CITY OF PONTIAC ● OAKLAND COUNTY ● MICHIGAN
Preliminary Program and Financial Structuring Report URBAN RESOURCE ALLIANCE OCTOBER 28, 2009
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
ACKNOWLEDGEMENTS: The Strand Theatre Program and Funding Report was prepared as a Technical Visit sponsored by Main Street Oakland County for the City of Pontiac with the cooperation of the following people:
Oakland County L. Brooks Patterson, Oakland County Executive Robert Donohue CMSM, Main Street Oakland County Program Coordinator City of Pontiac Fred P. Leeb, Emergency Financial Manager Khalfani Stephens, Acting Director, Pontiac Growth Group & Economic
Development Corporation Sandy‐Michael McDonald, Pontiac DDA Executive Director Member and Associated firms of the Urban Resource Alliance collaborated in the preparation of this report: Urban Resource Alliance Schervish Vogel Architects, PLC Finnicum Brownlie Architects, Inc Zachary and Associates, Inc Gerdom Management Group Theatre Consultant
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
TABLE OF CONTENTS:
Preface I. Introduction Purpose Background Assumptions Illustrations II. Program Goals Existing Conditions Space/Area Schedule Schematic Plans Assumptions/Schedule/ Conclusions III. Ownership Structure/Theatre Management Operations Entity Objectives Operating Plan Program Approach 52 Week Booking Plan Preliminary Operational Structure IV. Financial Structuring Approach Preliminary Sources and Uses of Funds Statement Assumptions Proposed Financial Structure V. Challenges/Recommendations Strategic Direction Operational Challenges Recommendations
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Preface: This preliminary Phase I feasibility report is based upon construction cost
assumptions provided to the Urban Resource Alliance by the Pontiac Growth Group. The URA has not done a specific line‐item cost estimate for the project. The PGG’s assumptions to complete the project are based upon past knowledge of the construction and conversations with contractors involved in the recent renovation. The URA used the assumptions to project all costs, hard and soft, as a basis for projecting the future funding sources needed to complete the project.
As outlined herein, the operating program of film and live performances,
together with food and beverage operations, is assumed to have the strength of cash flow necessary to sustain the Strand Theatre project to financial viability.
The necessary next phase toward determining the feasibility of the project will
involve determining the structure’s eligibility for historic tax credits; completing the construction cost estimates; analyzing the markets; identifying the costs relating to utilizing the adjacent Pontiac Growth Group building; and projecting the operating revenues, expenses and cash flow. Accomplishing Phase II will validate the financial structuring put forth in Phase I.
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
I. Introduction
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
“I can remember a time when where we went to the movies was just as important as the movies we went to see . . . From the moment moviegoers arrived to buy
their tickets, there was a sense of something special, a feeling that to step inside was to enter another time and
place.” – Gene Kelly
Introduction: Purpose‐This study is intended as a First Phase toward a plan to complete the
renovation of the Strand Theatre and to plan for its self‐sustaining operation. Aware of the need for a full feasibility study, which this report is not, Main Street Oakland County seeks to provide impetus by contracting for the formulation of a building program and an operating strategy. Therefore, the purpose of this report is to quantify the financial benefits of the project by demonstrating the potential use of tax incentives.
