POWER, WASTE and WASTE-WATER

Immediate Action Programm

INDONESIA

2015

presented by

Langenburg Technologies Europe GmbH

Page 3: Plt sampah langenburg

TO THE POINT

Page 4: Plt sampah langenburg

The power and waste problems in

Indonesia 2015:

� deficit of estimated 35.000 MW in 5-years

� non sufficient grid capabilities and capacities ?

� high losses in generation and transfer of power ?

� attacks on grid and power facilities ?

� high power demand for industry and household, to cope

with high economic growth rate

� totally necessary investments to restructure, to restore and

to renew the Indonesian power market and facilities are

estimated at xxx ? billion US$.

POWER

Page 5: Plt sampah langenburg

The power and waste problems in

Indonesia 2015:

� Yearly amount of solid waste approximately ?.000.000 tons.

� Collection rate of solid waste between ?xx % - ?xx%

� expected volume of garbage in 2016 more than ?.000.000

tons

� (nearly) no treatment of collected waste (power recovery,

recycling, etc.) ?

WASTE

� upcoming environmental and health disaster because of

dumped waste and landfills ?

Page 6: Plt sampah langenburg

THE BIGGEST PROBLEM IN REGARD

OF

WASTE AND POWER IN INDONESIA

is

TIME

Page 7: Plt sampah langenburg

WHAT IS NEEDED

Page 8: Plt sampah langenburg

A SOLUTION is needed, which:

� has to show an immediate impact!

� has to be financially feasible!

� has to be accepted by the public!

� creates additional benefits to the society! (next to stable

power supply and well organized waste collection)

� works stable on a long term!

� is expandable to future demands!

� causes no problems for future generations!

� IS EASILY TO BE CONTROLLED!

� IS FREE OF CORRUPTION!

� IS EASILY TO BE ESTABLISHED!

Page 9: Plt sampah langenburg

THE SOLUTION

Page 10: Plt sampah langenburg

LANGENBURG TECHNOLOGIES is not

only providing a Technology!

Page 11: Plt sampah langenburg

LANGENBURG TECHNOLOGIES is

providing a SOLUTION, which:

� shows immediate impact within 180 days after release!

� is able to recycle 100 % of the processed waste!

� is able to create more than xxx ? new, regular jobs!

� is able to stabilize the electrical power system

� is able to add more than 10.000 MW nominal power

generation capacity on a short term (360 days)

� is able to process more than 500 Million m³ of waste water

per year (10.000 MW)

� is able to process more than 40 Million Tons³ of solid waste

per year (10.000 MW)

Page 12: Plt sampah langenburg

GOING FORWARD

Page 13: Plt sampah langenburg

Inhabitants

Jakarta / Bali?,000,000 city

?,000,000 region

?,000,000 estimation

Waste in Jakarta

or Bali

Page 14: Plt sampah langenburg

50-70% of MSW

organic fraction + paper

< 3 mm

Municipal Solid Waste

?,000 ton/day

?,000 ton/yr

Sorting Plant

MSW

SORTNG PLANT

mineral fraction

to landfill

AQUA POWER

Power Plant

(PLT Sampah)

plastics

metals

glasses

wood

MARKET

Page 15: Plt sampah langenburg

Each processing station has the capacity of approximately ?.000 ton/year

MSW (one station)

? ton/day

?.000 ton/yr Hopper sieve

ferrous and non-

ferrous metals

deposition

metals

RECYCABLE:

metals: ? t/d

glasses: ? t/d

plastics: ? t/d

fines

manual

selection

Comminution:

Waste shredder

<3mm glasses,

plastics,

textile,

paper/

cardboard

oversize

(fraction <3 mm):

Xxx ton/day

AQUA POWER

Power Plant

(PLT Sampah)

long parts

depositionorganic

plastics

wood

disintegrationpre-disintegration

separation

light fraction

heavy fraction

(mineral)

landfill

paper/cardboard: ? t/d

textile: ? t/d

What LTE can do: Sorting Plant

MARKET

HopperShortcut,

alternative

solution

Electricity

xxx MWh

Drink

water xxx

M³/day

Ash x M³/dayFor cement or asphalt

Water/waste

water xxx

M³/day

Page 16: Plt sampah langenburg

Equipment Street Cleaning

Road Sweeper Road Sweeper

Page 17: Plt sampah langenburg

Equipment Waste Collection

Front Loader

Rear Loader

Sorting Shovel

Page 18: Plt sampah langenburg

Equipment Street Cleaning

Drum Sieve Sensor Sorting

Page 19: Plt sampah langenburg

STEP 1: POWER

Langenburg recommends to start with a first project in

Jakarta or Bali

AREA

� investigate needed volumes of electricity of „high-

demand- users/customers“ (HDU)

� investigate needed volumes for the public grid

� investigate volumes of waste and waste water of the

HDUs

� investigate best connection points to the public grid /

short ways necessary / highly recommended

� investigate grid capabilities and capacities in Jakarta to

determine destinations and sizes for Aqua Power and

Waste Plants.

Page 20: Plt sampah langenburg

STEP 1: POWER (con‘t) AREA : Jakarta or Bali

� Determine destinations of Aqua Power and Waste

Power Plants

� Calculate capacities for waste and waste-water

treatment.

Page 21: Plt sampah langenburg

STEP 2: WASTE / WASTE WATER

AREA : Jakarta or Bali

MAIN POINT OF THE JAKARTA/Bali WASTE SOLUTION ?

� Determine of waste and waste-water to be processed

at each Waste Power Plant

� Determine collection points in all areas of Jakarta

� Equipe all collection points with Langenburg waste

pressure-containers.

Page 22: Plt sampah langenburg

The short term future!

OUTLOOK

Page 23: Plt sampah langenburg

By following the Langenburg Technologies

„Immediate Action Program INDONESIA“

� The power generation system will be more decentralised,

power losses on the transport will be avoided or minimized

� The power generation capacities will be sufficient to avoid

black outs

� The power supply of the main industrial institutions and

industries will be secured

Page 24: Plt sampah langenburg

Thank you for your attention!