pola tanam padi palawija padi_v1

26
Lamp TABE KEBUTUHAN PENJENUHAN SELAMA PENYIA Jumlah Penjenuhan 200 mm T Penguapan dan Perembesan (Eo + P) m Hari 3.5 3.6 3.7 3.8 3.9 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 30 8.6 8.6 8.7 8.8 8.8 8.9 8.9 9.0 9.1 9.1 9.2 9.2 9.3 9.4 9.4 35 7.6 7.7 7.8 7.8 7.9 7.9 8.0 8.1 8.1 8.2 8.3 8.3 8.4 8.4 8.5 40 7.0 7.0 7.0 7.1 7.2 7.3 7.3 7.4 7.5 7.5 7.6 7.6 7.7 7.8 7.3 45 6.4 6.5 6.6 6.6 6.7 6.7 6.5 6.9 6.9 7.0 7.1 7.1 7.2 7.3 7.3 50 6.0 6.1 6.1 6.2 6.3 6.3 6.4 6.5 6.5 6.5 6.7 6.7 6.8 6.9 6.9 55 5.7 5.7 5.8 5.5 5.9 6.0 6.1 6.0 6.2 6.3 6.3 6.4 6.5 6.6 6.6 60 5.4 5.5 5.5 5.6 5.7 5.7 5.8 5.9 5.9 6.0 6.1 6.1 6.2 6.3 6.4 T Penguapan dan Hari 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7.0 7.1 7.2 7.3 7.4 30 10.1 10.2 10.2 10.2 10.4 10.4 10.5 10.6 10.6 10.7 10.8 10.8 10.9 10.9 11.0 35 9.2 9.3 9.4 9.4 9.5 9.6 9.6 9.7 9.8 9.8 9.9 9.9 10.0 10.1 10.1 40 8.6 8.7 8.7 8.7 8.8 8.9 9.0 9.1 9.1 9.2 9.3 9.3 9.4 9.5 9.5 45 8.1 8.2 8.2 8.2 9.4 8.5 8.5 8.6 8.7 8.8 8.8 8.9 8.9 9.0 9.1 50 7.7 7.8 7.9 7.9 8.0 8.1 8.2 8.2 8.3 8.4 8.5 8.5 8.6 8.7 8.7

Upload: okto-wisnu-nugroho

Post on 18-Jan-2016

139 views

Category:

Documents


20 download

DESCRIPTION

lolololol

TRANSCRIPT

Page 1: Pola Tanam Padi Palawija Padi_v1

Lampiran 4 -1.

TABEL ZYLSTRAKEBUTUHAN PENJENUHAN PENDAHULUAN (AIR IRIGASI)

SELAMA PENYIAPAN LAHAN UNTUK PADI

Jumlah Penjenuhan 200 mm

T Penguapan dan Perembesan (Eo + P) mm/hari

Hari 3.5 3.6 3.7 3.8 3.9 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 5.0 5.1 5.2

30 8.6 8.6 8.7 8.8 8.8 8.9 8.9 9.0 9.1 9.1 9.2 9.2 9.3 9.4 9.4 9.5 9.6 9.6

35 7.6 7.7 7.8 7.8 7.9 7.9 8.0 8.1 8.1 8.2 8.3 8.3 8.4 8.4 8.5 8.6 8.6 9.7

40 7.0 7.0 7.0 7.1 7.2 7.3 7.3 7.4 7.5 7.5 7.6 7.6 7.7 7.8 7.3 7.9 8.0 8.0

45 6.4 6.5 6.6 6.6 6.7 6.7 6.5 6.9 6.9 7.0 7.1 7.1 7.2 7.3 7.3 7.4 7.4 7.5

50 6.0 6.1 6.1 6.2 6.3 6.3 6.4 6.5 6.5 6.5 6.7 6.7 6.8 6.9 6.9 7.0 7.1 7.1

55 5.7 5.7 5.8 5.5 5.9 6.0 6.1 6.0 6.2 6.3 6.3 6.4 6.5 6.6 6.6 6.7 6.8 6.9

60 5.4 5.5 5.5 5.6 5.7 5.7 5.8 5.9 5.9 6.0 6.1 6.1 6.2 6.3 6.4 6.4 6.5 6.6

T Penguapan dan Perembesan (Eo + P) mm/hari

Hari 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7

30 10.1 10.2 10.2 10.2 10.4 10.4 10.5 10.6 10.6 10.7 10.8 10.8 10.9 10.9 11.0 11.1 11.1 11.2

35 9.2 9.3 9.4 9.4 9.5 9.6 9.6 9.7 9.8 9.8 9.9 9.9 10.0 10.1 10.1 10.2 10.3 10.4

40 8.6 8.7 8.7 8.7 8.8 8.9 9.0 9.1 9.1 9.2 9.3 9.3 9.4 9.5 9.5 9.6 9.7 9.8

45 8.1 8.2 8.2 8.2 9.4 8.5 8.5 8.6 8.7 8.8 8.8 8.9 8.9 9.0 9.1 9.2 9.2 9.3

50 7.7 7.8 7.9 7.9 8.0 8.1 8.2 8.2 8.3 8.4 8.5 8.5 8.6 8.7 8.7 8.8 8.9 9.0

Page 2: Pola Tanam Padi Palawija Padi_v1

55 7.4 7.5 7.6 7.6 7.7 7.8 7.9 8.0 8.1 8.1 8.2 8.2 8.2 8.4 8.5 8.5 8.6 8.7

60 7.2 7.3 7.3 7.3 7.5 7.6 7.7 7.7 7.8 7.9 8.0 8.0 8.1 8.2 8.3 8.3 8.4 8.5

Data : PSA - 010, Dirjen Pengairan, Bina Program (1985)

(Tab padi) Catatan : Sheet perhitungan Kebutuhan PenjenuhanEo+P 7.3 6.75 7.21 7.62 7.73 7.43 7.92 8.70 10.12 8.27 6.01 7.23

Pejenuhan 11.1 10.4 10.6 10.8 10.8 10.6 10.9 12.1 13.2 11.7 9.4 11.0

Page 3: Pola Tanam Padi Palawija Padi_v1

Lampiran 4 -1.

TABEL ZYLSTRAKEBUTUHAN PENJENUHAN PENDAHULUAN (AIR IRIGASI)

SELAMA PENYIAPAN LAHAN UNTUK PADI

Penguapan dan Perembesan (Eo + P) mm/hari

n haritabel penjenuhan tabel penjenuhan

5.3 5.4 5.5 5.6 5.7 5.8 5.9 200 mm 225 mm9.7 9.7 9.8 9.9 9.9 10.0 10.0 koef a koef b koef a8.8 8.8 8.9 9.0 9.0 9.1 9.2 30 0.63636 6.37274 0.618188.1 8.2 8.1 8.3 8.3 8.4 8.5 35 0.67272 5.24548 0.654547.6 7.7 7.9 7.3 7.9 8.0 8.0 40 0.67272 6.64548 0.672727.2 7.5 7.5 7.4 7.5 7.6 7.7 45 0.70909 3.91818 0.69096.9 7.0 7.1 7.1 7.2 7.5 7.4 50 0.72727 3.45455 0.727276.7 6.7 6.9 6.9 7.0 7.0 7.1 55 0.74545 3.09092 0.74545

60 0.76363 2.72729 0.74545

y=a*x+bPenguapan dan Perembesan (Eo + P) mm/hari y= Kebutuhan air penjenuhan (mm/hari)

7.8 7.9 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 9.0 X= Evaporasi Permukaan air dan Perkolasi (Eo + P), dalam mm/hari11.3 11.3 11.4 11.5 11.5 11.6 11.7 11.7 11.8 11.9 12.0 12.0 12.1 A = Konstanta X

10.4 10.5 10.6 10.6 10.7 10.8 10.9 10.4 11.0 11.1 11.2 11.2 11.3 b = Konstanta9.5 9.9 10.0 10.0 10.1 10.2 10.3 10.3 10.4 10.5 10.6 10.7 10.7