Background‐Designed by Pontiac architect Leo John Heenan, The Strand Theatre opened in March 1921 with almost 1,200 seats spread amongst a main floor and two balconies. A three‐story Renaissance‐style building, The Strand had a major renovation in 1949 by noted theater architect C. Howard Crane. In its heyday, The Strand was one of eight thriving movie palaces comprising a bustling downtown Theater District. As changes occurred throughout the entertainment business and the community, this once‐vibrant family movie house fell onto hard times. It suffered as other large, downtown theaters did over the years before turning to adult films in the 1970s when it was known as the Campus Theatre. The Strand finally closed near the end of that decade and was purchased by the City of Pontiac in 1986 for potential future restoration and re‐use. There was one “last hurrah” in the early 1990s when Detroit’s Attic Theater briefly staged productions there. At the beginning of this century, Strand Theater Center, Inc., a private, non‐profit 501 (c) (3) corporation was formed and charged with transforming the
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
aging jewel into a cultural, film and theater center. Funds were secured and demolition began in early 2002 on an estimated $10 million plan to transform the 82‐year‐old structure – now conjoined with two adjacent historic commercial buildings – into a 30,000‐square‐foot theater center boasting everything from a 600‐seat proscenium theater to a digital screening room. Other portions of the Center were expected to house a flexible "smart space" performance lab seating up to 200, a two‐level cabaret, an upper lounge useful for community or corporate events, a grand main lobby, and an arts‐related boutique. Difficulties with project oversight, cost overruns, constant changes in the plans, and the normal “surprises” that crop up in all restoration projects depleted available funding and the project was halted before completion. Now the sole survivor of Pontiac’s bustling Theater District of the 1930s and 40s (another former theater, the Eagle, was converted to a nightclub) the Strand is poised to re‐open and become the leader in a renewed effort to revitalize the downtown. The goal is to bring audiences, diners and shoppers into the center city, while an enhanced tax base helps new and existing businesses benefit from the influx of downtown traffic. The Strand Theatre is central to alternative downtown development strategies offered by the 2001 Updated Downtown Development Plan. The Plan calls for creating twenty‐four hour activity by attracting entertainment, arts and restaurant uses into the city’s historic fabric and creating new mixed use and residential development to feed it. (DDP Figure 3‐13) The downtown core, vital to the City’s character and economic viability, will be greatly impacted by a vibrant, restored Strand Theatre because of its prominent central location and ability to draw people to downtown. (DDP Figure 3‐14).
Assumptions‐Because the reality of limited funding at this time, the scope of this study deals only with the beginning and the conclusion of a feasibility study and certain broad assumptions are necessary. Revised architectural and engineering drawings have not been prepared to define the remaining scope of work, so construction costs have been assumed. A historic review has not been undertaken, so eligibility for historic tax credits has been assumed. Operating expenses and revenues have not been estimated, so projecting an operating proforma is not possible at this time. A Second Phase of this study addressing the above issues is necessary to fully determine the viability of the Strand Theatre project and what will be necessary to complete its development.
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Illustration I (Figure 3-12, 2001 Downtown Development Plan)
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Illustration II (Figure 3-13, 2001 Downtown Development Plan)
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Illustration III (Figure 3-14, 2001 Downtown Development Plan)
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
II. Program
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Goals: It was the intent of the Urban Resource Alliance in developing the program for
the Strand Theatre to maximize the value of previously completed work to the overall success of the project. The building will be modified only to the extent necessary to improve its ability to optimally accommodate a wide variety of performances and presentations. A team of architects and specialists experienced in the development of historic structures and expert in theatre operations has toured the building, studied the drawings and investigated the existing conditions. The degree of completion for each space was determined, the use of each space studied and modifications proposed to fit the projected operational program. The building is now programmed to accommodate film presentations, music performances, live theatre productions, for diverse public and private (rental) audiences.
A major component of the proposed program is the development of a
restaurant/bar/banquet venue in the adjacent structure, the Pontiac Growth Group Building. A symbiotic relationship must be developed between the theatre operation and the food and drink venue. The use of the adjacent building is assumed in the program but is not reflected in any of the financial projections because it is beyond the scope of this study.
Existing Conditions: At the point construction was halted, the majority of the infrastructure was
complete with most of the “in the walls” work done and awaiting external fixtures. Plumbing, electrical, and HVAC work is mostly complete as is wiring for stage lighting and sound controls. New stairways were installed and a new elevator, though unassembled, is in the building. New structural work to accommodate the stairwells and elevator is in place in the revised lobby layout, though there appear to be some issues with functionality and a fire break where the stairs meet the front wall. A new room layout is mostly complete throughout the building with walls in place. The main seating area has a newly poured concrete floor in a revised seating layout. Though work has been done in the stage area, it’s not clear if all lines and counterweights have been replaced or if the grid has been strengthened to accommodate modern rigging. No exterior work appears to have been done nor has any decorative or finish work been started inside.
