potential pakistan

Upload: wasif-bin-arif

Post on 07-Jul-2018

263 views

Category:

Documents


4 download

TRANSCRIPT

  • 8/18/2019 Potential Pakistan

    1/91

     

    PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY

  • 8/18/2019 Potential Pakistan

    2/91

     

  • 8/18/2019 Potential Pakistan

    3/91

     

    Oct 2013 www.wapda.gov.pk

  • 8/18/2019 Potential Pakistan

    4/91

     

  • 8/18/2019 Potential Pakistan

    5/91

     

    PREFACE

    Energy and water are the prime movers of human life. Though deficient in oil and gas,Pakistan has abundant water and other energy sources like hydel power, coal, wind and solarpower.

    The country situated between the Arabian Sea and the Himalayas, Hindukush and

    Karakoram Ranges has great political, economic and strategic importance. The total primaryenergy use in Pakistan amounted to 60 million tons of oil equivalent (mtoe) in 2006-07. Theannual growth of primary energy supplies and their per capita availability during the last 10years has increased by nearly 50%. The per capita availability now stands at 0.372 toe which isvery low compared to 8 toe for USA for example.

    The World Bank estimates that worldwide electricity production in percentage for coal is40, gas 19, nuclear 16, hydro 16 and oil 7. Pakistan meets its energy requirement around 41%by indigenous gas, 19% by oil, and 37% by hydro electricity. Coal and nuclear contribution toenergy supply is limited to 0.16% and 2.84% respectively with a vast potential for growth.

    The Water and Power Development Authority (WAPDA) is vigorously carrying outfeasibility studies and engineering designs for various hydropower projects with accumulativegeneration capacity of more than 25000 MW. Most of these studies are at an advance stage ofcompletion. After the completion of these projects the installed capacity would rise to around42000 MW by the end of the year 2020. Pakistan has been blessed with ample water resourcesbut could store only 13% of the annual flow of its rivers. The storage is fast depleting due tosedimentation. In contrast US has developed 497% storage capacity of annual flow of RiverColorado; Egypt possesses 281% of River Nile and India 35% on Sutlej-Bias Basin. All thesestatistics warrant construction of number of reservoirs to enhance availability of water whichstands at 1011 cubic meter per capita. Anything below 1000 cubic meter tantamount to a crisissituation. The hydropower potential in Pakistan is over 100,000 MW with identified sites of

    59000 MW. Currently, studies under way include Diamer Basha (4500 MW), Bunji (7100 MW)and Kohala (1100 MW) amongst many others.

    Pakistan with 185 billion tons of coal reserves, the fourth largest in the world, is underutilizing this resource. In the overall energy mix, the share of coal power is only 7% ascompared to world average of 40%. Coal is the main source for producing cheaper electricityand the Government has decided to enhance the share of coal in the overall energy mix of upto18% in 2030. The Government is striving hard to minimize the gap between consumption andgeneration of electricity at affordable rate.

    The Government Power Policies of 1995 and 2002 have encouraged many private sector

    foreign and local investment through the Independent Power Producers (IPPs).

    Secretary WAPDA

  • 8/18/2019 Potential Pakistan

    6/91

     

  • 8/18/2019 Potential Pakistan

    7/91

     

    CONTENTS 

    WATER AND POWER SECTOR DEVELOPMENT ............................................................................................................. 1 

    SUMMARY OF HYDROPOWER POTENTIAL ..................................................................................................................... 3 

    HYDEL STATIONS IN OPERATION ...................................................................................................................................... 4 

    HYDROPOWER PROJECTS – UNDER CONSTRUCTION ......................................................... ...................................... 4 

    HYDROPOWER PROJECTS WHICH CAN BE UNDERTAKEN FOR IMPLEMENTATION......................................... 5 

    HYDROPOWER PROJECTS FOR PUBLIC PRIVATE PARTNERSHIP (PPP) ............................................................. 6 

    EXISTING INSTALLED GENERATION CAPACITY ........................................................... ................................................. 6 

    HYDROPOWER PROJECTS ................................................................ .................................................................. ................. 7 

    NEELUM JHELUM HYDROELECTRIC PROJECT ............................................................................................................. 9 

    TRANSMISSION SCHEME FOR DISPERSAL OF POWER FROM NEELUM-JHELUM HYDROELECTRICPROJECT ...................................................................................................................................................................................12 

    DIAMER BASHA DAM PROJECT.........................................................................................................................................13  

    KURRAM TANGI DAM MULTIPURPOSE PROJECT ................................................................. .......................................27 

    TARBELA 4TH EXTENSION PROJECT ..............................................................................................................................28 

    KOHALA HYDROPOWER PROJECT ..................................................................................................................................30 

    MUNDA DAM MULTIPURPOSE PROJECT ........................................................................................................................31 

    BUNJI HYDROPOWER PROJECT  .......................................................................................................................................32 

    KEYAL KHWAR HYDROPOWER PROJECT  .....................................................................................................................33 

    GOLEN GOL HYDROPOWER PROJECT  ...........................................................................................................................34 

    DASU HYDROPOWER PROJECT ........................................................................................................................................35 

    LOWER PALAS VALLEY HYDROPOWER PROJECT .....................................................................................................37 

    AKHORI DAM PROJECT ........................................................................................................................................................38 

    THAKOT HYDROPOWER PROJECT ............................................................. ................................................................. .....39 

    PATAN HYDROPOWER PROJECT  .....................................................................................................................................40 

    PHANDAR HYDROPOWER PROJECT  ...............................................................................................................................41 

    BASHO HYDROPOWER PROJECT ............................................................... ................................................................. .....42 

    LAWI HYDROPOWER PROJECT .........................................................................................................................................43 

    HARPO HYDROPOWER PROJECT ............................................................... ................................................................. .....43 

     YULBO HYDROPOWER PROJECT  .....................................................................................................................................45 

    SHYOK (YUGO) HYDROPOWER PROJECT .......................................................... ............................................................46 

    TUNGUS HYDROPOWER PROJECT  ..................................................................................................................................47 

    SKARDU DAM PROEJCT  ......................................................................................................................................................48 

  • 8/18/2019 Potential Pakistan

    8/91

     DUDHNIAL HYDROPOWER PROJECT  ..............................................................................................................................49 

    SUKI KINARI HYDROPOWER PROJECT ............................................................... ............................................................50 

    KUNDAL SHAHI HYDROPOWER PROJECT .....................................................................................................................51 

    TRAPPI HYDROPOWER PROJECT ............................................................... ................................................................. .....52 

    RAJDHANI HYDROPOWER PROJECT ................................................................... ............................................................53 

    MATILTAN HYDROPOWER PROJECT ................................................................... ............................................................54 

    MAHL HYDROPOWER PROEJCT ................................................................. .................................................................. .....55 

    GULPUR HYDROPOWER PROJECT  ..................................................................................................................................56 

    KOTLI HYDROPOWER PROJECT  .......................................................................................................................................57 

    DOTARA DAM PROJECT WITH 200 MW MARGALA PUMPED STORAGE ......................................................... .....58 

    ULTRA MEGA POWER PROJECT/PARK ............................................................... ............................................................60 

    UP-GRADATION AND REFURBISHMENT OF GENERATING UNITS OF MANGLA POWER STATION...............61 

    UP-GRADATION, REHABILITATION AND MODERNIZATION OF WARSAK HYDROELECTRIC POWERSTATION ....................................................................................................................................................................................63 

    SMALL / MEDIUM DAMS........................................................................................................................................................65  

    DARAWAT DAM PROJECT ...................................................................................................................................................66 

    NAI GAJ DAM PROJECT  .......................................................................................................................................................67 

    GHABIR DAM PROJECT ........................................................................................................................................................68 

    NAULONG DAM PROJECT  ...................................................................................................................................................69 

    HINGOL DAM PROJECT ........................................................................................................................................................70 

    WINDER DAM PROJECT  .......................................................................................................................................................71 

    GARUK DAM PROJECT .........................................................................................................................................................72 

    PELAR DAM PROJECT ..........................................................................................................................................................73 

    BARA DAM PROJECT ............................................................................................................................................................74 

    TANK ZAM DAM PROJECT ................................................................ ................................................................... ................75 

    DARABAN DAM PROJECT  ...................................................................................................................................................76 

    PAPIN DAM PROJECT  ...........................................................................................................................................................77 

    SUKLEJI DAM PROJECT .......................................................... .................................................................... .........................78 

    INSTALLATION OF PILOT TREATMENT PLANT ALONG RIGHT BANK OUTFALL DRAIN (RBOD) SYSTEM .79 

    CANAL LINING .........................................................................................................................................................................81 

    EXISTING INSTALLED GENERATION CAPACITY ........................................................... ................................................82 

    PEAK DEMAND PROJECTIONS* (WHOLE COUNTRY)  .................................................................................................83 

  • 8/18/2019 Potential Pakistan

    9/91

     

    1

    WATER AND POWER SECTOR DEVELOPMENT

      Irrigated agriculture is the backbone of Pakistan's economy. The agriculture sector is themajor user of water and its consumption will continue to dominate the water requirements.Direct rainfall contributes less than 15 percent of the water supplied to the crops. Themajor user of water for irrigation is the Indus Basin Irrigation System. About 105 Million Acres Feet (MAF) out of 155 MAF of surface water is being diverted annually for irrigationwhile around 48 MAF is pumped from groundwater.

      Pakistan has a total 196.72 MA area out of that 72.7 MA is cultivable. The cultivated area(Irrigated & Barani) has come to 52.31 MA, whereas 47.62 MA is area under all sort ofirrigation sources. (27 MA is the area under canal irrigation).

      With large cultivable land base of 72.7 Million Acres (MA) of which only 27 MA are canalcommanded, Pakistan still has the additional potential of bringing about 20.3 MA of virginland under irrigation.

