Reklamasi Pluit Peta Lokasi

Reklamasi Pluit Data Bor Log

PROJECT :

LOCATION : PERAIRAN DEKAT WADUK PLUIT BORE HOLE NUMBER : BH - 48 DRILLING TYPE MACHINE : YBM DATE COMMENCED : METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : COORDINATES S : CORE DIAMETER (mm) : 73 GEOLOGIST :

E : WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER : GROUND ELEVATION : DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER :

: CASSING DIAMETER (MM) : 89 WEATHER :

B O R I N G M A C H I N E

DA

TE

DEP

TH (m

)

Cas

sing

G.W

.L (m

)

SPT

TEST

SA

MPL

E

N1 N2 N3 N

SUB SURFACE EXPLORATION LOG

2.000 meter Gopur / Odang

699264

14 November 2015

DETAIL DESAIN PEMBANGUNAN PENGAMAN PANTAI DI JAKARTA DAN PENGAMANAN PANTAI DI MUARA-MUARA SUNGAI WILAYAH SUNGAI CILIWUNG, CISADANE

TOTAL DEPTH (m)

15 November 2015

Ir. Suharjono-

9324657

-meter20.00

BO

RE

PRO

FILE

PER

MEA

BIL

ITY

CORE DESCRIPTIONS

CO

RE

REC

OVE

RY

(%)

UN

IT

SPT& N VALUE

STANDARD PENETRATION TESTNUMBER OF BLOW S

10 20 30 40 50 60

UNCONF. COMP. TESTCOMPRESSIVE STRENGTH0.4 0.8 1.2 1.6 2.0 4.0

0.0

1.0

1.00

2.0

SPT-1 3 5 8 13

3.0

4.0

SPT-2 12 15 18 33

5.0

6.0

SPT-3 16 19 25 44

7.0

14 N

ovem

ber

201

5

Lempung, Coklat Kemerahan, Kaku, Palstisitas Tinggi.

Pasir Halus - Sedang, Abu-abu, Lepas - Urai.

ooooooooooooooo

Lempung Kerikilan, Coklat Kemerahan, Sedang, Plastisitas Sedang.

4.45

7 X

10-4

1.57

3 X

10-4

Reklamasi Pluit Data Bor Log

PROJECT :

LOCATION : PERAIRAN DEKAT WADUK PLUIT BORE HOLE NUMBER : BH - 48 DRILLING TYPE MACHINE : YBM DATE COMMENCED : METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : COORDINATES S : CORE DIAMETER (mm) : 73 GEOLOGIST :

E : WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER : GROUND ELEVATION : DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER :

: CASSING DIAMETER (MM) : 89 WEATHER :

B O R I N G M A C H I N E

DA

TE

DEP

TH (m

)

Cas

sing

G.W

.L (m

)

SPT

TEST

SA

MPL

E

N1 N2 N3 N

SUB SURFACE EXPLORATION LOG

2.000 meter Gopur / Odang

699264

14 November 2015

DETAIL DESAIN PEMBANGUNAN PENGAMAN PANTAI DI JAKARTA DAN PENGAMANAN PANTAI DI MUARA-MUARA SUNGAI WILAYAH SUNGAI CILIWUNG, CISADANE

TOTAL DEPTH (m)

15 November 2015

Ir. Suharjono-

9324657

-meter20.00

BO

RE

PRO

FILE

PER

MEA

BIL

ITY

CORE DESCRIPTIONS

CO

RE

REC

OVE

RY

(%)

UN

IT

SPT& N VALUE

STANDARD PENETRATION TESTNUMBER OF BLOW S

10 20 30 40 50 60

UNCONF. COMP. TESTCOMPRESSIVE STRENGTH0.4 0.8 1.2 1.6 2.0 4.0

8.0

SPT-4 4 6 10 16

9.0

10.0

SPT-5 0 0 1 1

11.0

12.0 UDS-1

SPT-6 1 1 1 2

13.0

14.0

Sedimen

Cas

sing

f89

mm

Lempung Sisipan Kulit Kerang, Abu-abu, Lunak - Kaku, Plastisitas Tinggi.