Specifically, and pending further review and discussion with subcontractors,
the project status is as follows:
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Basement – The basement has been reconstructed under the lobby area to provide the majority of restrooms needed to meet current code. They are accessible by stairs or elevator. There is also a lobby between the restrooms and a storage room. Under the stage, the old orchestra pit has been filled in except for a small, unusable portion that remains. An electrical room is centered against the east wall with rooms identified as being for “laundry” and “production work” to the south. There is a clear area under a trap in the stage floor. Most of the work rooms are not as accessible to the stage as they need to be and might provide more useful space as orchestra or chorus dressing rooms. Additional stage storage is not feasible except for small, light items as there is no easy access to the stage level without a lift. There is also no way to roll trunks into the area.
Main Floor – What was once a grander lobby is not so grand anymore as a new
stairway and the elevator take up a lot of the space. Much of a vaulted ceiling has also been lost for a walkway from the elevator to the balcony public areas. A box office and coat room are on the south side of the lobby, but they have access and space issues. The doorway into the restaurant to the south has been sealed with brick. An office and vestibule is indicated next to a room labeled “Saginaw Room” that is directly behind the box office. Down a corridor on the south side of the seating area are two dressing rooms and a green room. On the north side are an unidentified room and a store room. The stage is small with only a 27 foot proscenium opening and limited depth, typical of the era when it was built. There is a small loading door to the alley with no truck height access and no “direct in” loading capability as the alley limits any trucks to north/south parking.
The seating area has been totally reconstructed with new concrete creating a
“continental seating” configuration, i.e., there are only side aisles and the seating goes all the way across. This configuration requires more space between seat backs as the “aisles,” from the standpoint of fire codes, are in front of the seats where people rest their feet. The new spacing is marginal for this usage and, even thought it improves sight lines, it significantly reduces the seating capacity. In this case, it appears to be about 400. There are also possible ADA issues since there are stairs going down on both sides except for a flat platform across the back. At the back of the seating area are two booths on either side of the elevator shaft for sound and lighting control consoles and personnel.
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Second Floor/Balcony – The main floor lobby is open through the second floor except for the elevator walkway. A “donor lounge” and smaller rest rooms are on the north side before entering the screening room, which is long and narrow and appears to hold 100 or less in normal theatre seats. On the south is an ‘L’ shaped room labeled for “rehearsal.” Down the corridor are additional restrooms before two chorus dressing rooms. The seating area is as it was originally constructed, however, the stairways have been removed and it appears the balcony seating was also going to be “continental.” This will definitely not meet code and the stairways will have to be put back to create additional aisles. There is no handicapped access as every seat involves access from a stairway of some sort. It appears to be able to seat about 200. On either side of the elevator shaft at the back of the seating area are two small, open rooms directly above the control booths on the main floor.
Third Floor/Second Balcony – What was apparently a third floor lobby for the
second balcony has become the mechanical/electrical room. Whether sufficient sound proofing was added has not been determined. The seating area is gone and a projection room flanked by two follow spot booths has been built over most of it. Audio and dimmer equipment rooms are behind the booths. All of this area has been wired into new controls as has a catwalk that is suspended above the main seating area for lighting positions. It appears neither the projector nor the follow spots can project past the catwalk to hit the stage. There are also light rails and ladders mounted on the side walls of the seating area, though historical lighting positions on the fronts of the balconies appear to have been removed.