9.4 9.5 9.5 9.6 9.7 9.8 9.8 9.9 10.0 10.1 10.2 10.2 10.3

9.0 9.1 9.2 9.3 9.4 9.4 9.5 9.6 9.7 9.8 9.8 9.9 10.0

Page 4: Pola Tanam Padi Palawija Padi_v1

8.7 8.9 8.9 9.0 9.1 9.2 9.3 9.4 9.4 9.5 9.6 9.7 9.8

8.6 8.7 8.7 8.8 8.9 9.0 9.1 9.3 9.3 9.3 9.4 9.5 9.6

Page 5: Pola Tanam Padi Palawija Padi_v1

tabel penjenuhan tabel penjenuhan tabel penjenuhan225 mm 250 mm 275 mm

koef b koef a koef b koef a koef b7.23637 0.61818 8.03637 0.6 8.96.00911 0.63636 6.77274 0.61818 7.536375.14548 0.65454 5.80911 0.65454 6.409114.48185 0.6909 4.89185 0.65454 5.709113.85455 0.6909 4.48185 0.67272 5.045483.39092 0.70909 4.01818 0.6909 4.481853.09092 0.72727 3.55455 0.70909 4.01818

y= Kebutuhan air penjenuhan (mm/hari)X= Evaporasi Permukaan air dan Perkolasi (Eo + P), dalam mm/hari

Page 6: Pola Tanam Padi Palawija Padi_v1

Faktor Koreksi ET Tanaman

Curah Hujan Me 12.5 25 37.5 50 62.5

Bulanan (mm)

Curah Hujan Efektif Rata-rata Bulanan (mm)

ET Tanama 25 8 16 24

Rata-rata 50 8 17 25 32 37

Bulanan 75 9 18 27 34 41

(mm) 100 9 19 28 35 43

125 10 20 30 37 46

150 10 21 31 39 49

175 11 23 32 42 52

200 11 24 33 44 54

225 12 25 35 47 57

250 13 25 38 50 60

Tampungan Efektif 20 25 38 50

Faktor Tampungan 0.73 0.77 0.86 0.93

Curah Hujan 157.95 208.14 124.21 106.92ET. Crop Tanaman 172.47 138.95 168.99 176.35Interpolasi 1 109.09 0.00 88.50 77.88Interpolasi 2 115.45 136.91 94.43 82.43Interpolasi 3 114.81 76.38 98.94 82.67

Page 7: Pola Tanam Padi Palawija Padi_v1

Faktor Koreksi ET Tanaman

75 87.5 100 112.5 125 137.5

Curah Hujan Efektif Rata-rata Bulanan (mm)

46

48 56 62 69

52 59 66 73 80 87

54 62 70 76 85 92

57 66 74 81 89 97

61 69 78 86 95 103

64 73 82 91 100 109

68 78 87 96 106 115

72 84 92 102 112 121

63 75 100 125 150 175

0.97 1.00 1.02 1.04 1.06 1.07

8.40 0.00 0.00 0.00 0.00 23.27185.54 170.41 191.75 217.21 254.79 203.07

6.39 0.00 0.00 0.00 0.00 22.207.06 0.00 0.00 0.00 0.00 23.207.34 0.00 0.00 0.00 0.00 23.32

Page 8: Pola Tanam Padi Palawija Padi_v1

Faktor Koreksi ET Tanaman

150 162.5 175 ### 200

Curah Hujan Efektif Rata-rata Bulanan (mm)

94 100 0 0

98 107 116 120 0

104 112 119 127 133

111 118 126 134 141

117 125 134 142 150

124 132 141 150 159

132 140 150 158 167

200

1.08

63.37 134.00125.78 169.4952.63 94.7654.70 100.7650.62 105.44

Page 9: Pola Tanam Padi Palawija Padi_v1

Tabel 5.2.

g + D

Tai 0 1 2 3 4 5 6 7

8.37 8.38 8.40 8.41 8.42 8.43 8.44 8.46

20 1.84 1.86 1.87 1.88 1.89 1.90 1.91 1.92

17.53 17.64 17.75 17.86 17.97 18.08 18.20 18.31

1.58 1.58 1.59 1.60 1.60 1.61 1.61 1.62

8.43 8.50 8.51 8.52 8.53 8.54 8.56 8.57

21 1.96 1.97 1.98 1.99 2.00 2.01 2.02 2.04

18.65 18.77 18.88 19.00 19.11 19.23 19.35 19.46

1.64 1.65 1.66 1.66 1.66 1.67 1.68 1.68

8.60 8.61 8.62 8.63 8.64 8.65 8.67 8.68

22 2.07 2.08 2.09 2.10 2.11 2.12 2.14 2.15

19.82 19.94 20.06 20.19 20.31 20.43 20.51 20.69

1.70 1.71 1.72 1.72 1.73 1.74 1.74 1.75

8.72 8.73 8.74 8.76 8.77 8.78 8.79 8.81

23 2.18 2.19 2.21 2.22 2.23 2.24 2.26 2.27

21.09 21.19 21.32 21.45 21.50 21.71 21.84 21.97

1.77 1.78 1.78 1.78 1.80 1.80 1.81 1.82

8.84 8.85 8.86 8.88 8.89 8.90 8.91 8.93

24 2.30 2.32 2.33 2.34 2.36 2.37 2.38 2.40

22.37 22.50 22.63 22.76 22.91 23.05 23.19 23.31

1.83 1.84 1.85 1.86 1.87 1.87 1.88 1.89

8.96 8.97 8.98 9.00 9.01 9.02 9.03 9.05

25 2.43 2.45 2.46 2.47 2.49 2.50 2.51 2.52

23.75 23.90 24.03 24.20 24.35 24.49 24.64 24.79

1.91 1.92 1.92 1.93 1.94 1.95 1.95 1.96

9.08 9.09 9.10 9.12 9.13 9.14 9.15 9.17

26 2.56 2.57 2.59 2.60 2.62 2.63 2.64 2.66

25.31 22.45 25.60 25.74 25.89 26.03 26.18 26.32

1.98 1.99 2.00 2.01 2.01 2.02 2.03 2.04

9.20 9.21 9.22 9.24 9.25 9.26 9.27 9.29

27 2.70 2.71 2.73 2.74 2.76 2.78 2.79 2.81

26.74 26.90 27.05 27.21 27.37 27.53 27.69 27.85

2.06 2.07 2.08 2.08 2.09 2.09 2.10 2.11

9.32 9.33 9.35 9.36 9.37 9.39 9.40 9.41

TABEL Tai UNTUK SUHU UDARA ANTARA 20oC - 29oC

f (Tai) x 10-2

D L-1 x 10-2

Pzwa ]sa

o C

Page 10: Pola Tanam Padi Palawija Padi_v1

28 2.86 2.87 2.88 2.90 2.91 2.92 2.94 2.95

28.32 28.49 28.66 28.83 29.00 29.17 29.34 29.51

2.14 2.15 2.16 2.17 2.18 2.18 2.19 2.20

9.45 9.46 9.47 9.49 9.50 9.51 9.52 9.54

29 2.99 3.01 3.02 3.04 3.05 3.07 3.08 3.10

30.03 30.20 30.38 30.56 30.74 30.92 31.10 31.28

2.23 2.24 2.25 2.25 2.26 2.70 2.28 2.29

Data : PSA-010 Dirjen Pengairan, Bina Program (1985)

JAN PEB MAR APR MEI JUN JUL AGU26.6 29.1 29.5 29.4 29.9 29.2 29.0 29.2

9.07 9.06 9.09 9.08 9.06 8.96 8.90 8.94

2.55 2.54 2.57 2.56 2.54 2.43 2.37 2.41

25.08 24.94 22.45 25.31 24.94 23.75 23.05 23.45

1.98 1.97 1.99 1.98 1.97 1.91 1.87 1.89

Page 11: Pola Tanam Padi Palawija Padi_v1

Tabel 5.2.

g + D

8 9

8.47 8.48

1.93 1.94

18.43 18.54

1.62 1.63

8.58 8.59

2.05 2.06

19.58 19.70

1.69 1.70

8.69 8.71

2.16 2.17

20.80 20.93

1.75 1.76

8.82 8.83

2.28 2.29

22.10 22.23

1.82 1.83

8.94 8.95

2.41 2.42

23.45 23.60

1.89 1.90

9.06 9.07

2.54 2.55

24.94 25.08

1.97 1.98 26.649.18 9.19 9.1582.67 2.69 2.648

26.46 26.60 26.2362.04 2.05 2.0349.30 9.31

2.82 2.84

28.10 28.16

2.12 2.13

9.43 9.44

C - 29oC

Page 12: Pola Tanam Padi Palawija Padi_v1

2.96 2.98

29.68 29.85

2.21 2.22

9.55 9.56

3.11 3.13

31.46 31.64

2.30 2.31

SEP OKT NOP DES30.5 31.0 30.5 29.5

9.06 9.15 9.19 9.02

2.54 2.64 2.69 2.50

24.94 26.18 26.60 24.49

1.97 2.03 2.05 1.95

Page 13: Pola Tanam Padi Palawija Padi_v1

Tabel 5.3.

