prathyusha.sap+testing

Upload: nasir-ahmed

Post on 14-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Prathyusha.sap+Testing

    1/5

    MIFI Systems, Inc Prathyusha

    7 years of IT experience extensively in application software testing and experienced in performing differentroles across various phases of software development life cycle

    Summary of Experience:

    Knowledge in understanding full QA cycle to work hand in hand with the business analyst, Functionalanalyst, Developers ,Training departments and users.

    Extensive experience in Integration, Functional, regression, User Acceptance and End-To-End testing.

    Proficient with developing Test plans, Test strategy and Test cases. Extensive SAP integration knowledge in FI/CO, Sales and Distribution(SD) ,Material management(MM)

    Coordinated in integration with other SAP modules like SD, MM, PP, FI/CO, CRM and ABAP/4programming for data transfer and customized repots as required by client.

    Experience in testing XML and various webservices

    Reviewed functional deliverables before delivering to the technical team.

    Conducted design and review sessions with clients, consulting staff, vendors and management.

    Actively participated in User Interaction and Experience Design.

    Complied requirements for system enhancements and translate into specifications forimplementation/customization.

    Facilitated interaction between management, business and technical teams.

    Posses good inter personal skills and self-learning attitude.

    Presentation, Negotiation and Staff Acquisition

    Exceptional versatility and adaptability in handling onsite-offshore model.

    Dedication and drive as a hard-working individual. Ability to manage multiple tasks in a pressured environment

    Ascertained output requirements of organizational units

    Devised efficient formats for management reports

    Worked on exclusive Insurance, Manufacturing, Service, Communication domain.

    Expertise:

    Testing Tools : Win runner 7.x, Test Director 7.x/8.x,QTP 8.x, QC 9.xOperating System : MS-DOS, Windows 95/98/2000Development Language : C/C++, Java, JSP, JavaScript, XML, HTML, UML, VISUAL

    BASIC, ASP, Java Script, VB Script, SQL* Plus, PL/SQLDatabases : Oracle 9i/8.x, SQL Server 7.0, SQL Server 2000.

    Management Tools : MS PROJECT 2003, MS office.ERP : SAP R/3 4.6c, 4.7, ECC 5.0, ECC 6.0 (PP, MM, SD, FI/CO),

    SAP CRM 4.0, mySAP CRM 2007

    PROJECTS:

    T-Mobile, Frisco(QA Analyst) Nov 06 - Jul 10Projects& Production Support: T-mobile, Bellevue,WA SAP QA Analyst

    Supporting & testing all production fixes for SAP CRM/SD FICO, MM, SRM/EBP, HR order to cash andinteracting closely with Development team as well as functional team for issue escalation and resolution.

    Involved in all production support testing responsibilities included tracking all defects in Remedy

    analyzing them and coming up with appropriate test scenarios and creating test scripts and testplan. Testing both existing functionality and regression.Co-ordinating with SAP developers andmodule configurators.

    Analyzing test results and generating test report, tracking and supporting all post production fixes.

    Project: Flex-Pay:This project was implemented with an aim to capture a huge Sub prime market forwireless connections. Major customers were only with a bad credit history. The company envisaged a goalof a million + customers and revenue targets of around 50million per annum. This release was a mammothsuccess and largely attributed to time and efforts of many different teams.

    Page 1 of 5

  • 7/30/2019 Prathyusha.sap+Testing

    2/5

    MIFI Systems, Inc Prathyusha

    Created a Sales Order for Flex pay customer situations in Partner co-branded channels, T-mobile

    web based channels, back office and sales rep channels in the front end.

    validated the orders consistency in SAP CRM and SAP R/3 ECC5.0

    Created deliveries, IDocMockup , and activation of the SIM IMEIs to fulfill the order from

    warehouse.

    Created the Billing document and was responsible to execute the background job to make the

    payment postings to SAMSON interface.

    Created various document types such as Returns, exchanges and Credit memos in front end and

    validated the same against the back end in SAP R/3 and SAP CRM.

    Tested for various functionalities as specified in the Functional spec. document and technical specdocument.