Pasir Lempungan Sisipan Kulit Kerang, Abu-abu, Urai

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

15 N

ovem

ber

201

5

1.57

3 X

10-

1.37

2 X

10-4

Reklamasi Pluit Data Bor Log

PROJECT :

LOCATION : PERAIRAN DEKAT WADUK PLUIT BORE HOLE NUMBER : BH - 48 DRILLING TYPE MACHINE : YBM DATE COMMENCED : METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : COORDINATES S : CORE DIAMETER (mm) : 73 GEOLOGIST :

E : WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER : GROUND ELEVATION : DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER :

: CASSING DIAMETER (MM) : 89 WEATHER :

B O R I N G M A C H I N E

DA

TE

DEP

TH (m

)

Cas

sing

G.W

.L (m

)

SPT

TEST

SA

MPL

E

N1 N2 N3 N

SUB SURFACE EXPLORATION LOG

2.000 meter Gopur / Odang

699264

14 November 2015

DETAIL DESAIN PEMBANGUNAN PENGAMAN PANTAI DI JAKARTA DAN PENGAMANAN PANTAI DI MUARA-MUARA SUNGAI WILAYAH SUNGAI CILIWUNG, CISADANE

TOTAL DEPTH (m)

15 November 2015

Ir. Suharjono-

9324657

-meter20.00

BO

RE

PRO

FILE

PER

MEA

BIL

ITY

CORE DESCRIPTIONS

CO

RE

REC

OVE

RY

(%)

UN

IT

SPT& N VALUE

STANDARD PENETRATION TESTNUMBER OF BLOW S

10 20 30 40 50 60

UNCONF. COMP. TESTCOMPRESSIVE STRENGTH0.4 0.8 1.2 1.6 2.0 4.0

SPT-7 1 1 2 3

15.0

16.0

SPT-8 8 8 15 23

17.0

18.0

SPT-9 11 19 29 48

19.0

DS-1

20.0 SPT-10 16 21 39 60

Lempung, Abu-abu Kecoklatan, Keras, Plastisitas Tinggi.

Pasir Halus - Sedang, Coklat, Sedang - Agak Padat, Urai.

15 N

ovem

ber

201

5

1.67

9 X

10-4

Reklamasi Pluit Data Bor Log

PROJECT :

LOCATION : PERAIRAN DEPAN WADUK PLUIT BORE HOLE NUMBER : BH - 49 DRILLING TYPE MACHINE : YBM DATE COMMENCED : METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : COORDINATES S : CORE DIAMETER (mm) : 73 GEOLOGIST :

E : WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER : GROUND ELEVATION : DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER :

: CASSING DIAMETER (MM) : 89 WEATHER :

B O R I N G M A C H I N E

DA

TE

DEP

TH (m

)

Cas

sing

G.W

.L (m

)

SPT

TEST

SA

MPL

E

N1 N2 N3 N

SUB SURFACE EXPLORATION LOG

2.000 meter Odang / Gofur

699114

11 November 2015

DETAIL DESAIN PEMBANGUNAN PENGAMAN PANTAI DI JAKARTA DAN PENGAMANAN PANTAI DI MUARA-MUARA SUNGAI WILAYAH SUNGAI CILIWUNG, CISADANE

TOTAL DEPTH (m)

12 November 2015

Ir. Suharjono-

9325465

-meter23.00

BO

RE

PRO

FILE

PER

MEA

BIL

ITY

CORE DESCRIPTIONS

CO

RE

REC

OVE

RY

(%)

UN

IT

SPT& N VALUE

STANDARD PENETRATION TESTNUMBER OF BLOW S

10 20 30 40 50 60

UNCONF. COMP. TESTCOMPRESSIVE STRENGTH0.4 0.8 1.2 1.6 2.0 4.0

0.0

1.0

1.00

2.0

SPT-1 1 1 1 2

3.0

4.0

SPT-2 12 16 23 39

5.0

6.0

SPT-3 17 17/4 >60

7.0

11 N

ovem

ber

201

5

Material Timbunan (Lempung Kerikilan), Merah, Kaku.