TABEL Tdp KELEMBABAN RELATIFf (Tdp)

Pzwa (mmHg)

0 1 2 3 4 5 6 7

15 0.195 0.194 0.194 0.193 0.192 0.191 0.190 0.189 12.78 12.86 12.95 13.03 13.11 13.20 13.28 13.37

16 0.186 0.185 0.184 0.183 0.182 0.181 0.180 0.179 13.63 13.71 13.80 13.90 13.99 14.08 14.17 14.26

17 0.176 0.175 0.175 0.174 0.173 0.172 0.171 0.170 14.53 14.62 14.71 14.80 14.90 14.99 15.09 15.17

18 0.167 0.166 0.165 0.164 0.163 0.162 0.161 0.160 15.46 15.56 15.66 15.76 15.86 15.96 16.06 16.16

19 0.157 0.156 0.156 0.155 0.154 0.153 0.152 0.151 16.46 16.57 16.68 16.79 16.90 17.00 17.10 17.21

20 0.148 0.147 0.146 0.145 0.144 0.143 0.142 0.141 17.53 17.64 17.75 17.86 17.97 18.08 18.20 18.31

21 0.137 0.136 0.135 0.134 0.133 0.132 0.131 0.130 18.65 18.77 18.88 19.00 19.11 19.23 19.35 19.46

22 0.127 0.126 0.125 0.124 0.123 0.122 0.121 0.120 19.82 19.94 20.06 20.19 20.31 20.43 20.58 20.69

23 0.116 0.115 0.114 0.113 0.112 0.111 0.110 0.109 21.05 21.19 21.32 21.45 21.58 21.71 21.84 21.97

24 0.106 0.105 0.104 0.103 0.102 0.101 0.100 0.099 22.37 22.50 22.63 22.76 22.91 23.05 23.19 23.31

Data : PSA-010 Dirjen Pengairan, Bina Program (1985)

januarimmHg 22.4 23.6 20.7 22.4 21.4 19.5 18.4 18.1f (tdp) 0.157 0.160 0.182 0.163 0.168 0.179 0.188 0.194

Pzwa

(mmHg)

Page 14: Pola Tanam Padi Palawija Padi_v1

Tabel 5.3.

TABEL Tdp KELEMBABAN RELATIFf (Tdp)

Pzwa (mmHg)

8 9

0.188 0.187 13.45 13.54 0.178 0.177 14.35 14.44 0.169 0.168 15.27 15.38 0.159 0.158 16.26 16.36 0.150 0.149 17.32 17.43 0.140 0.139 18.43 18.54 0.129 0.128 19.58 19.70 0.119 0.117 22.37220.80 20.93 0.108 0.107 22.10 22.23 0.097 0.096 23.45 23.60

desember18.8 20.8 22.9 22.2

0.183 0.179 0.171 0.172

Page 15: Pola Tanam Padi Palawija Padi_v1

Tabel 5.4.

FUNGSI KECEPATAN ANGIN

0 1 2 3 4 5 6 7 8

(m/dt)

0 0.086 0.095 0.104 0.113 0.123 0.132 0.141 0.151 0.160

1 0.178 0.187 0.197 0.206 0.215 0.225 0.234 0.244 0.253

2 0.271 0.280 0.290 0.299 0.308 0.318 0.327 0.337 0.346

3 0.364 0.373 0.382 0.392 0.401 0.410 0.420 0.429 0.438

4 0.456 0.465 0.475 0.484 0.493 0.503 0.512 0.522 0.531

5 0.549 0.558 0.568 0.577 0.586 0.596 0.605 0.614 0.624

baris 3 2.5 2.1 2.3 2.2 2.2 2.2 2.7 3.3 3.9

0.187 0.178 0.178 0.169 0.169 0.169 0.197 0.206 0.206

Tabel 5.5.

LS JAN PEB MAR APR MEI JUNI JULI AGT SEPT

Latitude

5 8.97 9.08 8.91 8.42 7.81 7.45 7.56 8.08 8.64

6 9.04 9.12 8.91 8.37 7.72 7.35 7.47 8.01 8.62

7 9.12 9.16 8.90 8.32 7.64 7.25 7.37 7.95 8.59

8 9.19 9.20 8.90 8.27 7.55 7.15 7.28 7.88 8.57

9 9.27 9.24 8.90 8.22 7.47 7.05 7.18 7.81 8.54

7.52 9.16 9.18 8.90 8.30 7.60 7.20 7.33 7.92 8.58

Tabel 5-5Interpolasi linier untuk alpha dengan LS 7,527.9 9.18 9.20 8.90 8.28 7.56 7.16 7.29 7.89 8.57

9

Tabel 5.6.

TABEL FUNGSI (r)

Derajad r

LS 0 10 20 30 40 50 60 70 80

g x f (m2) = 0,49 x 0,35 (0,5 + 0,54 m2)

m2

aaH sh x 10-2

ash x f (r) = 0,75 [ 0,29 cos Wo S + 0,52 r x 10-2]

Page 16: Pola Tanam Padi Palawija Padi_v1

30 0.188 0.227 0.266 0.305 0.344 0.383 0.422 0.461 0.500

20 0.204 0.243 0.282 0.321 0.360 0.399 0.438 0.477 0.516

10 0.214 0.253 0.292 0.331 0.370 0.409 0.449 0.487 0.526

7.52 0.215 0.254 0.293 0.332 0.371 0.410 0.450 0.488 0.527

5 0.216 0.255 0.294 0.333 0.372 0.411 0.450 0.489 0.528

0 0.218 0.257 0.296 0.335 0.374 0.413 0.452 0.491 0.530

Data : PSA-010 Dirjen Pengairan, Bina Program (1985)

Tabel 5-6 Interpolasi linier untuk r dengan LS 7,52jan

7.52 0.215 0.254 0.293 0.332 0.371 0.410 0.450 0.488 0.527 0 10 20 30 40 50 60 70 80

Data Qi 28.77 36.48 47.21 62.08 73.28 75.92 82.25 83.54 85.95

ash x f ( r ) 0.31 0.36

Page 17: Pola Tanam Padi Palawija Padi_v1

Tabel 5.4.

FUNGSI KECEPATAN ANGIN

9

0.169 2.5020.262

0.355

0.447

0.540

0.632

3.5 3.3 2.7

0.187 0.178 0.169

Tabel 5.5.

OKT NOP DES

8.95 8.94 8.89

8.97 9.01 8.97

8.99 9.08 9.06

9.01 9.14 9.14

9.03 9.21 9.23

9.00 9.11 9.10

9.01 9.13 9.13

Tabel 5.6.

TABEL FUNGSI (r)

r

90 100

2)

S + 0,52 r x 10-2]

Page 18: Pola Tanam Padi Palawija Padi_v1

0.539 0.578

0.555 0.594

0.565 0.604

0.566 0.605

0.567 0.606

0.569 0.608

des0.566 0.605

90 100

66.84 64.16 43.88

Page 19: Pola Tanam Padi Palawija Padi_v1

PERHITUNGAN CURAH HUJAN BULANAN RATA-RATA

TAHUNB U L A N

JAN PEB MAR APR MEI JUN JUL AGU SEP OKT NOP DES

1994 ### 517 333 343 120 14 0 0 0 0 0 351 1501995 ### 328 506 0 137 0 99 0 0 0 225 0 2081996 ### 0 315 0 181 0 10 0 35 0 174 0 2551997 ### 0 467 0 213 0 0 0 29 0 42 78 4031998 ### 191 410 457 475 124 44 85 0 118 279 291 1611999 ### 309 435 340 195 129 0 86 22 15 368 199 2222000 ### 257 216 253 0 165 53 0 124 62 172 177 452001 ### 409 610 406 241 0 72 55 0 67 204 109 892002 ### 251 228 249 99 11 77 84 0 0 0 236 3162003 ### 211 362 265 183 62 3 0 0 42 88 196 2802004 ### 250 233 200 53 61 3 53 0 48 61 400 3622005 ### 254 168 297 171 0 272 94 101 0 169 146 2922006 ### 393 233 155 360 305 27 0 8 0 20 128 2992007 ### 152 230 292 202 93 44 10 0 0 63 145 4542008 ### 247 151 413 80 156 6 0 47 0 0 0 02009 ### 342 100 265 210 134 0 0 0 0 25 316 1322010 ### 440 398 181 356 81 70 58 7 85 89 115 3242011 ### 175 578 94 228 60 0 0 0 0 21 0 5142012 ### 257 220 285 302 107 59 0 168 22 225 183 2632013 430 388 245 213 2 85 0 0 0.00 38 168 152

x 270.65 329.05 237.00 200.95 75.20 46.20 26.25 27.05 22.95 113.15 161.90 246.05

SD 133.84 143.60 133.95 111.67 79.34 62.99 37.01 48.14 35.34 106.75 117.02 133.08

R80% bulanan 157.95 208.14 124.21 106.92 8.40 0.00 0.00 0.00 0.00 23.27 63.37 134.00