    Trouble-shoot the issues with AASP, Delego interface which are primarily responsible to do credit

    checks and validate the Credit card authorization respectively.

    Trouble-shoot the RFC call success status thru BAPI interface.

    Developed Use cases scenarios , project plan document.

    Held cross team meetings to resolve the issues particularly with Business users and development

    teams.

    Worked on Production and QA environments to fix the issues post production.

    Direct Channel Migration (DCM): Direct Channel Migration and Fulfillment provides the capability for thedirect fulfillment order capture systems(websites)to better control customer experience, improve responsetime to market demands, reduce development and maintenance costs, and enhance orderprocessing/management capabilities. The objective was to bring the order management systems in house

    and migrate the fulfillment away from TESSCO

    Tested a variety of areas in SAP in SD, MM and FI modules including: standard order processing,

    purchase order, credit memo, debit memo, pricing, billing, goods receipt, invoice, material master,posting keys, movement types, PR, revenue recognition.

    Conducted Functionality and Regression testing during the various phases of the application using

    Quick Test Pro (QTP).

    Tested the User Exits that were developed for tax calculation and for posting tax to a specific

    account and for Price difference comparison between SAP PO & EDI invoice amounts.

    Tested reports in SD, MM application areas - monthly sales details, stock details, inventory, and

    price, listing of materials, customer balances and details regarding fixed assets.

    Did a functional test of the following in MM module: Uploading S&OP data from excel-sheet into

    MC94, Goods Receive Note IDoc (Inbound Delivery), Inbound Shipment Notification.

    Tested on SD module: Delivery Order / Invoice, Packing List, Credit/Debit Note for Customers like

    Wal-Mart, Best buy, Pioneer and Fujitsu. Tested newly configured companies by creating vendors and posting invoices and credit memos,

    posting parked documents, reversing posted documents, manual and automatic payment for openitems with new payment methods, clearing vendors, automatic clearing of GR/IR accounts.

    Environment: SAP 4.6.C, ECC 6.0, SAP CRM 4.0, mySAP CRM 2007, SD, MM, FICO, Oracle 8, TIBCO,QTP, SAP Script, Unix.

    Verizon(QA Analyst) July06 - Oct06Project Title: Dealer Tracking System (DTS)

    The Dealer Tracking System (DTS) is a business application that resides on an ORACLE database for thepurpose of collecting, storing and tracking Verizon dealer information.DTS stores information which is needed tomaintain the relationship between Verizon and the dealer. From an end to end perspective, the new dealer

    application is entered into DTS, a risk assessment occurs, once the application has been approved, contractinformation is entered as well as specific details related to the dealer. The dealer is then able to conduct businessand sell DirecTV products and services.

    Scope of the project:

    Master data conversion relative to Verizon partner relationships with authorized dealer to be converted into

    SAP.

    Conversion data to be loaded into the CRM Quality Assurance system until final review and approval when

    it will be brought into the CRM Production system.

    Page 2 of 5

  • 7/30/2019 Prathyusha.sap+Testing

    3/5

    MIFI Systems, Inc Prathyusha

    Creation of Corporate (Corp) for dealers with various types of relationships with Verizon. In the CRM

    system, it is maintained as an internally assigned Business Partnerrecord.

    Creation of chain connected to the Corp Business Partnerthrough a Relationship.

    Creation of store with same master data information as a corp thereby sending to external system (STMS)

    forprocessing and returning billing number. The Billing Number master record holds the Store Number in aunique field and will link the Chain and Corp entities through relationships.

    Access to Dealer website (DWS) via interface through a batch job updating DMZ database. The Dealer

    website is the primary system for dealers to report sales and manage dealer attributes. Dealers log into DWSand are able to create or make changes to existing MDUs. The changes are captured in the DMZ database

    and then are pushed back to the DTS database. Implementation ofSAP CRM on SAP Enterprise Portal and the web application serverusing the People

    Centric User Interface (PCUI). Users will log on to the CRM system using the web interface (web browser)and will be authenticated. CRM functionality is enabled based on the users role.

