 thick cladding panels 1,880 m2 corner cladding panels

قامت شركة الحاج حسن للخرسانة الجاهزة بتصميم و إنتاج و توصيل 26٫620 متر مربع من ألواح التغطية التي يبلغ سمكها x 2٫500 x 1٫000 100 مم، بما في ذلك من مربع متر 1٫880 إلى إضافة سيزونز. الفور فندق بناء لموقع المتغيرات 100 المرنة بسمك األلواح 400 متر مربع من و 100 مم للزوايا بسمك ألواح تغطية x 100 مم، بما في ذلك 1٫200 x مم و 2٫506 متر مربع من ألواح تغطية بسمك 600

المتغيرات من أجل المنصة.

زودت شركة الحاج حسن للخرسانة الجاهزة أكثر من نصف متطلبات الخرسانة العلوي الجسر البحرين سيتي سنتر، عالوة على تصميم وتشييد لبناء مجمع

والذي يصل بين الطريق السريع والطابق الرابع من المجمع.

وقامت شركة البحرين للخرسانة مسبقة الصب بتصميم وإنتاج وتركيب أكثر و77٫000 متر مربع 500 ملم الجوفية ذات مقاس األلواح 22٫000 متر مربع من من من األلواح الجوفية ذات مقاس 265 ملم شمل معظمها الجزء الفندقي من

المجمع.

السيتي مجمع لبناء للطابوق الوحيد المزود البحرين طابوق شركة وتعتبر سنتر مع استهالك ما يزيد عن 1٫181٫600 من الطابوق مما يجعلها واحدة من أكبر متعدد تسوق مركز هو (BCC) سنتر ستي البحرين مجمع الشركة. طلبيات الطوابق، افتتح في سبتمبر 2008م ويقع في ضاحية السيف في مملكة البحرين. ويضم المركز التجاري أكثر من 350 من تجار التجزئة ويغطي مساحة 450٫000 متر

مربع.

Haji Hassan Readymix company has designed, produced and delivered

26,620 m2 of 1000 x 2500 x 100 mm thick cladding panels, including

variants, for the Main Four Seasons Hotel area. In addition to 1,880

m2 of corner cladding panels, 100 mm thick, 400 m2 of coping panels,

100 mm thick and 2,506 m2 of 600 x 1200 x 100 mm thick cladding

panels, including variants, for the Podium area.

Haji Hassan Readymix has supplied more than 50% of the concrete for

the structural requirement of Bahrain City Centre (BCC). In addition, HHR

designed, built and structured the access bridge, which is termed as

‘flyover’, from the highway to BCC’s fourth floor.

Bahrain Precast Concrete (BPC) introduced 500 mm of Hollowcore slabs

to cater to the requirements of this shopping cum hotel complex. BPC

designed, produced, delivered and erected approximately 22,000 m2 of

500 mm and 77,000 m2 of 265 mm thick Hollowcore slabs.

Bahrain Blocks (BB) has been the sole supplier of blocks in the construction

of BCC with the consumption of 1,181,600 blocks making it one of the

second largest single orders for the company.

Four Seasons Hotel Sofitel Bahrain

99,000 m2 of Hollowcore slabs 450,000 m2 area for the complex

7,600 m2 cladding panels1,792,730 concrete block pieces 51,736 m2 of concrete interlocking paving bricks

DivisionsInvolved

DivisionsInvolved

DivisionsInvolved

HajiHassanWorkshop

∫ (π x r

2 )

CIVIL ENGINEERING & CONTRACTING

DivisionsInvolved

CIVIL ENGINEERING & CONTRACTING

Page 45: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

BUIlDINGS BAHRAIN

ألواح وتركيب وإنتاج بتصميم الصب مسبقة للخرسانة البحرين شركة قامت مجوفة و ألواح للتغطية لمشروع فندق الريجينسي.

BPC has designed, produced, delivered and erected Hollowcore slabs and

cladding panels for the construction project of Regency Hotel.

Regency Hotel Zamil Tower

عملت شركة البحرين للخرسانة مسبقة الصب على تصميم وتركيب ما يقارب 200 من األلواح الخارجية السميكة لمبنى شركة البحرين الوطنية القابضة.

BPC has designed, produced, supplied and erected 200 pieces of insulated and

solid pigmented panels.