STRAND THEATRE ● Preliminary Program and Financial Structuring Report________________
____________________________________________Urban Resource Alliance October 2009
SPACE / AREA SCHEDULE: Strand Theatre Building: Pontiac Growth Group Building Space
First Floor Lobby Concessions House Bar Office Office Storage Stage Dressing Green Room Stage Storage Stage Vestibule
Second Floor Lobby Balcony Donor Lounge Screening Room Rehearsal Chorus Projector Booth Corridor Storage
Area (sq. feet)
Total: 11,276
1,811
959
3,168
581
508
93
1,237
882
505
456
1,076
Total: 8,129
1,844
1,755
791
845
865
1,173
143
604
118
Space
Area (sq. feet)
STRAND THEATRE ● Preliminary Program and Financial Structuring Report________________
____________________________________________Urban Resource Alliance October 2009
Strand Theatre Building: Pontiac Growth Group Building Space
Third Floor Corridor Proj. Booth Mechanical Phone Catwalk
Basement Lobby/Restrooms Storage Production Vestibules Net Area Summary: First Floor: Second Floor: Third Floor Basement: Total:
Area (sq. feet)
Total: 2,793
600
600
1,129
72
392
Total: 6,548
1,868
2,563
1,083
1,034
11,276
8,129
2,793
6,548
28,746
Space
Area (sq. feet)
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Assumptions/Schedule /Conclusions: Assumptions‐The approach to the Strand Theatre renovation assumed herein is to
regard its completion as primarily the application of finishes and installation of mechanical and electrical equipment. The structural improvements are in place and will, for the most part, be retained. Relatively minor changes are assumed necessary to accommodate certain reprogramming of spaces, such as relocating the concession area, enlarging the stage, providing space for cabaret seating and relocating access to the ticket booth.
It is important to note that the adjacent building to the south (Pontiac
Growth Group building) is regarded as an integral part of the project from a use and a spatial standpoint. A restaurant is located on the first floor; its bar can be located to also serve patrons in the theatre lobby. The second floor can be used as additional dining/banquet space, as screening rooms or a combination of each. For this reason the adjacent building is shown on the schematic plans but please note that it is not included in the Sources and Uses of Funds Statement. The financial data relates only to the Strand Theatre Building.
Schedule‐It is anticipated that pre‐development, construction and set‐up activities
will take place over a two year period. The sequence of general milestones is:
Pre‐Development/Feasibility
Historical Questionnaire to SHPO
Choose Developer (select/negotiate)
Identify Owner/Operator
Architectural/Engineering/Estimating
Financing
Construction
Fittings, Furnishings and Equipment
Project Close‐out
Grand Opening Conclusions‐The Strand Theatre Building as modified and in conjunction with the
PGG building is believed to provide adequate facilities necessary to sustain the operations of a diverse entertainment venue. It will present successful and financially viable entertainments that attract broad, diverse audiences of Pontiac and surrounding Oakland County residents to the Theatre and adjoining restaurant, and draw them into the downtown area where they will utilize other area merchants and establishments
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
III. Ownership Structure/ Theatre management Operations Entity
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Objectives:
To be successful, the Strand Theatre project must create a strong Ownership Structure that maintains a cooperative, synergistic relationship between the Theatre/Film/Entertainment entity and the Food/Drink/Banquet entity. The operating program must be designed around the strengths of the building, its history, quality, and location, maximizing the uses of each available public space.
Operating Plan: Present successful and financially viable entertainments in the recently
renovated Strand Theatre
Main Stage
Present live, high quality professional musical/theatrical programming in the Main Stage for multiple week runs, distinguished from other area offerings by its uniqueness and the feeling of a special experience for all audience members attending.
Integrate a variety of single night music and comedy attractions to balance out the programming and attract different audiences.
Explore partnerships with high quality renters and promoters to further increase Theatre usage and audiences while providing a broader variety of attractions
Exploit the facility’s historical legacy in programming that reflects various periods in the building’s history.
Screening Room(s)/Film Exhibition
Initiate a daily film exhibition schedule in the Screening Room(s) presenting an eclectic mix of main stream current films and classic films intermingled with foreign, art‐house and independent films not otherwise available in the community.
Utilize the full‐sized screen in the Main Stage for special showings of current broad appeal and/or family films integrated among the live attractions.
Encourage local filmmakers with opportunities for showings and discussions
Develop a unique viewing experience with special seating and amenities to distinguish the Screening Room(s) from area multiplexes.
Develop a second screening room and additional public space on the second floor above the restaurant in the building to the south of the Theatre to provide more options and variety in film presentations. This space is referred to as the “Cinema” later in this report.