R80% harian 5.10 7.43 4.01 3.56 0.27 0.00 0.00 0.00 0.00 0.75 2.11 4.32

Catatan : x = Curah Hujan Bulanan Rata - Rata ( mm )

SD = Standar Deviasi = ; n = Jumlah Data

R80% bulanan = Curah Hujan Efektif 20 % Kering Bulanan ( mm )

_

= x + K . SD ; K = - 0,842

R80% harian = Curah Hujan Efektif 20 % Kering Harian ( mm )

= R5 bulanan / m m = Jumlah Hari Dalam Satu Bulan

√ X2−(∑ X )2 /nn−1

Page 20: Pola Tanam Padi Palawija Padi_v1

Data Klimatologi:Tipe c

DATA LAMA PENYINARAN MATAHARI STANDAR 8 JAM ( % )STASIUN : ADI SOEMARMO SURAKARTA

ELEVASI : + 104 m MSL

NO TAHUN JAN PEB MAR APR MEI JUN JUL AGU SEP OKT NOP DES JUMLAH

1 2004 63.8 48.4 58.7 91.3 90.2 97.9 92.4 107.8 108.9 107.8 82.5 58.3 1007.95 84.00

2 2005 73.7 67.1 69.3 74.8 90.2 72.6 93.5 - 101.2 74.8 82.5 24.2 823.90 74.90

3 2006 40.7 40.9 33.0 66.0 79.2 97.9 104.5 104.5 110.0 92.4 100.1 68.2 937.44 78.12

4 2007 80.3 61.6 33.0 57.2 89.1 78.1 102.3 105.6 - - - - 607.20 75.90

5 2008 - - - - - - - - - - - - 0.00 0.00

6 2009 39.6 46.2 55.9 72.6 90.1 95.2 98.0 101.6 107.4 73.2 61.7 32.9 874.52 72.88

7 2010 42.7 38.4 54.6 69.9 88.0 84.1 104.0 92.4 101.8 66.6 54.8 66.0 863.30 71.94

8 2011 48.3 14.2 56.8 78.2 96.5 95.1 93.2 100.2 105.5 56.7 - - 744.64 74.46

9 2012 59.3 22.6 66.5 75.3 91.5 107.8 108.9 95.8 101.4 91.8 90.9 57.5 969.31 80.78

10 2013 - 38.7 73.2 85.9 84.8 100.9 105.5 107.1 103.4 81.8 68.0 52.8 902.15 82.01

JUMLAH 448.40 378.11 500.98 671.26 799.49 829.67 902.21 815.03 839.56 645.10 540.61 359.99 7730.41 694.99

56.05 42.01 55.66 74.58 88.83 92.19 100.25 101.88 104.94 80.64 77.23 51.43 773.04 69.50

Keterangan : fn : data-kli.xls

Sumber data : Badan Meteorologi dan Geofisika Wilayah II

Stasiun Klimatologi Klas I Semarang

DATA KECEPATAN ANGIN ( m / dt )STASIUN : ADI SOEMARMO SURAKARTA

ELEVASI : + 104 m MSL

NO TAHUN JAN PEB MAR APR MEI JUN JUL AGU SEP OKT NOP DES JUMLAH

1 2004 2.2 2.2 2.8 1.7 2.8 3.3 3.9 4.4 4.4 5.0 3.9 4.4 40.70 3.39

2 2005 - 2.8 2.2 3.3 1.7 2.2 2.8 2.8 3.3 3.3 3.3 2.2 29.70 2.70

3 2006 1.7 2.8 2.2 2.2 2.2 2.8 2.2 2.2 3.9 3.9 3.9 1.7 31.35 2.61

4 2007 2.8 2.8 3.3 1.1 1.7 1.7 1.7 3.9 5.0 4.4 3.9 1.1 33.00 2.75

5 2008 1.7 1.1 2.2 2.8 2.8 2.8 2.8 2.8 3.9 2.8 2.2 2.8 30.25 2.52

6 2009 1.5 1.7 2.2 2.4 1.8 0.8 2.6 3.1 3.1 2.3 2.3 1.1 24.96 2.08

7 2010 3.1 1.9 1.6 2.4 2.4 2.3 2.3 3.1 3.9 3.5 2.2 3.4 32.04 2.67

8 2011 1.7 1.5 2.0 2.1 1.8 1.9 1.7 3.6 3.9 2.0 4.3 4.8 31.25 2.60

9 2012 4.1 1.9 2.3 1.4 2.4 3.8 3.4 3.2 3.6 3.3 3.2 2.5 35.09 2.92

10 2013 2.3 2.3 1.9 2.4 2.6 1.1 3.8 4.2 4.3 4.3 3.6 2.6 35.34 2.95

JUMLAH 21.08 20.82 22.69 21.63 21.98 22.48 27.00 33.12 39.07 34.60 32.60 26.61 323.69 27.20

2.34 2.08 2.27 2.16 2.20 2.25 2.70 3.31 3.91 3.46 3.26 2.66 32.37 2.72

Keterangan : fn : data-kli.xls

Data mulai tahun 1993 sampai dengan 2002 tidak tercatat.

Sumber data : Badan Meteorologi dan Geofisika Wilayah II

Stasiun Klimatologi Klas I Semarang

STASIUN : ADI SOEMARMO SURAKARTA

ELEVASI : + 104 m MSL

NO TAHUN JAN PEB MAR APR MEI JUN JUL AGU SEP OKT NOP DES JUMLAH RATA-RATA

1 2004 28.8 28.8 28.8 30.6 30.4 27.9 29.0 28.8 30.6 31.4 31.0 29.6 355.74 29.65

2 2005 29.7 29.7 30.4 25.4 30.6 30.6 29.5 30.1 30.8 31.1 30.7 29.5 357.96 29.83

3 2006 29.2 29.4 28.7 29.7 29.6 28.7 28.7 28.7 29.8 31.8 31.9 30.9 357.06 29.76

4 2007 30.4 29.4 29.5 30.1 30.4 29.4 29.2 29.2 29.9 31.9 28.9 28.9 357.06 29.76

5 2008 27.5 28.4 29.0 27.9 28.9 28.7 28.8 29.4 31.1 30.4 29.9 28.8 348.92 29.08

6 2009 28.7 28.6 29.2 29.6 29.5 29.2 28.6 29.2 30.0 30.4 30.3 29.1 352.64 29.39

7 2010 28.5 28.3 28.9 29.6 28.9 28.8 28.9 28.7 30.9 29.0 29.6 28.7 348.85 29.07

8 2011 29.6 29.1 29.6 30.5 30.3 29.4 29.2 29.2 31.2 30.5 30.4 29.6 358.53 29.88

9 2012 30.0 29.5 30.3 30.0 30.6 29.7 29.5 29.0 30.2 31.9 31.2 30.3 362.29 30.19

10 2013 29.3 29.4 30.3 30.9 30.0 29.5 29.1 29.4 30.7 31.1 30.7 29.7 360.04 30.00

JUMLAH 291.65 290.61 294.76 294.24 299.21 291.94 290.39 291.56 305.27 309.51 304.73 295.23 3559.10 296.59

29.17 29.06 29.48 29.42 29.92 29.19 29.04 29.16 30.53 30.95 30.47 29.52 355.91 29.66

Keterangan : fn : data-kli.xls

Data tahun 1988 dan 1991 tidak tercatat.