      With increased population, Pakistan is fast heading towards a situation of water shortagePer capita surface water availability was 5260 cubic meters in 1951 when population was34 million, which reduced to 1032 cubic meter in 2013 when the estimated population is

    184 million. In the year 2014, Pakistan will have reached the stage of" acute watershortage"  According to the 1960 Indus Water Treaty, signed between India and Pakistan with the

    good offices of World / Bank, India was allowed exclusive rights to use waters of Ravi,Sutlej and Beas rivers, whereas the waters of Western Rivers, Indus, Jhelum and Chenabwere assigned to Pakistan. Under the 1960 Treaty, the Indus Basin Replacement Workscomprising two major dams, 5 barrages and 8 link canals were constructed to alleviate theproblems. However, due to excessive sediment inflows in the river water, all the threestorages (Tarbela, Mangla, Chashma) are rapidly loosing their capacities. By the year2025, these storages would loose 37% (5.96 MAF) of their capacity, which virtually meansloss of one mega storage project.

      An annual average of over 35.2 MAF escapes below Kotri varying from 9 MAF to 92 MAF.However this surplus water in the river system is available in about 70-100 days ofsummer only. To save and utilize available water, construction of additional storagefacilities is essential for sustainable irrigated agriculture, which supports about 70% of thepopulation of Pakistan.

      National demand of electricity has been and would keep on growing rapidly. Based on thepresent generation capacity, the hydel:thermal mix in the country is 37:63, which is almostthe reverse of an ideal hydel - thermal mix, which should be 70:30 for overall economicdevelopment of the Pakistan. Though induction of thermal generation initially helped inovercoming load shedding, it resulted in substantial increase in power tariff. Therefore, asizeable injection of cheap hydropower through multipurpose storages is a viable option to

    keep the cost of electricity within affordable limits.  To facilitate the process of economic development and to ensure greater social

    stabilization in Pakistan, it is imperative that employment creation and poverty reductionissues are addressed on priority. Additional water storages and power generation wouldform the basis of this strategy during the next decade.

      At present the rated electric power generating capacity in Pakistan is only 20822 MW withthe demand growing at 10% annually. The average per capita consumption is only 482units. Power shortage in the industrial, agricultural and domestic sectors has been evidentfor the past few years with the shortage assuming critical proportions last year.

      The water shortage is even more acute. To feed a population of nearly 184 million people,existing water storage capacity of 15 Million Acre Feet (MAF) needs to be tripled in the

    years ahead so that the remaining 20.3 Million Acres of cultivable land can be broughtunder plough. Water conservation and increased water productivity must also beencouraged.

      It is an economically unsustainable fact that the total water storages capacity in thecountry is only 15 MAF representing 9.67% of the total annual flows of 155 MAF.

  • 8/18/2019 Potential Pakistan

    10/91

     

    2

    Countries in Asia, Africa and the Americas have a storage capacity many times greater.To address this problem the Government of Pakistan (GoP) is developing feasibility anddetailed engineering studies for nearly 20 MAF of water storage and 25,000 MW of hydelpower. This is apart from thermal power being developed by the private sector,Independent Power Producers (IPPs) and the Government.

      Pakistan has a total area of 196.72 million acres (MA) out of that 72.7 Million Acres is cultivableout of that 47.62 MA is irrigated. Pakistan still has the potential to bring about 17 MA of rain fed

    land under irrigation. Pakistan had a storage capacity of 15 MAF in 1976 which has been reducedto 12.10 MAF in 2010 due to excessive sediment inflows in the river water. The three storages(Tarbela, Mangla, Chashma) are rapidly losing their capacities and by 2025, it is expected that wemay lose 37% (5.96 MAF) of their capacity which virtually means loss of one mega storageproject. To save and utilize available water and to ensure the water availability, construction ofadditional storage facilities is essential for sustainable irrigated Agriculture. Accordingly, seriousefforts were made for the construction of large reservoirs during 2008-2013 when Diamer BashaDam (to store 8.1 MAF & to generate 4500 MW) was approved in 2009 whereas construction workhas commenced in 2010. On completion of Diamer Basha Dam, the water availability will berestored to the level of 1976. Besides, Mangla Dam Raising project has been completed in 2010which will store 2.88 MAF of water in addition to existing capacity of 5.37 MAF. In addition,multipurpose Gomal Zam Dam in  South Waziristan  Agency to store 1 MAF of water and to

    generate 17.4 MW of power has been completed in 2010. Satpara Dam  in Skardu (GilgitBaltistan) to store 93000 Acre Feet & to generate 17.4 MW of power has been completed. MiraniDam  in Turbat (Balochistan) (storage capacity of 3 lac Acre Feet) & Sabakzai Dam  Zhob(Balochistan) (storage capacity of 33000 Acre Feet) have been completed in 2009 respectively.Mohmand (Munda) Dam (1.3 MAF) & Kurram Tangi Dam (1.2 MAF) will be constructed in nearfuture to mitigate flood & to generate cheap hydropower to irrigate the barren & undevelopedareas, Mega canals were built during these years i.e. Greater Thal Canal (Punjab) completed andhanded over to Govt of Punjab in 2009 whereas work on Kachhi Canal (Balochistan)  andRainee Canal (Sindh) is in progress.

      The installed power generation capacity was 18000 MW in year 2007 which has been increased to20822 MW in year 2013. However, the dependable capacity is 18,800 MW out of which 6,928 isbeing produced through Hydropower, 3,580 by Government (GENCOs), 7571 by Independent

    Private Power Producers (IPPs) and 665 MW through Nuclear and Wind 106 MW. Gap in demandand supply which rose to 6,000 MW in summer depicts acute power crises. WAPDA is producingthis Hydropower @ Rs.1.35 per unit as compared to Rs.16.99 per unit of Thermal Powerbeing produced by IPPs through Furnace Oil. The demand of power is currently about 20,000MW which will rise to 36,000 MW in the year 2015. WAPDA has added 554 MW i.e. Khan Khwar72 MW, Rehabilitation of Tarbela (100 MW), Allai Khwar, (121 MW) and Jinnah HPP (96 MW) Duber Khwar HPP (130 MW), Gomal Zam Dam (17.4 MW), Satpara Dam (17.36 MW) to thesystem in 2010-13 whereas it will add 1136 MW , whereas Golen Gol (106 MW)  and NeelumJhelum HPP (969 MW)  will produce power in year 2015-16. In addition, WAPDA has initiatedactivities to produce 19194 MW in next 5 years through Diamer Basha Dam (4500 MW), KurranTangi Dam (84 MW), Tarbela 4th Extension (1410 MW), Munda Dam (740 MW), Dasu Dam(4320 MW), Bunji Dam (7100 MW) and Kohala Dam (1100 MW) respectively.

      To achieve the above objectives the GoP through WAPDA and the private sector plans toconcentrate on the following water and power projects in the next few years: (i)Construction of large dams including Diamer-Basha Dam for Public/Private Partnership (ii)Construction of Hydropower Projects (iii) Construction of Medium/Small Water StorageDams (iv) Construction of Canals (v) Construction of Transmission Lines for dispersal ofPower from Hydropower Project to Load Centres of National Grid. These projects wouldcreate additional water storages, generate cheap indigenously developed electricity andprevent flood damages. All these measures would also ensure food security, employmentgeneration and above all poverty alleviation.

  • 8/18/2019 Potential Pakistan

    11/91

     

    3

    SUMMARY OF HYDROPOWER POTENTIAL(RIVERWISE)

    Sr. No.  River/ Tributary  Power (MW) 

    A  Hydropower Projects above 50 MW 

    1  Indus River   39558 

    2  Tributaries of Indus in Gilgit-Baltistan 1698 

    3  Tributaries of Indus in Khyber-Pakhtunkhwa 4028 

    Sub Total (1-3)  45284 

    4  Jhelum River   4341 

    5  Kunhar River   1455 

    6  Neelum River & its Tributaries  1769 

    7  Poonch River   462 

    Sub Total (4-7)  8027 

    8  Swat River & its Tributaries  2297 

    9  Chitral River & its Tributaries  2285 

    Sub Total (8-9)  4582 

    Total A  57893 

    B.  Hydropower Projects below 50 MW 

    1  On Tributaries  1591 

    2  On Canals  674 

    Total B  2265 

    TOTAL (A+B)  60,158 

  • 8/18/2019 Potential Pakistan

    12/91

     

    4

    HYDEL STATIONS IN OPERATION

    Sr.No.

    Power StationInstalledCapacity

    (MW)

    EnergyGeneration

    (GWh)

    CommercialOperation Date

    1 Tarbela 3,478 15,801 1977-93

    2 Ghazi Barotha 1,450 7,037 2003-04

    3 Mangla 1,000 5,443 1967-944 Warsak 243 1,009 1960-81

    5 Chashma 184 959 2001

    6 Rasul 22 63 1952

    7 Dargai 20 162 1952

    8 Nandipur 14 32 1963

    9 Chichoki 13.2 23 1959

    10 Shadiwal 13.5 38 1961

    11 Other Small Hydel 6 29 1925,1975,1982

    12 Khan Khwar 72 306 201113 Allai Khwar 121 463 2013

    14 Jinnah 96 688 2013

    15 Gomal Zam 17.4 91 2013

    TOTAL 6,750.1 32,144

    HYDROPOWER PROJECTS – UNDER CONSTRUCTIONSr #  Name of Project 

    PC-I Cost(Rs. Billion) 

    Storage(MAF) 

    Hydropower(MW) 

    Progress/ Completion 

    1.Mangla Dam RaisingMirpur, AJK 62.558 2.88

     Addl 644GWh Substantially completed

    2.Gomal Zam Dam,South Waziristan Agency

    12.829 0.892 17.491.6%

    Dec 2013

    3.Satpara DamSkardu

    4.806 0.053 17.36 Completed

    4.KHAN KHWARBesham, KPK

    8.301 RoR 72CompletedFeb 2011

    5DUBER KHWARKohistan, KPK

    16.324 RoR 130Substantially completed

     Aug 2013

    6. ALLAI KHWAR – Battagram, KPK

    8.578 RoR 121CompletedMar 2013

    7. JINNAH HYDROPOWER,Jinnah Barrage

    13.546 RoR 96 Completed(P/H Unit 6-9 in Oct 2013) 

    8.NEELUM JHELUMNeelum, AJK

    274.882 RoR 96949%

    Nov 2016

    9.Repair & Maintenance of Units1,3 & 4 of Tarbela PowerHouse

    1.403 RoR 100CompletedMay 2012

    10.REHABILITATION OFJABBAN HYDROPOWERMalakand KPK

    3.753 RoR 2285%

    (Oct 2013)

    11.Golen Gol – Khyber

    Pakhtunkhwa

    7.035 RoR 106 Aug 2015

    12.Kurram Tangi Dam – FATA/KPK

    59 0.900 84

    Total  282.635  4.725  1734.76 

  • 8/18/2019 Potential Pakistan

    13/91

     

    5

    HYDROPOWER PROJECTS WHICH CAN BE UNDERTAKENFOR IMPLEMENTATIONS# 

    Project / District Estimated Cost

    (Rs. Billion) Storage(MAF) 

    Capacity(MW) 

    Status 

    1. Tarbela 4TH Ext. – Swabi

    88.825(US$ 0.935 B)

    - 1410 •  Letter of Acceptance has beenissued to M/s Sinohydro on17.08.2013.