Pasir Halus, Abu-abu, Lepas -Urai

Lempung Pasiran Halus, Abu-abu, Lunak, Plastisitas Sedang.

4.64

9 X

10-4

2.15

0 X

10-3

Reklamasi Pluit Data Bor Log

PROJECT :

LOCATION : PERAIRAN DEPAN WADUK PLUIT BORE HOLE NUMBER : BH - 49 DRILLING TYPE MACHINE : YBM DATE COMMENCED : METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : COORDINATES S : CORE DIAMETER (mm) : 73 GEOLOGIST :

E : WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER : GROUND ELEVATION : DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER :

: CASSING DIAMETER (MM) : 89 WEATHER :

B O R I N G M A C H I N E

DA

TE

DEP

TH (m

)

Cas

sing

G.W

.L (m

)

SPT

TEST

SA

MPL

E

N1 N2 N3 N

SUB SURFACE EXPLORATION LOG

2.000 meter Odang / Gofur

699114

11 November 2015

DETAIL DESAIN PEMBANGUNAN PENGAMAN PANTAI DI JAKARTA DAN PENGAMANAN PANTAI DI MUARA-MUARA SUNGAI WILAYAH SUNGAI CILIWUNG, CISADANE

TOTAL DEPTH (m)

12 November 2015

Ir. Suharjono-

9325465

-meter23.00

BO

RE

PRO

FILE

PER

MEA

BIL

ITY

CORE DESCRIPTIONS

CO

RE

REC

OVE

RY

(%)

UN

IT

SPT& N VALUE

STANDARD PENETRATION TESTNUMBER OF BLOW S

10 20 30 40 50 60

UNCONF. COMP. TESTCOMPRESSIVE STRENGTH0.4 0.8 1.2 1.6 2.0 4.0

8.0

SPT-4 17 27/6 >60

9.0

10.0

SPT-5 4 4 5 9

11.0

12.0 UDS-1

SPT-6 0 0 1 1

13.0

14.0

Sedimen

Cas

sing

f89

mm

11 N

ovem

ber

201

5

Lempung, Abu-abu, Lunak -Sedang, Plastisitas Tinggi.

2.15

0 X

10-

1.30

9 X

10-4

Reklamasi Pluit Data Bor Log

PROJECT :

LOCATION : PERAIRAN DEPAN WADUK PLUIT BORE HOLE NUMBER : BH - 49 DRILLING TYPE MACHINE : YBM DATE COMMENCED : METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : COORDINATES S : CORE DIAMETER (mm) : 73 GEOLOGIST :

E : WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER : GROUND ELEVATION : DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER :

: CASSING DIAMETER (MM) : 89 WEATHER :

B O R I N G M A C H I N E

DA

TE

DEP

TH (m

)

Cas

sing

G.W

.L (m

)

SPT

TEST

SA

MPL

E

N1 N2 N3 N

SUB SURFACE EXPLORATION LOG

2.000 meter Odang / Gofur

699114

11 November 2015

DETAIL DESAIN PEMBANGUNAN PENGAMAN PANTAI DI JAKARTA DAN PENGAMANAN PANTAI DI MUARA-MUARA SUNGAI WILAYAH SUNGAI CILIWUNG, CISADANE

TOTAL DEPTH (m)

12 November 2015

Ir. Suharjono-

9325465

-meter23.00

BO

RE

PRO

FILE

PER

MEA

BIL

ITY

CORE DESCRIPTIONS

CO

RE

REC

OVE

RY

(%)

UN

IT

SPT& N VALUE

STANDARD PENETRATION TESTNUMBER OF BLOW S

10 20 30 40 50 60

UNCONF. COMP. TESTCOMPRESSIVE STRENGTH0.4 0.8 1.2 1.6 2.0 4.0

SPT-7 1 1 2 3

15.0

16.0

SPT-8 1 1 1 2

17.0

18.0

SPT-9 1 2 2 4

19.0

20.0 SPT-10 3 5 7 12

Lempung, Coklat, Lunak, Plastisitas Tinggi.12

Nov

embe

r 2

015

Lempung, Coklat, Kaku, Palstisitas Tinggi.