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Restaurant
Develop the adjoining restaurant as an integral part of Theatre program offerings yet with an identity and reputation strong enough to stand alone
Partner with the restaurant’s operators to manage and provide bar, concession and other food needs for the Theatre.
Preserve the historic Strand Theatre for the benefit of the community through
ongoing conservation, further renovation and restoration of the physical structure, and the development of a special and unique audience experience; improve functionality of stage and technical support functions within the building’s current configuration; develop additional concession/bar/gathering areas and an additional screening room.
Maximize the number and variety of Strand Theatre audiences; project a fresh,
visionary brand identity to drive sales, communicate the organization’s role in, and benefit to, the community, and position the Strand for growth into the future.
Operate the organization in a manner that ensures artistic quality, program
success, organizational integrity and responsible growth; provide a solid financial foundation and managerial leadership to support all activities; assure superior customer service to create a “special occasion” for every event.
Program Approach: The goal of completing The Strand renovation is to attract broad, diverse
audiences of Pontiac and surrounding Oakland County residents to the Theatre and adjoining restaurant, and bring them into the central business area to utilize other area merchants and establishments. This requires near nightly activity to provide a regular presence and sustained traffic flow. The attached 52 Week Booking Plan shows how a variety of entertainments could be organized into a schedule that sees the Theatre open up to 324 days.
The chart is organized into two sections. On the left is a layout of the possible
attractions broken out with the number of productions, the number of ticketed events for each, and the number of days that the Theatre is in use for each. The other side of the chart shows how these attractions are spread among the Theatre’s three main venues – the Main Stage, Screening Room, and the additional Cinema to be built over the restaurant. The chart breaks out both the number of days the rooms are in use as well as the weekends scheduled. Given that a number of weekends are not attractive for bigger events, the Main Stage only uses 46 weekends, while the Cinema is open every weekend and has the most days of usage as main stream films can play regularly throughout the year.
STRAND THEATRE ● Preliminary Program and Financial Structuring Report____________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________Urban Resource Alliance October 2009
Total Events Main Stage Cinema Screening Room
Productions Ticketed Events
Rehearse Load-in/out
Total Days
Total Days
Total Weekends
Total Days
Total Weekends
Total Days
Total Weekends
Plays/Musicals 4 64 12 60 60 8 0 0 0 0
Jazz at The Strand 4 4 0 4 4 4 0 0 0 0
Classical Nouveau 4 4 0 4 4 4 0 0 0 0
Music/Comedy 12 12 0 12 12 10 0 0 0 0
Co-promotions 8 8 0 8 8 6 0 0 0 0
Rentals 8 32 32 56 56 8 0 0 0 0
Current film 52 680 0 324 24 4 324 52 84 12
Classic/Art film 44 252 0 216 0 0 0 0 216 36
Children's films 6 6 0 0 0 0 0 0 0 0
Festivals 2 16 6 14 14 2 0 0 8 0
Total 144 1,078 50 698 182 46 324 52 308 48
52 WEEK BOOKING PLAN
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Preliminary Operational Structure
Strand Theatre LLC
General Partner
Strand Theatre
Operations LLC
Strand
Restaurant LLC
Film
Restaurant
Rental
Banquet Facility
Live
Performance
Bar
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
IV. Financial Structuring
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Approach: The completion of the development of the Strand Theatre will require a blend of
traditional debt and equity financing together with public tax credit incentives including Federal and State Historic Investment Tax Credits, New Market Tax Credits, Brownfield S.B.T Credits, as well as the contribution of the theatre by the Pontiac Growth Group as additional equity.
The following Sources and Uses Projection quantifies the various financing
sources and leverages the historic credits and mortgage loan to create equity of $1,200,000.
The entity that is formed meets the criteria of these various tax credit programs
as indicated by the flow chart. It is a for‐profit LLC that takes on the responsibility of the development of the theatre and syndication of all the tax credit programs.
The costs associated with the use of funds generally fall into four categories: the
acquisition, hard construction related costs, soft costs and costs associated with the tax credit financing.