    •  Expected Project completion Dec2017

    2. Keyal Khwar – Kohistan

    22 B(Euro 180 M)

    RoR 122 •  Feasibility & Detailed EngineeringDesign completed.

    •  Evaluated bids sent to Kfw for awardof Contract.

    •  Construction of WAPDA O&M StaffColony under progress.

    •  Financing by KfW of Germany.•  Expected completion by October

    2017.

    3. Diamer Basha – Diamer/Kohistan894.000

    (US$ 13.683 B)8.1 4500 •  Project infrastructure activates in

    progress.•  EOI for Permanent Access Bridge

    d/s of Dam received, Evaluation is inprocess.

    •  EOI for Procurement of ConstructionSupervision Consultant and Contract Administration received, three JVswere pre-qualified. RFP is inprogress.

    4. Bunji – Astore 646.000(US$ 6.8 B)

    RoR 7100 •  Feasibility study completed.Detailed Design and Tender

    Documents are completed.•  PC-I submitted for approval.

    5. Mohmand (Munda) – Mohmand Agency

    133.095 1.3 740 •  Feasibility Completed. DetailedEngineering Design being prepared,to be completed by June 2014.

    •  Funded by AFD (France).6. Dasu – Kohistan 570.000 RoR 4320 •  Detailed engineering design has

    been completed. Tendering andcontracting will be completed byFeb. 2014.

    •  MoEAD through MoWP has been

    requested for seeking consent ofWorld Bank for funding.7. Lower Spat Gah – 

    Kohistan41.123 RoR 496 •  MoU signed with M/s KOMIPO

    POSCO Korea to implement theproject in Public Private Partnership(PPP) mode.

    •  Technical due diligence andpreparation of JDA is in progress.

    8. Lower Palas Valley -Kohistan

    72.485 RoR 665 •  MoU signed with M/s K-Water Koreato implement the project in PublicPrivate Partnership (PPP) mode.

    •  Technical due diligence and

    preparation of JDA is in progress.Total  9.4  19353 

  • 8/18/2019 Potential Pakistan

    14/91

     

    6

    HYDROPOWER PROJECTSFOR PUBLIC PRIVATE PARTNERSHIP (PPP)

      Lower Palas Valley Hydropower Project (Khyber Pakhtunkhwa)  Lower Spat Gah Hydropower Project (Khyber Pakhtunkhwa)  Lawi Hydropower Project (Khyber Pakhtunkhwa)   Mahl Hydropower Project (AJK)   Hingol Dam Project (Balochistan) 

    EXISTING INSTALLED GENERATION CAPACITYWAPDA Hydro

    6733

    32%

    Hydro (IPPs)

    195

    1%

    GENCOs

    4829

    23%

    Nuclear

    665

    3%

    Wind

    106

    1%

    IPPs

    8294

    40%

     ELECTRICITY GENERATION BY FUEL 

  • 8/18/2019 Potential Pakistan

    15/91

     

    7

    HYDROPOWER PROJECTS1. Neelum-Jhelum Hydroelectric Project

    2. Transmission Scheme for Dispersal of Power from Neelum-JhelumHydropower Project to Rawat & Gujranwala

    3. Diamer Basha Dam Project

    4. Transmission Scheme for Dispersal of Power from Diamer-Basha

    Hydropower Project to Major Load Centres in the National Grid5. Kurram Tangi Dam Multipurpose Project

    6. Tarbela 4th Extension

    7. Kohala Hydropower Project

    8. Transmission Scheme for Dispersal of Power from Kohala HydropowerProject to Gujranwala

    9. Munda Dam Project

    10. Transmission Scheme for Dispersal of Power from Mohmand (Munda) DamProject to Peshawar

    11. Bunji Hydropower Project12. Transmission Scheme for Dispersal of Power from Bunji Hydropower

    Project to Major Load Centres in the National Grid

    13. Keyal Khwar Hydropower Project

    14. Golen Gol Hydropower Project

    15. Dasu Hydropower Project

    16. Transmission Scheme for Dispersal of Power from Dasu HydropowerProject to Major Load Centres in the National Grid

    17. Lower Spat Gah Hydropower Project

    18. Lower Palas Valley Hydropower Project

    19. Akhori Dam Project

    20. Thakot Hydropower Project

    21. Pattan Hydropower Project

    22. Phandar Hydropower Project

    23. Basho Hydropower Project

    24. Lawi Hydropower Project

    25. Harpo Hydropower Project

    26. Yulbo Hydropower Project

    27. Suki Kinari Hydropower Project28. Shyok Dam Project

    29. Trappi Hydropower Project

    30. Matiltan Hydropower Project

    31. Mahl Hydropower Project

    32. Gulpur Hydropower Project

    33. Kotli Hydropower Project

    34. Ultra Mega Power Project/Park

    35. Rehabilitation of Tarbela, Mangla & Warsak Hydel Power Stations

  • 8/18/2019 Potential Pakistan

    16/91

     

    8

    REGIONAL DAMS

    36. Winder Dam Project

    37. Darawat Dam Project

    38. Ghabir Dam Project

    39. Tank Zam Dam Project

    40. Naulong Dam Project41. Hingol Dam Project

    42. Garuk Dam Project

    43. Pelar Dam Project

    44. Nai Gaj Dam Project

    45. Bara Multipurpose Dam Project

    46. Daraban Dam Project

    47. Papin Dam Project

    48. Sukleji Dam Project

  • 8/18/2019 Potential Pakistan

    17/91

     

    9

    NEELUM JHELUM HYDROELECTRIC PROJECT

    .

  • 8/18/2019 Potential Pakistan

    18/91

     

    10

    NEELUM JHELUM HYDROELECTRIC PROJECT

    Energy is the basic ingredient of development of a country. The fast-growing energyrequirements in Pakistan need to be met in order to achieve full economic and socialdevelopment. Currently, most of the energy demands are being met through thermal PowerProjects. Although thermal projects offer benefit of comparatively less time for completion,

    however their dependence on fossil fuel which is mostly imported through foreign exchange andtheir higher power generation cost is causing difficulty for general public and the industrialproducts to compete in the world.

    The Government of Pakistan is focusing on the development of indigenous domestic hydropowerresources. Pakistan has huge hydropower generation potential, which can be exploited on along-term basis for provision of power at much lower costs. The hydropower project, althoughtheir initial cost high and is relatively difficult to develop, may be given preference because oftheir low recurring expenses for provision of inexpensive energy. Neelum Jhelum HydropowerProject is presently, the only mega hydropower project with 969 MW generation capacity, beingconstructed on River Neelum in Azad Jammu & Kashmir. Govt. of Pakistan (GoP) approved the

    financing arrangement of this project as 50:50 loans to equity basis i.e. 50% financed by Govt. ofPakistan by levy Rs.0.10 per unit surcharge on electricity bills and 50% by Donors funding. Themajor Donors are IDB, Kuwait Fund, Abu Dhabi Fund, Saudi Fund and OPEC. In addition ChinaExim Bank will provide Buyer‟s Credit of US$ 448 Million. Due to earthquake of 2005, massivechanges are made in design and structure of the project whereas the cost of project has nowbeen increased from Rs.84.50 billion (as per first PC-I) to Rs. 274.88 billion (as per revisedproposed PC-I). The expected date of completion of project is in November 2016.

    THE PROJECT

    Neelum Jhelum Hydroelectric Project is located in the vicinity of Muzaffarabad (AJ&K). Itenvisages the diversion of Neelum river water through a tunnel out -falling into Jhelum river. The

    tunnel intake is at Nauseri 41 Km North East of Muzaffarabad. The Powerhouse will beconstructed at Chatter Kalas, 22 Km South of Muzaffarabad. After passing through the turbines,the water will be released into JhelumRiver about, 4 Km South of Chatter Kalas. Neelum JhelumHydroelectric Project has installed capacity of 969 MW. The Project will produce 5.15 Billion unitsof electricity annually.

    The total length of head race tunnel is 28.5 Km. A 19.5 Km stretch of the tunnel from the Nauseribe constructed as a twin tunnel system each with x-section ranging from 52 to 58 m 2. Theremaining headrace tunnel down to the surge chamber will be a single tunnel having x-section104 m2. The tunnel portion to be excavated with TBM will be shotcrete lined with a concreteinvert while the drill and blast portion of the tunnel will have full face concrete lining. The tunnel

    crosses Jhelum River approximately 200 m below its bed. The tunnel is accessed by 8 Adits forremoval of excavated spoil.

    The Surge Chamber consists of 341 m high riser shaft and 820 m long surge tunnel, Four steellined Penstock tunnels 154 m long and having 3.8 m internal diameter will also be constructed.The underground power Station will have 4 units with a total capacity of 969 MW. The PowerStation will be connected with Gakhar Grid station through 500KV double circuit transmissionline.

    Board of Directors NJHPC had approved the deployment of Tunnel Boring Machine (TBM)for the project on 23.11.2010. WAPDA has arranged procurement of TBM from M/SHerrenknecht Germany at a cost of US$ 92 Million. The deployment of TBM will certainly

    help to put the project on scheduled track and recover most part of delayed periodenvisaged for the commencement.