1.58

1 X

10-4

Reklamasi Pluit Parameter Tanah

Penentuan paramter tanah didasarkan pada nilai korelasi empiris hasil penyelidikan tanah

yaitu:

h (m) g ' (kN/m3) c (kN/m2) f Kalayer 1 4.5 18.50 22.00 20.00 0.49layer 2 4.0 8.69 22.00 20.00 0.49layer 3 3.0 9.16 84.50 - 1.00layer 4 5.0 11.01 - 41.35 0.20layer 5 5.0 3.93 13.00 - 1.00layer 6 2.5 7.62 - 36.61 0.25

Aktif

Beban Surcharge (q) = 20 kN/m2

Reklamasi Pluit Parameter Tanah Aktif

1. Tekanan Akibat Beban Surcharge (q)

Layer depth (m) Pq (kN/m2) Pq (kN/m)A 0 9.8 14.3B atas -4.5 9.8 14.3

B bawah -4.5 9.8 14.3

C atas -8.5 20.0 29.2

C bawah -8.5 20.0 29.2

D atas -11.5 4.1 6.0

D bawah -11.5 4.1 6.0

E atas -16.5 20.0 29.2

E bawah -16.5 20.0 29.2

F atas -21.5 5.1 7.4

F bawah -21.5 5.1 7.4

G atas -24.0 5.1 7.4 GG'

A

4.5 m

2.5 m

D'

F'

3.0 mC

E

2 t/m2

5.0 m

C'

E'

4.0 mB

5.0 m

D

F

Reklamasi Pluit Parameter Tanah Aktif

2. Tekanan Akibat Air

Layer depth (m) Pw (kN/m2) Pw (kN/m)A 0 0.0 0.0B atas -4.5 44.1 64.5

B bawah -4.5 44.1 64.5

C atas -8.5 83.4 121.7

C bawah -8.5 83.4 121.7

D atas -11.5 112.8 164.7

D bawah -11.5 112.8 164.7

E atas -16.5 161.9 236.3

E bawah -16.5 161.9 236.3

F atas -21.5 210.9 307.9

F bawah -21.5 210.9 307.9

G atas -24.0 235.4 343.7 GG'

A

2.5 m

D'

F'

4.5 m

E

2 t/m2

3.0 mC

E'

4.0 m

5.0 m

C'

F

B

5.0 m

D

Reklamasi Pluit Parameter Tanah Aktif

3. Tekanan Akibat Koreksi nilai kohesi (c)

GG'

A4.5 m

2.5 m

D'

F'

3.0 mC

E

2 t/m2

5.0 m

C'

E'

4.0 mB

5.0 m

D

F

Layer depth (m) Pc (kN/m2) Pc (kN/m)A 0 30.8 45.0B atas -4.5 30.8 45.0

B bawah -4.5 30.8 45.0

C atas -8.5 30.8 45.0

C bawah -8.5 169.0 246.7

D atas -11.5 169.0 246.7

D bawah -11.5 0.0 0.0

E atas -16.5 0.0 0.0

E bawah -16.5 26.0 38.0

F atas -21.5 26.0 38.0

F bawah -21.5 0.0 0.0

G atas -24.0 0.0 0.0

Reklamasi Pluit Parameter Tanah Aktif

4. Tekanan Akibat Tanah

Layer depth (m) P (kN/m2) P (kN/m)A 0 0.0 0.0B atas -4.5 40.8 59.6

B bawah -4.5 81.6 119.2

C atas -8.5 98.7 144.1

C bawah -8.5 133.4 194.8

D atas -11.5 160.9 234.9

D bawah -11.5 166.5 243.1

E atas -16.5 177.8 259.6

E bawah -16.5 232.8 339.9

F atas -21.5 252.5 368.6

F bawah -21.5 257.4 375.9

G atas -24.0 262.2 382.9 GG'