في مايو 2014م انتهت شركة البحرين للخرسانة مسبقة الصب من تركيب آخر لوحة خرسانة مسبق الصب على ارتفاع 150٫165 متر للمبنى ذو أطول بنية فوقية

خرسانية في العالم.

العصري والطابع التقليدي الطابع بين يجمع طابقا، 22 بارتفاع سياحي معلم مكسو بألواح خرسانة بيضاء صلبة معزولة ومصقولة بسمك 150 مم و200 مم زودتها شركة البحرين للخرسانة مسبقة الصب، ويشمل المشروع أيضا تزويد

1٫700 من الواح التغطية وال GRC لمجموع مساحة يصل حتى 10٫785 متر مربع.

In May 2014, BPC has completed erection of the last precast concrete

panel at 150.165 meters high for the world’s tallest precast concrete

superstructure building.

22 Story landmark Tower, which incorporates both traditional and modern

features, is cladded with 200 mm and 150 mm thick insulated and solid

white sandblasted panel supplied by BPC. It includes 1,700 cladding

panels and GRC (total area 10,785 m2)

Breaker Tower BNH Headquarters

10,785 m2 total area

2,500 m2 total area

قامت شركة البحرين للخرسانة مسبقة الصب بتصميم و إنتاج و تركيب عوارض، قباب و ألواح مجوفة لمشروع بناء مسجد عوالي.

Bahrain Precast Concrete company has designed, produced and erected

beams, Domes and Hollowcore Slabs for Awali Mosque.

Awali Mosque

DivisionsInvolved

DivisionsInvolved

DivisionsInvolved

DivisionsInvolved

DivisionsInvolved

Page 46: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

ألواح تركيب و بتصميم الصب مسبقة للخرسانة البحرين شركة قامت مجوفة تقدر بـ 20٫000 متر مربع و ألواح تغطية معزولة يصل عددها الى 1٫225 متر مربع، و جدران عالية التحمل بعناصر GRC لعدد 22 من الفلل الفخمة ألحد أشهر

المنتجعات و أكثرها رفاهية في العالم.

BUIlDINGS BAHRAIN

الصب مسبقة خرسانة ألواح وتركيب تصميم على المشروع هذا نطاق اشتمل جاهزة و مركبة و معزولة لمساحة 12٫000 متر مربع بسبب تفاوت أقطارها، مع طلب

ألواح تغطية مصقولة و مصبوغة باللون األصفر.

باإلضافة إلى ذلك، قامت شركة البحرين للخرسانة مسبقة الصب بتصميم و تزويد و توصيل عوارض مسبقة الصب، جدران للحدود، بالط للرصف و ألواح مجوفة.

CitiBank Tower GOSI ComplexThe Ritz-Carlton Hotel

يمكن القول بأن مسجد أحمد الفاتح )المعروف باسم المسجد الكبير( هو أضخم بناء تقليدي مميز في البحرين. يغطي المسجد مساحة تبلغ حوالي 150٫000 متر مربع، تنفيذ بدأ 70 مترا. يبلغ طولهما له منارتين و يبلغ قطرها 22 متر، و تتوسطه قبة مشروع بناء مسجد الفاتح عن طريق شركة C.C.I.C المعروفة عالميا في ديسمبر 1983م، و من أجل تشييد هذا البناء الرمزي تم اختيار شركة الحاج حسن للخرسانة

الجاهزة لتزويد المشروع بالخرسانة.

Arguably the grandest and most traditionally distinctive building in Bahrain is

the Ahmed Al Fateh Mosque (commonly referred to as the Grand Mosque). It

covers an area of 150,000 m2, it has a 22 meters diameter dome and two 70

meters tall minarets. Constructed by the internationally recognized company

C.C.I.C. which began in December 1983 and for such an important iconic

structure, they chose Haji Hassan Readymix as their supplier.

وتوصيل وتصنيع بتصميم الصب مسبقة للخرسانة البحرين شركة قامت وتركيب ألواح خرسانة للتغطية الخارجية، باإلضافة إلى ألواح اسمنتية بطبقتين التأمينات الفاتح لمشروع مجمع البني باللون التغطية، مصقولة ومطلية من التجاري، باإلضافة إلى تصميم وتصنيع وتوصيل وتركيب ألواح خرسانية مجوفة.

The project scope is to design, deliver and erect 12,000 m2 complex precast

insulated cladding panels due to its different radius, with a yellow pigmented

fairfaced finish for the cladding panels.

