platinum posiglaze

6
Tilt the glass with the turn of a spanner

Upload: paul-moseley

Post on 07-Feb-2017

87 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Platinum Posiglaze

SPIG-LITE ProDomestic Glass Railings

Tilt the glass with the turn of a spanner

Page 2: Platinum Posiglaze

Posi-Glaze isour innovativealuminiumrailing system

Posi-Glaze is so easy to install

Fit base 1 to the substructure (Detailson suitable fixing can be found on ourwebsite). 1 2

34

5

FAST INSTALLATION

FULLY ADJUSTABLE AFTER INSTALLATION

LIGHT WEIGHT AND EXTREMELY STRONG

EXCELLENTLY ENGINEERED

Designed to be installed without the need ofensuring the fitting surface is totally level.

Posi-Glaze uses a unique, simple adjustmentsystem allowing horizontal alignment of eachglass panel.

Our system is tested & engineered to meet the strictest buildingregulations(with the appropriate fixing& glass thickness) in both domestic and commercial installations. It can be installed in awide variety ofapplications.

For added protection we anodise our system

GLASS THICKNESS12mm (toughened glass), 13.5mm (laminated),15mm (toughened glass), 17.5mm (laminated),19mm (toughened glass),

Clip the glass slip clamps (2) to the bottom edge of the glass panel (We produce different sized clamps for different glass thicknesses).

Screw the bolts into the clampbar (3).

Position the glass in the channel.

Using the adjustment bolts; looseningone side and tightening the other.This will allow the alignment of theglass with the next panel and enable plumbing of the glass.

Attaching the cover strip (4) andbead gasket (5).

1

2

3

4

5

6

1

21.5mm (laminated).

increasing protection against the elements.

Page 3: Platinum Posiglaze

3

Base drilled Posi-Glaze channel. This is the main section thathold the glass. It is predrilled at 100mm from the ends andthen 200mm there after. The hole is to suit a 12mm fixingbolt and is counter bored to sink the bolt head.

Sided drilled Posi-Glaze channel. This is thge main section thathold the glass. It is predrilled at 100mm from the ends and then 200mm there after. The hole is to suit a 12mm fixing bolt and is counter bored to sink the bolt head. Drilled through both walls.

A pre-fabricated 90 corner. Supplied with four dowels for easierfitting. Does not include extra top seal strip cladding.

The top seat strip holds the gasket in place and is pressed on tothe channel at the end. Covers the clamps from view. Generallytwo are used with base channel unless otherwise instructed.

To be used with side fixed channel if chosen. It is angled to losethe square finish of just having channel. Clips into the groovesunder the channel.

As with the top seal strip it holds the gasket in place and coversthe clamps from view. To be used with side drilled channel tocover the drill holes from view. Requires adhesive to hold flatsurface against channel. Some prefer side cladding with basechannel as there is no join line.

Base Drilled Posi-Glaze 3m S/S Brushed SG-5001.BF 3m Natural Anodised SG-5002.NA

Side Drilled Posi-Glaze3M Natural Anodised

90CornerS/S Brushed

Top seal Strip3m S/S Brushed

Bottom Cladding3m S/S Brushed

Side Cladding3m S/S Brushed

SG-5101.SF

SG-5306

SG-5306

SG-5302

SG-5301

PARTS AND ACCESORIES

PRODUCT CODE DESCRIPTION

Page 4: Platinum Posiglaze

PARTS AND ACCESORIES

4

Clamp kits have enough items to suit a 3m length of channel.The clamps can fit glass thicknesses 1mm either way of saidglass thickness i.e, 15mm glass clamps will suit 14 - 16 mmglass. Included are the clamp bars which sit into the top mouldof the clamps and the clamp bolts which screw into the bars and are the undone to hold the glass in place. These are undoneand tightened each side allowing the glass allignment.6m gasket to suit glass thickness.

Extra gasket can be supplied in any length. The small gasketsuits 19-21 mm glass, the large gasket suits 12-17mm glass.

Stainless steel end caps cut to suit each option.An adhesive will need to be used to hold them in place.

The dowels are used to allow for better aliligning when joiningchannel sections together. There are three slots in the channel tohold dowels although two would be enough.

Steel spanner with angle to reach the clamp bolts totighten/loosen the glass.

Aluminium drain block. Can be fitted underneath the channel to allow water to flow freely out of the channel.

Clamp Kits

Gasket

End Caps

Dowel

Spanner

Drain Block

12mm Glass SG-521213.5mm Glass SG-521315mm Glass SG-521517.5mm Glass SG-521719mm Glass SG-521921.5mm Glass SG-5221

(Inc Clamps, gasket, bars,bolts)

1m Large Gasket SG-54021m Small Gasket SG-5403

End Cap Base Drilled SG-5303End Cap One Side-Clad SG-5303MEnd Cap Two Side-Clad SG-5303LEnd Cap Shaped Right SG-5303REnd Cap Shaped Left SG-5304L

SG-5401

SG-5400

SG-5500

PRODUCT CODE DESCRIPTION

Page 5: Platinum Posiglaze
Page 6: Platinum Posiglaze

Only 2 spigots & fixings requiredper metre

Extremely quick to install, elongated holes to allow for easyalignment

No need to drill the glass

No drainage issues

Uses the proven adjustmentsystem as Posi-glaze

Our glass clamping mechanism removes the need tohold the glass with locking pins

Free drainage between the spigots means no watergets trapped inside the balconey area

MEGAGripCommercial Frameless Balustrade

3kN Loadings25-33mm glass types all achieveless than 25mm Deflection

Simple to install

No specialist tools

Durable

Clamps simply attach to the glassand can be placed in the channel

Standard 13mm socket to adjust andtighten the glass

8

EXPLORE OUR RANGE

Anodised to (20 micron) A4 gradestainless steel