Because the scope of this study was limited, the construction costs were
assumed to be fixed at approximately $4,000,000. This provided the basis on which to estimate all the other costs and establish the financing mix and amounts.
STRAND THEATRE ● Preliminary Program and Financial Structuring Report____________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________Urban Resource Alliance October 2009
PRELIMINARY SOURCES AND USES OF FUNDS
Strand Theater Sources and Uses of Funds NMTC Calculation21-Oct-09 Equity (State Historic) 1,125,985 $
0.72 1,563,869 $
Sources: Construction Permanent
NMTC Equity 437,883 $ Equity
MBT Credit Equity - $ 822,100 $
Equity (Federal Historic) 1,308,958 $ 0.72
Financing 1,817,997 $ Construction Loan (7.5%) 822,100 $
- $ NMTC Equity 509,039 $
NMTC 1
Loan A (7.5%) (Loan) 2,027,400 $
2,027,400 $ Loan A 2,027,400 $
Federal Historic Tax Credit 1,308,958 $ 1,308,958 $
0.72 State Historic Tax Credit 1,125,985 $
1,125,985 $ 2,815,833 $
Equity 1,226,317 $ 1,226,317 $
NMTC Equity 788,433 $ Total 6,510,760 $
6,510,760 $
Surplus/Shortage (0) $ (0) $
Total NMTC Equity 1,226,317 $
State Historic Federal Historic Michigan BusinessUses: Tax Credit Tax Credit Tax CreditAcquisition Total Allocation 5,688,660 $
Acquisition 50,000 $ 50,000 $
Loan Loss Reserve (1%) 170,660 $ Working Capital Reserve (1%) 170,660 $ Construction
Construction 4,000,000 $ 4,000,000 $
4,000,000$
4,000,000$
4,000,000$ Construction Contingency (10%) 400,000 $
400,000 $ 400,000$
400,000$
400,000$ Permit Fees 40,000 $
40,000 $ 40,000$
40,000$
40,000$ Testing, Surveys, Soil Borings 45,000 $
45,000 $ 45,000$
45,000$
45,000$ FF&E (Included in Construction) - $
- $ -$
-$
-$
Soft Costs Predevelopment Fees and Costs 100,000 $
100,000 $ 100,000$
100,000$
-$ Soft Cost Contingency 117,507 $
117,507 $ 117,507$
117,507$
-$ Financing Fees 20,274 $
20,274 $ 20,274$
20,274$
-$ Interest - Construction Loan 55,492 $
55,492 $ 55,492$
55,492$
-$ Interest - Loan A 182,466 $
182,466 $ 182,466$
182,466$
-$ A/E Fees (10%) 400,000 $
400,000 $ 400,000$
400,000$
400,000$ Historic Designation Fees 25,000 $
25,000 $ 25,000$
25,000$
-$ Economic Consultant 50,000 $
50,000 $ 50,000$
50,000$
-$ Development Fee 200,000 $
200,000 $ 200,000$
200,000$
-$ Insurance and Taxes 20,000 $
20,000 $ 20,000$
20,000$
-$ Misc. Development Costs 20,000 $
20,000 $ 20,000$
20,000$
-$ Marketing and Promotion 50,000 $
50,000 $ 50,000$
50,000$
-$ Obsolete District Petition & Exemption Certificate
District Petition & Certificate Application 5,000 $ 5,000 $
5,000$
5,000$
-$ City District Establishing Fee 1,800 $
1,800 $ 1,800$
1,800$
-$ Michigan Business Tax Credit
Part I 4,000 $ 4,000 $
4,000$
4,000$
-$ Brownfield Plan 3,000 $
3,000 $ 3,000$
3,000$
-$ Part II 3,000 $
3,000 $ 3,000$
3,000$
-$
PBRA Application Fee 1,000 $ 1,000 $
1,000$
1,000$
-$ PBRA Processing Fee 1% of estimated Credit 10,000 $
10,000 $ 10,000$
10,000$
-$ State Application Fee for Part II 10,000 $
10,000 $ 10,000$
10,000$
-$ State Administrative Fee 6,839 $
6,839 $ 6,839$
6,839$
-$ Legal/Accounting 100,000 $
100,000 $ 100,000$
100,000$
-$ Construction Draw Servicing (CDE) 7,200 $
7,200 $ -$
-$
-$ Compliance Monitoring (CDE) 14,222 $
14,222 $ -$
-$
-$
Origination Fee - 4% (CDE) 227,546 $ 227,546 $
-$
-$
-$ Loan Loss Reserve - 3% (CDE) 170,660 $
170,660 $ -$
-$
-$ Working Capital Reserve - 3% (CDE) 170,660 $
170,660 $ -$
-$
-$ Misc. 95 $
95 $ -$
-$
-$ Total 6,510,760 $
6,510,760 $ $7,044,453 $7,044,453 4,885,000