BPC also designed, supplied, delivered and erected precast beams, boundary

walls, paving tiles and hollowcore slabs.

Al Fateh Mosque

BPC has designed, produced, delivered and erected external cladding

panels with two finishing ie. sandblasted and fairfaced on beige colored

concrete for GOSI Complex, in addition designing, producing, delivering

and erecting Hollowcore slabs.

BPC has designed, produced, delivered and erected approximately

20,000 m2 Hollowcore slabs, 1,225 m2 insulated cladding panels, load-

bearing walls and GRC elements for 22 nos. of VIP Villas of one of the

world renowned luxury resorts.

DivisionsInvolved

DivisionsInvolved

DivisionsInvolved

DivisionsInvolved

12,000 m2 complex precast insulated cladding panels

150,000 m2 total area 20,000 m2 hollowcore slabs 1,225 m2 insulated cladding panels

CIVIL ENGINEERING & CONTRACTING

Page 47: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

الحاج الوطني من قبل شركة الصرح التحتية لمشروع مبنى البنية أعمال تنفيذ تم حواجز لصب الجاهز االسمنت من خليط توفير خالل من الجاهزة للخرسانة حسن مقوسة كبيرة من أجل بناء الحاجز البحري والمنصة والواجهة البحرية، الجدير بالذكر بأن تلك الحواجز تم صبها في موقع العمل نظرا لضخامة حجمها وصعوبة نقلها عن

طريق الشوارع الرئيسية.

يحمل هذا النوع من المشاريع طابعا خاصا وأتاح فرصة للشركة لكي تثبت إمكانياتها تلك لمثل والمطلوبة الدقيقة التقنية الجوانب مع التعامل في كادرها وخبرة والذي العمل المتنقل في موقع المصنع تركيب أسابيع تم المشاريع. في غضون 8 عزز بدوره الحصول على الموافقة الفورية من قبل الوزارة المعنية واإليذان بالبدء في األعمال التابعة. تطلب التصميم اختيار نوعية خرسانة خاصة لتكوين أسطح ملساء ذات شكل بارز وقوي مستخدمين مادة ال Silica وتقوية مبكرة تسمح بإدارة القوالب

ل 24 ساعة قبل استخدامها.

شركة وهي للمجموعة، آخر فرع قبل من البحرية الواجهة شكل تطوير تم أيضا، البحرين للخرسانة مسبقة الصب، والتي زودت المشروع بحواجز كبيرة ذات لون احمر

وذلك من أجل تعزيز الروح الوطنية لهذا المشروع المميز.

ساهمت شركة الحاج حسن للخرسانة الجاهزة في بناء معلم استثنائي آخر ينضم إلى الجائزة الوطني على البحرين البحرين حيث حاز مسرح الهندسية لمملكة اإلنجازات المسارح لتكنولوجيا األمريكي المعهد قبل من والمقدمة 2015م لعام المعمارية

(USITT) وذلك عن مساحات العروض االستثنائية.

مع بالتعاون باريس، في المعمارية الهندسة أستوديو قبل من المسرح صمم الشرق العروض في أكبر مساحات أحد المسارح في لندن، ويعد مستشاري مشاريع

األوسط.

تم افتتاح هذه التحفة المعمارية في عام 2012م والمطلة على واجهة البحر وتغطي 1٫001 شخصا وقاعة أخرى 12٫000 متر مربع وتحتوي على قاعة احتفاالت تتسع ل مساحة

أصغر تتسع ل 150 شخصا.

Construction of Bahrain’s National Assembly Building (BNAB) began with the

formation of the substructure. Ready mixed concrete was required for the

casting of mass blocks to form the sea walls for podium and lagoon promenade.

These blocks were too large to transport on public roads so they were to be

manufactured on site.

Haji Hassan Readymix (HHR) presented an opportunity to demonstrate how

expertise, experience and resources can lead to the rapid establishment and

Ministry approval of a site batch plant. Once the agreement was signed, HHR

poured approved concrete from the erected, commissioned and certified site

batch plant within 8 weeks. The mix design was specially developed to provide a

particularly smooth surface, high durability using Silica Fume and early strength to

allow 24-hour turn-around of moulds.