Sumber data : Badan Meteorologi dan Geofisika Wilayah II

Stasiun Klimatologi Klas I Semarang

DATA KELEMBABAN UDARA RELATIF ( % )STASIUN : ADI SOEMARMO SURAKARTA

ELEVASI : + 104 m MSL

NO TAHUN JAN PEB MAR APR MEI JUN JUL AGU SEP OKT NOP DES JUMLAH RATA-RATA

1 2004 94.6 93.5 92.4 85.8 84.7 82.5 79.2 73.7 74.8 74.8 85.8 91.3 1013.10 84.43

2 2005 - 91.3 91.3 89.1 85.8 85.8 82.5 75.9 75.9 81.4 81.4 94.6 935.00 77.92

3 2006 94.6 95.7 91.3 91.3 89.1 71.5 77.0 77.0 70.4 67.1 75.9 88.0 988.90 82.41

4 2007 81.4 95.7 91.3 91.3 85.8 81.4 78.1 73.7 72.6 74.8 83.6 91.3 1001.00 83.42

5 2008 90.2 93.5 92.4 86.9 80.3 77.0 73.7 71.5 70.4 82.5 89.1 88.0 995.50 82.96

6 2009 93.6 92.9 90.0 86.2 82.7 78.4 76.4 71.8 69.7 81.2 88.1 90.6 1001.63 83.47

7 2010 91.8 93.7 92.9 87.1 84.3 81.2 77.2 73.6 76.0 81.6 89.4 84.7 1013.69 84.47

8 2011 93.5 92.4 92.6 89.2 86.2 89.9 89.0 87.4 84.9 90.5 91.4 93.4 1080.48 90.04

9 2012 96.1 98.9 94.2 93.3 90.6 86.8 85.4 84.3 84.8 83.6 88.6 94.4 1080.95 90.08

10 2013 94.9 97.2 95.7 86.3 88.1 85.3 80.7 80.9 74.1 77.9 85.7 90.8 1037.67 86.47

JUMLAH 830.66 944.74 924.18 886.53 857.68 819.83 799.27 769.82 753.57 795.51 859.10 907.04 ### 845.66

92.30 94.47 92.42 88.65 85.77 81.98 79.93 76.98 75.36 79.55 85.91 90.70 1014.79 84.57

Keterangan : fn : data-kli.xls

Data tahun 1988, 1997 dan 1998 tidak tercatat.

Sumber data : Badan Meteorologi dan Geofisika Wilayah II

Stasiun Klimatologi Klas I Semarang

KOORDINAT : 070 52' 000" LS dan 110 55' 000" BT

RATA 2

RATA2

KOORDINAT : 070 52' 000" LS dan 110 55' 000" BT

RATA 2

RATA2

DATA SUHU UDARA ( 0 Celcius )

KOORDINAT : 070 52' 000" LS dan 110 55' 000" BT

RATA 2

KOORDINAT : 070 52' 000" LS dan 110 55' 000" BT

RATA2

Page 21: Pola Tanam Padi Palawija Padi_v1

Tabel D.2. Evapotranspirasi potensial.

No Keterangan Notasi Satuan Jan Feb Mar Apr Mei Jun Jul Agt Sep Okt Nop Des

1 Temperatur Udara t oC 29.17 29.06 29.48 29.42 29.92 29.19 29.04 29.16 30.53 30.95 30.47 29.52

2 Kelembaban Relatif h % 92.30 94.47 92.42 88.65 85.77 81.98 79.93 76.98 75.36 79.55 85.91 90.70

3 Kecepatan Angin (U2) U2 m/dt 2.34 2.08 2.27 2.16 2.20 2.25 2.70 3.31 3.91 3.46 3.26 2.66

4 Rasio Keawanan n/N % 56.05 42.01 55.66 74.58 88.83 92.19 100.25 101.88 104.94 80.64 77.23 51.43

5 Albedo / Koefisien Pemantulan r 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25

6 Radiasi Angot RA 940.2 960 918.1 858.6 784.45 744.1 761 818.25 884.3 927.25 934.85 933.65

7 Tekanan Uap Jenuh ea mmHg 30.33 30.14 30.88 30.79 31.68 30.38 30.10 30.31 32.81 33.61 32.71 30.97

8 Tekanan Uap Jenuh Air di Udara ed mmHg 27.99 28.47 28.54 27.30 27.17 24.90 24.06 23.33 24.73 26.74 28.10 28.09

9 Tangen Lengkung Tekanan Uap Jenuh Δ 1.75 1.74 1.78 1.77 1.81 1.76 1.74 1.75 0.00 0.00 0.00 1.78

10 Suhu Absolut Ta K 302.17 302.06 302.48 302.42 302.92 302.19 302.04 302.16 303.53 303.95 303.47 302.52

11 Radiasi Benda Hitam rTa4 983.69399 982.34325 987.7482 987.07376 993.57095 984.06617 982.05276 983.57179 1001.5453 1007.1524 1000.8287 988.36016

12 RI RI 387.15 346.79 376.78 410.84 415.60 403.20 434.44 471.94 519.79 463.90 456.23 368.92

13 RB RB 39.95 31.13 37.38 53.25 62.10 79.10 90.84 97.90 90.71 61.17 50.61 37.42

14 H H 347.21 315.66 339.40 357.60 353.49 324.10 343.60 374.04 429.08 402.73 405.63 331.50

15 Parameter Aliran Uap Ea mm/hr 1.44 0.95 1.41 2.04 2.66 3.28 4.14 5.59 7.39 5.70 3.65 1.95

16 Evapotranspirasi Eto mm/hr 4.84 4.32 4.74 5.11 5.20 4.94 5.38 6.09 7.39 5.70 3.65 4.75

17 Jumlah Hari 31 28 31 30 31 30 31 31 30 31 30 31

18 Evapotranspirasi Eto mm/bln 149.97603 120.82467 146.9444 153.34658 161.34344 148.18027 166.73988 188.88034 221.55373 176.58555 109.37313 147.38363

Angka Angot (RA)

LS Jan Feb Mar Apr Mei Jun Jul Agt Sep Okt Nop Des0 885 960 925 900 850 820 830 870 905 910 890 875

10 965 960 915 840 755 710 730 795 875 935 955 960asumsi lintang 6.9 940.2 960 918.1 858.6 784.45 744.1 761 818.25 884.3 927.25 934.85 933.65

Tekanan Uap Jenuh (ea)

t ea

10 9.2 0 0 0 0 0 0 0 0 0 0 0 011 9.84 0 0 0 0 0 0 0 0 0 0 0 012 10.52 0 0 0 0 0 0 0 0 0 0 0 013 11.23 0 0 0 0 0 0 0 0 0 0 0 014 11.98 0 0 0 0 0 0 0 0 0 0 0 015 12.78 0 0 0 0 0 0 0 0 0 0 0 016 13.63 0 0 0 0 0 0 0 0 0 0 0 017 14.53 0 0 0 0 0 0 0 0 0 0 0 018 15.46 0 0 0 0 0 0 0 0 0 0 0 019 16.46 0 0 0 0 0 0 0 0 0 0 0 020 17.53 0 0 0 0 0 0 0 0 0 0 0 021 18.65 0 0 0 0 0 0 0 0 0 0 0 022 19.82 0 0 0 0 0 0 0 0 0 0 0 023 21.05 0 0 0 0 0 0 0 0 0 0 0 024 22.27 0 0 0 0 0 0 0 0 0 0 0 025 23.75 0 0 0 0 0 0 0 0 0 0 0 026 25.31 0 0 0 0 0 0 0 0 0 0 0 027 26.74 0 0 0 0 0 0 0 0 0 0 0 028 28.32 0 0 0 0 0 0 0 0 0 0 0 029 30.03 30.32578 30.14001 30.88221 30.78977 31.67839 30.37693 30.10003 30.30898 0 0 0 30.9660530 31.82 0 0 0 0 0 0 0 0 32.81052 33.60752 32.70843 031 33.7 0 0 0 0 0 0 0 0 0 0 0 032 35.66 0 0 0 0 0 0 0 0 0 0 0 033 37.73 0 0 0 0 0 0 0 0 0 0 0 034 39.9 0 0 0 0 0 0 0 0 0 0 0 035 42.18 0 0 0 0 0 0 0 0 0 0 0 0

30.32578 30.14001 30.88221 30.78977 31.67839 30.37693 30.10003 30.30898 32.81052 33.60752 32.70843 30.96605

Tangen Lengkung Tekanan Uap Jenuh dari Udara Pada Suhu Rata-rata

t Δ20 1.08 0 0 0 0 0 0 0 0 0 0 0 021 1.16 0 0 0 0 0 0 0 0 0 0 0 022 1.21 0 0 0 0 0 0 0 0 0 0 0 023 1.23 0 0 0 0 0 0 0 0 0 0 0 024 1.36 0 0 0 0 0 0 0 0 0 0 0 025 1.41 0 0 0 0 0 0 0 0 0 0 0 026 1.49 0 0 0 0 0 0 0 0 0 0 0 027 1.57 0 0 0 0 0 0 0 0 0 0 0 028 1.65 0 0 0 0 0 0 0 0 0 0 0 029 1.74 1.753219 1.744917 1.778088 1.773956 1.813671 1.755505 1.74313 1.752468 0 0 0 1.78183530 1.82 0 0 0 0 0 0 0 0 0 0 0 0