    Responsibilities:

    Analyzing Software documentation for business, technical and Functional specification

    Involved in gathering testing requirement from IT, business and users.

    Work with project management team to coordinate testing within the overall project schedule.

    Developed Project Test Strategy and Test Plans.

    Developed Test scenarios, writing and Updating Test cases and Test Management,Defect

    tracking and Test report.

    Responsible for end-to-end analysis, diagnosisandproblem resolution, including quality

    assurance and acceptance testing. Developed test script templatewith Validation Condition/Test Procedure and expected results,

    testers initials and date of the test for Functional testing and integration testing.

    Tested inbound and outbound interfaces from and to SAP modules.

    Validated Data conversion from legacy to SAP CRM system.

    Organized testing status team meetings and co-coordinated with the Project Manager and

    Business to meet the dead lines.

    Verifying the quality of requirements, including testability, requirement definition, test

    design, test-script ,test-data development and test execution

    Tested interfaces, custom ABAPprograms and standard SAP CRM transactions.

    Responsible for production support, user training and documented user manuals.

    Environment:SAP CRM 4.0, SAP EP 6.0, Windows Server 2003, Oracle 9.2, See Beyond (EI) e*GateV4.5.3, e*Insight V4.5.3 and ICAN V5.0.5, DWS, STMS, Directv.com, Dealer Locator, EPS, EBI, DCP,

    ACTS, DWS, Differentiated Offer, RAS, DENRPT, DMSALEPD ,MS office, PVCS 7.5

    AT&T, San Ramon (QA Analyst) Jan06 - June 06Project Title: Reverse Logistics System

    The project involved of ensuring tested product after repair was shipped back to end user .From an end toend perspective, AT&T customer calls up Service centre and reports the problem of the product. Report isbeen lodged by customer representative, the product is shipped from Customer to repairing location.Product is physically tested. If it is out of scope repair, product is scrapped by creating a STO and inventoryis reduced. If no fault is found then a STO, GR, PGI is done and finally the product is shipped back tocustomer. If the product has to be repaired, then it is done at repairing facility location.

    Scope of the project:

    Create New Plant

    Review BAPIs to insure that the New Plant code, Auto Scrap, and Item Conversion process are

    compatible with the newly created plant.

    Create Storage Location for new plant.

    Create new shipping point and assign to new plant Configure Shipping point determination

    Modify Stock overview report add a column to the report that shows the in-transit.

    Responsibilities:

    Page 3 of 5

  • 7/30/2019 Prathyusha.sap+Testing

    4/5

    MIFI Systems, Inc Prathyusha

    Analyze Business Requirements Document, system specifications and identified test requirements.

    Developed Project Test Strategy and Test Plans.

    Participated in design review meetings to understand technical and functional systems overview.

    Communicate proactively with project stakeholders and biz representatives to ensure all parties are

    abreast of the plan, progress and act promptly on communications.

    Design and creation of appropriate test Cases and scenarios using business use cases and

    business requirement documents

    Timely updated the test cases with the modified/newly added requirements.

    Coordinate the test execution and documentation of test results

    Performed Functional, Integration, UI, Regression, Positive and Negative testing.

    Validating Data conversion from Legacy to SAP system

    Worked with Configurations/developers to prioritize defect fixes and to retest when the fixes are

    complete.

    Track and resolve all post go live issue till system stability

    Ensure systems readiness for cutover and testing process

    Track the progress of testing on daily basis and ensure all issues are appropriately logged and

    assigned to appropriate personnel for issue resolution and resolutions are made on a timely basisin order not to hinder the overall integration testing progress

    Compiled, analyzed and presented training documentation to the end-user community on the test

    scenarios developed.

    Successfully conducted UAT

    Environment: SAP EP 6.0, Windows Server 2003, Oracle9.2, See Beyond (EI) e*Gate V4.5.3, e*InsightV4.5.3 and ICAN V5.0.5, SAP R/3 4.7, SAP EP 6.0, DWS, PVCS tracker 7.5.