The shape of the lagoon was further enhanced by another Haji Hassan Group

Division, Bahrain Precast Company, who supplied red-hued coping blocks for sea

walls to reinforce the patriotic flavor of this iconic project.

Haji Hassan Readymix supplied concrete for yet another exceptional building that

adds to Bahrain’s architectural portfolio. The National Theatre has landed the

United States Institute for Theatre Technology’s (USITT) 2015 Architecture Award

for exceptional performance spaces.

The theatre was designed by Paris-based Architecture-Studio in collaboration with

Theatre Projects Consultants of London and is one of the largest performance

spaces in the Middle East.

Opened in 2012, the waterfront theatre covers 12,000 square meters and consists

of a 1,001 seat auditorium and a smaller 150 seat flexible studio theatre. The used

concrete mix was standard material, but it was required to form many of the

interesting shapes used in the theatre’s design.

Bahrain National Assembly Building Bahrain National Theatre

BUIlDINGS BAHRAIN

DivisionsInvolved

DivisionsInvolved

Page 48: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Riffa Views International School

بلغت تكلفة هذا المشروع اإلجمالية أكثر من 12 مليون دينار بحريني، وتم االنتهاء و سياحية وجهة يمثل و المميز بموقعه المشروع هذا يتميز و 2006م، في منه للخرسانة حسن الحاج لشركة الخرسانة تزويد إيعاز وتم البالد. في بارزا معلما

الجاهزة.

تم تقسيم مشروع المكتبة إلى قسمين: المبنى األول يتألف من المكتبة الرئيسية، 250٫000 عنوان و المكتبة على المؤتمرات. تشتمل الثاني يحتوى على مركز المبنى و

مصادر صوتية و بصرية متنوعة.

Completed in 2006, Shaikh Isa Library occupies a prime location and serves as

a landmark for Bahrain, it was entrusted to Haji Hassan Readymix for concrete

supplies.

The library project was divided into two parts. Building A comprised of the

library, while Building B accommodates the main conference center. The library

houses over 250,000 titles and audio visual items.

يعتبر مشروع مدرسة الرفاع فيوز الدولية جزء من مشروع تطوير الرفاع فيوز الحصري والمقام على مساحة تمتد لـ 70٫000 متر مربع والذي يضم حوض سباحة

بمقاييس أولمبية، صاالت عرض، وأخرى رياضية ومكتبة.

البحريني خالل السوق التي شهدها األولية البناء الحاد لمواد النقص إبان فترة بتوفير الجاهزة للخرسانة حسن الحاج شركة نجحت المشروع، تشييد فترة تلك المواد بما يشمل اإلسمنت والرمل والذي بدوره ساعد على المواصلة في أعمال البناء دون توقف، ويعود ذلك لسياسة الشركة الحكيمة المتبعة آنذاك.

على التنافسية قدرتنا أثبتت العمل أثناء الشركة واجهتها التي التحديات المضاد اإلسمنت مواد حلول توفير ذلك في بما التقنية المعضالت مواجهة للعزل المستخدم الوزن خفيف واإلسمنت السباحة لبركة والمستخدم

الصوتي و الحراري.

Riffa Views International School is a part of the exclusive Riffa Views

development of a 70,000 m2 plot including an Olympic sized swimming

pool, Band and Chorus Hall, gymnasium and library.

During a period where Bahrain was experiencing shortages of sand

and cement, Haji Hassan Readymix’s procurement and stocking policies

ensured continuous supplies to the project.

The usual technical challenges that such a project throws up served as a

showcase for Haji Hassan Readymix’s capacity for, amongst other facets,

pool’s waterproof concrete and lightweight concrete for acoustic and

thermal insulation.

Shaikh Isa Library

DivisionsInvolved

DivisionsInvolved

التحديات الغولف في 2009م. رغم الرفاع فيوز ونادي االنتهاء من تنفيذ مشروعي تم التقنية التي واجهت شركة الحاج حسن للخرسانة الجاهزة مثل صب العازل اإلسمنتي تلك لمثل األمثل الحل توفير في وجدارتها قدرتها أثبتت أنها إال السباحة، لبرك

المعوقات، باإلضافة الى توفير صوامع إضافية لتخزين اإلسمنت األبيض ومنع تلوثه.