1.753219 1.744917 1.778088 1.773956 1.813671 1.755505 1.74313 1.752468 0 0 0 1.781835

cal/cm2/hr

mmHg/oC

cal/cm2/hr

cal/cm2/hr

cal/cm2/hr

cal/cm2/hr

Page 22: Pola Tanam Padi Palawija Padi_v1

Lampiran 5.4a.KEBUTUHAN AIR SELAMA PENGOLAHAN TANAH UNTUK PALAWIJA

B U L A N JAN PEB MAR APR MEI JUN JUL AGU SEP OKT NOP DES

Eto (dari penman) 4.84 4.32 4.74 5.11 5.20 4.94 5.38 6.09 7.39 5.70 3.65 4.75

Eo 5.32 4.75 5.21 5.62 5.73 5.43 5.92 6.70 8.12 6.27 4.01 5.23 Eo = 1.1 Eto

M = Eo + P 7.32 6.75 7.21 7.62 7.73 7.43 7.92 8.70 10.12 8.27 6.01 7.23 P = 2.00 mm/hari

T = 15 hari

k = MT / S 2.20 2.02 2.16 2.29 2.32 2.23 2.37 2.61 3.04 2.48 1.80 2.17 S = 50 mm

8.99 7.57 8.71 9.84 10.15 9.30 10.75 13.61 20.84 11.94 6.07 8.75

8.24 7.77 8.15 8.48 8.57 8.33 8.73 9.39 10.63 9.02 7.20 8.16 mm/hari

ek

IR = M ek/ (ek - 1)

Page 23: Pola Tanam Padi Palawija Padi_v1

Lampiran 5.7.

HUJAN EFEKTIF UNTUK PALAWIJA

NO B U L A N JAN PEB MAR APR MEI JUN JUL AGU SEP OKT NOP DES KETERANGAN

1 157.95 208.14 124.21 106.92 8.40 0.00 0.00 0.00 0.00 23.27 63.37 134.00

ETc x c x n hari ( mm )

2 172.47 138.95 168.99 176.35 185.54 170.41 191.75 217.21 254.79 203.07 125.78 169.49 --- > ( c = 1.15 )

Tabel A.2.7 hal. 174

3 Faktor Tampungan 1.07 1.07 1.07 1.07 1.07 1.07 0.73 0.73 0.73 1.07 1.07 1.07 Buku KP-01

Tabel A.2.7 hal. 174

4 114.81 76.38 98.94 82.67 7.34 0.00 0.00 0.00 0.00 23.32 50.62 105.44 Buku KP-01

5 122.85 81.73 105.87 88.46 7.86 0.00 0.00 0.00 0.00 37.08 87.53 118.69 (5) = (3) x (4)

Re ( mm / hari ) 3.96 2.92 3.42 2.95 0.25 0.00 0.00 0.00 0.00 1.20 2.92 3.83 (5) : n hari

0 12.5 150 1750 10.00 9 10.00

12.50 25.0010.00 1.00

0.8 18.61 0.04 11.12 29.73

Hujan Bulanan ( 20 % kering)

ET Crop Rata-rata Bulanan

Hujan Efektif Bulanan (mm)

Koreksi Hujan Efektif (mm)

Page 24: Pola Tanam Padi Palawija Padi_v1

Lampiran 5.4b.

KEBUTUHAN AIR IRIGASI UNTUK TANAMAN PALAWIJA ( KEDELAI )DAERAH IRIGASI

B U L A N JAN PEB MAR APR MEI JUN JUL AGU SEP OKT NOP DESEo 4.84 4.32 4.74 5.11 5.20 4.94 5.38 6.09 7.39 5.70 3.65 4.75

Eo = 1,1 x Eto ( mm / hari ) 5.32 4.75 5.21 5.62 5.73 5.43 5.92 6.70 8.12 6.27 4.01 5.23

Re terkoreksi ( Re.t ) ( mm / hari ) 3.96 2.92 3.42 2.95 0.25 0.00 0.00 0.00 0.00 1.20 2.92 3.83

1 0.50 EVAPOTRAN- 3.06 2.73 3.00 3.23 3.29 3.12 3.40 3.85 4.67 3.60 2.31 3.01

Koefisien 2 0.51 SPIRASI 3.12 2.78 3.06 3.30 3.36 3.19 3.47 3.93 4.76 3.67 2.35 3.07

Tanaman 3 0.66 TANAMAN 4.04 3.60 3.96 4.27 4.35 4.12 4.49 5.09 6.17 4.76 3.04 3.97

( Kc ) 4 0.85 Etc = 5.20 4.64 5.10 5.50 5.60 5.31 5.78 6.55 7.94 6.12 3.92 5.11

5 0.95 Eo X Kc X 1.15 5.81 5.19 5.70 6.14 6.25 5.94 6.46 7.32 8.88 6.85 4.38 5.71

6 0.95 5.81 5.19 5.70 6.14 6.25 5.94 6.46 7.32 8.88 6.85 4.38 5.71

7 0.95 5.81 5.19 5.70 6.14 6.25 5.94 6.46 7.32 8.88 6.85 4.38 5.71

8 0.55 3.37 3.00 3.30 3.56 3.62 3.44 3.74 4.24 5.14 3.96 2.54 3.31

9 0.55 3.37 3.00 3.30 3.56 3.62 3.44 3.74 4.24 5.14 3.96 2.54 3.31

PENGOLAHAN TANAH IR 8.24 7.77 8.15 8.48 8.57 8.33 8.73 9.39 10.63 9.02 7.20 8.16

50 mm IR-Re.t A 4.27 4.85 4.74 5.54 8.32 8.33 8.73 9.39 10.63 7.83 4.28 4.33

SELAMA 15 HARI A x 0.116 B 0.50 0.56 0.55 0.64 0.96 0.97 1.01 1.09 1.23 0.91 0.50 0.50

P E R T U M B U H A N

KEBUTUHAN AIR ETc.1-Re.t A 0.00 0.00 0.00 0.28 3.04 3.12 3.40 3.85 4.67 2.41 0.00 0.00

2 MINGGU KE 1 A x 0.116 B 0.00 0.00 0.00 0.03 0.35 0.36 0.39 0.45 0.54 0.28 0.00 0.00

KEBUTUHAN AIR ETc.2-Re.t A 0.00 0.00 0.00 0.35 3.10 3.19 3.47 3.93 4.76 2.48 0.00 0.00

2 MINGGU KE 2 A x 0.116 B 0.00 0.00 0.00 0.04 0.36 0.37 0.40 0.46 0.55 0.29 0.00 0.00

KEBUTUHAN AIR ETc.3-Re.t A 0.08 0.68 0.54 1.32 4.09 4.12 4.49 5.09 6.17 3.56 0.13 0.14

2 MINGGU KE 3 A x 0.116 B 0.01 0.08 0.06 0.15 0.47 0.48 0.52 0.59 0.72 0.41 0.01 0.02

KEBUTUHAN AIR ETc.4-Re.t A 1.24 1.72 1.68 2.55 5.34 5.31 5.78 6.55 7.94 4.93 1.00 1.28

2 MINGGU KE 4 A x 0.116 B 0.14 0.20 0.20 0.30 0.62 0.62 0.67 0.76 0.92 0.57 0.12 0.15

KEBUTUHAN AIR ETc.5-Re.t A 1.85 2.27 2.28 3.19 6.00 5.94 6.46 7.32 8.88 5.65 1.46 1.88

2 MINGGU KE 5 A x 0.116 B 0.21 0.26 0.26 0.37 0.70 0.69 0.75 0.85 1.03 0.66 0.17 0.22

KEBUTUHAN AIR ETc.6-Re.t A 1.85 2.27 2.28 3.19 6.00 5.94 6.46 7.32 8.88 5.65 1.46 1.88

2 MINGGU KE 6 A x 0.116 B 0.21 0.26 0.26 0.37 0.70 0.69 0.75 0.85 1.03 0.66 0.17 0.22

KEBUTUHAN AIR ETc.5-Re.t A 1.85 2.27 2.28 3.19 6.00 5.94 6.46 7.32 8.88 5.65 1.46 1.88

3 MINGGU KE 7 A x 0.117 B 0.21 0.26 0.26 0.37 0.70 0.69 0.75 0.85 1.03 0.66 0.17 0.22

KEBUTUHAN AIR ETc.6-Re.t A 0.00 0.08 0.00 0.61 3.37 3.44 3.74 4.24 5.14 2.77 0.00 0.00

3 MINGGU KE 8 A x 0.117 B 0.00 0.01 0.00 0.07 0.39 0.40 0.43 0.49 0.60 0.32 0.00 0.00

KEBUTUHAN AIR ETc.5-Re.t A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 MINGGU KE 9 A x 0.118 B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Catatan : A = kebutuhan air ( mm / hari ) B = kebutuhan air ( lt / dt / ha )

