ponencia sfurio tesalonica nov14

Upload: dcch3945

Post on 07-Aug-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    1/29

    Improving the port-hinterland interface in the Mediterranean

    ICT in Supply Chain Management(Sponsored by FUTUREMED)

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    Thessaloniki, 18 th Nov 2014Salvador Furió / Director of Logistics

    18 th Panhellenic Logistics Conference

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    2/29

    Rail transport is becoming increasingly more important for the strategy of ports, shipping companies and operators. The Port Authority of Valencia andthe Valenciaport Foundation are working for its improvement from differentperspectives

    PHYSICAL LEVEL – INFRASTRUCTURE

    OPERATIONAL LEVEL – OPERATIONSMANAGEMENT

    INFORMATION LEVEL – ICTs, PCS

    Working groups with ADIFto increase capacity

    Quality group of work(involved stakeholders)

    Working group (Portauthorities + Puertos delEstado)

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    http://www.ford.es/http://www.ford.es/

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    3/29

    4,4 millions of TEUs

    Railway transport :5% of I/E traffics50 trains/week3-4 RU

    Railway infrastructureInternal:> 22 km rail tracksExternal:Support Shunting terminal(3km far)

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    4/29

    Maritime-rail operations involve a large number of stakeholders who interact at seaportsand inland terminals or dryports. Process standardisation and the advanced managementof information flows will be key factors to better coordinate and enhance the efficiency of logistic chains.

    RAIL INFRASTRUCTURE & CAPACITYMANAGEMENT

    TRAIN ARRIVAL & DEPARTURE

    TRAIN RECEPTION & EXPEDITION

    SHUNTING OPERATIONS

    SCHEDULE / BOOKING RAIL SERVICES

    TRAIN LOADING & UNLOADING

    CONTAINER YARD MANAGEMENT

    CONTAINER HANDLING & MOVEMENTS

    CONTAINER RELEASES AND ACCEPTANCES

    RAIL OPERATIONS PLANNINGRAIL OPERATIONS TRACEABILITY

    RAIL OPERATIONS STATISTICS

    CUSTOMS CONTROLS & INSPECTIONS

    m a i n s t a k e

    h o

    l d e r s

    m a i n o p e r a t i o n s

    / p r o c e s s e s i n v o

    l v e

    d

    RAILWAYOPERATOR

    RAILWAY

    UNDERTAKING

    CUSTOMS /INSPECTION

    AUTHORITIES

    MARITIMEAGENT

    SHIPPER /FREIGHT

    FORWARDER

    ROAD HAULIER

    PORTTERMINAL

    (maritime-rail)

    DRYPORT

    RAILWAYINFRASTRUCTURE MANAGER

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    5/29

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    At seaport and dryport activities we can find different commercial relations anda different involvement of stakeholders .

    R e c e p c i

    ó n

    ,

    m a n i o

    b r a s y

    c o m p o s i c i

    ó n

    d e t r e n e s

    C a r g a y

    d e s c a r g a

    d e

    t r e n e s

    R e c e p c i

    ó n y

    e n t r e g a

    d e

    c o n t e n e

    d o r e s

    P o s i c i o n a

    d o

    p a r a

    i n s p e c c i o n e s

    D e p

    ó s i t o

    d e

    c o n t e n e

    d o r e s

    v a c í o s

    Terminalferroviaria

    Operador decarga

    ferroviaria

    Operador/empresa

    ferroviaria

    Transportistade carretera

    AgenteMarítimo

    Aduana /Agentes de

    aduana

    Organismosoficiales de

    insp.

    PORT-RAILTERMINAL

    RAILWAY COMPANYRail infrastructure manager

    RAILWAY FREIGHTOPERATOR

    Container handling, Containerdeposit and storage

    SHIPPING LINE

    Empty container handlingand storage

    PORT

    AUTHORITY

    Train loading andunloading

    Container handling, Containerdeposit and storage

    Vessel loading andunloading

    Discounts in port dues for the use of railtransport

    Container acceptance andrelease

    Container acceptance andrelease

    TERMINAL

    FERROVIARIA

    EMPRESA FERROVIARIA

    Servicio de maniobras,carga y descarga trenes

    OPERADOR DE CARGAFERROVIARIA

    Ocupación, operaciones y

    movimientos anterioresy/o posteriores a

    lacarga/descarga del tren

    AGENTE MARÍTIMO

    Servicio de depósito decontenedores vacíos

    m a i n o p e r a t i o n s

    / p r o c e s s e s i n v o

    l v e d

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    6/29

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    7/29

    RAILWAYOPERATOR

    RAILWAYUNDERTAKING

    PORTRAILWAYTERMINAL

    DRYPORT MARITIMEAGENT

    CUSTOMS ROADHAULIER

    Train loading confirmation

    Train di scharge confirmation

    Instruction for empty container delivery

    Transport orde r (gate-out full container / gate-in empty container)

    SHIPPER /FREIGHT

    FORWARDER

    MARITIMETERMINAL

    Ship discharge confirmation

    Maritime transport contract – import operation (port t o door )

    Container gate-out order (full containers)Inland t ransport contract (import operation)

    Container gat-in order (full containers)Containe r gate-out confirmation (full containers)

    Container gate-in confirmation (full c ontainers)