Completed in 2009, Riffa Views Country and Golf Club was constructed as part

of the exclusive Riffa Views development which uses the Royal Golf Course as a

focal point. Although there were generally routine technical challenges, such as

waterproof concrete for the pool, a particular requirement for white concrete

with an exposed aggregate surface finish allowed Haji Hassan Readymix to flex

their specialist muscles. Additional silos for stocking white cement, sourcing and

quarantine of selected white aggregate, plus special plant operations to prevent

concrete mix contamination were employed.

Riffa Views Royal Golf and Country Club

BUIlDINGS BAHRAIN

DivisionsInvolved

CIVIL ENGINEERING & CONTRACTING CIVIL ENGINEERING & CONTRACTING

Page 49: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

BUIlDINGS DUBAI

HCS فرع دبي بتزويد وتركيب BPC قامت الشركة المتحدة للخرسانة مسبقة الصبلمشروع برج العرب. باإلضافة إلى تركيب درج حلزوني.

UPC Dubai has supplied, delivered and erected the HCS for Burj Al Arab, as

well as supplying spiral staircase.

Burj Al Arab

بتصميم دبي فرع BPC الصب مسبقة للخرسانة المتحدة الشركة عملت وإنتاج وتركيب 220 مم من األلواح العازلة السميكة مع اإلسمنت األبيض، وباقي التلميع قطع للمبنى الخارجي واإلسمنت الرمادي، والمواد المصقولة المطلية

للمباني الداخلية.

UPC Dubai has designed, produced, supplied, delivered and erected

220 mm thick insulated cladding panels with white concrete, exposed

aggregate finish for the external side and grey cement and the trowelled

smooth finish for the internal side.

Dubai Marina

قامت الشركة المتحدة للخرسانة مسبقة الصب BPC فرع دبي بتزويد وتركيب ألواح مم(، 100 )بسمك الحاملة وغير الحاملة واأللواح العازلة، الصب مسبقة الخرسانة

والساللم واأللواح الجوفية والحواجز، بما في ذلك تأجير رافعات البناء.

UPC Dubai has supplied, delivered and erected (including cranage) precast

concrete insulated panels, load bearing panels, non load bearing panels

(100 mm thick), staircase, hollowcore slabs and parapets.

Ritaj Residence Complex Index Building Project

Some of the major projects done in Dubai - Millennium Estate Villas, Ritaj-Blk, Labour city, Meydan Height Villas, Mirdif City Cent-C/Park, Police & Army

Acco, Central Fish Market at Abudhabi, Dubai Marina - Dist 7, Gems Lincoln Academy, New German International School Dubai, Cambridge International

School, Dubai, Index tower...

Meydan Height Villas

وتركيب بتزويد دبي فرع BPC الصب مسبقة للخرسانة المتحدة الشركة قامت ألواح الخرسانة مسبقة الصب للمشروع. وقد تم تزويد عناصر الخرسانة باإلسمنت األبيض، وركام مواد الصقل )1٫5% لون صباغة كحد أقصى( باستخدام الركام األبيض.

UPC Dubai supplied, delivered and erected (excluding cranage) of precast

concrete cladding panels. The precast elements are supplied with fully white

cement, exposed aggregate finish (with max. 1.5% color pigment) using white

aggregate.

قامت الشركة المتحدة للخرسانة مسبقة الصب BPC فرع دبي بتزويد وتركيب الخارجية(، األلواح جانب )إلى والحواجز العازلة، الصب مسبقة الخرسانة ألواح واأللواح والساللم الصلبة، واأللواح األحزام الحاملة، وغير الحاملة واأللواح

الجوفية بما في ذلك معدات الرف الثقيلة.

تصميم بتوفير دبي فرع BPC الصب مسبقة للخرسانة المتحدة الشركة قامت الخرسانة إنتاج وتركيب وحدات تغطية خارجية من إلى باإلضافة التعديالت، و البرج مسبقة الصب. إضافة إلى قيامها بتصميم وتزويد وتركيب ألواح مجوفة، وعوارض

مسبقة الصب.

BPC has provided tower design and fabrication in addition to supplying,

delivering, off-loading and erecting external precast concrete cladding units. It

has also provided podium design, fabrication, supply, delivery, off-loading and

erection of hollowcore slabs, precast band beams and wheel stopper.

UPC Dubai has supplied, delivered and erected the precast concrete

insulated panels, parapet (along with the external panels), load bearing

panels, non-load bearing panels, beams, solid slabs, staircase and hollow

core slab including Tower Crane.