Page 25: Pola Tanam Padi Palawija Padi_v1

KEBUTUHAN AIR IRIGASI UNTUK PADI PENDEKDENGAN SISTEM 1 GOLONGAN

DAERAH IRIGASI

B U L A N JAN PEB MAR APR MEI JUN JUL AGU SEP OKT NOP DESEto (dari penman) ( mm / hari ) 4.84 4.32 4.74 5.11 5.20 4.94 5.38 6.09 7.39 5.70 3.65 4.75

Eo = 1.1 X Eto ( mm / hari ) 5.32 4.75 5.21 5.62 5.73 5.43 5.92 6.70 8.12 6.27 4.01 5.23

P ( mm / hari ) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

Eo + P ( mm / hari ) 7.32 6.75 7.21 7.62 7.73 7.43 7.92 8.70 10.12 8.27 6.01 7.23

Rh = HUJAN ( 20 % KERING ) ( mm / hari ) 5.10 7.43 4.01 3.56 0.27 0.00 0.00 0.00 0.00 0.75 2.11 4.32

0,36 FACTOR 1 0.36 1.83 2.68 1.44 1.28 0.10 0.00 0.00 0.00 0.00 0.27 0.76 1.56

0,70 HUJAN 2 0.7 3.57 5.20 2.80 2.49 0.19 0.00 0.00 0.00 0.00 0.53 1.48 3.03

0,40 DENGAN 3 0.4 2.04 2.97 1.60 1.43 0.11 0.00 0.00 0.00 0.00 0.30 0.84 1.73

0,40 1 GOLONGAN 4 0.4 Re = Fh X Rh 2.04 2.97 1.60 1.43 0.11 0.00 0.00 0.00 0.00 0.30 0.84 1.73

0,40 TIAP 2 5 0.4 ( mm / hari ) 2.04 2.97 1.60 1.43 0.11 0.00 0.00 0.00 0.00 0.30 0.84 1.73

0,40 MINGGU 6 0.4 2.04 2.97 1.60 1.43 0.11 0.00 0.00 0.00 0.00 0.30 0.84 1.73

0,40 ( Fh ) 7 0.4 2.04 2.97 1.60 1.43 0.11 0.00 0.00 0.00 0.00 0.30 0.84 1.73

0,00 8 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1 1.20 5.81 5.18 5.69 6.13 6.25 5.93 6.45 7.31 8.86 6.84 4.37 5.71

KOEFISIEN 2 1.27 6.14 5.48 6.02 6.49 6.61 6.27 6.83 7.74 9.38 7.23 4.63 6.04

TANAMAN 3 1.33 Etc = Kc X Eo 6.43 5.74 6.30 6.80 6.92 6.57 7.15 8.10 9.82 7.58 4.85 6.32

( Kc ) 4 1.30 ( mm / hari ) 6.29 5.61 6.16 6.65 6.77 6.42 6.99 7.92 9.60 7.41 4.74 6.18

5 1.15 5.56 4.96 5.45 5.88 5.99 5.68 6.19 7.01 8.49 6.55 4.19 5.47

6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PENGOLAHAN TANAHLP 11.12 10.40 10.60 10.80 10.80 10.60 10.90 12.10 13.22 11.70 9.41 11.03

2 MINGGU KE 1 LP-Re.1 A 9.29 7.72 9.16 9.52 10.70 10.60 10.90 12.10 13.22 11.43 8.65 9.47

A X 0,116 B 1.08 0.90 1.06 1.10 1.24 1.23 1.26 1.40 1.53 1.33 1.00 1.10

B x 1,22 C 1.31 1.09 1.30 1.35 1.51 1.50 1.54 1.71 1.87 1.62 1.22 1.34

C x 1,15 D 1.51 1.26 1.49 1.55 1.74 1.73 1.77 1.97 2.15 1.86 1.41 1.54

D x 1,10 E 1.66 1.38 1.64 1.70 1.92 1.90 1.95 2.17 2.37 2.05 1.55 1.70

PENGOLAHAN TANAHLP 11.12 10.40 10.60 10.80 10.80 10.60 10.90 12.10 13.22 11.70 9.41 11.03

2 MINGGU KE 2 LP-Re.2 A 7.56 5.20 7.80 8.31 10.61 10.60 10.90 12.10 13.22 11.17 7.93 8.00

A x 0.116 B 0.88 0.60 0.90 0.96 1.23 1.23 1.26 1.40 1.53 1.30 0.92 0.93

B x 1,22 C 1.07 0.74 1.10 1.18 1.50 1.50 1.54 1.71 1.87 1.58 1.12 1.13

C x 1,15 D 1.23 0.85 1.27 1.35 1.73 1.73 1.77 1.97 2.15 1.82 1.29 1.30

D x 1,10 E 1.35 0.93 1.40 1.49 1.90 1.90 1.95 2.17 2.37 2.00 1.42 1.43

KEBUTUHAN AIR ETc.1-Re.3+P+W A 9.10 7.53 9.42 10.04 11.47 11.26 11.78 12.64 14.19 11.87 8.86 9.31

2 MINGGU KE 1 A x 0.116 B 1.06 0.87 1.09 1.16 1.33 1.31 1.37 1.47 1.65 1.38 1.03 1.08

W = 3.33 (mm / hari)B x 1,22 C 1.29 1.07 1.33 1.42 1.62 1.59 1.67 1.79 2.01 1.68 1.25 1.32

C x 1,15 D 1.48 1.23 1.53 1.63 1.87 1.83 1.92 2.06 2.31 1.93 1.44 1.51

D x 1,10 E 1.63 1.35 1.69 1.80 2.05 2.02 2.11 2.26 2.54 2.12 1.59 1.67

KEBUTUHAN AIR ETc.2-Re.4+P+W A 9.44 7.84 9.75 10.40 11.83 11.60 12.16 13.07 14.71 12.26 9.12 9.64

2 MINGGU KE 2 A x 0.116 B 1.09 0.91 1.13 1.21 1.37 1.35 1.41 1.52 1.71 1.42 1.06 1.12

W = 3.33 (mm / hari)B x 1,22 C 1.34 1.11 1.38 1.47 1.67 1.64 1.72 1.85 2.08 1.74 1.29 1.36

C x 1,15 D 1.54 1.28 1.59 1.69 1.93 1.89 1.98 2.13 2.39 2.00 1.48 1.57

D x 1,10 E 1.69 1.40 1.74 1.86 2.12 2.08 2.18 2.34 2.63 2.20 1.63 1.73

KEBUTUHAN AIR ETc.3-Re.5+P+W A 9.73 8.10 10.03 10.70 12.14 11.90 12.48 13.43 15.15 12.61 9.33 9.92

2 MINGGU KE 3 A x 0.116 B 1.13 0.94 1.16 1.24 1.41 1.38 1.45 1.56 1.76 1.46 1.08 1.15

W = 3.33 (mm / hari)B x 1,22 C 1.38 1.15 1.42 1.51 1.72 1.68 1.77 1.90 2.14 1.78 1.32 1.40

C x 1,15 D 1.58 1.32 1.63 1.74 1.98 1.94 2.03 2.19 2.47 2.05 1.52 1.62

D x 1,10 E 1.74 1.45 1.80 1.92 2.17 2.13 2.23 2.40 2.71 2.26 1.67 1.78

KEBUTUHAN AIR ETc.4-Re.6+P+W A 9.58 7.97 9.89 10.55 11.99 11.75 12.32 13.25 14.93 12.44 9.22 9.78

2 MINGGU KE 4 A x 0.116 B 1.11 0.92 1.15 1.22 1.39 1.36 1.43 1.54 1.73 1.44 1.07 1.13

W = 3.33 (mm / hari)B x 1,22 C 1.36 1.13 1.40 1.49 1.70 1.66 1.74 1.88 2.11 1.76 1.31 1.38