    Nestle, California (QA Analyst) March05 - Nov 05Project Title: SAP (PP, MM) enhancement and support maintenance

    Project involved the implementation of SAP (PP, MM) modules and testing custom transactions, customcode and configurations according to the business requirements.

    Responsibilities:

    Analyzed the Functional specifications and requirement documents to categorize the units.

    Created Test Cases as per the business requirements and Use cases.

    Participated in review meetings with core team.

    Carried Testing in material master, Bommaintainance, work centre and Routing.

    Tested the SD and PP integration by testing the requirement type and requirement class

    functionality.

    Tested Integration of PP module with FI/CO, QM, PP and SD modules.

    Developed Test documentation for configuration settings.

    Test planning for the requirements given & the required functionality.

    Created Test plans & Test Cases in Test Director

    Introduced checkpoints to validate state of the objects.

    Conducted UAT testing by providing the test data to the UAT testers.

    Environment:SAP R/3 4.6c (SD, FI, MM, PP) Oracle 8i, Windows 2000, Test Work Bench, CATT, QTP 7.x

    and Test Director 7.5.

    Lucent Technologies (Manual Tester) June04 - Jan 05Project Title: Implementation of SAPSD, MM, FI/CO modules)

    This project involved the implementation of different modules in SAP and testing custom transactions,custom code and configurations according to the business requirements.

    Responsibilities:

    Page 4 of 5

  • 7/30/2019 Prathyusha.sap+Testing

    5/5

    MIFI Systems, Inc Prathyusha

    Involved in Writing test scripts and developed test strategies.

    Tested the defined distribution cycle with the designated cost centers.

    Tested the program for the mass update of the warranty records of all the equipment.

    Tested various custom changes done FI that includes General Ledger (FI-GL), Accounts Payable

    (FI-AP), Accounts Receivable (FI-AR), Bank Accounting (FI-BL) and Special Purpose Ledger (FI-SL).

    Involved in testing of the interface program for creating a Return order. The program compares the

    Sales order and the materials reported by the technician and create the Return order.

    Tested the Advance Payment Report, which displays the information about the advance payment

    from the customers. Manually tested the functionality of Vendor balance display and customer balance display reports in

    AP, AR Modules.

    Defining plant, creating storage locations and assigning of plant to company code.

    Creating material master data, BOM, Work centre, Routing.

    Configuring planning strategies for Make to stock make to order and planning with final assembly

    scenarios.

    Creating Production orders, carrying out material availability, scheduling and releasing production

    orders and confirming process orders.

    Configuring various Customization settings in PP module

    Environment:SAP R/3 4.6c (SD, FI, MM) Oracle 8i, Windows 2000, QTP 6.5 and Test Director 7.5

    Kodak, New York (Functional Tester) Aug03 - May 04Project Title: SAP (SD,MM,FI/CO) enhancement and support maintenance

    This project involved the implementation of SD,MM,FI/CO modules in SAP and testing custom transactions,custom code and configurations according to the business requirements.

    Responsibilities:

    Worked extensively on Functionality, Validation, Integration, and Performance testing for

    transactions in SD, MM and FI/CO as per business requirements.

    Created test cases for the Business process/Requirement instructions and performed testing

    according to the Test Plans.

    Responsible for Black Box Functional testing (Positive and Negative), Validation testing, Installation

    testing, and Integration testing and also wrote test cases and User Acceptance Testing (UAT). Documented and tracked the defects, till complete resolution, communicating with Software

    developers and QA team members using Test Director.

    Generated reports and graphs of the defect repair progress using Test Director.

    Tested the whole functionality of Outstanding Purchase Orders report as per Business

    requirements.

    Integration Testing

    Generating Pull list with back flushing of goods.

    Post Implementation support to PP Module in SAP R/3 Implementation and Developmental

    activities.

    MRP run, MRP result, Material requirement planning details to Materials dept. for procurement

    Taking up new requirements from users and to coordinate with concerned ABAP programmers

    Environment:SAP 4.6B (SD, MM and FI/CO) Windows NT, QTP 7.x, Test Director 7.x.

    EDUCATIONAL QUALIFICATIONS:

    Bachelor of Engineering, India

    Page 5 of 5