A4.5 m

2.5 m

D'

F'

3.0 mC

E

2 t/m2

5.0 m

C'

E'

4.0 mB

5.0 m

D

F

Reklamasi Pluit Parameter Tanah Pasif

1. Tekanan Akibat Air

Layer depth (m) Pw (kN/m2) Pw (kN/m)A 0 0.0 0.0B atas 0.0 0.0 0.0

B bawah 0.0 0.0 0.0

C atas -4.0 39.2 57.3

C bawah -4.0 39.2 57.3

D atas -7.0 68.7 100.3

D bawah -7.0 68.7 100.3

E atas -12.0 117.7 171.9

E bawah -12.0 117.7 171.9

F atas -17.0 166.8 243.5

F bawah -17.0 166.8 243.5

G atas -19.5 191.3 279.3 G' G

A

4.0 m

2 t/m2

F' F

E' E

2.5 m

D'

5.0 m

D

5.0 m

C'3.0 m

C

B

4.5 m

Reklamasi Pluit Parameter Tanah Pasif

2. Tekanan Akibat Koreksi Nilai Kohesi (c)

Layer depth (m) Pc (kN/m2) Pc (kN/m)A 0 0.0 0.0B atas 0.0 0.0 0.0

B bawah 0.0 0.0 0.0

C atas -4.0 0.0 0.0

C bawah -4.0 169.0 246.7

D atas -7.0 169.0 246.7

D bawah -7.0 0.0 0.0

E atas -12.0 0.0 0.0

E bawah -12.0 26.0 38.0

F atas -17.0 26.0 38.0

F bawah -17.0 0.0 0.0

G atas -19.5 0.0 0.0G' G

A

4.0 m

2 t/m2

F' F

E' E

2.5 m

D'

5.0 m

D

5.0 m

C'3.0 m

C

B

4.5 m

Reklamasi Pluit Parameter Tanah Pasif

3. Tekanan Akibat Tanah

Layer depth (m) P (kN/m2) P (kN/m)A 0 0.0 0.0B atas 0.0 0.0 0.0

B bawah 0.0 0.0 0.0

C atas 0.0 70.9 103.5

C bawah 0.0 105.7 154.3

D atas -3.0 133.1 194.4

D bawah -3.0 267.6 390.8

E atas -8.0 537.0 784.1

E bawah -8.0 592.1 864.4

F atas -13.0 611.7 893.1

F bawah -13.0 689.5 1006.6

G atas -15.5 764.8 1116.6 G' G

A

4.0 m

2 t/m2

F' F

E' E

2.5 m

D'

5.0 m

D

5.0 m

C'3.0 m

C

B

4.5 m

Reklamasi Pluit Parameter Struktur

Parameter NilaiDiameter 1200 mm

Thickness 150 mm

Class A1

Moment Crack 120 ton.m

Allowable Axial 802.8 ton.m

Moment Ultimate 180 ton.m

Length 24 m

Sumber : WIKA Beton Brosur

Reklamasi Pluit Daya Dukung Tanah

Timbunan (Lempung)

Lempung sedang N-SPT 13

Pasir Halus N-SPT 38

Lempung lunak N-SPT 2

Beban 2 ton/m2

Beban timbunan 15.3 t/m2

Daya dukung tanah

OD = 1200t = 150mm

Tanah dasar

Reklamasi Pluit Daya Dukung Tanah

Perhitungan daya dukung tanah dasar mengacu pada Meyerhof (1963). Parameter tanah yang

digunakan merupakan hasil penyelidikan tanah berupa pengeboran dalam sebagai berikut :

• Jenis tanah : lempung

• N – SPT : 13

• Unit Weight () : 1.997 t/m3

• Sudut geser () : 0o

• Kedalaman (D) : 0 m (dasar timbunan)

• Nc , Nq , N : (5.74) , (1) , (0).