  • 8/18/2019 Potential Pakistan

    19/91

     

    11

    SALIENT FEATURES

    Installed Capacity 969 MW, Four Units @ 242 MW each

    Dam Type Composite Dam (Gravity + Rockfill)

    Height / Length 60 / 160 Meters

     Annual Energy 5.15 Billion electricity Units

     Average Head 420 Meters

    Design Discharge 280 Cumecs

    Tunneling Twin; Varies from 52 m2 to 58 m2 (19.5 km)Single; 104 m2 (12.5 Km)

    (Including 3.5 km Tailrace Tunnel)EIRR 25.46%

    Date of commencement 30-01-2008

    PROJECT BENEFITS

      Reduction of dependence on thermal power

      Saving in foreign exchange

      Employment opportunity during construction and operation

      Improved standard of living

      Social-economic uplift of the area

    PROJECT IMPLEMENTATION A contract has been awarded to M/s CGGC-CMEC, consortium China, for implementation of the

    project at a cost of Rs. 90.90 Billion. The project is expected to complete in November 2016.

    PROJECT COST•  Revised PC-1 Cost – Rs.274.88 Billion.•  Contract awarded Rs.90.90Billion•  Due to increase in the cost of project from Rs.84.50 billion to Rs.274.88 billion, WAPDA is making

    efforts for the balance financing of US$ 500 million of the project.•  IDB, Saudi Fund, Kuwait Fund has been approached to enhance their financing

  • 8/18/2019 Potential Pakistan

    20/91

     

    12

    PROJECT FINANCING

    Following financing plan was finalized.

    US$ in Million

    Year  

    Phasing ofExpenditure

    Source of Funding   Additional Financing 

    Total  NJSurcharge Mobilizationadv. etc  Effective F/ Loans Total Surplus/(Deficit)  GoPShare F/LoanShare0  1  2  3  4  5=(2+3+4) 6=(1-5) 

    2008 -09 to30-06-12 45,605  23,007  5,388  9,767  38,162  * (7,443) (3,721)  (3,721)

    2012-13  27,679  6,496  5,973  12,469  (15,210) (4,469)  (10,742)

    2013-14  36,592  6,690  5,345  12,035  (24,557) (8,008)  (16,548)

    2014-15  45,938  6,891  10,072  16,963  (28,975) (8,974)  (20,001)

    2015-16  57,207  7,097  9,975  17,072  (40,135) (13,067)  (27,067)

    2016-17  31,044  7,311  2,752  10,063  (20,981) (6,847)  (14,135)

    Total  244,064  57,491  5,388  43,884  106,764  (137,301) (45,087)  (92,214)IDC  33,438 

    Total cost 277,502

    * Deficit is payable Cost LessSalvage

    Value of TBM274,882

     Additional financing is required to meet with the increase in cost, due to enhanced scope of work,either from existing or new lenders.

    TRANSMISSION SCHEME FOR DISPERSAL OF POWERFROM NEELUM-JHELUM HYDROELECTRIC PROJECT

    Neelum-Jhelum Hydroelectric Project has a generation capacity of 969 MW and it is expected tobe commissioned by year 2016.The location of Neelum-Jhelum Hydroelectric Project is onNeelum River.The 500 kV Transmission Scheme for Dispersal of Power from Neelum-JhelumHydroelectric Project to Gujranwala the major load centers in the National Grid is envisaged asunder:

      500 kV Transmission Lines from Neelum-Jhelum Hydroelectric Project to 500 kV GhakkarGrid Station, Gujranwala

    The estimated cost of the above Power Dispersal Scheme for Neelum-JhelumHydroelectric Project is about US$ 251 million.

  • 8/18/2019 Potential Pakistan

    21/91

     

    13

    DIAMER BASHA DAM PROJECTGENERALGovernment of Pakistan decided to construct 5 multi-purpose storages in the country during next 10 -12years. Diamer Basha Dam Project will be undertaken in the first phase. President of Pakistan performedthe groundbreaking ceremony of the project. Detailed engineering design of the dam and allied structuresis completed and tender documents are ready. Project work is divided into five lots, which would beimplemented by contractors through international competitive bidding. 

    THE PROJECTThe project is located on Indus River, about 315 km upstream of Tarbela Dam, 180 km downstream of theGilgit-Baltistan capital Gilgit and 40 km downstream of Chilas (refer location map). The proposed damwould have a maximum height of 272 m, and impound a reservoir of about 8.1million acre feet (MAF),with live storage of more than 6.4 MAF. Mean annual discharge of Indus River at the site is 50 MAF. Thusthe dam will impound 15% of the annual river flow. The dam project would cover an area of 110 km2 andextend 100 km upstream of the dam site upto Raikot Bridge on Karakoram Highway (KKH).

    The dam is located at the boundary of Gilgit-Baltistan (GB) and Khyber Pakhtoonkhwa (KPK) in such away that the right abutment and the right Power House is in GB while the left bank of the dam and the leftPower House is in Khyber Pakhtoonkhwa. WAPDA offices and Colony including that of the Consultantsshall be in the Thor Nallah Valley in GB while the Contractor‟s Camp and fabrication yard and workshopshall be in Khyber Pakhtoonkhwa

    NEED OF THE PROJECT Agriculture is the backbone of Pakistan‟s economy. Pakistan today is among one of the World‟s fastestgrowing population, now estimated as over 150 million. Due to lack of large river regulation capability

    through sizeable storages, the country is already facing serious shortages in food grains. Given thepresent trend, Pakistan could soon become one of the food deficit countries in the near future. Therefore,there is a dire need to build storages for augmenting agriculture production.

  • 8/18/2019 Potential Pakistan

    22/91

     

    14

    Tarbela, Mangla and Chashma reservoirs have already lost about 5.3 MAF due to sedimentation. It isestimated that by year 2016, this loss would increase to 6.6 MAF, almost equal to the original combinedcapacity of Mangla and Chashma reservoirs. Due to complete stoppage of any sizable multi-purposestorage development after commissioning of Tarbela Dam in 1976, sustainability of existing irrigatedagriculture of Pakistan is in serious jeopardy.

    The present demand of electricity in country is above 17,000 MW, which is estimated to cross 30,000 MW

    by the year 2017. A large-scale injection of power thus becomes inevitable. Hydropower will provide therequired electricity at affordable price. Contribution of 4500 MW power from Diamer Basha Dam will go along way in alleviating this situation. 

    MAIN FEATURES Main Dam

    Maximum Height 272 m

    Type Roller Compacted Concrete (RCC)

    Diversion System  2 No. Diversion Tunnels (right side)

    1 No. Diversion Channel (right side)

    Upstream and Downstream Cofferdams

    Main Spillway No. of gates 14

    Size of gate 11.5 x 16.24 m

    Reservoir

    Full Supply Level  1160 masl 

    Crest Elevation Level 1170 masl

    Gross Storage 8.1 MAF (10.0 BCM)

    Live Storage 6.4 MAF (7.9 BCM)

    Min. operating level 1060 masl

    Outlets In Dam Body

    Low level 2

    Flushing 5

    Power House(s)  2 

    Total Installed Capacity 4500 MW

    Location and Type Underground, one each on right and left side 

    No. of Units 12 each of 375 MW

     Average Generation 19208 Gwh/year

    (Diamer Basha = 18097 Gwh/year)

    (Tarbela = 1111 Gwh/year)

    ESTIMATED COST US$ 11.178 Billion (As per approved PC-I 2009)UPDATED COST US$ 13.684 Billion (Updated July 2012)

    EIRR 15.3%

    FIRR  8.04% 

    Benefit/Cost Ratio  1.43 

    (Discount Rate 12%) 

    PROJECT IMPLEMENTATIONConstruction activities of main project shall undertaken through following five lots.

    LOT 1. Concrete Dam and Related Structures Including Diversion Tunnels and Permanent Access Bridge.

    LOT 2. Underground Works and Related Structures (Left and Right Banks).LOT 3. Hydro-Mechanical Equipment and Hydraulic Steel Structural StructuresLOT 4. Power Plant Generation Equipment (Left and Right Bank).LOT 5. Electrical High Voltage Equipment and Power Plant Electrical Equipment (Left and

    Right Bank).

  • 8/18/2019 Potential Pakistan

    23/91

     

    15

    PROJECT BENEFITS  Availability of about 6.4 MAF annual surface water live storage worth US $0.63 billion  Harnessing of renewable source of clean and cheap energy through installed capacity of 4500 MW

    generating revenue of US$ 2.216 billion per annum by producing 18,097 GWh/year.  Extending life of Tarbela reservoir by 35 years by blocking the sediments upstream.  Additional Annual Generation at Tarbela 1111 GWh worth US$ 136.09 million  Saving in foreign exchange of equivalent electricity generated on imported oil worth US$ 2.85

    billion  Carbon Credit Benefits costing US$ 0.300 billion  Employment opportunities, particularly to the locals during the construction and subsequently in

    agriculture, industry and the commercial sectors.  The project will pay back its cost in 8 yearsENVIRONMENT AND CULTURAL HERITAGE IMPACT ASSESSMENT:  Total Villages affected 32  Household/Families affected 4228  Persons affected 32350  Total Area to be affected 37419 acres  Agricultural land submerged 2660 acres  Existing Length of KKH submerged 100 km

      Length of KKH relocated 140 km  Pre-historic rock carvings 33000  Infrastructure Electricity Lines, Roads etc.  Total land to be acquired 37,419 Acres

    (Private Land = 18,357 Acres)(Govt. Land = 19,062 Acres)

      Three Composite Model Villages with all the amenities shall be built for resettlement of the affectees.  Selected important rock carvings shall be displayed in a museum in Chilas others shall be preserved

    in situ.  Resettlement and Environment management plans have been prepared on the international norms.SAFEGUARDS:The formulation of Environmental Impact Assessment (EIA) and development of Environmental

    Management Plan (EMP) are strong adherence to donors safeguards policies for resettlement andenvironment protection including following Pakistan Environmental, National and Customary LawsGoverning Natural Resource Management:

      International Environmental Safeguard Policies;  Pakistan Environmental Protection Act (1997);  Pakistan Environmental Assessment Procedures (1997);  Guidelines for the Preparation and Review of Environmental Reports (1997);  Indian Irrigation Commission (1901-1903);  Anderson Committee (1935);  Draft Sindh-Punjab Agreement (1945);  Indus Waters Treaty (1960);  Water Apportionment Accord (1991);

      Rawaj  Shariah 

    APPROVAL FROM COUNCIL OF COMMON INTEREST (CCI)National consensus has been developed and the Council of Common Interests (CCI) has unanimously approved theconstruction of Diamer Basha Dam project.