    Train loading list

    Train loadin g list

    I m p o r t : m a r i t i m e – r a i l – r o a

    d

    Train arrival notice

    Train discharge list

    Train discharge confirmation

    Train arrival noticeCustoms ‘transit’ val idation

    Gate-out order (full container)

    Gate-in o rder (empty container)

    Gate-out order information

    Customs gate-out validation

    Gate-in order information

    Gate-out confirmation (full container)

    Gate-in confirmation

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    8/29

    RAILWAYOPERATOR

    RAILWAYUNDERTAKING

    PORTRAILWAYTERMINAL

    DRYPORT MARITIMEAGENT

    CUSTOMS ROADHAULIER

    Train loading c onfirmation

    Train discharge confirmation

    Instruction for empty container delivery

    Transport orde r (gate-out full container / gate-in empty container)

    SHIPPER /FREIGHT

    FORWARDER

    MARITIMETERMINAL

    Ship discharge confirmation

    Maritime transport contract – import operation (port to door )

    Container gate-out order (full containers)Inland transport contract (import operation)

    Container gat-in order (full containers)Contain er gate-out confirmation (full containers)

    Container gate-in confirmation (full c ontainers)

    Train loading list

    Train loadin g list

    I m p o r t : m a r i t i m

    e – r a i l – r o a

    d

    Train arrival notice

    Train discharge list

    Train discharge confirmation

    Train arrival noticeCustoms ‘transit’ validation

    Gate-out order (full container)

    Gate-in order (empty container)

    Gate-out order i nformation

    Customs gate-out validation

    Gate-in orde r information

    Gate-out confirmation (full container)

    Gate-in confirmation

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    9/29

    Standard messages proposal for import operations at dryports

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    10/29

    Standard messages proposal for export operations at dryports

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    11/29

    PCS are technological platforms that integrate different stakeholders in portoperations and maritime transport providing an efficient management of

    information flows around main transport and trade procedures. PCS may playa key role integrating as well maritime-rail operations among their services ,simplifying this way the implementation of the standards proposed .

    Dryports

    Railway operator

    Railway undertakings

    In order to do thisdryports, railwayoperators and railwayundertakings should beintegrated in the PCS

    and new PCS servicesshould be developed tosatisfy their needs.

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    12/29

    The FUTUREMED Spanish Port Hinterland Intermodal Information System(SPHIIS) pilot case study will allow to test new solutions with this integratedapproach at the Valencia-Zaragoza corridor.

    The proposed solution involves:

    • The facilitation of a number of IT tools addressed to SMEs (Messageseditor tool, Web services tool, Process configuration tool)• The integration of railway operators, railway undertakings and dryportsin the PCS• The adaptation and/or development of new PCS services providingsupport to all the involved stakeholders and their relations orinformation exchanges:

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    13/29

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    14/29

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    15/29

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    16/29

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    17/29

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    18/29

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    19/29

    Agree the procedures with the involved stakeholders:

    • Martime Agents will send notice of container release / pre-announcement (COPARN) for railway operations to the PCS.

    • Railway operators & undertakings will send and receive train

    loading/unloading lists (COPINO // COPRAR) and confirmation• Port terminals will confirm the container delivery/receipt(CODECO ) for railway operations to the PCS, and/or trainloading/unloading (COARRI).

    • Extend this approach to inland terminals or dryports

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    20/29

    Technical developments:• Develop a new service/application in the PCS web/windowsapplication for the creation of train loading/unloading lists basedon notices for container release/pre-announcement . (Assignmentof containers to trains).

    • Develop an utility to facilitate the submission and confirmation ofloading/unloading lists to the PCS from different systems andformats (from Excel to XML COPRAR/COARRI).

    • Develop a number of IT tools addressed to SMEs for modellingprocesses, editing and sending electronic messages.

    Main drivers:flexibility and facilitation for systems integration (technology, msgstandards, etc.)

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    21/29

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    22/29

    Zaragoza, FUTUREMED Project meeting, 21-22 /10/ 2013

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    P r o c e s s e s e

    d i t o r

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    23/29

    Zaragoza, FUTUREMED Project meeting, 21-22 /10/ 2013

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    M e s s a g e s s c

    h e m a

    e d i t o r

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    24/29

    Zaragoza, FUTUREMED Project meeting, 21-22 /10/ 2013

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    M e s s a g e s e d i t o r

    ICT I P H I C

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    25/29

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    Road haulage service – general – (screen shot)

    ICT I P H I C

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    26/29

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    Road haulage service – container details – (screen shot)

    ICT I P H I C

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    27/29

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    Railway operations service – documents list – (screen shot)

    ICTS FOR INTEGRATEDPORT HINTERLANDINTERMODALCORRIDORS

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    28/29

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    Railway operations service – loading list – (screen shot)

  • 8/20/2019 Ponencia Sfurio Tesalonica Nov14

    29/29

    Improving the port-hinterland interface in the Mediterranean

    ICT in Supply Chain Management(Sponsored by FUTUREMED)

    ICTS FOR INTEGRATEDPORT-HINTERLANDINTERMODALCORRIDORS

    Thessaloniki, 18 th Nov 2014Salvador Furió / Director of Logistics

    18 th Panhellenic Logistics Conference