• Safety factor : 2.5

• Kohesi (c): 8.45 t/m2

• q : x D = 0.997 x 0 m = 0

Reklamasi Pluit Daya Dukung Tanah

𝑞𝑢𝑙𝑡=𝑐𝑁 𝑐𝑆𝑐𝑑𝑐+𝑞𝑁𝑞𝑆𝑞𝑑𝑞+0.5𝛾 ′𝐵 ′𝑁𝛾 𝑆𝛾 𝑑𝛾

(8.45 t/m2 x 5.740 x 1 x 1) + 0 + 0 = 48.503 t/m2

Jadi daya dukung ijin tanah dasar pada kondisi eksisting adalah

𝑞𝑎𝑙𝑙=𝑞𝑢𝑙𝑡

𝑆𝐹 =48.503 𝑡 /𝑚2

2.5=19.4 𝑡 /𝑚2

Beban rencana : beban timbunan + Beban hidup

: 15.3 t/m2 + 2 t/m2

: 17.3 t/m2

Nilai daya dukung ijin tanah dasar untuk lokasi Pluit cukup kuat untuk menahan beban

rencana (19.4 t/m2 > 17.3 t/m2), sehingga tidak diperlukan adanya perbaikan tanah ataupun

penggunaan pondasi dalam.

Reklamasi Pluit Settlement

Timbunan (Lempung)

Lempung sedang N-SPT 13

Pasir Halus N-SPT 38

Lempung lunak N-SPT 2

Beban 2 ton/m2

Beban timbunan 15.3 t/m2

OD = 1200t = 150mm

3 m

Tanah dasar

Reklamasi Pluit Settlement

Kondisi tanah dasar Pluit yang tergolong cukup baik, yaitu berupa lempung sedang. Oleh

sebab itu penurunan tanah yang terjadi hanya penurunan tanah seketika selama masa

konstruksi sedangkan konsolidasi tidak akan terjadi. Adapun nilai penurunan segera yang

terjadi adalah :

• Tinggi lapisan lempung (H) = 3 m

• N-SPT = 13

• Beban rencana (q) = 17.3 t/m2

• Es = 40 x 0.65 x 13 = 338 t/m2

𝑆𝑒𝑡𝑡𝑙𝑒𝑚𝑒𝑛𝑡 (𝑆𝑒 )=𝐻𝑥𝑞𝐸𝑠

=3𝑚𝑥 17.3𝑡 /𝑚2

338 𝑡 /𝑚2 =0.154𝑚=15.4 𝑐𝑚

Tanah urugan (timbunan) tidak mengalami settlement sehingga penurunan tanah hanya

terjadi pada tanah dasar. Besar penurunan segera (settlement) yang terjadi selama masa

konstruksi adalah 15.4 cm.

Reklamasi Pluit Settlement

Lempung sedang N-SPT 13

Pasir Halus N-SPT 38

Lempung lunak N-SPT 2

OD = 1200t = 150mm

Timbunan (Lempung)

Beban 2 ton/m2

Beban timbunan 15.3 t/m2

2.85 m

Tanah dasar

Reklamasi Pluit Finite Element Analisis

Pemodelan metode elemen hingga (finite element) dengan menggunakan perangkat lunak

Plaxis yang diperuntukkan untuk analisis dua dimensi dari deformasi dan analisis stabilitas

tanah, batuan dan sistem tanah – struktur serta dapat menganalisis besarnya penurunan yang

terjadi akibat beban-beban yang bekerja pada struktur

Gambar Model Finite Element Turap