    RESETTLEMENT ACTION PLAN:Top priority has been accorded to resettle and rehabilitate the affected households by the projectintervention. A comprehensive Resettlement Action Plan (RAP) has been drawn up, covering all activitieswith specific timelines. The plan ensures the relocation of affected families to model villages, safety oftheir livelihoods through income generation schemes and improvement of socio-economic conditions. SALIENT FEATURES:To accomplish the Resettlement, Social and Environment related activities as well to adopt fully fledged

    social responsibility; Pakistan WAPDA has augmented its institutional capability through establishment ofa fully-fledged Resettlement Team at WAPDA under exclusive charge of the General Manager (LA&R). A Land Acquisition and Resettlement (LA&R) Wing was created in 2009 by WAPDA for the first time tomanage the Resettlement and Rehabilitation activities in all the hydropower projects in Pakistanespecially focusing Diamer Basha Dam Project. Experienced Specialists of the following disciplines werehired to strengthen the institutional capacity of WAPDA:

  • 8/18/2019 Potential Pakistan

    24/91

     

    16

      Environment  Monitoring & Evaluation   Gender Development   Social Development  Community Development   Tribal Area Development 

      Anthropology   Agronomy   Soil Science   Irrigation   Livestock 

    ENVIRONMENT MANAGEMENT PLAN:The objective of Environmental Management Plan is to conserve and restore

    natural forests, improve biodiversity, limit damage to environment, safeguardendangered species, enforce mitigation measure and limit degradation of naturalwater springs. The following are the main features:

    S#  Activities  Cost(US$ in millions) 

    1  Ecological Conservation Plan to be executed by WWF (World Wide FundFor Nature)

    7.52 

    2  Environmental Management Cell 1.46 3  Environmental Monitoring and Mitigation

    1 Integrated Water Resource Management Plan 2. Climate and Air Management Plan 

    3. Health Protection & Safety Management Plan4. Wildlife Management and Monitoring Plan 5.Fish Stock Management Plan & Reservoir Fishery Management Plan 6. Replanting of trees and Reforestation 

    1097.44 

    4  Environmental Research, 0.66 Total 1107.24 

    STATUS OF ENVIRONMENT ACTIVITIES:Review of EIA and EMP:(i) As per requirement of International Donors, the WAPDA appointed International Panel of Expert to

    review the Environmental Impact Assessment and Environmental Management Plan (EIA&EMP).Mr. Peter John Meynelll visited the Diamer Basha Dam Project site and reviewed the EIA andEMP in December, 2011.

    (ii) The Environment section of LA&R in light of recommendations provided by International Panel ofExpert (IPOE) reviewed the EIA and conducted other studies as recommended by IPOE forDiamer Basha Dam project site.

    Approval of EIA and EMP FROM ENVIRONMENTAL PROTECTION AGENCIES:(i) As per Pakistan Environmental IEE/EIA regulation 2001, the Document of EIA&EMP of Diamer

    Basha Dam Project was submitted to Pakistan Environmental Protection Agency, Islamabad.However, after the 18th amendment the Environmental concern is the Provincial subject.

    (ii) Therefore, the case was taken with Government of Gilgit-Baltistan (GB) and EIA and EMPsubmitted to Gilgit-Baltistan Environmental Protection Agency (GB-EPA). The GB-EPA arrangedas mentioned below:

    1. Environmental Public Hearing on 6th  November, 2012 at Project area i.e. Chilas Town,

    District Diamer, Gilgit Baltistan2. Environmental Public Hearing on 8th  November, 2012 at Gilgit (Provincial Headquarter) ofGilgit-Baltistan.

    (iii) The EIA &EMP document has also been reviewed by the review committee of GB-EPA for DiamerBasha Dam Project. The comments of committee were furnished to LA&R. The replies ofcomments have been submitted to Secretary, Forest, Wildlife and Environment, Govt. of GB forissuance of NOC on EIA& EMP of Diamer Basha Dam Project. Therefore the case of issuance ofNOC from GB-EPA almost has been finalized.

    (iv) Simultaneously, the case for issuance of NOC from Khyber Pakhtunkhwa EnvironmentalProtection Agency (KPK-EPA) was initiated. In this connection, a briefing was conducted byReview Committee of KPK-EPA. The LA&R Wing and Advisor on Diamer Basha Dam Projectbriefed the Review Committee of KPK-EPA.

    (v) This public hearing of EIA & EMP of Diamer Basha Dam Project is to be held on 09th

     Oct-2013.ENVIRONMENTAL COORDINATION COMMITTEE:(vi) The LA&R-Wing WAPDA established and notified Environmental Coordination Committee (ECC)

    for Diamer Basha Dam Project. The purpose of the Committee is to hand environmental concernsof Diamer Basha Dam Project and develop a harmony on Environmental concerns and theirimplementation.

  • 8/18/2019 Potential Pakistan

    25/91

     

    17

    The Committee is headed by General Manager with the following composition:Sr#

    Organization

    1. General Manager, LA&R WAPDA Convener/Head2. Director, Gilgit-Baltistan, Environmental Protection Agency (GB-EPA),  Member3. Director, Department of Wildlife, Gilgit-Baltistan Member4. Director, Department of Livestock, Gilgit-Baltistan Member5. Director, Department of Agriculture, Gilgit-Baltistan Member6. Director, Department of Fisheries, Gilgit-Baltistan Member7. Director, Department of Forest, Gilgit-Baltistan Member8. Representative of WWF-Pakistan, Gilgit-Baltistan Member9. Department of Environmental Sciences, Karakorum International

    University, Gilgit, Gilgit-BaltistanMember

    COLLABORATION, COORDINATION:The LA&R Wing started its activities of collaboration and coordination with stakeholders, consultants,communities and line department to execute the environmental management plan and developsynchronization on environmental issues.Memorandum of Understandings with Pir Mehr Ali Shah-Arid Agriculture University Rawalpindi

    (PMAS-AAUR) and Karakoram International University (KIU), Gilgit:  The LA&R Wing as part of capacity building and research activities developed a Memorandum of

    Understanding (MoU) with Pir Mehr Ali Shah-Arid Agriculture University Rawalpindi (PMAS-AAUR). Asper MoU the WAPDA will support MS/M.phil and PhD researcher by providing some stipend. Theresearcher would work in the field of Environment in the Diamer Basha Dam Project Area. In year2012-13, WAPDA supported three (03) M.Phil researchers.

      The WAPDA has also initiated similar type of MoU with Karakoram International University (KIU), tosupport Gilgit, MS/M.phil and PhD researcher research activities in Diamer Basha Dam Project Area.WAPDA will support for their capacity building and provide some stipend to the researcher and theirsupervisors.

    SAFEGUARD REVIEW ON LAND ACQUISITION & RESETTLEMENT

    REQUIREMENT OF LANDThe land requirement for the Diamer Basha Dam Project is as under:

      Private Land 18,357 acres  Government Land 19,062 acres

    Total 37,419 acresLAND COMPENSATION RATESFor the purpose of deciding the rates for land compensation for this project, a committee was formed inwhich all the stakeholders were taken on broad. This committee included Federal Ministers, Govt. of GilgitBaltistan (Chief Secretary / Revenue Commissioner), District Collector of Diamer, Representatives of Affecties of DBDP, Dam Action Committee, Religious leaders, Members of Legislative Assembly (G-B),Civil Societies, Local Jirgas, Ministry of Water & Power and WAPDA. This Committee, after a series of

    meetings, taking into consideration various categories of lands and locations, decided the landcompensation rates as under:S# Location Commercial/

    Cultivated land perkanal (Rs.)

    Uncultivatedland per kanal

    (Rs.)

    Barren land perkanal (Rs.)

    1. Chilas (Municipal Area) 11,00,000/- 4,00,000/- 1,50,000/-2. Harpin Das (Model Villages

    Land)2,50,000/-

    3. Thore 8,00,000/- 2,59,000/- 1,00,000/-4. Hudur 8,00,000/- 2,07,000/- 1,00,000/- 5. Guner Das/Kino Das 1,00,000/- 6. Khinar 8,00,000/- 2,07,000/- 1,00,000/- 

    7. Thak 8,00,000/- 2,07,000/- 1,00,000/- 8. Gonar Farm and Guner Das 8,00,000/- 224,960/- 1,00,000/- 9. Gais to Shing Nullah 8,00,000/- 2,07,000/- 1,00,000/- 10. Khanbari 8,00,000/- 259,000/- 1,00,000/- 

  • 8/18/2019 Potential Pakistan

    26/91

     

    18

    RELOCATION OF AFFECTEESWAPDA have planned 03 Composite Model Villages for Resettlement of Affectees of DBDP at Thak Das,Harpan Das and Kino Das.To improve communication between communities on either side of River Indus, a bridge at Thakot hadbeen constructed at cost of Rs 647 Million ($7.6 Million).SOCIAL IMPACT ASSESSMENTThere is always a need to identify and measure such impacts in such a way so as to help and manage insuch a way that the positive externalities are maximized and the negative

    externalities are minimized.Before initiating any mega development project it is necessary to find outthe potential social impacts of the project and determine its effects on thelives of the direct and indirect project affetees and to devise a plan tomitigation these effects.During the house hold survey for data verification by the LA&R team, needwas felt to find out that what the project affectees are thinking about thechange that will occur in their social institutions after the completion of thismega project and to record their opinions accordingly. For this purpose,the LA&R wing initiated a process of workshops in the project area.Some specific objectives of the SIA workshop are as follow:

      To determine the social Impacts of Diamer Basha Dam Project.  To find out social institutional impact during and after the completion of

    Dam  To involve the affectees in future speculation of post project situation  To devise a mitigation plan based on comprehensive social impact assessment.