C x 1,15 D 1.56 1.30 1.61 1.72 1.95 1.91 2.01 2.16 2.43 2.02 1.50 1.59

D x 1,10 E 1.72 1.43 1.77 1.89 2.15 2.10 2.21 2.37 2.67 2.23 1.65 1.75

KEBUTUHAN AIR ETc.5-Re.7+P A 5.53 3.99 5.85 6.45 7.88 7.68 8.19 9.01 10.49 8.25 5.35 5.74

2 MINGGU KE 5 A x 0.116 B 0.64 0.46 0.68 0.75 0.91 0.89 0.95 1.04 1.22 0.96 0.62 0.67

W = 3.33 (mm / hari)B x 1,22 C 0.78 0.56 0.83 0.91 1.11 1.09 1.16 1.27 1.48 1.17 0.76 0.81

C x 1,15 D 0.90 0.65 0.95 1.05 1.28 1.25 1.33 1.47 1.71 1.34 0.87 0.93

D x 1,10 E 0.99 0.71 1.05 1.16 1.41 1.37 1.47 1.61 1.88 1.48 0.96 1.03

KEBUTUHAN AIR ETc.6-Re.8+P A 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

2 MINGGU KE 6 A x 0.116 B 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

W = 3.33 (mm / hari)B x 1,22 C 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28

C x 1,15 D 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33

D x 1,10 E 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36

Catatan :

A = kebutuhan air (mm/hari)

B = Kebutuhan air (lt/dt/ha)

C = Kebutuhan air di tersier (lt/dt/ha)

D = Kebutuhan air di sekunder (lt/dt/ha)

E = Kebutuhan air di primer (lt/dt/ha)

RH STASIUN : ADI SOEMARMO SURAKARTA

B9
P=Perembesan
D34
Dari Tabel Yielstra
Page 26: Pola Tanam Padi Palawija Padi_v1

RENCANA POLA TANAMDAERAH IRIGASI 1043,68 HA

UNTUK AREAL POTENSIAL DENGAN SISTEM 1 GOLONGANGOL 1 GOL 2 GOL 3

U R A I A NJANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI

KETERANGANII I II I II I II I II I II I II I II I II I II I II I II I

DAERAH IRIGASI LUAS AREAL TANAM :

GOLONGAN I GOLONGAN I : 0.00 Ha

LUAS AREAL = MASA TANAM I PADI

1,043.68 1,027.72

0.00 0.90 0.60 1.09 1.13 1.24 1.22 0.91 0.23 0.97 0.36 0.40 0.52 0.76 0.85 1.03 1.53 1.30 1.38 1.06 1.08 1.13 0.22 0.23 MASA TANAM II PADI

lt / dt / ha 1.08 0.60 0.87 1.13 1.16 1.22 0.75 0.23 0.96 0.36 0.37 0.52 0.67 0.85 0.85 1.53 1.53 1.38 1.42 1.08 1.07 0.22 0.23 0.00 1,027.72

1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 MASA TANAM III PALAWIJA

1,027.72

KEBUTUHAN AIR ( lt /dt / ha ) RATA-RATA 0.54 0.75 0.74 1.11 1.15 1.23 0.99 0.57 0.60 0.66 0.37 0.46 0.60 0.80 0.85 1.28 1.53 1.34 1.40 1.07 1.08 0.68 0.23 0.12 LUAS AREAL : 1,027.72 Ha

RATA-RATA 0.55 0.77 0.76 1.14 1.18 1.27 1.01 0.59 0.61 0.68 0.38 0.47 0.61 0.83 0.87 1.32 1.58 1.37 1.44 1.10 1.11 0.70 0.23 0.12 = MASA PERTUMBUHAN

KEBUTUHAN AIR ( lt / dt / ha ) 0.54 0.75 0.74 1.11 1.15 1.23 0.99 0.57 0.60 0.66 0.37 0.46 0.60 0.80 0.85 1.28 1.53 1.34 1.40 1.07 1.08 0.68 0.23 0.12 = PENGOLAHAN TANAH

UNTUK 1 GOLONGAN DI PETAK SAWAH = PENGERINGAN

SALURAN TERSIER ( lt / dt / ha ) 0.66 0.91 0.90 1.36 1.40 1.50 1.20 0.70 0.73 0.81 0.45 0.56 0.73 0.98 1.04 1.56 1.87 1.63 1.71 1.31 1.31 0.83 0.27 0.14 Koefisien :

SALURAN SEKUNDER ( lt / dt / ha ) 0.76 1.05 1.04 1.56 1.61 1.73 1.38 0.80 0.84 0.93 0.51 0.65 0.84 1.13 1.19 1.80 2.15 1.87 1.96 1.50 1.51 0.95 0.32 0.16 - Saluran Tersier = 1.22 0.5-1.5 SALURAN PRIMER ( lt / dt / ha ) 0.83 1.16 1.14 1.72 1.77 1.90 1.52 0.88 0.92 1.03 0.56 0.71 0.92 1.24 1.31 1.98 2.37 2.06 2.16 1.65 1.66 1.04 0.35 0.18 - Saluran Sekunder = 1.15

- Saluran Primer = 1.10

0.85 1.19 1.17 1.76 1.82 1.96 1.56 0.91 0.95 1.05 0.58 0.73 0.95 1.28 1.35 2.03 2.43 2.12 2.22 1.70 1.71 1.07 0.36 0.18

UNTUK 1 GOLONGAN DI SALURAN PRIMER Kebutuhan Air ( lt / dt / ha ) :

- Petak Sawah = 1.53

3.24 0.00 4.34 6.74 5.11 3.03 3.55 3.28 1.87 1.04 0.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.64 1.79 1.97 - Saluran Tersier = 1.87

- Saluran Sekunder = 2.15

KEANDALAN ( % ) 100.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 98.31 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.88 60.03 100.00 100.00 - Saluran Primer = 2.37

CATATAN:

DEBIT ANDALAN DARI PENCATATAN DEBIT SUNGAI NORMAL 1/2 BULANAN RATA-RATA

DI LOKASI BENDUNG GALOK ( TH 1990 - TH 2008 )

0 3.81825 6.737871 5.448017 3.03243 3.526161 2.759192 1.872322 1.03752 0.660972 0 0 0 0 0 0 0 0 0 0.105288 0.644216 2.015412 2.892296

URAIANJANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI

II I II I II I II I II I II I II I II I II I II I II I II I

0.85 1.19 1.17 1.76 1.82 1.96 1.56 0.91 0.95 1.05 0.58 0.73 0.95 1.28 1.35 2.03 2.43 2.12 2.22 1.70 1.71 1.07 0.36 0.18

UNTUK 3 GOLONGAN DI SALURAN PRIMER

3.24 0.00 4.34 6.74 5.11 3.03 3.55 3.28 1.87 1.04 0.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.64 1.79 1.97

KEANDALAN ( % ) 100.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 98.31 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.88 60.03 100.00 100.00

CATATAN :

DEBIT ANDALAN DARI PENCATATAN DEBIT NORMAL 1/2 BULANAN RATA-RATA

DILOKASI BENDUNG COLO UNTUK INTAKE COLO BARAT ( TH 1986 - TH 2005 )

DEBIT KEBUTUHAN AIR ( m3 / dt )

DEBIT KEBUTUHAN AIR ( m3 / dt )

DEBIT ANDALAN (m3 / dt )

KEBUTUHAN AIR ( m3 / dt )

DEBIT ANDALAN (m3 / dt )

JAN

UA

RI I

IIDE-

SEM-BER

I

IINO-

VEM-BER

I

IIOK-TO-BER

I

IISEP-

TEMBERI

IIAGUSTUS

I

IIJULI I

IIJUNI I

IIMEI I

IIAPRIL I

IIMARET I

IIFEBRU

ARII

JANUARI II

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

0.85 1.19 1.17

1.76 1.82 1.96 1.56

0.91 0.95 1.05 0.58 0.73 0.95

1.28 1.35

2.03 2.43

2.12 2.22 1.70 1.71

1.07

0.36 0.18

3.24

0.00

4.34

6.74

5.11

3.03 3.55

3.28

1.87

1.04 0.66

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.64

1.79 1.97

GRAFIK NERACA AIR (WATER BALANCE) RENCANA POLA TANAMDAERAH IRIGASI

LUAS TANAM AREAL POTENSIAL = 1043.68 HA

Kebutuhan Air Debit Andalan

DEB

IT (

m3

/de

t)

PADI = 1027,72 HApalawija = 1027,72

HA Padi = 1102,07 HApadi = 1027,72 HA

AC11
Masukkan Luasan Sawah
AD25
Masukkan Faktor Kehilangan Energi antara 0.5-1.5
AA31
Masukkan Debit Andalan Dari Perhitungan Mock