Burj Development Tower

Page 50: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

BUIlDINGS ABU DHABI

بتزويد وتركيب عناصر خرسانة الصب للخرسانة مسبقة المتحدة الشركة قامت بسمك 120 مم لألعمدة و العوارض. باإلضافة إلى ألواح للتغطية الخارجية، الساللم، تم .Links Investments لشركة تابع مبنى 22 من يتألف لمشروع مجوفة وألواح

تنفيذ المشروع من قبل مقاوالت علي و أبناءه.

UPC Abu Dhabi has supplied, delivered and erected 120 mm thick precast

concrete elements for columns and beams, in addition to 100 mm thick external

cladding panels and internal load bearing walls including stair core and lift core

walls and non load bearing walls, staircases, parapets and hollow core slab for

the 22 Buildings project for Links investments. The project contractor is Ali and

Sons Contracting.

Links Investments

دعائم تركيب و بتزويد الصب مسبقة للخرسانة المتحدة الشركة قامت GEMS مستطيلة و أخرى مسبقة الشد و دعائم للمدرجات لمشروع أكاديميةمغطاة ملساء إسمنتية ألواح تزويد يشمل بما ظبي، أبو إمارة في األمريكية

بطبقة رمادية و بقوالب فوالذية.

GEMS American Academy

2,358 m3 Tilt 26,113 m2 HCS

11,229 m3 Tilt 23,392 m2 HCS

من عناصر تركيب و بتزويد الصب مسبقة للخرسانة المتحدة الشركة قامت الخرسانة مسبقة الصب لمشروع مواقف سيارات شركة أدونك في إمارة أبو ظبي،

باإلضافة إلى توفير األعمدة و مجموعة دعائم و ألواح صلبة و ساللم.

UPC Abu Dhabi has supplied delivered and erected precast concrete elements

for ADNOC Underground Car park at AUH. In addition to columns, band

beams, I-beams Solid slab, Stair & HCS. The project contractor is Arabtec.

ADNOC Underground Carpark

UPC Abu Dhabi has supplied delivered and erected precast Rectangular

beams, Prestressed band beams, Prestressed I-beams, Staircases, Bleachers

& Bleacher beams for Premier Schools International for the GEMS

American Academy project in Abu Dhabi, using Tower crane provided by

Main Contractor (Chicago Maintenance & Construction Co). All precast

concrete elements are supplied with fully grey cement fair faced finish

against steel mold.

BUIlDINGS OMAN

Muscat City Center (Car Park Extension)

بكمية Port City مشروع الصب مسبقة للخرسانة المتحدة الشركة زودت HCS وكمية 2٫000 متر مربع من الـ (A) 508 متر مربع من ألواح خرسانة للمبنى الرئيسي

.(C) لمبنى

UPC Oman has supplied Port City project with 508 m² thick of hollow core

slabs for Block ‘A’ and 2,000 m² of thick HCS for Block ‘C’.

Port City Development LLC (Block ‘A’ & ‘C’)

UPC Oman has designed, supplied, delivered and erected 150 mm thick

precast concrete panels and 400 mm thick Hollow Core Slabs for Muscat

City Center Car Park Extension.

وتركيب وتزويد بتصميم الصب مسبقة للخرسانة المتحدة الشركة قامت لوحات خرسانة بسمك 150 مم وألواح جوفية بسمك 400 مم لموقف سيارات

مجمع مسقط سيتي سنتر.

150 mm thick precast concrete

panels and 400 mm thick Hollow Core

Slabs

Page 51: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

BUIlDINGS QATAR

وفرت الشركة المتحدة للخرسانة مسبقة الصب عوازل PC، وساللم. باإلضافة إلى .Strategic Studio Center لكل من المبنى الرئيسي وكذلك مبنى HCS تزويد

UPC Qatar has provided for Qatar Foundation Headquarters PC Cladding and

Stair Flights. Moreover, BPC offered HCS for QF Headquarters Bldg. and the

Strategic Studio Center Bldg.

قامت الشركة المتحدة للخرسانة مسبقة الصب بتصميم وتزويد وتركيب عناصر من الخرسانة مسبقة الصب لعدد 48 مبنى يتألفون من 3٫000 شقة تقريبا.

UPC Qatar designed, supplied, delivered and erected precast concrete elements

for 48 buildings approximately 3,000 flats.