    LIVELIHOOD RESTORATION & DEVELOPMENT PROGRAM After collecting a land acquisition and social statistical data a comprehensive Livelihood Restoration andDevelopment Plan has been prepared. The Plan developed after carrying out Stakeholder Analysis,existing Socio-economic Analysis and Need Analysis of the affected communities at the villages. Duringthe Preparation of Plan the Project Affected People were thoroughly consulted and series of meetingswere conducted at village level.The Livelihood Restoration and Development Plan will cover the Direct and Indirect Affectees of the

    Diamer District (Gilgit Baltistan) and upper part of Kohistan District (Khyber Pakhtunkhwa).To ensure the participation of the local population at a grass root level in everysphere of livelihood development process, a proper social organizationmechanism has been developed. The process of social organization will becarried out by the NGO to ensure the grass rooted community involvement fromplanning to implementation level. The affected communities would be organizedby the formation of community based organizations at village level. TheCommunity Based Organizations (CBOs) will be liable to share 20% of the totalcost of scheme, so as to ensure the owner ship of the project by the community. This share may be inshape of labor, land and material. The CBO will be guided to make consensus on the single infrastructurescheme, according to the top priorities of the relevant CBO. The whole process will be facilitated by theNGO and will be supervised by the LA&R (WAPDA).

     A project Non-Government Organization (NGO) is being engaged for effective implementation of theseplans by mobilizing local communities. It will also be utilized for monitoring on various stages ofresettlement activities. The Various Schemes had been devised keeping in view the social sensitivity ofthe tribal society. The objective is to engage communities restore the livelihood loses and developed toextent that they feel better of the existing situation that to play active role in the national building in futureThe activities are listed below:

    S#  Activities  Cost (US$) (US$ in millions) 

    1  Project NGO  6.00 2   Agriculture and Livestock  13.31 

    3  Irrigation and Rural Sanitation  7.54 4  Community Infrastructure  9.20 5  Gender Action Plan  3.50 6  Non Formal Education  5.90 

    Total 45.45 

  • 8/18/2019 Potential Pakistan

    27/91

     

    19

    CORPORATE SOCIAL RESPONSIBILITY:  As a corporate social responsibility, WAPDA has Initiated a number of projects in the following fields:-

    S#  Activities  Cost (US$) (US$ in millions) 

    1  Education 21.19 

    2  Health  1.18 

    3  Social Safety Net  0.55 

    Total 22.92 i) WAPDA organized medical camps  in project area in which Specialist doctor‟s team from

    WAPDA hospital Lahore were participated and medication of womenfolk at their door steps.S# Patients Numbers

    1  Male  8032  Female  6593  Children  743

    Total  2196

    WAPDA has planned to construct 4 schools  in different valleys, improve andupgrade two High Schools, one Vocational Training Institute, improve hospitals and establish one

    Trauma Centre at Chilas District. Due to remoteness of the area, The Activities of Livelihood Restorationand Development Plan were pre-tested in Thore valley and 0.28 $ million were spent through CommunityBased Organizations (CBOs), formed by the LA&R for sustainable development through participatoryapproach and assistance were provided to the 120 household of Thore valley affectees.ii) In 2012 WAPDA organized Mobile Veterinary Camps at Project area (Thore Valley) where free

    medical services were provided. The following animals were treated:

    S# Animals Treated

    1  Sheep & Goats 35152  Cattle 14323  Horses 48

    Donkeys/ Mules 109Total  5104

    AGRICULTURE DEVELOPMENT:  Agriculture is the main source of income for the project affected people of Diamer Basha Dam Project. Agriculture is the subsistence farming due to less land available for agriculture. Various agriculturedevelopment schemes are incorporated in Resettlement Action Plan for sustainable livelihood of theproject affected people. These interventions include; Agriculture Services Centre, Tunnel/Green HouseFarming, Value addition & market linkages, Apiculture/Honeybee rearingschemes, Trainings and Seminars and courses in VTI on Fruit Processing &Packaging.Furthermore as a pilot testing project, Kitchen Gardening scheme has beensuccessfully carried out in Thore Valley, DBDP as a part of Corrective ActionPlan (CAP).In this intervention 250 households were given trainings on modern agriculturetechniques and were provided good quality winter season vegetable seeds andtool kits. This intervention resulted in increased production and in this way enhanced household incomes.This scheme has also been replicated for summer season vegetables.LA&R has also conducted soil & water analysis of Kino Das as proposed by DBDO for assessment of itssuitability to agriculture.GRIEVANCE REDRESSES MECHANISM A Grievance Redresses Mechanism was developed to address the complaints and grievances of theProject Affectees arise during the Land acquisition process. For the purpose the Land Acquisition andResettlement wing has establish Compliant Cell at Chilas and Thore Das. The PRO office was

    established to carry out social activities; two Specialists of LA&R were deputed to bridge up theassociation between the affected communities and Land Acquisition staff and coordinate the authorities inrespect of communities grievancesENVIRONMENT MANAGEMENT PLANThe objective of Environmental Management Plan is to conserve and restore natural forests, improvebiodiversity, limit damage to environment, safe endangered species, enforce mitigation measure and limit

  • 8/18/2019 Potential Pakistan

    28/91

     

    20

    degradation of natural water springs. . An International Environment Specialist Mr. Peterjohn Meynell(Member Panel of Experts) visited the site in December 2011 and gave his report to fill the gaps in EIA &EMMP of DBDP. The Environment Specialist of LA&R has incorporated the required changes in EIA &EMMP and conducted the two public hearings in Chilas & Gilgit in November 2012. The following are themain features:S#  Activities  Cost

    (US$ inmillions) 

    1  Ecological Conservation Plan to be executed byWWF (World Wide Fund For Nature)

    7.52 

    2  Environmental Management Cell 1.46 3  Environmental Monitoring and Mitigation

    1 Integrated Water Resource Management Plan 2. Climate and Air Management Plan 3. Health Protection & Safety Management Plan

    0.44 

    4  Environmental Research, 0.66 Total 10.08 

    The Worldwide Fund for Nature (WWF) had entered into a partnership with WAPDA for conservation

    and restoration of the ecology of the project area. A mechanism is developed whereby the localcommunities will be provided with appropriate incentives to help conserve forests, freshwater, pasturesand wildlife.CULTURE AND HERITAGE MANAGEMENT PLANThe project area is known for about 33,000 prehistoric rock carving along theIndus Gorge. LA&R Wing has improved and devised a Culture and HeritageManagement Plan which includes:  Documentation and preservation of world famous rock carvings in close

    collaboration with Dr. Hauptman and his team of experts fromHeidelberg Academy, Germany. WAPDA is acquiring British ColonialChilas Fort from Gilgit  – Baltistan Government. After renovation, the Fortwould be converted into a museum where some of the rock carvings would

    be placed for posterity.  Within this museum, the German Embassy has also shown interest to

    finance WAPDA in developing a special gallery for Mountaineering History.This is in relation to Nanga Parbat (Killer Mountain) which was first scaled byGerman Mountaineer. An audio Video Library, Archives, cultural center andsome shops for local handicraft would also be established in the fort.WAPDA has already restored an old Colonial Dak Bungalow in Thore Valley. 

      WAPDA has signed a contract with Heidelberg Academy for theimprovement of Cultural Heritage Management Plan of DBDP 

    PROMOTION OF ECO TOURISM AND CULTUREIn October 2012, WADPA organized „First Chairman WAPDA PoloTournament and School Sports Mela‟ for District Diamer. Gilgit – Baltistan hasa rich and diversified cultural heritage and among its several specialties, Polois the core cultural activity. Locally Polo is called the game of Kings. Theinhabitants of Gilgit  –  Baltistan and Chitral are having cultural attachmentswith Polo. Every year Shandoor cultural festival is celebrated where best Poloteams from Gilgit  – Baltistan and Chitral participate. The event even attractsnational and international affectionate of Polo.Keeping up with popular trends, WAPDA has decided to adopt a Polo Team ofChilas and will help Gilgit  – Baltistan Government in organizing Babusar Polo Mela. The Babusar Melaalong with the Polo tournament planned at the highest polo ground in the world would be a majorattraction for both local as well as foreign tourists. It will generate economic activity and will also contributeas an additional source of income to the local population. Recreational parks, pony trails, development of

    lake and promotion of handicraft are other salient features of Culture and Heritage Plan.WAPDA is already engaged in confidence building measures amongst the affectees of DiamerBasha Dam and to look after their Cultural values. By arranging the Polo tournament, deep and strongroots have been established in the project area as it was for the first time in the history of Gilgit  – BaltistanProvince that such kind of event was organized. Total four (4) teams participated in the Polo Tournament

  • 8/18/2019 Potential Pakistan

    29/91

     

    21

    and eight (8) High Schools participated from all the valleys of District Diamer for School Sports Mela atChilas.CULTURAL HERITAGE MANAGEMENT PLANThe contract between Wapda and Heidelberg Academy, Germany has been signed on 15.02.2013. Rockcarvings likely to be submerged (33000 approx) in the DBD reservoir shall be preserved, as far aspossible. A museum at Chilas Fort is also being established. 

    S#  Activities  Cost (US$) 

    (US$ inmillions) 

    1  Petroglyphs and its Preservation (Dr. Hauptman & Heidelberg Academy ) 

    3.36 

    2  Chilas Fort, Museums, Library, CultureCenter  

    0.60 

    3  Promotion of Echo-Cultural Tourism  2.44 Total  6.4 

    GENDERThe project area had particular social sensitivities due to tribal societies and adherence to age oldcustoms. Women had little control over resources; opportunities for personal income generation are low

    and had negligible levels of literacy. The Gender Unit of LA&R Wing worked out a comprehensive Gender Action Plan (GAP) with a total budget of Rs 639.6 Million  .The salientfeatures of the plan include:  Capacity Building for Gender Mainstreaming  Women Skill centre  Livehoods restoration schemes  Community level supportive health services  Domestic income Development Schemes  Formal & Non-formal education schemes for women and girlsLAND ACQUISITION  Priority Land Acquisition has started.  Economic Coordination Committee (ECC) of the Cabinet, GoP on 29.06.2010 has approved the

    revised Compensation Rates recommended by Ministerial committee constituted by Prime Minister.Federal Cabinet in its meeting held on 14.07.2010 has endorsed decision of the ECC of the Cabinet;resultantly Land Compensation Cost has increased from Rs.26.4 billion to Rs.41.8 billion.

