plt sampah langenburg
TRANSCRIPT
POWER, WASTE and WASTE-WATER
Immediate Action Programm
INDONESIA
2015
presented by
Langenburg Technologies Europe GmbH
TO THE POINT
The power and waste problems in
Indonesia 2015:
� deficit of estimated 35.000 MW in 5-years
� non sufficient grid capabilities and capacities ?
� high losses in generation and transfer of power ?
� attacks on grid and power facilities ?
� high power demand for industry and household, to cope
with high economic growth rate
� totally necessary investments to restructure, to restore and
to renew the Indonesian power market and facilities are
estimated at xxx ? billion US$.
POWER
The power and waste problems in
Indonesia 2015:
� Yearly amount of solid waste approximately ?.000.000 tons.
� Collection rate of solid waste between ?xx % - ?xx%
� expected volume of garbage in 2016 more than ?.000.000
tons
� (nearly) no treatment of collected waste (power recovery,
recycling, etc.) ?
WASTE
� upcoming environmental and health disaster because of
dumped waste and landfills ?
THE BIGGEST PROBLEM IN REGARD
OF
WASTE AND POWER IN INDONESIA
is
TIME
WHAT IS NEEDED
A SOLUTION is needed, which:
� has to show an immediate impact!
� has to be financially feasible!
� has to be accepted by the public!
� creates additional benefits to the society! (next to stable
power supply and well organized waste collection)
� works stable on a long term!
� is expandable to future demands!
� causes no problems for future generations!
� IS EASILY TO BE CONTROLLED!
� IS FREE OF CORRUPTION!
� IS EASILY TO BE ESTABLISHED!
THE SOLUTION
LANGENBURG TECHNOLOGIES is not
only providing a Technology!
LANGENBURG TECHNOLOGIES is
providing a SOLUTION, which:
� shows immediate impact within 180 days after release!
� is able to recycle 100 % of the processed waste!
� is able to create more than xxx ? new, regular jobs!
� is able to stabilize the electrical power system
� is able to add more than 10.000 MW nominal power
generation capacity on a short term (360 days)
� is able to process more than 500 Million m³ of waste water
per year (10.000 MW)
� is able to process more than 40 Million Tons³ of solid waste
per year (10.000 MW)
GOING FORWARD
Inhabitants
Jakarta / Bali?,000,000 city
?,000,000 region
?,000,000 estimation
Waste in Jakarta
or Bali
50-70% of MSW
organic fraction + paper
< 3 mm
Municipal Solid Waste
?,000 ton/day
?,000 ton/yr
Sorting Plant
MSW
SORTNG PLANT
mineral fraction
to landfill
AQUA POWER
Power Plant
(PLT Sampah)
plastics
metals
glasses
wood
MARKET
Each processing station has the capacity of approximately ?.000 ton/year
MSW (one station)
? ton/day
?.000 ton/yr Hopper sieve
ferrous and non-
ferrous metals
deposition
metals
RECYCABLE:
metals: ? t/d
glasses: ? t/d
plastics: ? t/d
fines
manual
selection
Comminution:
Waste shredder
<3mm glasses,
plastics,
textile,
paper/
cardboard
oversize
(fraction <3 mm):
Xxx ton/day
AQUA POWER
Power Plant
(PLT Sampah)
long parts
depositionorganic
plastics
wood
disintegrationpre-disintegration
separation
light fraction
heavy fraction
(mineral)
landfill
paper/cardboard: ? t/d
textile: ? t/d
What LTE can do: Sorting Plant
MARKET
HopperShortcut,
alternative
solution
Electricity
xxx MWh
Drink
water xxx
M³/day
Ash x M³/dayFor cement or asphalt
Water/waste
water xxx
M³/day
Equipment Street Cleaning
Road Sweeper Road Sweeper
Equipment Waste Collection
Front Loader
Rear Loader
Sorting Shovel
Equipment Street Cleaning
Drum Sieve Sensor Sorting
STEP 1: POWER
Langenburg recommends to start with a first project in
Jakarta or Bali
AREA
� investigate needed volumes of electricity of „high-
demand- users/customers“ (HDU)
� investigate needed volumes for the public grid
� investigate volumes of waste and waste water of the
HDUs
� investigate best connection points to the public grid /
short ways necessary / highly recommended
� investigate grid capabilities and capacities in Jakarta to
determine destinations and sizes for Aqua Power and
Waste Plants.
STEP 1: POWER (con‘t) AREA : Jakarta or Bali
� Determine destinations of Aqua Power and Waste
Power Plants
� Calculate capacities for waste and waste-water
treatment.
STEP 2: WASTE / WASTE WATER
AREA : Jakarta or Bali
MAIN POINT OF THE JAKARTA/Bali WASTE SOLUTION ?
� Determine of waste and waste-water to be processed
at each Waste Power Plant
� Determine collection points in all areas of Jakarta
� Equipe all collection points with Langenburg waste
pressure-containers.
The short term future!
OUTLOOK
By following the Langenburg Technologies
„Immediate Action Program INDONESIA“
� The power generation system will be more decentralised,
power losses on the transport will be avoided or minimized
� The power generation capacities will be sufficient to avoid
black outs
� The power supply of the main industrial institutions and
industries will be secured
Thank you for your attention!