20% 20% 20%1 The NMTC allocation is estimated at: 5,688,660 $
1,408,890.68
1,408,890.68
977,000$ *A Deferred Developer Fee of 20% or 1,304,953 is included as part of the basis in the calculation of Eligible Historic Tax Credits 99.90% 99.90% 99%
1,407,482$
1,407,482$
967,230$ 0.80 0.93 0.85
1,125,985$
1,308,958$
822,146$
For Planning Purposes Only
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Assumptions: New Markets Tax Credit
Assumptions ‐ For the purposes of maximizing the financial resources available to the project it is assumed that he Strand Theater will be developed by a for‐profit entity. Further, that the project will be developed as a historic structure in accordance with US Department of Interior Standards. Finally, that the existing structure will qualify as a Brownfield under Michigan law and therefore be eligible for tax credits. The following describes the components assumed for the Strand Theater project: Strand Theater non‐profit – One possible structure would be to include a non‐ profit entity in the ownership of the for‐profit LLC. Strand Theater LLC for‐profit – The LLC would be an investment LLC that would be made up solely or in the majority by an equity investor (99%) and with incidental ownership by the Strand Theater non‐profit. Equity – The amount of equity in a New Markets Tax Credit (NMTC) project is based upon a 39 percent credit to be earned out over a seven year period. The resulting equity is usually 27 percent of the defined NMTC project. Loan A – Loans for NMTC projects usually may be repaid interest‐only for 7 years. Principal repayment for the same period is limited. CDE – A Community Development Entity is a corporation that has received an allocation from the US Department of Treasury of NMTC. The CDE is a pass‐through for all funds that are a part of a project’s NMTC ‘s basis, Federal Historic Tax Credits – Tax credits for federally designated historic buildings may receive a 20 percent tax credit on eligible basis. Credits have been placed for about 93 cents for $1.00 of tax credit. State Historic Tax Credits – Tax credits for locally designated historic buildings may receive from a minimum of a 5 to a maximum of a 20 percent tax credit on eligible basis. Credits have been placed for about 85 cents for $1.00 of tax credit for Michigan Business Taxes.
Brownfield Tax Credits – Tax Credits may accrue to buildings that are of the condition of the Strand Theater. Buildings may receive from a minimum of a 12.5 to a maximum of a 20 percent tax credit on eligible basis. Credits have been placed for about 85 cents for $1.00 of tax credit for Michigan Business Taxes.
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Bank or Sec. 108 or NMTC 39% Investor
Proposed Financial Structure
Strand Theatre LLC
For-Profit
Strand Theatre
Project
$6,510,760
Community Development
Entity $5,688,660
Strand TheatreNon-Profit (Optional)
Brownfield Tax Credit
$822,100
Equity
$1,226,317
Loan A
$2,027,400
Federal Historic Tax
Credit $1,308,958
State Historic Tax Credit
$1,125,985
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
V. Challenges/Recommendations
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Strategic Direction: Present successful and financially viable entertainments in a renovated Strand Theatre that attract broad, diverse audiences of Pontiac and surrounding Oakland County residents to the Theatre and adjoining restaurant, and bring them into the downtown to patronize other area merchants and establishments.