      One Window Compensation Cell has been established by Deputy Commissioner, Diamer.  Rs.6825 billion has been released to the Government of Gilgit-Baltistan for acquisition of land and

    1945 Acres of land has been acquired.  Rs.262 million was released to D.C. Kohistan for acquisition of land and 162 Acres land has been

    acquired of Khyber Pakhtunkhwa area.GOP’S APPROVALS 

      PC-I of Diamer Basha Dam Project for Rs. 894257 million with F.E.C Rs. 312943 million wasapproved by ECNEC on August 20, 2009.

      PC-I (Part-1) for land Acquisition and Resettlement (LA&R) was approved earlier by ECNEC onNovember 06, 2008 for Rs. 60000 million with F.E.C Nil. Its cost is included in the Main PC-I. RevisedPC-I of Land Acquisition & Resettlement is being prepared by incorporating approval of EconomicCoordination Committee (ECC) dated 29.06.2010 for enhanced compensation package asrecommended by the Ministerial Committee constituted by the Prime Minister of Pakistan on23.12.2009. Further additional requirements of ADB‟s Safeguard Policy Statement 2009 are beingincluded. The revised PC-I of Land Acquisition & Resettlement is at final stage.

      Diamer Basha Dam Project was approved unanimously by Council of Common Interests (CCI) on18.07.2010 for National Consensus.

    STATUS OF ONGOING PROJECT ACTIVITIES i. Land Acquisition

      Land Acquired (Uptodate) = 1945 AcresGBA 1783 AcresKPK 162 Acres

  • 8/18/2019 Potential Pakistan

    30/91

     

    22

      Payment Made = Rs 6825 millionGBA Rs 6563 millionKPK Rs 262 million

      One Window Compensation Cell has been established by Deputy Commissioner, Diamer.  Acquisition of remaining private land is in process.

      4,603 Acres government land has been transferred to DBDP by GBA.ii. Project Colony At Thor Valley

    Project Colony in Thor Valley, Chilas, Distt. Diamer is being constructed through 16 packages. 12contracts are under implementation. Award of remaining 4 contracts is in pipeline. Up-to-dateprogress is 49%.

    iii. Construction of Composite Model Villages for Resettlement of AffecteesThree (3) Composite Model Villages at Thak Das, Harpan Das and Kino Das with all the amenitiesshall be developed for resettlement of 4228 affected households / families. Each affectedhouseholds / families shall be given a residential plot of one kanal free of cost.  The construction

    work of Composite Model Village –II (Harpan Das) is planned through 6 contract packages. 2contracts have been awarded, other contracts are in pipeline.

    iv. Construction of Bypass From Shatial To Thor Nullah To Existing KKH (35 Km) By NHA asWapda’s Deposit Work.During Construction of Main Dam the existing KKH will be used for construction activities while the

    Bypass from Shatial to Thor Nullah will be utilized for uninterrupted traffic flow. Rs.500.00 millionhas been transferred to NHA for Construction of Bypass from Shatial to Thor Nullah to ExistingKKH (35 Km) as WAPDA‟S Deposit Work. Contractor has started the work at site. 

    v. Construction Of Permanent Access Bridge Over Indus River Downstream Of Diamer BashaDam Project Permanent Bridge shall be constructed for movement from Left Bank to Right Bank of River Indus.Procurement of Consultancy Services for Design, Construction Supervision and Contract Administration of Permanent Access Bridge is under process.

    vi. Consultants for Core ProjectProcurement of Consultancy Services for Construction Design, Construction Supervision andContract Administration of Diamer Basha Dam Project is under process.

    DIAMER BASHA DAM STAKEHOLDERS SEMINAR

  • 8/18/2019 Potential Pakistan

    31/91

     

    23

    PROJECT IMPLEMENTATION 

    Implementation of the dam appurtenant structures shall be through international competitive bidding comprising of

    the following five lots:-US$ Million

    Sr.

    No. Description of work   Local  Foreign 

    Total

    Cost 

    Const.

    Period

    (Yrs.) 

    1.  Contract Lot-1 (Concrete Dam and Related Structures including Diversion Tunnelsand Permanent Access Bridge) 

    1,096  731  1,827  9 

    2.  Contract Lot-2 (Underground Works and Related Structures (Left and Right Banks) 

    512  173  685  6.4 

    3.  Contract Lot-3 (Hydro-Mechanical Equipment and Hydraulic Steel Structures) 

    42  380  422  8 

    4.  Contract Lot-4 (Power Plant Generation Equipment (Left and Right Bank) 

    103  927  1,030  7 

    5.  Contract Lot-5 (Electrical High Voltage Equipment and Power Plant Electrical

    Equipment (Left and Right Bank). 

    109  954  1,063  7 

    Total  1,862  3165  5,027 

    TENTATIVE SUMMARY OF UPDATED CAPITAL COST

  • 8/18/2019 Potential Pakistan

    32/91

     

    24

    Strategy

      After approval of FODP/ADB Report on Water Sector Task Force by Federal Cabinet new strategy to beadopted.  In case of non commitment of World Bank/ADB for financing Diamer Basha Dam Project an alternate financing

     plan needs to be prepared.

      GoP to provide funds for land acquisition.  80% of the cost of project will be met through loan/supplier credit/buyer’s credit.   20% of the cost of the project will be met through Govt. funding, domestic loan/local bonds (Sukuk) and PSDP.  Foreign financing will be made through Donor Agency/ADB//IDB/Middle East Donors/Buyer

    Credits/Supplier’s Credit 

      Special request will be made to Islamic Development Bank, Asian Development Bank, Kuwait DevelopmentFund, Saudi Development Fund, Qatar Development Fund, Abu Dhabi Fund for investing in Diamer Basha DamProject.

      Special request may be made to USAID to support this project as signatory project in Pakistan.  Consortium will be made comprising of Chinese Turkish and other Civil Contractors.  Consortium will also be made for supplying Electro-Mechanical equipment as Supplier’s Credit.

    PRESENT STATUS  Detailed Engineering Design of Diamer Basha Dam Project (DBDP) was completed in June-2008.  PC-I for Land Acquisition and Resettlement was approved by Executive Committee of National Economic

    Council (ECNEC) on 6.11.2008 for Rs. 60 billion.

      Main PC-I for DBDP was approved by ECNEC on 20.08.2009 for Rs.894.257 billion.  Resolution on Consensus of Diamer Basha Dam Project approved from Council of Common Interest (CCI) on

    18.07.2010 headed by Prime Minister of Pakistan.

      Bridge at Thakot on Indus River is completed by NHA for transportation of material and heavy machinery for

    construction of Diamer Basha Dam Project.  Priority Land Acquisition has started.  Rs.6.563 billion have been released to the Government of Gilgit-Baltistan for acquisition of land and 1783 Acres

    of land has been acquired.

  • 8/18/2019 Potential Pakistan

    33/91

     

    25

      Rs.262 million was released in to D.C. Kohistan for acquisition of land and 162 Acres land has been acquired ofKhyber Pakhtunkhwa area.

      A vocational Training Institute has been setup.  Inauguration ceremony for commencement of works of Diamer asha Dam Project has been carried out by the

    Prime Minister of Pakistan on 18.10.2011.

    TENTATIVE TIMEFRAME FOR OVERALL IMPLEMENTATION 

    PROJECT LAYOUT

  • 8/18/2019 Potential Pakistan

    34/91

     

    26

    TRANSMISSION SCHEME FOR DISPERSAL OF POWERFROM DIAMER BASHA DAM PROJECT

    Diamer Basha Dam Hydro Power Project (HPP) has a generation capacity of 4500 MW. The 765kV HVAC Transmission Scheme for Dispersal of Power from Diamer Basha HPP to the majorload centers in the National Grid is envisaged as under:

      765 kV Transmission Lines from Basha HPP to a newly proposed 765 kV Substation at GujarKhan (3x407 km)

      765 kV Transmission Lines from Gujar Khan to a newly proposed 765 kV Substation atLahore (2x260 km)

      In & Out of 500 kV Rewat – Gujranwala Transmission Line at Gujar Khan

      A new 765 kV Substation at Gujar Khan

      A new 765 kV Substation at Lahore

    Estimated Cost of T/L & S/S is US$ 1800 Million

    The contract for feasibility study for evacuation of power from Northern Areas has been awarded to JVcomprising of P.B. (UK), Teshmont (Canada) and Mirza Associate Pakistan on 26.06.2009.

  • 8/18/2019 Potential Pakistan

    35/91

     

    27

    KURRAM TANGI DAM MULTIPURPOSE PROJECT

    Location The proposed project site is located acrossKurram river in North Wazirstan Agency about22 KM up-stream of Kurram Garhi Head worksand 32 KM North of Bannu City in Khyber

    Pakhtunkhwa. 

    This project was conceived by WAPDA for a multipurpose dam in North Waziristan on Kurram Riverabout 22 km upstream of Kurram Garhi Head works and 32 KM North of Bannu City in KPK with storagecapacity of 1.20 MAF of water and power generation of 83.4 MW. It will irrigate 362,380 Acres of land and will provide cheep hydropower to the area being a positive impact on the socio economic conditionsin North Waziristan Agency. USAID has shown willingness to fund this project. USAID appointedConsultants M/s. MWH-NESPAK-ACE JV are preparing EIA & RAP by August 2013. Salient Features   Dam Height  322 ft 

      Gross Storage  1.20 MAF-1.48 BCM  Live Storage 0.90 MAF-1.11 BCM   Power Houses (5 Nos)  83.4 MW (350 GWh)   Command Area  3,62,380 ACRES (including new area of 84,380 Acres)   Supplementing existing System of Civil &

    Marwat Canals 277,500 Acres 

    Project Benefits    Irrigated Agriculture Development   Hydropower generation   Socio-economic uplift of the area.   Employment opportunities during the construction

    and maintenance of the Project. 