Barwa City

Qatar Foundation Headquarters

وتزويد بتصميم قطر بدولة الصب مسبقة للخرسانة البحرين شركة قامت .Heritage Park وتسليم وتركيب عناصر من الخرسانة لمشروع برج التبريد بالـ

UPC Qatar designed ,supplied, delivered and erected Precast Elements.

PC Elements Heritage Park (Cooling Tower)

من عناصر توصيل و بتزويد الصب مسبقة للخرسانة المتحدة الشركة قامت الخرسانة مسبقة الصب لبناء أساس مشروع مكتبة قطر المركزية، باإلضافة إلى

.HCS توفير لوحات للسقف و عوارض و

BPC has supplied and delivered precast concrete elements to Qatar Foundation

Central Library, in addition to roof panels, beams and HCS.

Qatar Foundation Central Library Building

MOI office at Wadi Al-Sail

وتسليم وتزويد بتصميم الصب مسبقة للخرسانة المتحدة الشركة قامت وتركيب األلواح العازلة من الخرسانة الجاهزة في مشروع لؤلؤة قطر.

UPC Qatar designed, produced, delivered and erected Precast Concrete

200 mm thick solid cladding panels for substations.

قامت الشركة المتحدة للخرسانة مسبقة الصب بتزويد وتسليم عناصر من الرئيسي للمبنى العازلة واأللواح HCS والـ والحزم األسطح ولوحات الخرسانة

لوزارة الداخلية القطرية بوادي السيل.

BPC Qatar supplied and delivered Precast Concrete Elements, Roof Panel,

Beams, HCS and Precast Cladding for the Main Bldg.

Lusail Sub Stations

Page 52: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

Arabian Chemical IndustriesP.O. Box 530Tel: +973 17784777Fax: +973 [email protected]

Arabian Parts Co. P.O. Box 530Tel: +973 17785666Fax: +973 [email protected]

Bahrain Asphalt Establishment P.O. Box 530 Tel: +973 17556556Fax: +973 [email protected]

Bahrain Blocks P.O. Box 530 Tel: +973 17830044Fax: +973 [email protected]

Bahrain PipesP.O. Box 530 Tel: +973 17786607Fax: +973 [email protected] www.bahrainpipes.com

Bahrain Precast Concrete Co. W.L.L.P.O. Box 20095Tel: +973 17875600Fax: +973 [email protected]

Bahrain Rubber Co.P.O. Box 10150Tel: +973 17830188Fax: +973 [email protected]

Bahrain TanksP.O. Box 530 Tel: +97317783533Fax: +973 [email protected]

Haji Hassan ReadymixP.O. Box 5822Tel: +973 17785353Fax: +973 17785025Email: [email protected] www.hajihassanreadymix.com

Haji Hassan Reinforcements P.O. Box 32133Tel: +973 17786008Fax: +973 [email protected]

Haji Hassan Workshop P.O. Box 530Tel: +973 17783052Fax: +973 [email protected]

Al A’ali Complex P.O. Box 530Tel: +973 17581000Fax: +973 [email protected]

Haji Hassan CranesP.O. Box 530Tel: +973 17875299Fax: +973 [email protected]

KRAH BahrainP.O. Box 32671Tel: +973 17879400Fax: +973 [email protected]

Haji Hassan PropertiesP.O. Box 530Tel: +973 17784989Fax: +973 [email protected]

United Precast Concrete Dubai L.L.C.P.O. Box 52900, Dubai, UAETel: +971 4 3474440Fax: +971 4 [email protected]

United Precast Concrete Qatar L.L.C.P.O. Box 22995, Doha, QatarTel: +974 44770167Fax: +974 [email protected]

United Precast Concrete Abu Dhabi L.L.C.P.O Box 43774, Abu Dhabi, UAETel: +971 2 5515404Fax: +971 2 [email protected]

United Precast Concrete (Oman)P.O Box 2150, Ruwi, Sultanate of OmanTel: +968 603811fax: +968 [email protected]

Haji Hassan Group BSC (c)

P.O. Box 530 Tel: +973 17551111 / 17875287Fax: +973 [email protected]

www.hajihassan.com

Page 53: perpetual ambitions - Haji Hassan Group · Haji Hassan’s success story began with many struggles and hardships, but he overcame them all. He succeeded in the construction industry

© copyright Haji Hassan Group