Operational Challenges: Programming
Designing an interesting, appropriate and profitable mix of programs to attract audiences, overcome competitive challenges, and drive customer traffic and concession revenue
Developing a unique, programmatic identity for the facility that will distinguish The Strand from other performance venues in the area and from organizations that might rent the facility
Attracting high quality, popular attractions with the limited income potential of 600 seats and restrictive stage facilities
Providing near nightly activities to maximize revenues, build traffic in the restaurant and increase traffic flow into the downtown
Adjusting existing design and construction work to improve functionality for both audience and performer
Integrating activities between the Main Stage, Screening Room(s), restaurant and ancillary rooms to maximize revenues and heighten the audience’s “sense of occasion” when attending activities
Capitalizing on the historical significance of the Theatre as a building, its superior performance environment, and the long history of community service it represents
Preservation and Historical Significance
Identifying and restoring those design and structural elements that represent and define the Theatre’s history and contribute to securing appropriate historic tax credits
Maintaining the interior and exterior of The Strand in a manner that reflects positively on the facility as a premier performance venue and significant historical site
Marketing
Creating an identity/brand/image to communicate the Theatre’s role in the community and drive sales
Pricing the products appropriately for the community and the direct competition while producing sufficient revenues to fund the attractions
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Attracting new audiences and drawing audiences from other long‐standing area arts organizations and entertainment facilities and the increasing array of new performance venues and offerings
Communicating its quality and exploiting the facility as a first‐class venue
Expanding marketing budgets to drive attendance increases without reducing profit margins
Finance, Operations and Customer Service
Developing and maintaining sufficient cash flow and profits to cover operating costs, pay taxes, service any debt and provide return on investment
Ensuring an appealing venue to enhance the audience’s experience; improving audience amenities without extensive building renovations and associated construction costs
Enhancing functionality of the Theatre’s limited stage facilities and production capabilities to meet professional, technical, and contractual requirements and expand programming without extensive building renovations and associated construction costs
Maximizing revenues from all events and insuring adequate compensation for the facilities and services provided
Providing superior customer service to audiences and renters to assure the feeling of a “special occasion” for every visit to The Strand
Developing and administering rental agreements with rental rates both competitive and appropriate for the quality of the venue; establishing a reputation for a staff that is highly skilled, competent and easy to work with in a venue that is attractive to promoters
Assuring timely and meaningful financial and management reporting to better evaluate operations and make critical management and policy decisions
Management
Securing an investor/operator to pull the project together
Providing growth and return on investment to satisfy community supporters and investors while providing tax revenues to the City of Pontiac
Attracting and retaining high quality, experienced, professional staff to oversee activities and the facilities
Affording a staffing structure of sufficient size to best meet organizational demands
Maintaining a deep sense of “community responsibility”
STRAND THEATRE ● Preliminary Program and Financial Structuring Report_________
______________________________________Urban Resource Alliance October 2009
Recommendations: Feasibility Study/Development Plan‐To fully determine the viability of the Strand
Theatre project and what it will take to complete its development a Phase II of this study is necessary in the form of a feasibility study/development plan. A historical study must be accomplished to determine eligibility for the historic tax credits. Programming and design drawings must be refined. An operating proforma based upon estimates of hard construction costs, development (soft) costs and operating expenses and revenues must be developed to test this study’s assumptions and reveal the project’s merits.
Downtown Plan‐To help insure the Strand Theatre becomes a self‐sustaining
entertainment/restaurant venue serving the diverse audiences of Pontiac and Oakland County, it must be woven into the fabric of the downtown and the existing entertainment district. The Arts community must also be regenerated. That the city pursues recommendations of the 2001 Updated Downtown Development Plan is crucial. Improvements such as restoration/adaptive reuse of historic downtown structures, mixed use infill development, daylighting the Clinton River, introducing residential and live/work lofts to downtown, dealing with the Phoenix Center and reestablishing the street grid will provide a steady presence of people downtown. A synergistic relationship between the Strand Theatre and downtown Pontiac will emerge from a solid downtown implementation plan that adds a financial strategy to a physical plan.