      Development of Fisheries. PC-I Cost  Rs. 59.561 Billion (Equivalent to US$ 700 Million) 

    Consultants  M/s Pakistan Engineering Services (PES) JV appointedas Consultants for the preparation of feasibility andDetailed Engineering Design of the project.

    Present Status   Feasibility study, detailed engineering design and tender documents completed in July 2007 with an

    elevated height to enhance the storage capacity.  Government of KPK assured total support alongwith all out security arrangements with the desire to

    take care of the entire stakeholder during construction of the project.  M/s Mott Macdonald‟s JV (MMP in association with PES, MML UK, Creative Engineering Consultants

    & DMC) appointed as project review & supervision consultants at a consultancy cost of 484 Million.Contract Agreement for supervision consultancy signed on November 17, 2011 in Governor House,Peshawar.

      The Revised PC-I amounting to Rs. 59.561 Billion submitted to Ministry of Water and Power forarranging approval of ECNEC.

      Letter of commencement issued to the Consultants on December 12, 2011. Tender / Bids forConstruction will be invited on availability of required funds.

      210 acres lands have so far acquired and Rs. 17.0 million has been paid to DCO/DOR Bannu.  WAPDA is also interacting with USAID for possible financing of Component – 1 (Kaitu Weir & Affiliated

    Structures) of Kurram Tangi Dam Project, with the initial investment of US$ 93 million during 2013-2014.

      USAID indicated to finance the Project, for which EIA & RAP by USAID Consultants is in progress.

  • 8/18/2019 Potential Pakistan

    36/91

     

    28

    TARBELA 4TH EXTENSION PROJECT

    Location  Tarbela Dam Existing Install Capacity 3478 MW

    Tarbela 4th Extension Hydropower Project (T4HP) is an extensionproject with a proposed installed generating capacity of 1410 MW,

    comprising of three (03) units having 470 MW capacity each. Itwould be constructed on existing tunnel 4 of Tarbela Dam, thusreducing exposure to many social and environmental challengesgenerally associated with large dams project. The project is asignificant and sustainable expansion in Pakistan's hydropowergeneration and will play vital role in strengthening country'seconomy. The project is considered a low hanging fruit and it is a "low-risk-high-award" operationaimed at providing over 3.84 billion units annually of least cost low-carbon renewable energy.The expected saving of Foreign Exchange of US $ 900 Million on import of one million tons offurnace oil equivalent generation of electricity from thermal resources.

    Salient Features

    Project Cost  US $ 928.9 Million

    Main Dam:  (Already Constructed)Height 470 feet (143 m)Length 9000 feet (2743 m)

    Existing Tunnel-4:Purpose IrrigationType Concrete/Steel LinedDiameter 45 ft to 36 ft (13.72 M to 10.87 M)Cross Section CircularLength 2997 ft (913.5 M)

    Proposed Project:Capacity 1410 MWGenerating Units 3 x 470 Mw Annual Energy Generation 3840 GWhDesign Discharge 1318.3 m3 /sEIRR 30.3% ~ 36.7%FIRR 17.42%

    Turbine:Type Vertical Shaft Francis

    Rated Capacity 477 MW, 50 HzRated Speed 107.14 rpmRated Head 118.8 M

    Generators:Type Vertical Shaft Semi-umbrellaRated Capacity 522 MVA, 50 HzRating/Power Factor 470 MW / 0.9Rated Voltage 18 KVRated Current 16,745 AmpCircuit Breaker SF6 Type

    Transformer:Type Bank of Single Phase Units

    Rating 174 MVA, 50 HzRatio 18/500/√3 

  • 8/18/2019 Potential Pakistan

    37/91

     

    29

    Present Status

      PC-I Stands Approved by ECNEC on 16.08.2012 for Eqv. PKR 83.6 Billion including ForeignExchange Component of Eqv. PKR 65.8 Billion.

      Independent Panel of Experts of various disciplines (Technical, Environment & Social) engaged. Firstmeeting will be planned to held after mobilization of Civil Contractor at site.

      PSIA Consultants Amendment-3 to Assignment A dated 21.05.2013 was further transmitted to WorldBank for NOL on 29.05.2013.

      Civil Bidding Docs opened on 04.06.2013. Out of the seven (7) pre-qualified Firms / JVs. five (5)bidders submitted the bids:

      Letter of Acceptance issued to M/s Sinohydro – China on 17 August 2013.  After confirmation of Performance Guarantee, the Contract Agreement signed with Civil Works

    Contractor M/s Sinohydro China on 09.09.2013.

      After issuance of NOL by World Bank on 22.05.2013 & 23.05.2013 for hiring services of POEs(Structural & Hydraulic Experts) from M/s NESPAK for GBHP energy enhancement study andengagement of Individual Consultants for Sediment Monitoring System and Automation / Up-gradationof Existing Instrumentation System of TDP respectively.

      Bidding documents for E&M Works have been issued to the following pre-qualified Firms / JVs on 23July 2013:

    (i) JV of Voith Hydro GmbH & Co KG and Voith Hydro Shanghai Ltd.(ii) JV of Dongfang Electric Corporation (DEC) and Sinohydro Group Ltd.(iii) Andritz Hydro GmbH.(iv) JV of Harbin Electric Company Ltd (HECL) and China Gezhouba Group Company (CGGC)(v) OJSC “Power Machines”. 

      The target date for receipt of Bids is 23.10.2013. 

    Transmission Scheme For Dispersal of Power from Tarbela 4th Extension Hydropower

    Project

    No additional 500KV transmission line shall be constructed for power evacuation of Tarbela

    4th Extension Hydropower Project. Existing lines are capable for power dispersal of the

    generation from new Power House. 

  • 8/18/2019 Potential Pakistan

    38/91

     

    30

    KOHALA HYDROPOWER PROJECT

    LOCATION 

    The project is located in Muzaffarabad District, AzadJammu & Kashmir. The dam site is proposed justupstream of Domel on Jhelum River, 30 km and 174

    km from Muzaffarabad and Islamabad respectivelyand powerhouse is located 7 km upstream fromKohala Bridge.

    SALIENT FEATURES

    Installed Capacity 1100 MWGross Head 320 mDesign Discharge 425 m /secMean Annual Energy 4800 GWhNo. & Type of Turbines 4 (Francis)Type of Dam RCCHeight of Dam 57 mHead race Tunnel length 17760 mTotal Base Cost US$ 2155 MillionEIRR 19.9%Benefit Cost Ratio 1.83Estimated construction period (years) 6

    BACKGROUND/ PRESENT STATUS  Feasibility Study completed in December, 2008 by Joint Venture of National and International

    Consultants.  Based on an MoU, Private Power and Infrastructure Board (PPIB) issued LOI to China International

    Water and Electric Corporation (CWE) on 15.01.2009 for updating of feasibility completed by WAPDA

    Consultants.  Detailed Engineering Design and Tender Documents completed in November 2009 by China

    International Water and Electric Corporation (CWE).  The project is being developed in Private Sector through Private Power and Infrastructure Board

    (PPIB).  WAPDA hired Consultants in October 2008 for registration of project with UNFCCC to acquire carbon

    credit as decided under CDM Kyoto Protocol.  PPIB has appointed auditors and audit of Kohala HPP is under process.  After change of ownership of Kohala, M/s. Perenia, the CDM Consultants demanded that WAPDA

    may approach PPIB in order to obtain written assurance from CWE China so that they may be boundto abide by all the rights and obligations described in the original Consultancy Contract with WAPDAwithout any loss to M/s. Perenia and / or its Constituent companies.

      Third meeting regarding CDM issue was held on 23rd May 2012 in the office of PPIB Islamabad.  The following decision has been conveyed vide letter dated 12.06.2012.

    “Perenia / SMEC shall continue work on the acquisition of CDMcredits as per their agreement with WAPDA:” 

      Final meeting with PPIB and Auditor appointed by PPIB was held on 30.01.2013 for settlement ofaccount.

    Transmission Scheme for Dispersal of Power from Kohala Hydropower Project to

    Gujranwala  –  Estimated Cost of US$ 130 million.

    RAINKOT

    POWERHOUSE

        K    U    N    H   A    R

        R   I    V

        E    R

      J  A   N   D  A   R   B  A

       I   N    N .

       J    H    E   L    U    M 

    757

    ZAMINABAD

    KOHALA BRIDGE

    BARSALA

    967

    DOPATTA

    1685

          R     I     V     E     R

    R     O     A     D     

    1725

    MAJHOI

    GARHI

    THOTHA

    769

    CHATTIAN  INTAKER I V E R 

    J   H   E   L U   M   R  O   A  D  DHAL

    RANJKOT

    NULLAH

    MUZAFFARABAD

    3086

    2915

    3182

    NAUSADDA

    KOHALA HYDROPOWER PROJECT

    DAM &

    J  H  E   L  U  

    M    R  I  V   

    E   R  

    N E E L U M  R I V E R 

  • 8/18/2019 Potential Pakistan

    39/91

     

    31

    MUNDA DAM MULTIPURPOSE PROJECT

    LOCATIONThis project is proposed to be constructed on Swat River about5 Km upstream of Munda Head Works in Mohmand Agency(FATA), Khyber Pakhtunkhwa. 

    K   A  B  U   

    L    R  I   V   E   R  

    C  A  N   

    A  L  

     KA B U L  R

     I V E R 

    PESHAWAR

     BARA

    TARUJABBA

          R     I      V     E     R

     

    PABBI

    K  A B  U  L   R  I  V   E  R   

    CHARSADDA 

    R I V  E  R 

    NOWSHERA 

    T  O   I  S  L A M  A B  A D  

     

    RISALPURCANTONMENT 

    UTMANZAI 

    SHERPAO 

    MUNDA DAM SITE 

                                                                                                                P                                                                                                            I                                                                                                             N

                                                                                                                J                                                                                                              K                                                                                                             O  

                                                                                                                R