Plant Life Management Canada 2015/02/25 TWG on LM for NPP

- Copyright -

General Utility Focus/Concerns › Driven primarily by desire to improve Equipment Reliability Index (ERI)

› Reduction of Forced Loss Rate (FLR) › Critical Component Failures › Timely PM Completions/Reduced Backlogs › Promotion of Predictive/Condition Based Maintenance › PM Feedback Improvements › Buried Piping › Risk Informed Approaches

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

General Utility Focus/Concerns › Standardizing / Guidance of:

› Trending Methods › Single Point Vulnerabilities › System/Component Health Reporting › Critical Spare Parts › AP913 criticality alignment › Incoming corrective and deficient analysis › FIN Process Effectiveness › Transitioning to CBM

› Critical Spare Parts Management

› Integrated Ageing Management

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

Refurbishment

›Point Lepreau › Refurbishment complete and station operating

›Bruce Units 1&2 › Units 1&2 refurbished and operating.

›Bruce Units 3&4 › Unit 4 project under development

›Darlington › Refurbishment project started. Detailed planning and support engineering.

4

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

Refurbishment

›Pickering A

› 2 units shut down. 2 units refurbished. Due to shut down

›Pickering B

› Continued operation to 2020. Looking at Ageing Management for post operation equipment.

›Gentilly 2

› Shut down and being decommissioned.

›NRU

› Planned to shutdown in 2018

5

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

Regulator

›Number of regulatory documents already in place

› Updated recently Regdoc 2.6.3 Aging Management

› Issued Regdoc 2.5.2, Design of Reactor Facilities: Nuclear Power Plants

› Canadian Standards Association has also been updating:

› CSA N285.7, Periodic inspection of CANDU nuclear power plant balance of plant systems and components

› Introduces risk based inspection.

6

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

Fuel Channels: A highly developed program captured in CSA

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

7

REGDOC 2.6.3 -Integrated AMP (Plant Level) ›REGDOC 2.6.3 -Integrated AMP (Plant Level)

›1.Organizational arrangements;

›2.Data collection and record keeping;

›3.Screening and selection process;

›4.Evaluations for aging management;

›5.Condition Assessments;

›6.SSC Specific AMPs;

›7.Management of Obsolescence;

›8.Interfaces with Other Supporting Plant Programs;

›9.Implementation of AMPs; and

›10.Review and improvement of AMPs

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

8

OPG Ageing Management

› Implementation of the AM at OPG is through several interfacing programs, including but not limited to the following:

› Equipment Reliability Program (e.g. System Health Reports, Plant Health Committee)

› Components and Equipment Surveillance (e.g. Strategy Manuals)

› Major Components Program (e.g. LCMPs)

› Major Programs:

› Containment LCM

› Cables LCM

› Flow Accelerated Corrosion

› Fatigue Monitoring

› Heat Transport System Ageing

› Ageing Effects in PSA

› Program Health Indices including ERI

› Integration through SHR

- Copyright-

© [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

Bruce Power

› Overall Plant Integrated Ageing Management

› Programme – General Overview

› Ageing Management at Bruce Power is embedded in a comprehensive Asset Management Programme.

› Ageing effects of significant SSCs are managed through Condition Assessments, Technical Basis Assessments and Life Cycle Management

› Bruce Power’s Ageing Management process is designed around the INPO Standard Nuclear Performance Model.

› Bruce Power’s Ageing Management process has also considered REGDOC-2.6.3, Ageing Management and IAEA NS-G-2.12 in it’s design.

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

11

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

Technical Basis

Life Cycle Management Process Life Cycle Management Plan

Asset Management and Business

Planning

Maintenance Strategy

PM / PMCR Implementation

Engineering Programs F/C, SG, Feeders, FAC, PIP, etc.

Scope of Work Process

Capital Projects

Work Management (Maintenance)

End

Start

Condition

Assessment

Simplified Ageing Management Model of Bruce Power

Feedback Process

Point Lepreau

› PLGS has a multi-faceted aging management program

› Major Programs:

› Containment

› Cables as part of EQ program

› Flow Accelerated Corrosion

› Fatigue Program under development

› Supported by COG program

› Heat Transport System Ageing

› Fuel Channels

› Steam Generator

› Pressure Vessel

› Heat Exchanger (under development)

› Ageing Effects in PSA

12

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

National Research Universal

› Over 50 years old

› Key attributes of AMP

› Integrated workflow

› Built on industry standards

› Living Program centered on SPMPs

› Continuous improvement

› Mechanistic programs addressed through individual system management

› Fatigue, FAC, Cables (separate program to be developed)

› Containment – 2 AMPs

› Fuel Rods

› Spare parts key: Obsolescence issues being addressed

› PSA being updated to reflect current condition assessments

13

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

New Designs (Candu Energy)

› Regulation Regdoc 2.5.2 driving new build to include PLiM

› Industry Standards (INPO AP-913 Appendix G) driving new build to include Equipment Reliability

› Potential Owners demanding it be included

› New advanced (ACR) and enhanced designs (EC6, AFCR) driven in this direction.

› New designs also targeting longer design life at high capacity factors with fewer planned outages (3 years).

14

- Copyright- © [2015] SNC-Lavalin Inc. and its member companies. All rights reserved. Unauthorized use or reproduction is prohibited.

Summary

›Canadian Focus › Equipment Reliability

› Includes SPV identification and management › Move to CBM

› Several planned refurbishments

› Regulator has/is putting standards in place to govern

› Overall enhancement of plant programs is occurring

› Fleet alignment is a theme

15